CN103437765B - " adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls - Google Patents
" adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls Download PDFInfo
- Publication number
- CN103437765B CN103437765B CN201310304267.5A CN201310304267A CN103437765B CN 103437765 B CN103437765 B CN 103437765B CN 201310304267 A CN201310304267 A CN 201310304267A CN 103437765 B CN103437765 B CN 103437765B
- Authority
- CN
- China
- Prior art keywords
- filling
- fill
- operation face
- stay
- filling operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000605 extraction Methods 0.000 title claims abstract description 39
- 230000001808 coupling Effects 0.000 title claims abstract description 33
- 238000010168 coupling process Methods 0.000 title claims abstract description 33
- 238000005859 coupling reaction Methods 0.000 title claims abstract description 33
- 239000003245 coal Substances 0.000 claims abstract description 77
- OKTJSMMVPCPJKN-UHFFFAOYSA-N carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 claims abstract description 76
- 238000004519 manufacturing process Methods 0.000 claims abstract description 62
- 238000005065 mining Methods 0.000 claims abstract description 40
- 239000011435 rock Substances 0.000 claims abstract description 20
- 230000002146 bilateral Effects 0.000 claims abstract description 13
- 230000015572 biosynthetic process Effects 0.000 claims description 8
- 238000005755 formation reaction Methods 0.000 claims description 8
- 230000001413 cellular Effects 0.000 claims description 6
- 238000011084 recovery Methods 0.000 abstract description 16
- 230000000694 effects Effects 0.000 abstract description 7
- 230000002708 enhancing Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 241000521257 Hydrops Species 0.000 description 3
- 239000000945 filler Substances 0.000 description 2
- 229920002459 Intron Polymers 0.000 description 1
- 240000005428 Pistacia lentiscus Species 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
Abstract
The invention discloses " adopt to fill and stay " coupling harmonic extraction method that a kind of colliery strata movement controls.Carry out the cooperative type filling mining of reserved coal pillar+part filling+partial mining, to stay the coal column set as core, make coal column, obturator, be caving body coordination support top covering rockmass, control the movement and deformation value of rock stratum and earth's surface.Unilateral filling model is in reserved coal pillar side, is sequentially arranged filling operation face and not filling operation face;Bilateral filling model then both sides are laid successively.First adopt filling operation face, rear back production not filling operation face, or fill back production while of adopting merging.Reserved coal pillar width should meet basicly stable requirement;Filling operation face, not filling operation face width degree, determined by extreme astatic requirement.The present invention is compared with Striping noise, and the stress state improving coal column is filled in coal column side, improves recovery ratio.Compared with entirely adopting and entirely filling, decrease charging quantity, but enhance the support strength of obturator and coal column, improve CONTROL OF STRATA MOVEMENT effect, provide cost savings.
Description
Technical field
The present invention relates to a kind of seam mining method, " adopt-fill-stay " coupling controlled particularly to a kind of colliery strata movement
Close harmonic extraction method.
Technical background
Exploitation certainly will cause ground settlement and deformation.In phreatic table district higher, mining type back production coal money routinely
Source, meeting is a large amount of hydrops in the subsidence basin that earth's surface is formed, if building or structures are positioned at subsidence basin, can cause building
Thing or the long-term hydrops of structures or excessive moisture, impact is normal to be used;Building or structure also can be caused when earth's surface deformation is bigger
Build the damage of thing.Therefore, when earth's surface, buildings or structures are more, when pressure coal amount is big, the most typically take earth's surface buildings or structures different
Ground resettlement, or take underground filling exploitation and Striping noise measure, to avoid or to reduce the mining damage of earth's surface buildings or structures
Influence degree.Different measure has a characteristic that
1, strange land resettlement
Buildings or structures from mines influencing area, resettlement is to the place of not affected by exploitation.The method can fundamentally solve
Certainly buildings or structures are affected by exploiting, and are the maximally efficient approach avoiding Mining subsidence.But the method existence expropriation of land difficulty,
Fund input is relatively big, resettlement cycle length, relationship between industry and agriculture are difficult to the problems such as coordination.
2, conventional exploitation
Refer to comprehensive mechanical coal mining, the coal-mining method of whole caving methods management top board.This method resource recovery is the highest, high yield
Efficiently, system is arranged simple, and tunnelling amount is little, but the infringement to surface buildings, structures is the most serious.
3, Striping noise
Working seam being divided into beam shapes, stays ratio by necessarily adopting, adopt one, stay one, intervening sequences is exploited, and makes to stay
Under strip coal pillar support overlying rock, thus reach reduce surface movement and deformation method.The method preferably can control ground
The movement of table and deformation, buildings or structures are less by mining influence, but lose that coal is serious, resource recovery is low, and the rate of extraction is only
About 40%, when adopting the biggest, the rate of extraction is lower.If coal column stay set width bigger time to lose coal serious, time too small, coal column can be caused
Unstability, does not has the effect that control overlying mining rock moves.
4, filling mining (entirely adopt and entirely fill)
After filling mining refers to mining face under mine exploitation, spoil, garbage or mastic, high-water material etc. is used to be filled to adopt
Dead zone, crushes with suppression, thus plays the recovery method controlling rockmass and surface subsidence deformation.The method can effectively control
Surface subsidence and deformation, resource recovery is high;Exploit with filling alternately operating, influence each other so that yield poorly.Fund is disposable
Putting into big, cost of ton coal increases, and the unwarranted mining area of filler is difficult to carry out the method.
Actual measurement and experimental study show, ground and strata movements is controlled primarily by key stratum, when Chief layer is complete,
Above it, rock stratum is mobile with the movement of key stratum, and sinking and the deformation on earth's surface are the least;The disrumpent feelings meeting of Chief layer causes
Quickly sinking under earth's surface, surface subsidence speed is periodically the most disrumpent feelings and present the change of cycle jumping characteristic with main key stratum, works as key stratum
Movement and deformation when reaching earth's surface unconsolidated formation, unconsolidated formation can adjust the non-homogeneous sinking absorbing key stratum, if unconsolidated formation is relatively thin,
Being not enough to all absorb heterogeneous deformation, earth's surface can occur moderate finite deformation, and when unconsolidated formation is sufficiently thick, and key stratum is disrumpent feelings to be caused
Discontinuous Deformation will all be absorbed, and earth's surface shows as continuous modification.Mineral Engineering research in recent decades achieves prominent
Achievement, particularly critical sheaf theoretic proposition, solve on-the-spot many technical problems, and carry for design of its support, gas drainage technique
Supply theoretical foundation.In overlying strata, key stratum can control the movement of overlying strata above it, and main key stratum is the most disrumpent feelings and steady in a long-term
In the case of, earth's surface occur movement and deformation less, this be design exploitation " three times (build/structures under, under railway and under water body) "
The basic principle of coal resources.
Any of the above recovery method intrinsically, is effective protection on high efficiente callback or the earth's surface laying particular emphasis on resource,
Can not the two take into account.China's " three times " pressure coal problem generally exists at present, and some mining areas pressure coal amount is even up to 100%, resettlement
Expense enterprise is difficult to bear, and the response rate of Striping noise resource is the lowest, and whole filling mining costs are the highest.Therefore, in " three times "
In the urgent need to a kind of safety, high-recovery, the production technique of low cost in exploitation.
In sum, Migration is difficult to carry out, easy hydrops, pressure big, widely distributed the building of coal amount after subsidence
(structure) is built and is exploited under thing;One will be sought and can reduce sinking and earth's surface deformation, to reach to protect earth's surface buildings or structures
Safe handling, ensure resource recovery requirement, exploitation measure that again can be cost-effective.
Summary of the invention
The technical problem to be solved is to provide a kind of movement that can efficiently control rock stratum and earth's surface and change
Shape, Mining subsidence can be reduced, reduce area pack completeness, and improve that the colliery strata movement of coal recovery rate controls " adopt-
Fill-stay " coupling harmonic extraction method.
The present invention is achieved through the following technical solutions: the control of colliery strata movement " adopt-fill-stay " coupling harmonic extraction side
Method, is divided into m production unit by mine district, and m is positive integer;The exploitation of production unit is divided into unilateral filling and bilateral filling
Both of which, each production unit carries out reserved coal pillar, part filling and the cooperative type filling mining of partial mining, sets to stay
Coal column is core, makes coal column, obturator and is caving body coordination support top covering rockmass, controlling the movement and deformation value of rock stratum and earth's surface.
The strata movement control of above-mentioned colliery " adopt-fill-stay " coupling harmonic extraction method, according to unilateral filling model, often
Individual production unit all uses unilateral fill pattern to exploit: unilateral filling model is in reserved coal pillar side, is sequentially arranged one
Individual filling operation face and a not filling operation face;First fill in the cut and fill cellular zone of n-th production unit
Fill out working face extraction and filling forms obturator;Then the whole caving method production unit districts in n-th production unit are carried out not
The back production of filling operation face, forms goaf, and n is positive integer and n less than or equal to m;The coal column of adjacent two production unit with adopt
Dead zone is adjacent.
The strata movement control of above-mentioned colliery " adopt-fill-stay " coupling harmonic extraction method, according to bilateral filling model, often
Individual production unit uses bilateral fill pattern to exploit, and bilateral filling model is to lay one successively in the side of reserved coal pillar
Filling operation face and a not filling operation face, and lay another filling operation face at the opposite side staying the coal column set;First
In the cut and fill cellular zone of n-th production unit, carry out the back production of filling operation face and filling forms obturator;Then exist
Whole caving method production unit districts of n-th production unit carry out the back production of not filling operation face, form goaf, and n is the most whole
Number and n are less than or equal to m;Adjacent two production unit use obturator adjacent with goaf.
The strata movement control of above-mentioned colliery " adopt-fill-stay " coupling harmonic extraction method, in whole mine district, one
The coal column of point production unit only has obturator, the both sides of the coal column of another part production unit all to have obturator in side;Adjacent
Two production unit use obturator adjacent with goaf or use coal column adjacent with goaf.
The strata movement control of above-mentioned colliery " adopt-fill-stay " coupling harmonic extraction method, filling operation face and not stower
Make face to merge, back production simultaneously.
It needs to be noted: the width of reserved coal pillar can be determined by basicly stable requirement, filling operation face, not filling
Face width, can be determined by sub-extraction or the most insufficient requirement according to concrete geological mining condition;This is to this area skill
It is common knowledge for art personnel, needn't elaborate any further at this.
This invention provides the benefit that: the control of colliery of the present invention strata movement " adopt-fill-stay " coupling harmonic extraction side
Method is particularly well-suited under buildings or structures and water body, low-angle dip or nearly level and directly top are more complete, overlying strata lithology in being hard or
The seam mining of competent bed.Seam mining takes " fender+two (singly) filling face, side+two (singly) side extreme astatic
Face ".Control overlying mining rock is caving scope, thus reduces movement and deformation of overburden strata degree, reaches the most controllably table movement and deformation, can carry again
The purpose of high resource recovery.
Colliery of the present invention strata movement control " adopt-fill-stay " coupling harmonic extraction method, by reducing reserved coal pillar width
Degree improves resource recovery, utilizes obturator filling to adopt space to reduce, and makes key stratum displacement and deformation in overlying rock send out
The space of exhibition reduces, and jointly supports the pressure of overlying key stratum with fender, plays auxiliary supporting role, and to coal (rock) body and
Roof and floor country rock provides certain resistance, and (it is to cause to cover that stress is concentrated to slow down the stress concentration phenomenon in coal column and key stratum
Rock deformation and destruction cause the basic reason that ground is damaged) so that obturator and Pillar load support propping up of key stratum jointly
Support body system, plays the effect reducing surface movement and deformation;On the other hand obturator produces lateral pressure to fender, makes fender
It is in two-way or three-dimensional stress state, improves the country rock situation of fender, improve the ability of its resistance to deformation so that it is have relatively
Good integrity and stability.
The Striping noise generally used, coal column both sides are goaf, and coal column is in pure stress or two-dimensional state of stress, adopts
At dead zone, top board is by the bigger movement and deformation of scope.Apply that colliery of the present invention strata movement controls " adopt-fill-stay " coupling association
Tune to open mining method to reduce strip coal pillar and stay and set width, and can the deformation range of effective controlroof, it is ensured that main in overlying strata
Key stratum is the most disrumpent feelings and steady in a long-term, can reach to reduce the extension from the bottom to top of top board movement and deformation, make earth's surface not by or be subject to
To less mining effect.
The present invention is compared with Striping noise, and the stress state improving coal column is filled in coal column side, improves recovery ratio.With entirely adopt
Entirely fill and compare, decrease charging quantity, but enhance the support strength of obturator and coal column, improve CONTROL OF STRATA MOVEMENT effect, save
Cost.
Accompanying drawing explanation
Fig. 1 a is the profile of bank;
Fig. 1 a ' is that " adopt-fill-stay " the coupling harmonic extraction method using that colliery of the present invention strata movement controls is in Fig. 1 a institute
Show the coal column mined bank unilateral " adopt-fill-stay " exploitation plane graph;
Fig. 1 b is the profile of another bank;
Fig. 1 b ' is the strata movement control of employing colliery of the present invention " adopt-fill-stay " couple harmonic extraction method at Fig. 1 b '
Shown in coal column both sides " adopt-fill-stay " the exploitation plane graph mined of bank;
D adopts-uses the conventional exploitation work surface of whole caving method exploitation;
D fills-uses the work surface of whole cut and fill;
D Liu-stay the fender supporting overlying rock set;
" adopt-fill-stay " coupling harmonic extraction method that Fig. 1 c controls for colliery of the present invention strata movement is in part of coal
Post unilateral " adopt-fill-stay " exploitation and the plane graph exploited at another part coal column bilateral " adopt-fill-stay ".
Fig. 2 a-2d is certain ore mining, and with " adopt-fill-stay ", harmonic extraction is adopted entirely with whole caving methods, whole filling method is opened in coupling
Adopting surface movement and deformation curve comparison diagram, wherein: Fig. 2 a is surface subsidence comparison diagram, Fig. 2 b is that earth's surface tilts comparison diagram, Fig. 2 c
Moving horizontally comparison diagram for earth's surface, Fig. 2 d is earth's surface horizontal deformation contrast figure.
Fig. 3 a-3e is that destruction of surface grade cloud atlas is exploited, wherein in subregion, head exploiting field, certain ore deposit: Fig. 3 a is " adopt-fill-stay "
Unilateral placement method exploitation destruction of surface grade cloud atlas is coordinated in coupling, and Fig. 3 a-1 is black after WORD picture instrument processes of Fig. 3 a
Bai Tu;Fig. 3 b coordinates bilateral placement method exploitation destruction of surface grade cloud atlas for " adopt-fill-stay " coupling, and Fig. 3 b-1 is Fig. 3 b warp
Artwork master after the process of WORD picture instrument;Fig. 3 c is whole caving method management top board routine exploitation destruction of surface grade cloud atlas,
Fig. 3 c-1 is Fig. 3 c artwork master after WORD picture instrument processes;Fig. 3 d is that whole filling method adopts rear destruction of surface grade cloud entirely
Figure, Fig. 3 d-1 is Fig. 3 d artwork master after WORD picture instrument processes;Fig. 3 e is destruction of surface grade cloud atlas after Striping noise,
Fig. 3 e-1 is Fig. 3 e artwork master after WORD picture instrument processes.
In figure: 1-mine district, n-n-th production unit, the N+1 production unit of n+1-;N+2-the N+2 exploits single
Unit;The N+3 production unit of n+3-;MZ-coal column;CTT-obturator;CKQ-goaf.In Fig. 3 a-3e: " white space " represents
Full mining face, " blank space is filled with stain region " represents filling operation face, and " black region " represents reserved coal pillar, " blue
Region " represent I level destruction (the slightest), " yellow area " represents I level and destroys (slightly), and " green area " represents II level and destroy.
Detailed description of the invention
Below by example, the present invention is described in further detail.
Embodiment 1
As shown in Fig. 1 a and Fig. 1 a ', the control of the present embodiment colliery strata movement " adopt-fill-stay " coupling harmonic extraction side
Method, is divided into m production unit by mine district 1, and m is positive integer;Each production unit all uses unilateral fill pattern to carry out
Exploitation: unilateral filling model is in reserved coal pillar MZ side, is sequentially arranged a filling operation face and a not filling operation face;
First in the cut and fill cellular zone of n-th production unit n, carry out the back production of filling operation face and filling forms obturator
CTT;Then the whole caving method production unit districts in n-th production unit n carry out the back production of not filling operation face, form goaf
CKQ, n are positive integer and m less than or equal to n;The coal column MZ of adjacent two production unit is adjacent with goaf CKQ.Set to stay
Coal column MZ is core, makes coal column MZ, obturator CTT and is caving body coordination support top covering rockmass, carrying out the movement of rock stratum and earth's surface
Deformation values controls.
Embodiment 2
As shown in Fig. 1 b and Fig. 1 b ', the control of the present embodiment colliery strata movement " adopt-fill-stay " coupling harmonic extraction side
Method, is divided into m production unit by mine district 1, and m is positive integer;Each production unit uses bilateral fill pattern to open
Adopting, bilateral filling model is to lay a filling operation face and a not filling operation face successively in the side of reserved coal pillar MZ,
And lay another filling operation face at the opposite side staying the coal column MZ set;First in the cut and fill of n-th production unit n
Carry out the back production of filling operation face in cellular zone and filling forms obturator CTT;Then it is caving the whole of n-th production unit n
Method production unit district carries out the back production of not filling operation face, forms goaf CKQ, n and is positive integer and n less than or equal to m;Adjacent two
Individual production unit uses obturator CTT adjacent with goaf CKQ.
Embodiment 3
As illustrated in figure 1 c, the control of the present embodiment colliery strata movement " adopt-fill-stay " coupling harmonic extraction method, by coal
Ore mining district 1 is divided into m production unit, and m is positive integer;In whole mine district 1, the coal column MZ of a part of production unit is only
Have obturator CTT in side, all there is obturator CTT the both sides of the coal column MZ of another part production unit;Adjacent two exploitations are single
Unit uses obturator CTT adjacent with goaf CKQ or uses coal column MZ adjacent with goaf CKQ.First single in n-th exploitation
Carry out the back production of filling operation face in the cut and fill cellular zone of unit n and filling forms obturator CTT;Then exploit in n-th
Whole caving method production unit districts of unit n carry out the back production of not filling operation face, form goaf CKQ, n and are positive integer and n
Less than or equal to m.
Embodiment 4
Certain exploiting field, ore deposit one is positioned at northeast, field with "nine squares", and coal measure strata is Shanxi group and Taiyuan Forma-tion, and seam inclination is 10 °, averagely
Coal thickness 2.7m, this district's ground even, absolute altitude about+46m, down-hole coal bed absolute altitude-550~-850m, the generally middle hard rock of overlying strata
Property, overlying rock has the packsand rock stratum of a thickness about 50m, for Chief layer in overlying strata.
Fig. 2 a-2d is certain ore mining with " adopt-fill-stay " coupling harmonic extraction and full extraction, whole filling (solid filling)
Surface movement and deformation curve comparison diagram after method exploitation.
Developed and at this patent before the applying date of present patent application by utilizing present patent application inventor to wear Huayang
" inclined seam subsidence prediction the analyzes system " simulation published before the applying date of application calculates, can by Fig. 2 a
To find out, Striping noise earth's surface maximum sinking value is minimum, entirely adopts method surface subsidence value maximum, " adopt-fill-stay " coupling harmonic extraction
The earth's surface maximum sinking value of method differs less with filling mining, and effectiveness of reducing subsidence is essentially identical.
By Fig. 2 b it can be seen that each recovery method is compared, the earth's surface inclination and distortion maximum of Striping noise is minimum, Quan Caifa
Maximum, but the coverage of the inclination and distortion higher value of " adopt-fill-stay " coupling harmonic extraction method is compared with filling and the impact of entirely adopting method
Scope is little, and inclination and distortion value is less with filling method difference.
By Fig. 2 c it can be seen that the maximum moved horizontally of Striping noise is minimum, method of entirely adopting is maximum, " adopt-fill-stay " coupling
Close harmonic extraction and differ less with filling mining horizontal movement value.
By Fig. 2 d it can be seen that the maximum of the earth's surface horizontal distortion of Striping noise is minimum, method of entirely adopting is maximum, " adopt-fill-
Stay " coupling harmonic extraction horizontal distortion maximum essentially identical with whole filling methods, the coverage of higher value is relatively concentrated.
From accompanying drawing 3a~3e, entirely adopt method earth's surface buildings or structures damaged condition up to II level, Striping noise I level with
In, " adopt-fill-stay " coupling harmonic extraction is identical with filling mining, and damaged condition major part is I level, and respective regions reaches II level
Damage.
In a word, comparing and entirely adopt method, the extent of damage on " adopt-fill-stay " coupling harmonic extraction earth's surface alleviates, under earth's surface significantly
Heavy amount is obviously reduced;Compared with Striping noise, resource recovery is greatly improved, in sample calculation the rate of extraction of band less than
40%, " adopt-fill-stay " couple the harmonic extraction response rate more than 70%;Compared with entirely adopting the filling mining entirely filled, " adopt-fill-stay "
The coupling sinking on harmonic extraction earth's surface and movement and deformation and basically identical to the damaged condition of surface buildings, but " adopt-
Fill-stay " coupling harmonic extraction filler demand greatly reduce, filling cost is substantially reduced, and working face extraction efficiency is big
Big raising.As can be seen here, enterprise higher at earth's surface phreatic table be difficult to bear relatively high investment cost, resource recovery requirement high,
Table destroys the higher mining area of class requirement, and " adopt-fill-stay " the coupling harmonic extraction method using that colliery strata movement controls both may be used
Meeting underground mining requirement, can reduce again earth's surface buildings or structures adopts damage.
The present invention according to " production face is the most insufficient+obturator combines roof supporting+top board main key stratum and do not breaks with coal column
Disconnected " principle, take into account under conditions of unconsolidated formation adjusts and absorb that key stratum is disrumpent feelings and cause Discontinuous Deformation ability, design fender,
Filling operation face and the size of exploitation work surface.
Being applicable under buildings or structures and water body, low-angle dip or nearly level and directly top are more complete, overlying strata lithology is hard in being
Or the seam mining of competent bed.Seam mining takes double (singly) side of reserved coal pillar to carry out filling mining, at another of filling face
Side uses the mode of routine exploitation, carries out reserved coal pillar, filling and conventional exploitation successively;Obturator reduces the sky that overlying strata move down
Between, jointly support roof and floor pressure with reserved coal pillar, thus slow down the stress concentration phenomenon in key stratum and coal column;Additionally, fill
Fill out body and be positioned at coal column side or bilateral, to coal column produce lateral pressure, make coal column be in two to or three-dimensional stress state, change
The country rock situation of coal column, improves coal column bearing capacity, makes coal column have preferable integrity, globality and stability, thus has
Effect slow down the stress concentration phenomenon in key stratum, controls moving and being caving scope of overlying strata, greatly reduces opening of earth's surface
Adopt the extent of damage, improve resource recovery.Owing to key stratum is effectively supported, the most disrumpent feelings and can maintain a long-term stability
Property, make key stratum overlying rock and unconsolidated formation move and synchronizing moving with key stratum bending, thus play and slow down surface subsidence and change
The effect of shape.
It addition, in embodiment 1 to embodiment 3, it is also possible to take filling operation face and not filling operation face to merge, simultaneously
Back production.
Claims (2)
1. " adopt-fill-stay " coupling harmonic extraction method that colliery strata movement controls, it is characterised in that mine district (1) is drawn
Being divided into m production unit, m is positive integer;The exploitation of production unit is bilateral filling model, and each production unit is carried out to stay and set coal
The cooperative type filling mining of post, part filling and partial mining, to stay the coal column set as core, makes coal column, obturator and is caving
Body is coordinated to support top covering rockmass, controls the movement and deformation value of rock stratum and earth's surface;
According to bilateral filling model, each production unit uses bilateral fill pattern to exploit: staying the coal column (MZ) that sets
Side lays a filling operation face and a not filling operation face successively, and lays another at the opposite side of reserved coal pillar (MZ)
Individual filling operation face;First in the cut and fill cellular zone of n-th production unit (n), carry out the back production of filling operation face and fill
Fill out formation obturator (CTT);Then the whole caving method production unit districts in n-th production unit (n) carry out not filling operation
Face back production, forms goaf (CKQ), and N is positive integer and N less than or equal to m;Adjacent two production unit use obturator
(CTT) adjacent with goaf (CKQ).
Colliery the most according to claim 1 strata movement control " adopt-fill-stay " coupling harmonic extraction method, its feature
Being, filling operation face and not filling operation face merge, back production simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310304267.5A CN103437765B (en) | 2013-07-19 | " adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310304267.5A CN103437765B (en) | 2013-07-19 | " adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103437765A CN103437765A (en) | 2013-12-11 |
CN103437765B true CN103437765B (en) | 2016-11-30 |
Family
ID=
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1963149A (en) * | 2006-11-17 | 2007-05-16 | 中国矿业大学 | Mining method for replacement of banded coal under building by waste rock |
CN101660410A (en) * | 2008-11-03 | 2010-03-03 | 侯忠杰 | Long wall alternate type coal mining method |
CN102011588A (en) * | 2010-11-30 | 2011-04-13 | 淄博市王庄煤矿 | House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock |
CN102678121A (en) * | 2012-05-21 | 2012-09-19 | 山东黄金矿业(莱州)有限公司三山岛金矿 | Layered top-controlling filling mining method for residual ores in deep hole in diskless area |
CN102877848A (en) * | 2012-09-26 | 2013-01-16 | 山东科技大学 | Method for performing coal mining and gangue cementation stripe filling simultaneously |
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1963149A (en) * | 2006-11-17 | 2007-05-16 | 中国矿业大学 | Mining method for replacement of banded coal under building by waste rock |
CN101660410A (en) * | 2008-11-03 | 2010-03-03 | 侯忠杰 | Long wall alternate type coal mining method |
CN102011588A (en) * | 2010-11-30 | 2011-04-13 | 淄博市王庄煤矿 | House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock |
CN102678121A (en) * | 2012-05-21 | 2012-09-19 | 山东黄金矿业(莱州)有限公司三山岛金矿 | Layered top-controlling filling mining method for residual ores in deep hole in diskless area |
CN102877848A (en) * | 2012-09-26 | 2013-01-16 | 山东科技大学 | Method for performing coal mining and gangue cementation stripe filling simultaneously |
Non-Patent Citations (1)
Title |
---|
浅埋煤层柔性条带充填保水开采基础研究;李亮;《中国优秀硕士学位论文全文数据库 工程科技I辑》;20130215;第28页至第30页 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103902780B (en) | Solid filling coal mining earth's surface Deformation prediction method | |
CN104775816B (en) | Isolated grouting-filling mining method for overburden rock without village migration under cut-side local pressed-coal conditions | |
AU2015345830B2 (en) | Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence | |
CN105971606B (en) | A kind of thick sandstone coal wall recovery method | |
CN108194088A (en) | A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion | |
CN106150546B (en) | A kind of method that the filling of goaf part is carried out according to earth's surface subsidence | |
CN106014410A (en) | Filling mining method for downward access part | |
CN105422099A (en) | Method for completely filling two sides of pillars with repeated mining and residual mining area remaining coal pillars | |
CN103939137B (en) | The drift-sand barnyard placement method of western desertification mining area shallow buried coal seam | |
CN103628876B (en) | Across the exploiting field block formula tendency band harmonic extraction method in half-edge coal seam deep | |
CN109117589A (en) | A kind of quantitative description method of roof crack field | |
CN107559008A (en) | A kind of method combined second mining super high seam and stop adopting line coal column | |
CN106761750B (en) | Slot type recovery method is built in the longwell plane milling of half-edge coal seam longitudinal direction | |
CN107339105A (en) | A kind of method for being layered the residual exploiting field of paste body filling second mining super high seam and stopping adopting line coal column | |
CN102102518B (en) | Top coal caving coordinated mining method for thick coal seam under dam body of reservoir | |
CN102678119A (en) | High-efficiency filling mining method for controlling rock mass movement | |
CN106401609A (en) | Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure | |
CN102226412A (en) | Underground dark mining drilling well gas extraction method | |
CN102777205A (en) | Method for determining spatial position of horizontal well for gas drainage in worked-out area | |
CN103437765B (en) | " adopt to fill and stay " coupling harmonic extraction method that colliery strata movement controls | |
CN203570313U (en) | Double-alley chain type stoping and filling arrangement structure | |
Slashchova | Water effect on the rocks and mine roadways stability | |
CN209483345U (en) | A kind of face in steep thick coal seam Multi sectional protects lane without coal column staggered floor | |
CN114017103A (en) | Longwall roadway-by-roadway cemented filling coal face parameter design method | |
CN104632222B (en) | A kind of breaking ore body stoping method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |