CN102654242A - Natural gas pressure regulating device - Google Patents
Natural gas pressure regulating device Download PDFInfo
- Publication number
- CN102654242A CN102654242A CN2012100904350A CN201210090435A CN102654242A CN 102654242 A CN102654242 A CN 102654242A CN 2012100904350 A CN2012100904350 A CN 2012100904350A CN 201210090435 A CN201210090435 A CN 201210090435A CN 102654242 A CN102654242 A CN 102654242A
- Authority
- CN
- China
- Prior art keywords
- pressure regulating
- gas
- flowmeter
- stage
- natural gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The invention discloses a natural gas pressure regulating device, relating to the technical field of pressure regulating equipment. The natural gas pressure regulating device comprises a mounting underframe, wherein a heat insulation square cabin is arranged on the mounting underframe, a gas pipeline part and an electric control part are arranged in the heat insulation square cabin, and the gas pipeline part is connected with a pollution discharge pipeline part. The natural gas pressure regulating device is characterized in that the gas pipeline part comprises a main pipeline, a gas inlet of the main pipeline is connected with a high-pressure gas unloading flexible pipe in a natural gas tank car, a first-stage pressure regulating valve, a second-stage pressure regulating valve, a third-stage pressure regulating valve and a flowmeter are sequentially arranged on the main pipeline, a first-stage separation buffer tank is arranged between the second-stage pressure regulating valve and the third-stage pressure regulating valve, a second-stage separation buffer tank is arranged between the third-stage pressure regulating valve and the flowmeter, one end of the flowmeter is connected with the main pipeline, and the other end of the flowmeter is connected to a gas supply port. The natural gas pressure regulating device disclosed by the invention has the advantages of simple structure and stability and reliability in working, can lead the liquid and impurities which are separated by first-stage and second-stage buffer separators to a designated part of a user for discharge through a pollution discharge pipeline, and can further provide measurement data for downstream gas consumption.
Description
Technical field
The present invention relates to the voltage adjusting device technical field, be specifically related to a kind of rock gas regulator.
Background technique
Because used compressed natural gas one CNG of gas-fueled vehicles is mostly supplied by the CNG gas station.Come in the rock gas of pipeline, before getting into compressor, its pressure because of ground, because of the time different, they possibly change between 0.15MPa~7MPa.Pressure is 3MPa~7MPa near major trunk roads; Arterial highway internal pressure before the urban gate station is 0.8MPa~3.0MPa; Pressure in the urban pipe network is 0.15MPa-0.6MPa.For example pressure is 3.0MPa winter in the Xi'an arterial highway, and then be 1.1MPa summer; And for example the pressure in urban pipe network changes between 0.25MPa-0.72MPa throughout the year, therefore requires the pressurizing system of gas station can be at any time, this variation of adaptation everywhere.The manufacturing enterprise of some gas station compressors gets an average pressure value and designs compressor, when pressure surpasses mean value, adopts the way of throttling to reduce pressure, so just can waste useful energy; When the pressure subaverage, compressor can move, but air demand just can reduce.Thus, make the user of gas station always feel dissatisfied.To confirm to stablize air feed when in addition, gas station being designed and power consumption also produces difficulty.Be warm in getting into the downstream using process, often need decompression, buffering, separate and metering, traditional voltage adjusting device complex structure, using effect is not good, can not stable, safe low-pressure gas source be provided for the user.
Summary of the invention
It is a kind of safe in utilization that technical problem to be solved by this invention is to provide, the rock gas regulator of working stability.
Technical problem to be solved by this invention adopts following technological scheme to realize:
A kind of rock gas regulator; Comprise the installation underframe, said installation underframe is provided with the insulation shelter, is provided with air pipe parts and electric controling part in the said insulation shelter; Described air pipe parts are connected with the blowoff line parts; It is characterized in that: described air pipe parts comprise main line, and the pressurized gas in the suction port of said main line and the rock gas tank car unload the gas flexible pipe and are connected, and are provided with one-level pressure regulator valve, secondary pressure regulator valve, three grades of pressure regulator valves and flowmeter on the described main line successively; Be provided with one-level separation buffer jar between described secondary pressure regulator valve and three grades of pressure regulator valves; Be provided with secondary separation buffer jar between described three grades of pressure regulator valves and the flowmeter, described flowmeter one end is connected with main line, and the other end is connected to air taking port.
Described blowoff line parts comprise drain pipe, and described drain pipe one end is connected with secondary separation buffer jar with one-level separation buffer jar respectively, and the said drain pipe the other end is connected to total sewage discharge outlet.
Described flowmeter is provided with one at least.
The invention has the beneficial effects as follows: the present invention is simple in structure, and working stability is reliable, can liquid and the impurity that the I and II surge separator is separated be caused user's appointment place discharging through blowoff line, and can continuous data be provided for downstream usefulness gas.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is air pipe member principle figure of the present invention.
Embodiment
For technological means, creation characteristic that the present invention is realized, reach purpose and effect and be easy to understand and understand, below in conjunction with concrete diagram, further set forth the present invention.
As shown in Figure 1, a kind of rock gas regulator comprises underframe 2 is installed, and underframe 2 is installed is provided with insulation shelter 1, is provided with air pipe parts 3 and electric controling part 4 in the insulation shelter 1, air pipe parts 3 be connected with blowoff line parts 5 as; Shown in Figure 2; Air pipe parts 3 comprise main line 37, and the pressurized gas in the suction port of main line 37 and the rock gas tank car unload the gas flexible pipe and are connected, and are provided with one-level pressure regulator valve 30, secondary pressure regulator valve 31, three grades of pressure regulator valves 32 and flowmeters 35 on the main line 37 successively; Be provided with one-level separation buffer jar 33 between secondary pressure regulator valve 31 and three grades of pressure regulator valves 32; Be provided with secondary separation buffer jar 34 between three grades of pressure regulator valves 32 and the flowmeter 35, flowmeter 35 1 ends are connected with main line 37, and the other end is connected to air taking port 36; Blowoff line parts 5 comprise drain pipe 50; Drain pipe 50 1 ends are connected with secondary separation buffer jar 34 with one-level separation buffer jar 33 respectively, and drain pipe 50 the other ends are connected to total sewage discharge outlet 51, and flowmeter 35 can be provided with a plurality of as required.
The gas flexible pipe that unloads of rock gas tank car is connected with the quick release coupling of equipment, after three grades of decompressions, gas pressure is reduced to 0.3MPa.At first high-pressure natural gas is through the decompression of I and II depressurized system; After the decompression through first-level buffer separator steady pressure (simultaneously contained humidity in the gas and impurity being separated); Measure through flowmeter then; Last gas gets into three grades of depressurized systems, and three post-decompression gases are once more through level 2 buffering separator steady pressure, and the low pressure natural gas with pressure and stable components offers custom system at last.
More than show and described basic principle of the present invention and major character and advantage of the present invention.The technician of the industry should understand; The present invention is not restricted to the described embodiments; That describes in the foregoing description and the specification just explains principle of the present invention; Under the prerequisite that does not break away from spirit and scope of the invention, the present invention also has various changes and modifications, and these variations and improvement all fall in the scope of the invention that requires protection.The present invention requires protection domain to be defined by appending claims and equivalent thereof.
Claims (3)
1. rock gas regulator; Comprise the installation underframe, said installation underframe is provided with the insulation shelter, is provided with air pipe parts and electric controling part in the said insulation shelter; Described air pipe parts are connected with the blowoff line parts; It is characterized in that: described air pipe parts comprise main line, and the pressurized gas in the suction port of said main line and the rock gas tank car unload the gas flexible pipe and are connected, and are provided with one-level pressure regulator valve, secondary pressure regulator valve, three grades of pressure regulator valves and flowmeter on the described main line successively; Be provided with one-level separation buffer jar between described secondary pressure regulator valve and three grades of pressure regulator valves; Be provided with secondary separation buffer jar between described three grades of pressure regulator valves and the flowmeter, described flowmeter one end is connected with main line, and the other end is connected to air taking port.
2. rock gas regulator according to claim 1; It is characterized in that: described blowoff line parts comprise drain pipe; Described drain pipe one end is connected with secondary separation buffer jar with one-level separation buffer jar respectively, and the said drain pipe the other end is connected to total sewage discharge outlet.
3. rock gas regulator according to claim 1 is characterized in that: described flowmeter is provided with one at least.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100904350A CN102654242A (en) | 2012-03-30 | 2012-03-30 | Natural gas pressure regulating device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100904350A CN102654242A (en) | 2012-03-30 | 2012-03-30 | Natural gas pressure regulating device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102654242A true CN102654242A (en) | 2012-09-05 |
Family
ID=46729918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100904350A Pending CN102654242A (en) | 2012-03-30 | 2012-03-30 | Natural gas pressure regulating device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102654242A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109442216A (en) * | 2018-12-27 | 2019-03-08 | 浙江海畅气体有限公司 | A kind of nitrogen pressure regulating metering device |
CN111412382A (en) * | 2020-04-09 | 2020-07-14 | 西北工业大学 | Load reduction model experiment air supply device |
CN111594755A (en) * | 2020-06-23 | 2020-08-28 | 山东奥扬新能源科技股份有限公司 | LNG system of unloading |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998043140A1 (en) * | 1997-03-22 | 1998-10-01 | Bg Plc | Pressure regulating system |
CN1304010A (en) * | 2000-01-12 | 2001-07-18 | 党为民 | Peak-regulating and gas-storing method for natural gas pipe network |
CN101280887A (en) * | 2007-06-06 | 2008-10-08 | 中国人民解放军总后勤部军需装备研究所 | Pipe gas pressure stabilizing regulation system |
CN201969414U (en) * | 2011-01-11 | 2011-09-14 | 宋华英 | Filtration-type dirt collection tank of fuel gas pressure adjusting device |
CN202561437U (en) * | 2012-03-30 | 2012-11-28 | 蚌埠高科能源装备有限公司 | Natural gas pressure regulating device |
-
2012
- 2012-03-30 CN CN2012100904350A patent/CN102654242A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998043140A1 (en) * | 1997-03-22 | 1998-10-01 | Bg Plc | Pressure regulating system |
CN1304010A (en) * | 2000-01-12 | 2001-07-18 | 党为民 | Peak-regulating and gas-storing method for natural gas pipe network |
CN101280887A (en) * | 2007-06-06 | 2008-10-08 | 中国人民解放军总后勤部军需装备研究所 | Pipe gas pressure stabilizing regulation system |
CN201969414U (en) * | 2011-01-11 | 2011-09-14 | 宋华英 | Filtration-type dirt collection tank of fuel gas pressure adjusting device |
CN202561437U (en) * | 2012-03-30 | 2012-11-28 | 蚌埠高科能源装备有限公司 | Natural gas pressure regulating device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109442216A (en) * | 2018-12-27 | 2019-03-08 | 浙江海畅气体有限公司 | A kind of nitrogen pressure regulating metering device |
CN111412382A (en) * | 2020-04-09 | 2020-07-14 | 西北工业大学 | Load reduction model experiment air supply device |
CN111594755A (en) * | 2020-06-23 | 2020-08-28 | 山东奥扬新能源科技股份有限公司 | LNG system of unloading |
CN111594755B (en) * | 2020-06-23 | 2024-06-07 | 山东奥扬新能源科技股份有限公司 | LNG unloading system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202158355U (en) | Liquid nitrogen transmitting system | |
CN202561438U (en) | Gas pipeline system for natural gas pressure regulation device | |
CN202493900U (en) | Pressure flow regulation device | |
CN207094197U (en) | Pressure regulating system | |
CN202791338U (en) | Pipeline gas pressure energy recovery device | |
CN204328479U (en) | A kind of Gas Pressure Regulating Equipment adopting the uninterrupted air feed of monitoring guarantee in parallel | |
CN104456067A (en) | Mixed gas filling device and mixed gas filling method of CNG and HCNG | |
CN102654242A (en) | Natural gas pressure regulating device | |
CN106870945B (en) | Natural gas pressure regulating skid-mounted device with multistage safety protection function | |
CN202561437U (en) | Natural gas pressure regulating device | |
CN202056524U (en) | Gas pressure regulator | |
CN202452115U (en) | Biogas pressure-stabilizing and conveying system | |
CN202609903U (en) | Sulfuric acid pressure conveying system | |
CN210014208U (en) | Device for improving HCNG unloading efficiency and saving energy | |
CN202580605U (en) | Natural gas integral skip-mounted type gas-entrapping system | |
CN204962299U (en) | User's gas pressure regulating cabinet system | |
CN102913756A (en) | Residual gas recovery system of gas station compressor | |
CN202430106U (en) | Natural gas supply guaranteeing system of glass tank furnace | |
CN203147284U (en) | Outlet pressure balance adjusting device of natural gas gate station | |
CN202252858U (en) | Gas pressure adjusting metering cabinet | |
CN202056512U (en) | Multi-machine shared pressure stabilization, drying, purifying and air supply device | |
CN203223740U (en) | Multi-channel parallel CNG (Compressed Natural Gas) skid-mounted gas unloading device | |
CN203743859U (en) | Pressure regulating device of coalbed methane feed gas inlet pipe | |
CN102650372A (en) | Device for reducing pressure | |
CN205155556U (en) | Point supplies gasification equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120905 |