CN103437765B - " adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls - Google Patents

" adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls Download PDF

Info

Publication number
CN103437765B
CN103437765B CN201310304267.5A CN201310304267A CN103437765B CN 103437765 B CN103437765 B CN 103437765B CN 201310304267 A CN201310304267 A CN 201310304267A CN 103437765 B CN103437765 B CN 103437765B
Authority
CN
China
Prior art keywords
filling
fill
operation face
stay
filling operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310304267.5A
Other languages
Chinese (zh)
Other versions
CN103437765A (en
Inventor
戴华阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201310304267.5A priority Critical patent/CN103437765B/en
Publication of CN103437765A publication Critical patent/CN103437765A/en
Application granted granted Critical
Publication of CN103437765B publication Critical patent/CN103437765B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses " adopt to fill and stay " coupling harmonic extraction method that a kind of colliery strata movement controls.Carry out the cooperative type filling mining of reserved coal pillar+part filling+partial mining, to stay the coal column set as core, make coal column, obturator, be caving body coordination support top covering rockmass, control the movement and deformation value of rock stratum and earth's surface.Unilateral filling model is in reserved coal pillar side, is sequentially arranged filling operation face and not filling operation face;Bilateral filling model then both sides are laid successively.First adopt filling operation face, rear back production not filling operation face, or fill back production while of adopting merging.Reserved coal pillar width should meet basicly stable requirement;Filling operation face, not filling operation face width degree, determined by extreme astatic requirement.The present invention is compared with Striping noise, and the stress state improving coal column is filled in coal column side, improves recovery ratio.Compared with entirely adopting and entirely filling, decrease charging quantity, but enhance the support strength of obturator and coal column, improve CONTROL OF STRATA MOVEMENT effect, provide cost savings.

Description

Colliery strata movement control " adopt-fill-stay " coupling harmonic extraction method
Technical field
The present invention relates to a kind of seam mining method, " adopt-fill-stay " coupling controlled particularly to a kind of colliery strata movement Close harmonic extraction method.
Technical background
Exploitation certainly will cause ground settlement and deformation.In phreatic table district higher, mining type back production coal money routinely Source, meeting is a large amount of hydrops in the subsidence basin that earth's surface is formed, if building or structures are positioned at subsidence basin, can cause building Thing or the long-term hydrops of structures or excessive moisture, impact is normal to be used;Building or structure also can be caused when earth's surface deformation is bigger Build the damage of thing.Therefore, when earth's surface, buildings or structures are more, when pressure coal amount is big, the most typically take earth's surface buildings or structures different Ground resettlement, or take underground filling exploitation and Striping noise measure, to avoid or to reduce the mining damage of earth's surface buildings or structures Influence degree.Different measure has a characteristic that
1, strange land resettlement
Buildings or structures from mines influencing area, resettlement is to the place of not affected by exploitation.The method can fundamentally solve Certainly buildings or structures are affected by exploiting, and are the maximally efficient approach avoiding Mining subsidence.But the method existence expropriation of land difficulty, Fund input is relatively big, resettlement cycle length, relationship between industry and agriculture are difficult to the problems such as coordination.
2, conventional exploitation
Refer to comprehensive mechanical coal mining, the coal-mining method of whole caving methods management top board.This method resource recovery is the highest, high yield Efficiently, system is arranged simple, and tunnelling amount is little, but the infringement to surface buildings, structures is the most serious.
3, Striping noise
Working seam being divided into beam shapes, stays ratio by necessarily adopting, adopt one, stay one, intervening sequences is exploited, and makes to stay Under strip coal pillar support overlying rock, thus reach reduce surface movement and deformation method.The method preferably can control ground The movement of table and deformation, buildings or structures are less by mining influence, but lose that coal is serious, resource recovery is low, and the rate of extraction is only About 40%, when adopting the biggest, the rate of extraction is lower.If coal column stay set width bigger time to lose coal serious, time too small, coal column can be caused Unstability, does not has the effect that control overlying mining rock moves.
4, filling mining (entirely adopt and entirely fill)
After filling mining refers to mining face under mine exploitation, spoil, garbage or mastic, high-water material etc. is used to be filled to adopt Dead zone, crushes with suppression, thus plays the recovery method controlling rockmass and surface subsidence deformation.The method can effectively control Surface subsidence and deformation, resource recovery is high;Exploit with filling alternately operating, influence each other so that yield poorly.Fund is disposable Putting into big, cost of ton coal increases, and the unwarranted mining area of filler is difficult to carry out the method.
Actual measurement and experimental study show, ground and strata movements is controlled primarily by key stratum, when Chief layer is complete, Above it, rock stratum is mobile with the movement of key stratum, and sinking and the deformation on earth's surface are the least;The disrumpent feelings meeting of Chief layer causes Quickly sinking under earth's surface, surface subsidence speed is periodically the most disrumpent feelings and present the change of cycle jumping characteristic with main key stratum, works as key stratum Movement and deformation when reaching earth's surface unconsolidated formation, unconsolidated formation can adjust the non-homogeneous sinking absorbing key stratum, if unconsolidated formation is relatively thin, Being not enough to all absorb heterogeneous deformation, earth's surface can occur moderate finite deformation, and when unconsolidated formation is sufficiently thick, and key stratum is disrumpent feelings to be caused Discontinuous Deformation will all be absorbed, and earth's surface shows as continuous modification.Mineral Engineering research in recent decades achieves prominent Achievement, particularly critical sheaf theoretic proposition, solve on-the-spot many technical problems, and carry for design of its support, gas drainage technique Supply theoretical foundation.In overlying strata, key stratum can control the movement of overlying strata above it, and main key stratum is the most disrumpent feelings and steady in a long-term In the case of, earth's surface occur movement and deformation less, this be design exploitation " three times (build/structures under, under railway and under water body) " The basic principle of coal resources.
Any of the above recovery method intrinsically, is effective protection on high efficiente callback or the earth's surface laying particular emphasis on resource, Can not the two take into account.China's " three times " pressure coal problem generally exists at present, and some mining areas pressure coal amount is even up to 100%, resettlement Expense enterprise is difficult to bear, and the response rate of Striping noise resource is the lowest, and whole filling mining costs are the highest.Therefore, in " three times " In the urgent need to a kind of safety, high-recovery, the production technique of low cost in exploitation.
In sum, Migration is difficult to carry out, easy hydrops, pressure big, widely distributed the building of coal amount after subsidence (structure) is built and is exploited under thing;One will be sought and can reduce sinking and earth's surface deformation, to reach to protect earth's surface buildings or structures Safe handling, ensure resource recovery requirement, exploitation measure that again can be cost-effective.
Summary of the invention
The technical problem to be solved is to provide a kind of movement that can efficiently control rock stratum and earth's surface and change Shape, Mining subsidence can be reduced, reduce area pack completeness, and improve that the colliery strata movement of coal recovery rate controls " adopt- Fill-stay " coupling harmonic extraction method.
The present invention is achieved through the following technical solutions: the control of colliery strata movement " adopt-fill-stay " coupling harmonic extraction side Method, is divided into m production unit by mine district, and m is positive integer;The exploitation of production unit is divided into unilateral filling and bilateral filling Both of which, each production unit carries out reserved coal pillar, part filling and the cooperative type filling mining of partial mining, sets to stay Coal column is core, makes coal column, obturator and is caving body coordination support top covering rockmass, controlling the movement and deformation value of rock stratum and earth's surface.
The strata movement control of above-mentioned colliery " adopt-fill-stay " coupling harmonic extraction method, according to unilateral filling model, often Individual production unit all uses unilateral fill pattern to exploit: unilateral filling model is in reserved coal pillar side, is sequentially arranged one Individual filling operation face and a not filling operation face;First fill in the cut and fill cellular zone of n-th production unit Fill out working face extraction and filling forms obturator;Then the whole caving method production unit districts in n-th production unit are carried out not The back production of filling operation face, forms goaf, and n is positive integer and n less than or equal to m;The coal column of adjacent two production unit with adopt Dead zone is adjacent.
The strata movement control of above-mentioned colliery " adopt-fill-stay " coupling harmonic extraction method, according to bilateral filling model, often Individual production unit uses bilateral fill pattern to exploit, and bilateral filling model is to lay one successively in the side of reserved coal pillar Filling operation face and a not filling operation face, and lay another filling operation face at the opposite side staying the coal column set;First In the cut and fill cellular zone of n-th production unit, carry out the back production of filling operation face and filling forms obturator;Then exist Whole caving method production unit districts of n-th production unit carry out the back production of not filling operation face, form goaf, and n is the most whole Number and n are less than or equal to m;Adjacent two production unit use obturator adjacent with goaf.
The strata movement control of above-mentioned colliery " adopt-fill-stay " coupling harmonic extraction method, in whole mine district, one The coal column of point production unit only has obturator, the both sides of the coal column of another part production unit all to have obturator in side;Adjacent Two production unit use obturator adjacent with goaf or use coal column adjacent with goaf.
The strata movement control of above-mentioned colliery " adopt-fill-stay " coupling harmonic extraction method, filling operation face and not stower Make face to merge, back production simultaneously.
It needs to be noted: the width of reserved coal pillar can be determined by basicly stable requirement, filling operation face, not filling Face width, can be determined by sub-extraction or the most insufficient requirement according to concrete geological mining condition;This is to this area skill It is common knowledge for art personnel, needn't elaborate any further at this.
This invention provides the benefit that: the control of colliery of the present invention strata movement " adopt-fill-stay " coupling harmonic extraction side Method is particularly well-suited under buildings or structures and water body, low-angle dip or nearly level and directly top are more complete, overlying strata lithology in being hard or The seam mining of competent bed.Seam mining takes " fender+two (singly) filling face, side+two (singly) side extreme astatic Face ".Control overlying mining rock is caving scope, thus reduces movement and deformation of overburden strata degree, reaches the most controllably table movement and deformation, can carry again The purpose of high resource recovery.
Colliery of the present invention strata movement control " adopt-fill-stay " coupling harmonic extraction method, by reducing reserved coal pillar width Degree improves resource recovery, utilizes obturator filling to adopt space to reduce, and makes key stratum displacement and deformation in overlying rock send out The space of exhibition reduces, and jointly supports the pressure of overlying key stratum with fender, plays auxiliary supporting role, and to coal (rock) body and Roof and floor country rock provides certain resistance, and (it is to cause to cover that stress is concentrated to slow down the stress concentration phenomenon in coal column and key stratum Rock deformation and destruction cause the basic reason that ground is damaged) so that obturator and Pillar load support propping up of key stratum jointly Support body system, plays the effect reducing surface movement and deformation;On the other hand obturator produces lateral pressure to fender, makes fender It is in two-way or three-dimensional stress state, improves the country rock situation of fender, improve the ability of its resistance to deformation so that it is have relatively Good integrity and stability.
The Striping noise generally used, coal column both sides are goaf, and coal column is in pure stress or two-dimensional state of stress, adopts At dead zone, top board is by the bigger movement and deformation of scope.Apply that colliery of the present invention strata movement controls " adopt-fill-stay " coupling association Tune to open mining method to reduce strip coal pillar and stay and set width, and can the deformation range of effective controlroof, it is ensured that main in overlying strata Key stratum is the most disrumpent feelings and steady in a long-term, can reach to reduce the extension from the bottom to top of top board movement and deformation, make earth's surface not by or be subject to To less mining effect.
The present invention is compared with Striping noise, and the stress state improving coal column is filled in coal column side, improves recovery ratio.With entirely adopt Entirely fill and compare, decrease charging quantity, but enhance the support strength of obturator and coal column, improve CONTROL OF STRATA MOVEMENT effect, save Cost.
Accompanying drawing explanation
Fig. 1 a is the profile of bank;
Fig. 1 a ' is that " adopt-fill-stay " the coupling harmonic extraction method using that colliery of the present invention strata movement controls is in Fig. 1 a institute Show the coal column mined bank unilateral " adopt-fill-stay " exploitation plane graph;
Fig. 1 b is the profile of another bank;
Fig. 1 b ' is the strata movement control of employing colliery of the present invention " adopt-fill-stay " couple harmonic extraction method at Fig. 1 b ' Shown in coal column both sides " adopt-fill-stay " the exploitation plane graph mined of bank;
D adopts-uses the conventional exploitation work surface of whole caving method exploitation;
D fills-uses the work surface of whole cut and fill;
D Liu-stay the fender supporting overlying rock set;
" adopt-fill-stay " coupling harmonic extraction method that Fig. 1 c controls for colliery of the present invention strata movement is in part of coal Post unilateral " adopt-fill-stay " exploitation and the plane graph exploited at another part coal column bilateral " adopt-fill-stay ".
Fig. 2 a-2d is certain ore mining, and with " adopt-fill-stay ", harmonic extraction is adopted entirely with whole caving methods, whole filling method is opened in coupling Adopting surface movement and deformation curve comparison diagram, wherein: Fig. 2 a is surface subsidence comparison diagram, Fig. 2 b is that earth's surface tilts comparison diagram, Fig. 2 c Moving horizontally comparison diagram for earth's surface, Fig. 2 d is earth's surface horizontal deformation contrast figure.
Fig. 3 a-3e is that destruction of surface grade cloud atlas is exploited, wherein in subregion, head exploiting field, certain ore deposit: Fig. 3 a is " adopt-fill-stay " Unilateral placement method exploitation destruction of surface grade cloud atlas is coordinated in coupling, and Fig. 3 a-1 is black after WORD picture instrument processes of Fig. 3 a Bai Tu;Fig. 3 b coordinates bilateral placement method exploitation destruction of surface grade cloud atlas for " adopt-fill-stay " coupling, and Fig. 3 b-1 is Fig. 3 b warp Artwork master after the process of WORD picture instrument;Fig. 3 c is whole caving method management top board routine exploitation destruction of surface grade cloud atlas, Fig. 3 c-1 is Fig. 3 c artwork master after WORD picture instrument processes;Fig. 3 d is that whole filling method adopts rear destruction of surface grade cloud entirely Figure, Fig. 3 d-1 is Fig. 3 d artwork master after WORD picture instrument processes;Fig. 3 e is destruction of surface grade cloud atlas after Striping noise, Fig. 3 e-1 is Fig. 3 e artwork master after WORD picture instrument processes.
In figure: 1-mine district, n-n-th production unit, the N+1 production unit of n+1-;N+2-the N+2 exploits single Unit;The N+3 production unit of n+3-;MZ-coal column;CTT-obturator;CKQ-goaf.In Fig. 3 a-3e: " white space " represents Full mining face, " blank space is filled with stain region " represents filling operation face, and " black region " represents reserved coal pillar, " blue Region " represent I level destruction (the slightest), " yellow area " represents I level and destroys (slightly), and " green area " represents II level and destroy.
Detailed description of the invention
Below by example, the present invention is described in further detail.
Embodiment 1
As shown in Fig. 1 a and Fig. 1 a ', the control of the present embodiment colliery strata movement " adopt-fill-stay " coupling harmonic extraction side Method, is divided into m production unit by mine district 1, and m is positive integer;Each production unit all uses unilateral fill pattern to carry out Exploitation: unilateral filling model is in reserved coal pillar MZ side, is sequentially arranged a filling operation face and a not filling operation face; First in the cut and fill cellular zone of n-th production unit n, carry out the back production of filling operation face and filling forms obturator CTT;Then the whole caving method production unit districts in n-th production unit n carry out the back production of not filling operation face, form goaf CKQ, n are positive integer and m less than or equal to n;The coal column MZ of adjacent two production unit is adjacent with goaf CKQ.Set to stay Coal column MZ is core, makes coal column MZ, obturator CTT and is caving body coordination support top covering rockmass, carrying out the movement of rock stratum and earth's surface Deformation values controls.
Embodiment 2
As shown in Fig. 1 b and Fig. 1 b ', the control of the present embodiment colliery strata movement " adopt-fill-stay " coupling harmonic extraction side Method, is divided into m production unit by mine district 1, and m is positive integer;Each production unit uses bilateral fill pattern to open Adopting, bilateral filling model is to lay a filling operation face and a not filling operation face successively in the side of reserved coal pillar MZ, And lay another filling operation face at the opposite side staying the coal column MZ set;First in the cut and fill of n-th production unit n Carry out the back production of filling operation face in cellular zone and filling forms obturator CTT;Then it is caving the whole of n-th production unit n Method production unit district carries out the back production of not filling operation face, forms goaf CKQ, n and is positive integer and n less than or equal to m;Adjacent two Individual production unit uses obturator CTT adjacent with goaf CKQ.
Embodiment 3
As illustrated in figure 1 c, the control of the present embodiment colliery strata movement " adopt-fill-stay " coupling harmonic extraction method, by coal Ore mining district 1 is divided into m production unit, and m is positive integer;In whole mine district 1, the coal column MZ of a part of production unit is only Have obturator CTT in side, all there is obturator CTT the both sides of the coal column MZ of another part production unit;Adjacent two exploitations are single Unit uses obturator CTT adjacent with goaf CKQ or uses coal column MZ adjacent with goaf CKQ.First single in n-th exploitation Carry out the back production of filling operation face in the cut and fill cellular zone of unit n and filling forms obturator CTT;Then exploit in n-th Whole caving method production unit districts of unit n carry out the back production of not filling operation face, form goaf CKQ, n and are positive integer and n Less than or equal to m.
Embodiment 4
Certain exploiting field, ore deposit one is positioned at northeast, field with "nine squares", and coal measure strata is Shanxi group and Taiyuan Forma-tion, and seam inclination is 10 °, averagely Coal thickness 2.7m, this district's ground even, absolute altitude about+46m, down-hole coal bed absolute altitude-550~-850m, the generally middle hard rock of overlying strata Property, overlying rock has the packsand rock stratum of a thickness about 50m, for Chief layer in overlying strata.
Fig. 2 a-2d is certain ore mining with " adopt-fill-stay " coupling harmonic extraction and full extraction, whole filling (solid filling) Surface movement and deformation curve comparison diagram after method exploitation.
Developed and at this patent before the applying date of present patent application by utilizing present patent application inventor to wear Huayang " inclined seam subsidence prediction the analyzes system " simulation published before the applying date of application calculates, can by Fig. 2 a To find out, Striping noise earth's surface maximum sinking value is minimum, entirely adopts method surface subsidence value maximum, " adopt-fill-stay " coupling harmonic extraction The earth's surface maximum sinking value of method differs less with filling mining, and effectiveness of reducing subsidence is essentially identical.
By Fig. 2 b it can be seen that each recovery method is compared, the earth's surface inclination and distortion maximum of Striping noise is minimum, Quan Caifa Maximum, but the coverage of the inclination and distortion higher value of " adopt-fill-stay " coupling harmonic extraction method is compared with filling and the impact of entirely adopting method Scope is little, and inclination and distortion value is less with filling method difference.
By Fig. 2 c it can be seen that the maximum moved horizontally of Striping noise is minimum, method of entirely adopting is maximum, " adopt-fill-stay " coupling Close harmonic extraction and differ less with filling mining horizontal movement value.
By Fig. 2 d it can be seen that the maximum of the earth's surface horizontal distortion of Striping noise is minimum, method of entirely adopting is maximum, " adopt-fill- Stay " coupling harmonic extraction horizontal distortion maximum essentially identical with whole filling methods, the coverage of higher value is relatively concentrated.
From accompanying drawing 3a~3e, entirely adopt method earth's surface buildings or structures damaged condition up to II level, Striping noise I level with In, " adopt-fill-stay " coupling harmonic extraction is identical with filling mining, and damaged condition major part is I level, and respective regions reaches II level Damage.
In a word, comparing and entirely adopt method, the extent of damage on " adopt-fill-stay " coupling harmonic extraction earth's surface alleviates, under earth's surface significantly Heavy amount is obviously reduced;Compared with Striping noise, resource recovery is greatly improved, in sample calculation the rate of extraction of band less than 40%, " adopt-fill-stay " couple the harmonic extraction response rate more than 70%;Compared with entirely adopting the filling mining entirely filled, " adopt-fill-stay " The coupling sinking on harmonic extraction earth's surface and movement and deformation and basically identical to the damaged condition of surface buildings, but " adopt- Fill-stay " coupling harmonic extraction filler demand greatly reduce, filling cost is substantially reduced, and working face extraction efficiency is big Big raising.As can be seen here, enterprise higher at earth's surface phreatic table be difficult to bear relatively high investment cost, resource recovery requirement high, Table destroys the higher mining area of class requirement, and " adopt-fill-stay " the coupling harmonic extraction method using that colliery strata movement controls both may be used Meeting underground mining requirement, can reduce again earth's surface buildings or structures adopts damage.
The present invention according to " production face is the most insufficient+obturator combines roof supporting+top board main key stratum and do not breaks with coal column Disconnected " principle, take into account under conditions of unconsolidated formation adjusts and absorb that key stratum is disrumpent feelings and cause Discontinuous Deformation ability, design fender, Filling operation face and the size of exploitation work surface.
Being applicable under buildings or structures and water body, low-angle dip or nearly level and directly top are more complete, overlying strata lithology is hard in being Or the seam mining of competent bed.Seam mining takes double (singly) side of reserved coal pillar to carry out filling mining, at another of filling face Side uses the mode of routine exploitation, carries out reserved coal pillar, filling and conventional exploitation successively;Obturator reduces the sky that overlying strata move down Between, jointly support roof and floor pressure with reserved coal pillar, thus slow down the stress concentration phenomenon in key stratum and coal column;Additionally, fill Fill out body and be positioned at coal column side or bilateral, to coal column produce lateral pressure, make coal column be in two to or three-dimensional stress state, change The country rock situation of coal column, improves coal column bearing capacity, makes coal column have preferable integrity, globality and stability, thus has Effect slow down the stress concentration phenomenon in key stratum, controls moving and being caving scope of overlying strata, greatly reduces opening of earth's surface Adopt the extent of damage, improve resource recovery.Owing to key stratum is effectively supported, the most disrumpent feelings and can maintain a long-term stability Property, make key stratum overlying rock and unconsolidated formation move and synchronizing moving with key stratum bending, thus play and slow down surface subsidence and change The effect of shape.
It addition, in embodiment 1 to embodiment 3, it is also possible to take filling operation face and not filling operation face to merge, simultaneously Back production.

Claims (2)

1. " adopt-fill-stay " coupling harmonic extraction method that colliery strata movement controls, it is characterised in that mine district (1) is drawn Being divided into m production unit, m is positive integer;The exploitation of production unit is bilateral filling model, and each production unit is carried out to stay and set coal The cooperative type filling mining of post, part filling and partial mining, to stay the coal column set as core, makes coal column, obturator and is caving Body is coordinated to support top covering rockmass, controls the movement and deformation value of rock stratum and earth's surface;
According to bilateral filling model, each production unit uses bilateral fill pattern to exploit: staying the coal column (MZ) that sets Side lays a filling operation face and a not filling operation face successively, and lays another at the opposite side of reserved coal pillar (MZ) Individual filling operation face;First in the cut and fill cellular zone of n-th production unit (n), carry out the back production of filling operation face and fill Fill out formation obturator (CTT);Then the whole caving method production unit districts in n-th production unit (n) carry out not filling operation Face back production, forms goaf (CKQ), and N is positive integer and N less than or equal to m;Adjacent two production unit use obturator (CTT) adjacent with goaf (CKQ).
Colliery the most according to claim 1 strata movement control " adopt-fill-stay " coupling harmonic extraction method, its feature Being, filling operation face and not filling operation face merge, back production simultaneously.
CN201310304267.5A 2013-07-19 " adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls Active CN103437765B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310304267.5A CN103437765B (en) 2013-07-19 " adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310304267.5A CN103437765B (en) 2013-07-19 " adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls

Publications (2)

Publication Number Publication Date
CN103437765A CN103437765A (en) 2013-12-11
CN103437765B true CN103437765B (en) 2016-11-30

Family

ID=

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963149A (en) * 2006-11-17 2007-05-16 中国矿业大学 Mining method for replacement of banded coal under building by waste rock
CN101660410A (en) * 2008-11-03 2010-03-03 侯忠杰 Long wall alternate type coal mining method
CN102011588A (en) * 2010-11-30 2011-04-13 淄博市王庄煤矿 House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock
CN102678121A (en) * 2012-05-21 2012-09-19 山东黄金矿业(莱州)有限公司三山岛金矿 Layered top-controlling filling mining method for residual ores in deep hole in diskless area
CN102877848A (en) * 2012-09-26 2013-01-16 山东科技大学 Method for performing coal mining and gangue cementation stripe filling simultaneously

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963149A (en) * 2006-11-17 2007-05-16 中国矿业大学 Mining method for replacement of banded coal under building by waste rock
CN101660410A (en) * 2008-11-03 2010-03-03 侯忠杰 Long wall alternate type coal mining method
CN102011588A (en) * 2010-11-30 2011-04-13 淄博市王庄煤矿 House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock
CN102678121A (en) * 2012-05-21 2012-09-19 山东黄金矿业(莱州)有限公司三山岛金矿 Layered top-controlling filling mining method for residual ores in deep hole in diskless area
CN102877848A (en) * 2012-09-26 2013-01-16 山东科技大学 Method for performing coal mining and gangue cementation stripe filling simultaneously

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
浅埋煤层柔性条带充填保水开采基础研究;李亮;《中国优秀硕士学位论文全文数据库 工程科技I辑》;20130215;第28页至第30页 *

Similar Documents

Publication Publication Date Title
CN103902780B (en) Solid filling coal mining earth's surface Deformation prediction method
CN104775816B (en) Isolated grouting-filling mining method for overburden rock without village migration under cut-side local pressed-coal conditions
AU2015345830B2 (en) Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence
CN105971606B (en) A kind of thick sandstone coal wall recovery method
CN108194088A (en) A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion
CN106150546B (en) A kind of method that the filling of goaf part is carried out according to earth's surface subsidence
CN106014410A (en) Filling mining method for downward access part
CN105422099A (en) Method for completely filling two sides of pillars with repeated mining and residual mining area remaining coal pillars
CN103939137B (en) The drift-sand barnyard placement method of western desertification mining area shallow buried coal seam
CN103628876B (en) Across the exploiting field block formula tendency band harmonic extraction method in half-edge coal seam deep
CN109117589A (en) A kind of quantitative description method of roof crack field
CN107559008A (en) A kind of method combined second mining super high seam and stop adopting line coal column
CN106761750B (en) Slot type recovery method is built in the longwell plane milling of half-edge coal seam longitudinal direction
CN107339105A (en) A kind of method for being layered the residual exploiting field of paste body filling second mining super high seam and stopping adopting line coal column
CN102102518B (en) Top coal caving coordinated mining method for thick coal seam under dam body of reservoir
CN102678119A (en) High-efficiency filling mining method for controlling rock mass movement
CN106401609A (en) Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure
CN102226412A (en) Underground dark mining drilling well gas extraction method
CN102777205A (en) Method for determining spatial position of horizontal well for gas drainage in worked-out area
CN103437765B (en) " adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls
CN203570313U (en) Double-alley chain type stoping and filling arrangement structure
Slashchova Water effect on the rocks and mine roadways stability
CN209483345U (en) A kind of face in steep thick coal seam Multi sectional protects lane without coal column staggered floor
CN114017103A (en) Longwall roadway-by-roadway cemented filling coal face parameter design method
CN104632222B (en) A kind of breaking ore body stoping method

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant