CN103422437A - 波形钢腹板桥梁台阶式施工工艺 - Google Patents
波形钢腹板桥梁台阶式施工工艺 Download PDFInfo
- Publication number
- CN103422437A CN103422437A CN2013103063370A CN201310306337A CN103422437A CN 103422437 A CN103422437 A CN 103422437A CN 2013103063370 A CN2013103063370 A CN 2013103063370A CN 201310306337 A CN201310306337 A CN 201310306337A CN 103422437 A CN103422437 A CN 103422437A
- Authority
- CN
- China
- Prior art keywords
- sections
- wavelike steel
- steel webplate
- base plate
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310306337.0A CN103422437B (zh) | 2013-07-18 | 2013-07-18 | 波形钢腹板桥梁台阶式施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310306337.0A CN103422437B (zh) | 2013-07-18 | 2013-07-18 | 波形钢腹板桥梁台阶式施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103422437A true CN103422437A (zh) | 2013-12-04 |
CN103422437B CN103422437B (zh) | 2015-11-18 |
Family
ID=49647789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310306337.0A Active CN103422437B (zh) | 2013-07-18 | 2013-07-18 | 波形钢腹板桥梁台阶式施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103422437B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797659A (zh) * | 2019-03-21 | 2019-05-24 | 东南大学 | 一种波形钢腹板连续梁桥移动支架异步施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004116060A (ja) * | 2002-09-25 | 2004-04-15 | Sumitomo Mitsui Construction Co Ltd | 波形鋼板ウェブ橋の架設方法 |
JP2006118314A (ja) * | 2004-10-25 | 2006-05-11 | Ps Mitsubishi Construction Co Ltd | 波形鋼板ウエブ橋の架設方法 |
JP2006307575A (ja) * | 2005-04-28 | 2006-11-09 | Ps Mitsubishi Construction Co Ltd | 波形鋼板ウエブ橋の張出施工方法および架設作業車 |
JP2006316506A (ja) * | 2005-05-12 | 2006-11-24 | Sumitomo Mitsui Construction Co Ltd | 橋桁の構築方法 |
JP2007092313A (ja) * | 2005-09-27 | 2007-04-12 | Ps Mitsubishi Construction Co Ltd | Pc波形鋼板ウエブ箱桁の構築方法 |
-
2013
- 2013-07-18 CN CN201310306337.0A patent/CN103422437B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004116060A (ja) * | 2002-09-25 | 2004-04-15 | Sumitomo Mitsui Construction Co Ltd | 波形鋼板ウェブ橋の架設方法 |
JP2006118314A (ja) * | 2004-10-25 | 2006-05-11 | Ps Mitsubishi Construction Co Ltd | 波形鋼板ウエブ橋の架設方法 |
JP2006307575A (ja) * | 2005-04-28 | 2006-11-09 | Ps Mitsubishi Construction Co Ltd | 波形鋼板ウエブ橋の張出施工方法および架設作業車 |
JP2006316506A (ja) * | 2005-05-12 | 2006-11-24 | Sumitomo Mitsui Construction Co Ltd | 橋桁の構築方法 |
JP2007092313A (ja) * | 2005-09-27 | 2007-04-12 | Ps Mitsubishi Construction Co Ltd | Pc波形鋼板ウエブ箱桁の構築方法 |
Non-Patent Citations (1)
Title |
---|
董晓: "波形钢腹板连续刚构与PC连续刚构的对比研究", 《工程科技Ⅱ辑》, no. 12, 15 December 2010 (2010-12-15) * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797659A (zh) * | 2019-03-21 | 2019-05-24 | 东南大学 | 一种波形钢腹板连续梁桥移动支架异步施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103422437B (zh) | 2015-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108678417B (zh) | 一种钢结构楼板改造节点 | |
CN101457514A (zh) | 一种斜拉桥的施工方法 | |
CN109629461A (zh) | 一种不断交进行现浇箱梁复位及支座更换的方法 | |
CN103966947B (zh) | 一种基于桥梁梁体减震的防落梁装置 | |
CN103422437B (zh) | 波形钢腹板桥梁台阶式施工工艺 | |
CN104213511B (zh) | 一种桥梁施工平台结构及其搭建方法 | |
CN202000265U (zh) | 桥梁高墩混凝土施工模板 | |
CN104060841B (zh) | 大跨度钢梁安装施工方法 | |
CN203923922U (zh) | 具备整体横移功能的箱型梁现浇支撑架 | |
CN202969979U (zh) | 抽柱施工加固结构 | |
CN203488088U (zh) | 行人天井梯子间钢制结构 | |
CN106991254B (zh) | 一种公铁两用大桥钢桥面铺装的多尺度设计方法 | |
CN204298741U (zh) | 一种桥墩快速施工内工作平台 | |
CN104343382B (zh) | 行人天井梯子间钢制结构及施工方法 | |
CN204162235U (zh) | 电梯上梁安全检修装置 | |
CN107862165A (zh) | 一种用于钢筋混凝土厂房安全评估的多层次数值模拟方法 | |
CN203741847U (zh) | 沟道反支模施工装置 | |
CN203101030U (zh) | 多液压缸组合式大型液压试验机 | |
CN105113542A (zh) | 地下车站施工用悬挑系统及地下车站施工方法 | |
CN204919608U (zh) | 地下车站施工用悬挑系统 | |
CN203786160U (zh) | 一种避雷器试验用平台 | |
CN104326331A (zh) | 一种电梯上梁安全检修装置 | |
CN203729331U (zh) | 一种可调节的组合式地锚梁结构 | |
CN204341019U (zh) | 一种车站站台的临时通行装置 | |
CN204626964U (zh) | 混凝土浇筑防漏装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: HANGZHOU FENGSHI COLOR PLATE CO., LTD. Free format text: FORMER OWNER: HANGZHOU BOSHU CIVIL ENGINEERING TECHNOLOGY CO., LTD. Effective date: 20141113 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 311215 HANGZHOU, ZHEJIANG PROVINCE TO: 311200 HANGZHOU, ZHEJIANG PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20141113 Address after: 311200 Nanyang Economic Development Zone, Xiaoshan District, Zhejiang, Hangzhou Applicant after: Hangzhou Feng Shi color steel Co., Ltd Address before: Hangzhou City, Zhejiang province 311215 Xiaoshan economic and Technological Development Zone, North Building 2 room 1711 Ning'an Applicant before: Hangzhou Boshu Civil Engineering Technology Co., Ltd. |
|
ASS | Succession or assignment of patent right |
Owner name: ZHEJIANG CTB CORRUGATED STEEL WEB CO., LTD. Free format text: FORMER OWNER: HANGZHOU FENGSHI COLOR PLATE CO., LTD. Effective date: 20150227 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 311200 HANGZHOU, ZHEJIANG PROVINCE TO: 314422 HANGZHOU, ZHEJIANG PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20150227 Address after: 314422, No. 168-2, village, town, Hangzhou, Xiaoshan District, Zhejiang Applicant after: Zhejiang CTB Corrugated Steel Web Co., Ltd. Address before: 311200 Nanyang Economic Development Zone, Xiaoshan District, Zhejiang, Hangzhou Applicant before: Hangzhou Feng Shi color steel Co., Ltd |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |