CN103437558B - A kind of construction method preventing resonance damage - Google Patents

A kind of construction method preventing resonance damage Download PDF

Info

Publication number
CN103437558B
CN103437558B CN201310376455.9A CN201310376455A CN103437558B CN 103437558 B CN103437558 B CN 103437558B CN 201310376455 A CN201310376455 A CN 201310376455A CN 103437558 B CN103437558 B CN 103437558B
Authority
CN
China
Prior art keywords
floor
arch
column
support
beam forms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310376455.9A
Other languages
Chinese (zh)
Other versions
CN103437558A (en
Inventor
饶友平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Transmission and Transformation Engineering Corp
Original Assignee
State Grid Corp of China SGCC
Tianjin Electric Power Transmission and Transformation Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tianjin Electric Power Transmission and Transformation Engineering Corp filed Critical State Grid Corp of China SGCC
Priority to CN201310376455.9A priority Critical patent/CN103437558B/en
Publication of CN103437558A publication Critical patent/CN103437558A/en
Application granted granted Critical
Publication of CN103437558B publication Critical patent/CN103437558B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of construction method preventing resonance damage, external scaffolding is built on the outer ground of floor, internal vertical support, beam forms support and form bracing is built between floor, above-mentioned external scaffolding, vertical support, beam forms support and form bracing forms Integral net shaped bracing frame jointly, arch reticular supporting structure is built between the upper and lower floor plate of Integral net shaped bracing frame, this arch reticular supporting structure is supported by multiple skewed horizontal load frame that can regulate, and the two ends of multiple skewed horizontal load frame are arranged on the column at adjacent or diagonal angle respectively.The netted support system of overall arch of the present invention constructs, dismounting is simple, uniform force, be adapted at cast-in-situ concrete beam, plate, post prop up in die process and apply, by the construction quality obviously promoted, enhance productivity, have good effect in practical and economically.

Description

A kind of construction method preventing resonance damage
Technical field
The invention belongs to construction techniques field, especially a kind of construction method preventing resonance damage.
Background technology
At present, during electricity grid substation based on cast-in-place concrete construction and ancillary facility construction, National urban building are built, under existing construction technology, after Lou Liang, floor complete structure construction, there is the phenomenon of the microcrack of not intervisibility, infiltration in the beam of discovery cast-in-situ concrete, flooring, floor can occur damaging crack because of resonance sometimes.
The appearance analyzing these problems after deliberation is mainly subject to resonant enhance, in the construction of current floor, the method supporting slab form is lower floor, multi-layer scaffold supports floor slab construction method, the anti-resonance vibration performance indications of floor and construction carry out designing according to the load-bearing conditions after having built, but, in work progress, the personnel of working face walk about, placing of material, crane hangs thing pounds pressure floor, uneven cast, the situation vertical motion processes such as template deformation can cause the passive floor of lower floor to produce resonance effects, to the floor of this lower floor, there is certain destruction, resonance damage can be produced to floor, the resonance damage in work progress effectively cannot be resisted in current construction technology.
Through retrieval, find following Patents document.
A kind of construction method (CN101985847B) preventing insulating layer of external wall from ftractureing, working procedure is: check basal plane and process, afterwards bonding and thermal insulation plate; Basal plane is criticized and scrapes lightweight protective slurry; Setting-out on batch lightweight protective slurry scraped, by surperficial zoning; Lay alkali resistant glass fibre open weave cloth, alkali resistant glass fibre open weave cloth is criticized and scrapes the high-elastic anti-cracking waterproof putty of lightweight; Criticize and scrape polishing cover putty layer, batch polishing cover putty layer of scraping is polished and maintenance; Spray paint and flexible fluorine carbon finishing paint three layers of coating in flexible fluorine carbon priming paint, flexible fluorine carbon successively; Lattice divides, with each lattice for unit is painted; Repair, clear up.The invention also discloses a kind of elastic composite Anti-crack F-carbon coating, be made up of insulation layer, elastic composite crack-resistant layer and elastic fluorocarbon paint finish coat.Solve the problem that existing insulating layer of external wall occurs cracking, hollowing, peels off.
Through contrast, there is relatively big difference in the technical scheme of above patent and present patent application.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art part, provide a kind of and prevent the construction method damaged that resonates, avoid resonance to produce damaging slight crack, improve building operations efficiency, support system dismounting is simple, uniform force.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of construction method preventing resonance damage, external scaffolding is built on the outer ground of floor, between floor, build internal vertical support, beam forms supports and form bracing, above-mentioned external scaffolding, vertical support, beam forms supports and form bracing forms Integral net shaped bracing frame jointly, it is characterized in that: upper at Integral net shaped bracing frame, arch reticular supporting structure is built between lower floor's floor, this arch reticular supporting structure is supported by multiple skewed horizontal load frame that can regulate, the two ends of multiple skewed horizontal load frame are arranged on the column at adjacent or diagonal angle respectively.
And, described Integral net shaped bracing frame comprises upper strata floor, lower floor's floor, column, crossbeam, beam forms support, form bracing, external scaffolding, multiple column is arranged at intervals with between upper strata floor and lower floor's floor, floor lower end, upper strata level between column is fixed with the crossbeam for strengthening floor intensity, crossbeam lower end is provided with many beam forms uniformly at intervals and supports, and the lower end of upper strata floor is provided with many form bracings uniformly at intervals; Described many beam forms support is all provided with internal vertical with form bracing lower end and supports, and internal vertical support and connection are erected at the external scaffolding of building external.
And, described skewed horizontal load frame comprises plane adjustable truss, template clamp and arch support pipe, be provided with plane adjustable truss between adjacent upright posts, these plane adjustable truss two ends are all fixed with one and are shaped with the template clamp of metal half-rings structure and are fixed on column by this template clamp; The template clamp at plane adjustable truss two ends is provided with an arch support pipe, arch support pipe is arranged on above plane adjustable truss.
Advantage of the present invention and good effect are:
1, the object of the invention is under existing construction technology, execution conditions, consider that natural frequency is under the prerequisite of the harm probability increase of building, set up the netted support system of overall arch that a shape is suspended from floor, top surface of the beam, completely avoid construction cast-in-situ concrete beam, cause beam to lower floor in the whole operation of plate, the resonance infringement of floor, avoid the damaging crack because resonance produces.
2, present invention enhances the cross binding power to column template, effectively prevent the generation of column ' bulge ' phenomenon, because flooring end face, top surface of the beam directly do not support obstruction, on the basis considering natural frequency, safe construction, the work of other operations can be carried out in this scope of operation, improve construction efficiency.
3, striking time of the present invention precisely can be grasped by Design of Construction Organization, eliminates Multi-layer supporting, makes support component, template have enough to meet the need utilization rate and accelerates; Described arch reticular supporting structure is suspended from the construction space formed between upper strata floor, lower floor's floor, column and crossbeam, and arch reticular supporting structure and external scaffolding, internal vertical support, beam forms supports and form bracing connects to form Integral net shaped braced structures.
4, construction method of the present invention structure rationally, dismounting is simple, uniform force, is adapted at cast-in-situ concrete beam, plate, post prop up in die process and apply, will obviously promote construction quality, enhance productivity, have good effect in practical and economically.
Accompanying drawing explanation
Fig. 1 is braced system constructing structure schematic diagram of the present invention;
Fig. 2 is floor of the present invention, back supports and combines braced structures schematic diagram with outer eaves external scaffolding.
Detailed description of the invention
Below in conjunction with accompanying drawing, also by specific embodiment, the invention will be further described, and following examples are descriptive, are not determinate, can not limit protection scope of the present invention with this.
A kind of construction method preventing resonance damage, outside building, external scaffolding is built on ground, internal vertical support, beam forms support and form bracing is built between floor, above-mentioned external scaffolding, vertical support, beam forms support and form bracing forms Integral net shaped bracing frame jointly, and innovative point of the present invention is:
Arch reticular supporting structure is built between the upper and lower floor plate of Integral net shaped bracing frame, this arch reticular supporting structure is supported by multiple skewed horizontal load frame that can regulate, and multiple skewed horizontal load frame is arranged between adjacent column or between the column at diagonal angle respectively successively.
Carry out reasonable arrangement according to place, job site situation, by skewed horizontal load frame in a ground assembling part, the scope of operation can be lifted into and be arranged on corresponding column or sleeper, also can assemble in the scope of operation completely; In order to strengthen structural rigidity, be convenient to lifting, dismounting, can be independent making, reuse, also can on the stressed permission basis of calculating, arch reticular supporting structure is formed completely with scaffold lapping, this arch support pipe can be special according to force-bearing situation, also can meet direct use shelf pipe under force-bearing situation.
The braced structures embodiment schematic diagram that above-mentioned construction method adopts, as shown in accompanying drawing 1 to 2, comprise upper strata floor 5, lower floor's floor 8, column 9, crossbeam 2, beam forms support 3, form bracing 6, external scaffolding 1, one deck building structure in construction as shown in drawings is example, multiple column is arranged at intervals with between upper strata floor and lower floor's floor, floor lower end, upper strata level between column is fixed with the crossbeam for strengthening floor intensity, crossbeam lower end is provided with many beam forms uniformly at intervals and supports, and the lower end of upper strata floor is provided with many form bracings uniformly at intervals; Described many beam forms support is all provided with internal vertical with form bracing lower end and supports 4, and internal vertical support and connection are erected at the external scaffolding 1 of building external, external scaffolding, internal vertical support, beam forms supports and form bracing connects into overall mesh-supported system; Be provided with multiple adjustable skewed horizontal load frame 7 between described column, the plurality of skewed horizontal load frame forms arch reticular supporting structure.
For parallel four pillar constructions, practical structures central post may be sleeper, arch reticular supporting structure comprises the multiple skewed horizontal load framves be arranged between adjacent upright posts, skewed horizontal load frame comprises plane adjustable truss 11, template clamp 14 and arch support pipe 10, the plane adjustable truss that length can regulate is installed between adjacent upright posts, these plane adjustable truss two ends are all fixed with one and are shaped with the template clamp of metal half-rings structure and are fixed on the side of column by this template clamp, strengthen the cross binding power to column template, effectively prevent the generation of column ' bulge ', the template clamp at plane adjustable truss two ends is provided with an arch support pipe, arch support pipe is arranged on above plane adjustable truss, skewed horizontal load frame is installed between the column at diagonal angle, ensures support force.
This overall arch reticular supporting structure makes Form beam, plate supports the feature with unsettled property, except internal vertical supports and upper strata floor, lower floor's floor has contact, can not by vertical force under the effect of arch support structures, the parts of other braced structuress all not with the crossbeam of level, upper strata floor, lower floor's floor contacts, eliminate at beam, because shuttering supporting conduction Construction Vibration problem in plate cast-in-place concrete operation side, and can at crossbeam, floorslab concrete formwork, build in link the direct conduction avoiding vertical motion, thus to avoid in conduction construction works the natural frequency of floor to crossbeam, upper strata floor, the infringement of lower floor's floor, avoid the damaging crack because resonance produces.

Claims (1)

1. one kind prevents the construction method damaged that resonates, external scaffolding is built on the outer ground of floor, between floor, build internal vertical support, beam forms supports and form bracing, above-mentioned external scaffolding, internal vertical supports, beam forms supports and form bracing forms Integral net shaped bracing frame jointly, it is characterized in that: upper at Integral net shaped bracing frame, arch reticular supporting structure is built between lower floor's floor, this arch reticular supporting structure is supported by multiple skewed horizontal load frame that can regulate, the two ends of multiple skewed horizontal load frame are arranged on the column at adjacent or diagonal angle respectively,
Described Integral net shaped bracing frame comprises upper strata floor, lower floor's floor, column, crossbeam, beam forms support, form bracing, external scaffolding, multiple column is arranged at intervals with between upper strata floor and lower floor's floor, floor lower end, upper strata level between column is fixed with the crossbeam for strengthening floor intensity, crossbeam lower end is provided with many beam forms uniformly at intervals and supports, and the lower end of upper strata floor is provided with many form bracings uniformly at intervals; Described many beam forms support is all provided with internal vertical with form bracing lower end and supports, and internal vertical support and connection are erected at the external scaffolding of building external;
Described skewed horizontal load frame comprises plane adjustable truss, template clamp and arch support pipe, be provided with plane adjustable truss between adjacent upright posts, these plane adjustable truss two ends are all fixed with one and are shaped with the template clamp of metal half-rings structure and are fixed on column by this template clamp; The template clamp at plane adjustable truss two ends is provided with an arch support pipe, arch support pipe is arranged on above plane adjustable truss.
CN201310376455.9A 2013-08-26 2013-08-26 A kind of construction method preventing resonance damage Active CN103437558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310376455.9A CN103437558B (en) 2013-08-26 2013-08-26 A kind of construction method preventing resonance damage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310376455.9A CN103437558B (en) 2013-08-26 2013-08-26 A kind of construction method preventing resonance damage

Publications (2)

Publication Number Publication Date
CN103437558A CN103437558A (en) 2013-12-11
CN103437558B true CN103437558B (en) 2015-09-30

Family

ID=49691265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310376455.9A Active CN103437558B (en) 2013-08-26 2013-08-26 A kind of construction method preventing resonance damage

Country Status (1)

Country Link
CN (1) CN103437558B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87106812A (en) * 1987-10-14 1988-06-01 阎石钤 Hollow cylinder arch roof and the anti-thrust structure of high pivot point thereof
CN88201993U (en) * 1988-03-17 1988-12-21 重庆第三建筑工程公司 Steel tube form
JP2004232250A (en) * 2003-01-29 2004-08-19 Shiyousuke Maruyama Air roof apparatus
WO2007040412A3 (en) * 2005-10-05 2007-11-08 Craig Wallace Lonsdale Suspended concrete floor
CN201202272Y (en) * 2008-06-06 2009-03-04 中冶天工建设有限公司 Rapid replacement formwork for tall building construction
CN102444203A (en) * 2011-09-15 2012-05-09 浙江城建建设集团有限公司 High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN102535845A (en) * 2012-02-14 2012-07-04 浙江省建工集团有限责任公司 Construction method of bearing frame of corridor structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87106812A (en) * 1987-10-14 1988-06-01 阎石钤 Hollow cylinder arch roof and the anti-thrust structure of high pivot point thereof
CN88201993U (en) * 1988-03-17 1988-12-21 重庆第三建筑工程公司 Steel tube form
JP2004232250A (en) * 2003-01-29 2004-08-19 Shiyousuke Maruyama Air roof apparatus
WO2007040412A3 (en) * 2005-10-05 2007-11-08 Craig Wallace Lonsdale Suspended concrete floor
CN201202272Y (en) * 2008-06-06 2009-03-04 中冶天工建设有限公司 Rapid replacement formwork for tall building construction
CN102444203A (en) * 2011-09-15 2012-05-09 浙江城建建设集团有限公司 High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN102535845A (en) * 2012-02-14 2012-07-04 浙江省建工集团有限责任公司 Construction method of bearing frame of corridor structure

Also Published As

Publication number Publication date
CN103437558A (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN103696359B (en) A kind of prefabricated and cast-in-place bridge pier body structure of combining and construction method
CN203866966U (en) Novel assembly type frame core tube steel structure residential housing system
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN102704705A (en) Building long-stroke redescending-free multi-point synchronous jacking method
CN110042768A (en) Main beam double-section circulating construction method for composite beam cable-stayed bridge
CN204060020U (en) A kind of Reinforced Concrete Reinforcement structure
CN204001652U (en) The portable exterior wall operating platform of fabricated shear wall structure
CN105350559A (en) Construction method suitable for emery structural ground of large factory building
CN109162437B (en) Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN104060760A (en) Layered construction method for oversized concrete beam of structural transfer floor of high-rise building
CN109339479B (en) Internal replacement structure and method for existing reinforced concrete building
CN109113335A (en) Parapet falsework and construction method
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN103437558B (en) A kind of construction method preventing resonance damage
CN204919932U (en) Assemble integral non -reinforced concrete ribbed floor
CN202055502U (en) Basket-type operating platform for construction of high-rise building construction
CN104404883A (en) Inner working platform for rapid construction of bridge pier and construction method using inner working platform
CN215978575U (en) Safety protection system for dismantling reinforced concrete water tower in limited space
CN115726462A (en) Super high-rise core tube and steel structure flat layer construction method and temporary support frame
Kang et al. Strengthening double curved arch bridges by using extrados section augmentation method
CN110118014B (en) Exterior wall template system free of exterior scaffold and construction method thereof
CN210597020U (en) Construction support device and system
CN207727618U (en) Basement contignation template system for pit top-down
CN104963344A (en) Deep foundation pit underground construction method allowing concrete support removal and structure construction to be conducted simultaneously

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant