CN204777658U - Economizer ash conveying system - Google Patents

Economizer ash conveying system Download PDF

Info

Publication number
CN204777658U
CN204777658U CN201520402156.2U CN201520402156U CN204777658U CN 204777658 U CN204777658 U CN 204777658U CN 201520402156 U CN201520402156 U CN 201520402156U CN 204777658 U CN204777658 U CN 204777658U
Authority
CN
China
Prior art keywords
conveying pipe
ash
ash conveying
economizer
along journey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520402156.2U
Other languages
Chinese (zh)
Inventor
孙建朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huadian Engineering Group Co Ltd
Original Assignee
China Huadian Engineering (group) Co Ltd Design Institute
China Huadian Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huadian Engineering (group) Co Ltd Design Institute, China Huadian Engineering Group Co Ltd filed Critical China Huadian Engineering (group) Co Ltd Design Institute
Priority to CN201520402156.2U priority Critical patent/CN204777658U/en
Application granted granted Critical
Publication of CN204777658U publication Critical patent/CN204777658U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an economizer ash conveying system, including economizer ash bucket (1), manual push -pull valve (2), delivery pump (3), ash conveying pipe (4), pipeline compensator (5), along journey air supplement unit (6) and storage grey storehouse (7), manual push -pull valve (2) and delivery pump (3) connect gradually in economizer ash bucket (1) below, delivery pump (3) are connected through ash conveying pipe (4) with the grey storehouse of storage (7), pipeline compensator (5) set up on ash conveying pipe (4) behind delivery pump (3) of end, along journey air supplement unit (6) set up ash conveying pipe (4) outside just with ash conveying pipe (4) parallel arrangement. The utility model discloses having replaced and traditional will having followed the nested form in ash conveying pipe of journey air supplement unit, will follow journey air supplement unit and ash conveying pipe parallel arrangement, avoided along journey air supplement unit's wearing and tearing, the convenient maintenance is changed, does not occupy the ash conveying pipe inner space, has improved the transport efficiency to the ash, is suitable for and popularizes and applies at coal fired power plant.

Description

A kind of economizer ash delivery system
Technical field
The utility model relates to a kind of grey delivery system, particularly a kind of economizer ash delivery system, belongs to coal fired power plant ash conveying technology field.
Background technology
Current China coal-fired power station boiler flying dust generally adopts the mode of malleation thick and thin phase burner to collect, particularly for the conveying of coal-burning boiler coal economizer ash.Economizer ash has the advantages that particle is thick, temperature is high, ash quantity is relatively less.Because economizer ash is comparatively thick, in course of conveying, easy accumulated plugging, has certain conveying difficulty.For preventing stifled ash, need to arrange tonifying Qi point at ash conveying pipe along journey.
Existing delivery duct adopts the form of inner sleeve usually, namely be nested in ash conveying pipe along journey blowdown pipe, this washes away lower easy to wear with regard to existing along journey blowdown pipe at ash, the problem even come off, and general economizer ash pipe specification less (being generally DN100 or DN125), adopt the form of inner sleeve to make in ash pipeline, to utilize space to reduce, affect transport efficiency.In addition, the delivery system of existing economizer ash adopts a dress usually, and namely economizer ash transmission pump is arranged on below ash bucket on inspection platform, and expansion joint is arranged between economizer hopper and transmission pump, needs very large installing space; Meanwhile, when boiler operatiopn, economizer hopper expands downwards, and inspection platform can bear larger load, and it is unfavorable to run equipment.
Utility model content
The purpose of this utility model is, a kind of economizer ash delivery system is provided, it be arranged on outside ash conveying pipe along journey making-up air device, be arranged in parallel with ash conveying pipe, avoiding problems the wearing and tearing and the problem that comes off that adopt inner sleeve, also facilitate examine and replace, and do not take the inner space of ash conveying pipe, improve the transport efficiency of ash.
The technical solution of the utility model: a kind of economizer ash delivery system, comprise economizer hopper, hand operated gate valve, transmission pump, ash conveying pipe, pipeline compensator, along journey making-up air device with store up grey storehouse, hand operated gate valve and transmission pump are connected in turn below economizer hopper, transmission pump is connected by ash conveying pipe with the grey storehouse of storage, pipeline compensator is arranged on the ash conveying pipe after the transmission pump of end, is arranged on ash conveying pipe outer and be arranged in parallel with ash conveying pipe along journey making-up air device.Be arranged on outside ash conveying pipe along journey making-up air device, layout in parallel, avoids wearing and tearing, convenient for maintaining, and does not take the inner space of ash conveying pipe, improves transport efficiency; Because economizer ash quantity is relatively few, transmission pump can adopt little positive displacement pump, is directly lifted on below economizer hopper, needs less installing space; Pipeline compensator is arranged on the horizontal segment ash conveying pipe after the transmission pump of end, the thermal expansion amount of Absorbable rod economizer hopper.
In aforesaid this economizer ash delivery system, comprise along journey making-up air device and mend pneumatic module along journey tonifying Qi pipeline with along journey, mend pneumatic module one end along journey and be connected with along journey tonifying Qi pipeline, the other end is connected with ash conveying pipe.Be arranged in parallel along journey tonifying Qi pipeline and ash conveying pipe, mend pneumatic module install a set of from the transmission pump outlet of end at a certain distance along journey, when economizer ash is directly delivered to the grey storehouse of storage, the installing space often overlapped along journey benefit pneumatic module is generally 4m.
In aforesaid this economizer ash delivery system, mend pneumatic module along journey and comprise non-return valve and air inlet orifice plate, air inlet orifice plate is arranged on along on journey tonifying Qi pipeline, and non-return valve one end is connected with air inlet orifice plate, and the other end is connected with ash conveying pipe.
In aforesaid this economizer ash delivery system, economizer hopper is provided with level-sensing device.Arrange level-sensing device, trigger controlling delivery system by high charge level in ash bucket, easily and effectively, material level counts prior art, can buy in market.
Compared with prior art, the utility model is carried coal-burning boiler coal economizer ash, delivery system is arranged on outside ash conveying pipe along journey making-up air device, be arranged in parallel with ash conveying pipe, instead of traditional form that will be nested in along journey making-up air device in ash conveying pipe, solve along journey making-up air device easy to wear under the washing away of ash, the problem even come off, and no longer take the inner space of ash conveying pipe, improve the transport efficiency of system to ash, there is the value applied at coal fired power plant.
Accompanying drawing explanation
Fig. 1 is integral structure schematic diagram of the present utility model;
Fig. 2 is the structural representation mending pneumatic module along journey.
Being labeled as in accompanying drawing: 1-economizer hopper, 2-hand operated gate valve, 3-transmission pump, 4-ash conveying pipe, 5-pipeline compensator, 6-is along journey making-up air device, and 7-stores up grey storehouse, and 8-is along journey tonifying Qi pipeline, 9-mends pneumatic module along journey, 10-non-return valve, 11-air inlet orifice plate, 12-level-sensing device.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further described.
Embodiment 1 of the present utility model: a kind of economizer ash delivery system, comprise economizer hopper 1, hand operated gate valve 2, transmission pump 3, ash conveying pipe 4, pipeline compensator 5, along journey making-up air device 6 with store up grey storehouse 7, hand operated gate valve 2 and transmission pump 3 are connected in turn below economizer hopper 1, transmission pump 3 is connected by ash conveying pipe 4 with the grey storehouse 7 of storage, pipeline compensator 5 is arranged on the ash conveying pipe 4 after the transmission pump 3 of end, is arranged on ash conveying pipe 4 outer and be arranged in parallel with ash conveying pipe 4 along journey making-up air device 6.Transmission pump 3 adopts little volume transmission pump, is lifted on economizer hopper 1 time by suspension rod, saves installing space, can move when economizer hopper 1 expands downwards together with ash bucket.Transmission pump 3 exit arranges pipeline compensator 5, can absorb the het expansion of economizer hopper 1.
Wherein, comprise along journey making-up air device 6 and mend pneumatic module 9 along journey tonifying Qi pipeline 8 with along journey, mend pneumatic module 9 one end along journey and be connected with along journey tonifying Qi pipeline 8, the other end is connected with ash conveying pipe 4.Namely be arranged in parallel along journey tonifying Qi pipeline 8 and ash conveying pipe 4.Connect from economizer ash conveying air feed mother pipe along journey tonifying Qi pipeline 8 source of the gas, control to open and close along journey tonifying Qi source of the gas by the operated pneumatic valve on pipeline.The grey storehouse 7 of storage is exported to from the transmission pump 3 of end, a set of along journey benefit pneumatic module 9 apart from installing every about 4m, also install a set of along journey benefit pneumatic module 9 after every platform transmission pump 3 simultaneously.
Mend pneumatic module 9 along journey and comprise non-return valve 10 and air inlet orifice plate 11, air inlet orifice plate 11 is arranged on along on journey tonifying Qi pipeline 8, and non-return valve 10 one end is connected with air inlet orifice plate 11, and the other end is connected with ash conveying pipe 4.
In addition, economizer hopper 1 is provided with level-sensing device 12.
Embodiment 2 of the present utility model: a kind of economizer ash delivery system, comprise economizer hopper 1, hand operated gate valve 2, transmission pump 3, ash conveying pipe 4, pipeline compensator 5, along journey making-up air device 6 with store up grey storehouse 7, hand operated gate valve 2 and transmission pump 3 are connected in turn below economizer hopper 1, transmission pump 3 is connected by ash conveying pipe 4 with the grey storehouse 7 of storage, pipeline compensator 5 is arranged on the ash conveying pipe 4 after the transmission pump 3 of end, is arranged on ash conveying pipe 4 outer and be arranged in parallel with ash conveying pipe 4 along journey making-up air device 6.Transmission pump 3 adopts little volume transmission pump, is lifted on economizer hopper 1 time by suspension rod, saves installing space, can move when economizer hopper 1 expands downwards together with ash bucket.Transmission pump 3 exit arranges pipeline compensator 5, can absorb the het expansion of economizer hopper 1.
Wherein, comprise along journey making-up air device 6 and mend pneumatic module 9 along journey tonifying Qi pipeline 8 with along journey, mend pneumatic module 9 one end along journey and be connected with along journey tonifying Qi pipeline 8, the other end is connected with ash conveying pipe 4.Namely be arranged in parallel along journey tonifying Qi pipeline 8 and ash conveying pipe 4.Connect from economizer ash conveying air feed mother pipe along journey tonifying Qi pipeline 8 source of the gas, control to open and close along journey tonifying Qi source of the gas by the operated pneumatic valve on pipeline.The grey storehouse 7 of storage is exported to from the transmission pump 3 of end, a set of along journey benefit pneumatic module 9 apart from installing every about 4m, also install a set of along journey benefit pneumatic module 9 after every platform transmission pump 3 simultaneously.
Mend pneumatic module 9 along journey and comprise non-return valve 10 and air inlet orifice plate 11, air inlet orifice plate 11 is arranged on along on journey tonifying Qi pipeline 8, and non-return valve 10 one end is connected with air inlet orifice plate 11, and the other end is connected with ash conveying pipe 4.
Embodiment 3 of the present utility model: a kind of economizer ash delivery system, comprise economizer hopper 1, hand operated gate valve 2, transmission pump 3, ash conveying pipe 4, pipeline compensator 5, along journey making-up air device 6 with store up grey storehouse 7, hand operated gate valve 2 and transmission pump 3 are connected in turn below economizer hopper 1, transmission pump 3 is connected by ash conveying pipe 4 with the grey storehouse 7 of storage, pipeline compensator 5 is arranged on the ash conveying pipe 4 after the transmission pump 3 of end, is arranged on ash conveying pipe 4 outer and be arranged in parallel with ash conveying pipe 4 along journey making-up air device 6.Transmission pump 3 adopts little volume transmission pump, is lifted on economizer hopper 1 time by suspension rod, saves installing space, can move when economizer hopper 1 expands downwards together with ash bucket.Transmission pump 3 exit arranges pipeline compensator 5, can absorb the het expansion of economizer hopper 1.
Wherein, comprise along journey making-up air device 6 and mend pneumatic module 9 along journey tonifying Qi pipeline 8 with along journey, mend pneumatic module 9 one end along journey and be connected with along journey tonifying Qi pipeline 8, the other end is connected with ash conveying pipe 4.Namely be arranged in parallel along journey tonifying Qi pipeline 8 and ash conveying pipe 4.Connect from economizer ash conveying air feed mother pipe along journey tonifying Qi pipeline 8 source of the gas, control to open and close along journey tonifying Qi source of the gas by the operated pneumatic valve on pipeline.The grey storehouse 7 of storage is exported to from the transmission pump 3 of end, a set of along journey benefit pneumatic module 9 apart from installing every about 4m, also install a set of along journey benefit pneumatic module 9 after every platform transmission pump 3 simultaneously.
Principle of work of the present utility model: during boiler operatiopn, flying dust is settled down to economizer hopper 1, transmission pump 3 is fallen into through hand operated gate valve 2, pressurized air is adopted to send into ash conveying pipe 4 and carry, pipeline compensator 5 absorbs the swell increment of economizer hopper 1, tonifying Qi is carried out along journey making-up air device 6 pairs of ash conveying pipes 4 in course of conveying, prevent ash deposition blocking in ash conveying pipe 4, ash is transported to the grey storehouse 7 of storage the most at last; Native system includes full factory control system in, triggers controlling delivery system, also by arranging transmission pump 3 blanking and the intercycle time controls delivery system during operation by high charge level in economizer hopper 1.

Claims (4)

1. an economizer ash delivery system, it is characterized in that: comprise economizer hopper (1), hand operated gate valve (2), transmission pump (3), ash conveying pipe (4), pipeline compensator (5), along journey making-up air device (6) and the grey storehouse of storage (7), hand operated gate valve (2) and transmission pump (3) are connected to economizer hopper (1) below in turn, transmission pump (3) is connected by ash conveying pipe (4) with the grey storehouse of storage (7), pipeline compensator (5) is arranged on the ash conveying pipe (4) after the transmission pump (3) of end, ash conveying pipe (4) is arranged on and be arranged in parallel with ash conveying pipe (4) outward along journey making-up air device (6).
2. economizer ash delivery system according to claim 1, it is characterized in that: comprise along journey making-up air device (6) and mend pneumatic module (9) along journey tonifying Qi pipeline (8) with along journey, mend pneumatic module (9) one end along journey to be connected with along journey tonifying Qi pipeline (8), the other end is connected with ash conveying pipe (4).
3. economizer ash delivery system according to claim 2, it is characterized in that: mend pneumatic module (9) along journey and comprise non-return valve (10) and air inlet orifice plate (11), air inlet orifice plate (11) is arranged on along on journey tonifying Qi pipeline (8), non-return valve (10) one end is connected with air inlet orifice plate (11), and the other end is connected with ash conveying pipe (4).
4. economizer ash delivery system according to claim 1, is characterized in that: economizer hopper (1) is provided with level-sensing device (12).
CN201520402156.2U 2015-06-11 2015-06-11 Economizer ash conveying system Active CN204777658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520402156.2U CN204777658U (en) 2015-06-11 2015-06-11 Economizer ash conveying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520402156.2U CN204777658U (en) 2015-06-11 2015-06-11 Economizer ash conveying system

Publications (1)

Publication Number Publication Date
CN204777658U true CN204777658U (en) 2015-11-18

Family

ID=54517755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520402156.2U Active CN204777658U (en) 2015-06-11 2015-06-11 Economizer ash conveying system

Country Status (1)

Country Link
CN (1) CN204777658U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111410042A (en) * 2020-05-07 2020-07-14 西安华电清洁能源技术有限公司 Anti-blocking energy-saving system and method suitable for powder conveying system
CN114955555A (en) * 2022-06-27 2022-08-30 纽普兰能源科技(镇江)有限公司 Storehouse pump ash bucket structure for positive and negative integrated multifunctional pump and use method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111410042A (en) * 2020-05-07 2020-07-14 西安华电清洁能源技术有限公司 Anti-blocking energy-saving system and method suitable for powder conveying system
CN114955555A (en) * 2022-06-27 2022-08-30 纽普兰能源科技(镇江)有限公司 Storehouse pump ash bucket structure for positive and negative integrated multifunctional pump and use method
CN114955555B (en) * 2022-06-27 2023-11-21 纽普兰能源科技(镇江)有限公司 Cabin pump ash bucket structure for positive and negative integrated multifunctional pump and use method

Similar Documents

Publication Publication Date Title
CN205090388U (en) Economizer ash merges conveying system with dust remover ash
CN202414800U (en) Energy-saving dry ash removing intelligent conveying device of coal-fired power plant
CN106516753A (en) Storehouse pump ash conveying device
CN204777658U (en) Economizer ash conveying system
CN206606767U (en) A kind of air-transport system of boiler slag
CN103604131B (en) Suspension type economizer ash-transmission system
CN102285535A (en) Safe energy-saving dynamic pneumatic ash handling system
CN203497734U (en) Additionally-arranged blowing assisting device of exhaust pipe of pneumatic ash conveying bin pump
CN206407636U (en) Blow tank conveying device
CN203158829U (en) Anti-blocking device for pulverized coal feeding system
CN204675149U (en) A kind of dust conveying system blockage-eliminating device
CN202765845U (en) Pneumatic dust conveying device
CN205090392U (en) Novel economizer ash merges conveying system with dust remover ash
CN201473058U (en) Conveying device in positive-negative integrated multifunctional pump system
CN203478232U (en) U type material returning device for circulating fluidized bed boilers
CN202089599U (en) Ash conveying system for economizer
CN203442806U (en) Afterburning device for boiler fly ash of circulating fluidized bed
CN202912388U (en) Rapid delivery device of powder materials
CN205240746U (en) Novel economizer ash conveying system
CN205187360U (en) Material sealing pump
CN102009850A (en) Conveying device in positive and negative integrated multifunctional pump system
CN105110015A (en) Pneumatic force slag removal conveying system
CN107032002A (en) A kind of ash-transmission system fluidizes pipe anti-block apparatus
CN106743675A (en) A kind of pneumatic ash conveying pipe system for economizer
CN201942320U (en) Improved petroleum coke powder combustion conveying device for industrial kiln

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100160 Beijing, Fengtai District Automobile Museum Road, No. 6, Ying Kun century A block, floor 11

Patentee after: CHINA HUADIAN ENGINEERING CO., LTD.

Patentee after: China Huadian Engineering (Group) Co., Ltd. Design Institute

Address before: 100160 Beijing, Fengtai District Automobile Museum Road, No. 6, Ying Kun century A block, floor 11

Patentee before: China Huadian Engineering (Group) Co., Ltd.

Patentee before: China Huadian Engineering (Group) Co., Ltd. Design Institute

TR01 Transfer of patent right

Effective date of registration: 20170606

Address after: 100160 Beijing, Fengtai District Automobile Museum Road, No. 6, Ying Kun century A block, floor 11

Patentee after: CHINA HUADIAN ENGINEERING CO., LTD.

Address before: 100160 Beijing, Fengtai District Automobile Museum Road, No. 6, Ying Kun century A block, floor 11

Co-patentee before: China Huadian Engineering (Group) Co., Ltd. Design Institute

Patentee before: CHINA HUADIAN ENGINEERING CO., LTD.

TR01 Transfer of patent right