CN103422467B - Mucky soil filling bag embankment method - Google Patents

Mucky soil filling bag embankment method Download PDF

Info

Publication number
CN103422467B
CN103422467B CN201210153925.0A CN201210153925A CN103422467B CN 103422467 B CN103422467 B CN 103422467B CN 201210153925 A CN201210153925 A CN 201210153925A CN 103422467 B CN103422467 B CN 103422467B
Authority
CN
China
Prior art keywords
bag
laying
filling
construction
embankment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210153925.0A
Other languages
Chinese (zh)
Other versions
CN103422467A (en
Inventor
陈亚萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210153925.0A priority Critical patent/CN103422467B/en
Publication of CN103422467A publication Critical patent/CN103422467A/en
Application granted granted Critical
Publication of CN103422467B publication Critical patent/CN103422467B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The key technology that traditional mucky soil filling bag embankment needs solve is: one is the draining seepage paths shortening silt soil in bag, accelerates drainage rates, and two is that filling earth bag needs to increase build-in measure between layers.It is short that the technical program has bag draining seepage paths, band drain can effectively discharge many She moisture content in bag, bag and bag between because the fissure of displacement arranges mutual build-in, different laying methods can meet the different using function of dykes and dams, adopts special charging arrangement prodigiosin to meet the demand of construction.The technical program has started the new approach of mucky soil filling bag embankment; have broad application prospects in riverine, coastal land reclamation embankment and dam construction; compared with existing sand filling bag fill; cost can save more than 20%, and opens up a Tiao Xin road for riverine, coastal ecological environmental protection.

Description

Mucky soil filling bag embankment method
Technical field
The present invention relates to mucky soil filling bag embankment method
Background technology
In the existing design of land reclamation embankment, in construction technology, mucky soil filling bag embankment is the focus technology received much concern in land reclamation engineering field always, along with the active demand of industrial land, create the develop rapidly of coastal land reclamation industry, but owing to being subject to coastal sand, the restriction of the day by day deficient and ecological environmental protection of stone resource, traditional sand filling bag fill faces very large predicament, and it is riverine, the mucky soil that Coastal beach widely distributes can be used for filling bag embankment be always land reclamation industry try hard to for many years develop an important technology.
The general particle of mucky soil is comparatively thin, water content is higher, and longer between discharging consolidation after the fill of filling earth bag, filling earth bag easily slides between layers, and difficulty of construction is larger.
The key technology that traditional filling earth bag fill needs solve is: one is the draining seepage paths shortening mucky soil in bag, accelerate drainage rates, two is that filling earth bag increases build-in measure between layers, prevents bag from causing the slip between bag in the construction period because of the non-consolidation of mud.
Summary of the invention:
The technical issues that need to address of the present invention are to provide a kind of mucky soil filling bag embankment method, solve existing mucky soil filling bag embankment and exist in bag longer between native discharging consolidation, filling earth bag between layers easily slip wait technical barrier.
Technical scheme:
Technical solution of the present invention constructs drainage channel by the processing of bag, the construction method of fill, band drain, four parts such as construction equipment selection of fill form.
The selection of bag is characterized in that the woven cloth geotextile tube bag or (woven cloth+non-woven fabrics) the acupuncture Compound Fabric geotextile tube bag that adopt the production of geotextile manufacturer, splicing is made and is formed Contiuum type filled geotube one by one again, and the diameter of filled geotube is about 1.2 meters or 1.6 meters.
The construction method of fill is characterized in that the function played according to mucky soil filling bag embankment, generally have and longitudinally lay and laterally lay two kinds of construction technologies, longitudinally laying is by geotextile tube bag along dike axis direction laying construction, and laterally laying is perpendicular to dike axis direction laying construction by geotextile tube bag.
Band drain is constructed in seam road that drainage channel is characterized in that adopting plastic draining board to be laid on the splicing of every layer of geotextile tube bag and the joint of segmentation dike.
The construction equipment of fill is selected to it is characterized in that (1) longitudinal laying construction facility adopt dredge pump+high-pressure hydraulic pump to carry out mud excavation, carry, charge bag.(2) horizontal laying construction facility adopt dredge pump+high-pressure hydraulic pump+auxiliary to charge facility to carry out mud excavation, carry, charge bag.
It is short that the technical program has bag draining seepage paths, band drain can effectively discharge excessive moisture in bag, bag and bag between because the fissure of displacement arranges mutual build-in, different laying methods can meet the different using function of dykes and dams, adopts special charging arrangement prodigiosin to meet the demand of construction.
The technical program has started the new approach of mucky soil filling bag embankment; have broad application prospects in riverine, coastal land reclamation embankment and dam construction; compared with existing sand filling bag fill; cost can save more than 20%, and opens up a Tiao Xin road for riverine, coastal ecological environmental protection.
Accompanying drawing illustrates:
What accompanying drawing 1 represented is the processing of mucky soil filling bag embankment bag, plastic draining slab pavement method schematic diagram.
What accompanying drawing 2 represented is mucky soil filling bag embankment construction method schematic diagram
What accompanying drawing 3 represented is mucky soil filling bag embankment construction auxiliary machine tool schematic diagram.
Detailed description of the invention:
Accompanying drawing 1: the processing of bag is by the geotextile tube bag 1 be once made into, one by one geotextile tube bag is connected by splicing sewing line 2, plastic draining board 3 is laid in the seam road of every layer of geotextile tube bag splicing, need overlay plastic draining board 3 when laying along dike axis direction 4 (longitudinal direction) in the joint of segmentation dike.
Accompanying drawing 2: the longitudinal construction technology of fill is by geotextile tube bag 1 along dike axis direction 4 laying construction, the horizontal construction technology of fill is perpendicular to dike axis direction 4 laying construction by geotextile tube bag 1.
Accompanying drawing 3: fill construction auxiliary machine tool is that the mud of being discharged by mud pipe 1 flows into arm 2, through the fill of valve 3 filling geotextile tube bag.

Claims (2)

1. a mucky soil filling bag embankment method, is characterized in that: the method is made up of following steps:
(1) tubular bag sews up: adopt the geotextile tube bag be once made into splice one by one and make formation Contiuum type filled geotube, the diameter of filled geotube is 1.2 meters or 1.6 meters;
(2) tubular bag is laid: adopt longitudinally laying or horizontal laying method to lay tubular bag, wherein longitudinally laying is by geotextile tube bag along dike axis direction laying construction, and laterally laying is perpendicular to dike axis direction laying construction by geotextile tube bag;
(3) drainage channel is constructed: lay plastic draining board in the seam road that every layer of geotextile tube bag splice and the joint of segmentation dike, formation drainage channel;
(4) selecting construction equipment to carry out tubular bag filling: when longitudinally laying tubular bag, adopting dredge pump and high-pressure hydraulic pump to carry out mud excavation, carry and charge; When laterally laying tubular bag, adopting dredge pump, high-pressure hydraulic pump and auxiliaryly charging facility and carry out mud excavation, carry and charge.
2. method according to claim 1, is characterized in that: describedly auxiliary charge facility and be made up of mud pipe, arm and valve, and its filling and pouring method is that the mud of being discharged by mud pipe flows into arm, through the fill of valve filling geotextile tube bag.
CN201210153925.0A 2012-05-17 2012-05-17 Mucky soil filling bag embankment method Expired - Fee Related CN103422467B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210153925.0A CN103422467B (en) 2012-05-17 2012-05-17 Mucky soil filling bag embankment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210153925.0A CN103422467B (en) 2012-05-17 2012-05-17 Mucky soil filling bag embankment method

Publications (2)

Publication Number Publication Date
CN103422467A CN103422467A (en) 2013-12-04
CN103422467B true CN103422467B (en) 2015-09-09

Family

ID=49647816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210153925.0A Expired - Fee Related CN103422467B (en) 2012-05-17 2012-05-17 Mucky soil filling bag embankment method

Country Status (1)

Country Link
CN (1) CN103422467B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150649A (en) * 2021-12-23 2022-03-08 武汉大学 Annular cavity grid earthwork tube bag storage sludge retaining structure

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869149B (en) * 2017-01-12 2019-05-07 中交天航南方交通建设有限公司 A kind of debris dam water storage filling construction method for geotextile tube bag
CN109056762B (en) * 2018-08-28 2020-05-12 中交上海航道局有限公司 Construction method of sea island beach dike

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1209488A (en) * 1997-08-25 1999-03-03 江苏河海疏浚工程集团公司 Construction method for confferdam and dyke-dam
CN2706510Y (en) * 2004-04-05 2005-06-29 中港第一航务工程局第一工程公司 Solidified soil bag dyke core structure for coffer dyke and dam and bank revetment
CN1793516A (en) * 2005-12-31 2006-06-28 清华大学 Mould bag line curtain and method for preventing falldown of river bank
CN101016734A (en) * 2006-02-06 2007-08-15 中交上海航道勘察设计研究院有限公司 Back pressure curing method for soft soil filling bag diking
CN101357817A (en) * 2008-09-11 2009-02-04 中国科学院武汉岩土力学研究所 Stereoscopic network drainage for accelerating water drainage consolidation velocity of hydraulic mud fill sludge
CN102127908A (en) * 2011-04-18 2011-07-20 中交四航工程研究院有限公司 Method for quickly reinforcing ultra-soft soil foundation by using bagged sand cushion

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1209488A (en) * 1997-08-25 1999-03-03 江苏河海疏浚工程集团公司 Construction method for confferdam and dyke-dam
CN2706510Y (en) * 2004-04-05 2005-06-29 中港第一航务工程局第一工程公司 Solidified soil bag dyke core structure for coffer dyke and dam and bank revetment
CN1793516A (en) * 2005-12-31 2006-06-28 清华大学 Mould bag line curtain and method for preventing falldown of river bank
CN101016734A (en) * 2006-02-06 2007-08-15 中交上海航道勘察设计研究院有限公司 Back pressure curing method for soft soil filling bag diking
CN101357817A (en) * 2008-09-11 2009-02-04 中国科学院武汉岩土力学研究所 Stereoscopic network drainage for accelerating water drainage consolidation velocity of hydraulic mud fill sludge
CN102127908A (en) * 2011-04-18 2011-07-20 中交四航工程研究院有限公司 Method for quickly reinforcing ultra-soft soil foundation by using bagged sand cushion

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150649A (en) * 2021-12-23 2022-03-08 武汉大学 Annular cavity grid earthwork tube bag storage sludge retaining structure

Also Published As

Publication number Publication date
CN103422467A (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN102839630B (en) Construction method for embankment by using mucky soil filling bags
CN103031836B (en) A kind of method of building road on new hydraulically filled sludge ground fast
CN104153380B (en) A kind of antiseepage cofferdam structure and construction technology
Zhu et al. Vacuum preloading method for land reclamation using hydraulic filled slurry from the sea: a case study in coastal China
CN102966072B (en) Construction method for treating widened and heightened engineering joint surfaces of dikes on soft clay foundation
CN107780425A (en) A kind of large-scale yard drain french drain method to set up of banketing in Gullied Rolling Loess Region
CN103422467B (en) Mucky soil filling bag embankment method
CN103696416A (en) Novel foundation treatment method
CN112343003A (en) Reinforcing and seepage-proofing treatment method for ultra-shallow soil covering of river bed in tunnel underpass river construction
CN106498959A (en) Gutter for deep overburden
CN107419628A (en) A kind of construction method of the rapid build road on reclaimed ground
CN101831898B (en) Horizontal shallow layer negative-pressure consolidation working cushion layer technique
CN109235474B (en) Structure of super-large cofferdam based on marine environment and construction process thereof
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN104929141B (en) Town road passes through the construction method of river embankment or irrigation canals and ditches
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN105804045A (en) Equipment for strengthening deep soft soil foundation by vacuum preloading of filter well and method
CN106761914B (en) A kind of routed water water damage prevention and controls of shallow buried coal seam mine raceway groove flood
CN102704458A (en) Sand-free cushion layer vacuum-surcharge preloading reinforcement device and method for soft ground
CN102425179B (en) Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes
CN103276717A (en) Method for treating soft soil foundations with composite geotechnical synthetic material reinforced cushions
CN203057815U (en) Coastal saline-alkali soil greening alkali discharging system
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
CN213013736U (en) Reinforced riprap silt squeezing expansion roadbed
CN201580547U (en) Pontoon applicable to excavation operation on water surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

CF01 Termination of patent right due to non-payment of annual fee