CN103401201A - 一种高压输电线缆的除冰方法 - Google Patents
一种高压输电线缆的除冰方法 Download PDFInfo
- Publication number
- CN103401201A CN103401201A CN2013103442682A CN201310344268A CN103401201A CN 103401201 A CN103401201 A CN 103401201A CN 2013103442682 A CN2013103442682 A CN 2013103442682A CN 201310344268 A CN201310344268 A CN 201310344268A CN 103401201 A CN103401201 A CN 103401201A
- Authority
- CN
- China
- Prior art keywords
- transmission cable
- air
- power transmission
- voltage power
- polymer matrix
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
一种高压输电线缆的除冰方法,涉及高压输电线缆除冰技术领域。本发明是为了解决现有的高压输电线缆的除冰方法效率低、工作时需要除冰线路断电而影响电网正常运行的问题。本发明所述的高压输电线缆的除冰方法,在不断开电网的情况下利用空气热源和风机向风道吹入热空气,使树脂基复合材料套管受热膨胀胀破冰层,并通过持续的热空气把残冰融化。而温室硫化硅橡胶涂料RTV层具有的憎水憎冰性减缓了雨雪在其表面的积聚,且该层还具有光谱吸热能力,利用太阳能产生热量,提高高压输电线缆表面的温度,防止其表面结冰。本发明所述的高压输电线缆的除冰方法适用于为铺设在气温比较低、容易结冰地域的套有树脂基复合材料套管的高压输电线缆除冰。
Description
技术领域
本发明属于高压输电线缆除冰技术领域。
背景技术
在冬季冰冻雨雪天气下,野外的高压输电线路覆冰容易引起各种机械事故和电气事故,并导致严重后果。为了加强和改善高压输电线缆的抗覆冰能力,确保电力线路的安全,提高电网的可靠性,需要采用输电线除冰防冰技术来去除覆冰。
目前国际上经常采用的输电线除冰防冰技术分为:热力融冰法、机械除冰法、自然被动法和其他方法。
热力融冰法和机械除冰法是较为常用的输电线除冰方法,而热力融冰是目前最主要的抗冰除冰方法。热力融冰法就是利用各种技术,来增加输电线路中的电流密度,或者采用其他方式,使导线自身产生足够多的热量,以避免冰雪的覆积,同时使已有的覆冰融化脱落。但是热力融冰法存在诸多缺点:热力融冰需要电网断开,影响输电网的正常运行及电力用户的正常使用;热力融冰的能耗大,浪费资源。机械除冰相对热力融冰,具有较低的的经济成本,但实施起来相对困难,效果较差,需要的时间久,而且人员和线路都可能受到损伤。自然被动法虽然不需基本投入且运作价格低廉,但此方法的效率低,受自然条件制约且局限于一定类型的冰。其他方法无法独立除冰,只能作为其他除冰方法的辅助手段。
发明内容
本发明是为了解决现有的高压输电线缆的除冰方法效率低、工作时需要除冰线路断电而影响电网正常运行的问题。现提供一种高压输电线缆的除冰方法。
一种高压输电线缆的除冰方法,该方法中待除冰的高压输电线缆包括:电缆芯和树脂基复合材料套管,树脂基复合材料套管套在电缆芯的外侧,电缆芯和树脂基复合材料套管之间留有空隙,该空隙为风道,树脂基复合材料套管的壁厚为3mm,该树脂基复合材料套管的内径比电缆芯的外径大7mm至9mm之间;
将空气热源的热空气出口与风机的进气口相连通,将风机的出风口与高压输电线缆的风道相连通,开启空气热源使热空气通过风机吹入风道,树脂基复合材料套管遇到吹入风道的热空气产生张力,体积膨胀,从而把冰层涨破,同时树脂基复合材料套管的温度升高,能够把残余的冰融化,达到除冰的目的。
上述风机的出风口与风道之间通过固定在高压电缆塔身上的输气管道相连通。
上述空气热源为含发电机的空气源热泵。
上述热空气的温度在30°至40°之间。
通入热空气的时间在40分钟至50分钟之间。
将空气热源固定在第一移动撬装上,将风机固定在第二移动撬装上,用于移动空气热源和风机。
上述树脂基复合材料套管的外表面涂有一层温室硫化硅橡胶涂料RTV层。
本发明所述的高压输电线缆的除冰方法,在不需要断开电网的情况下利用空气热源和风机向高压输电线缆内的风道吹入热空气,使电缆芯表面的树脂基复合材料套管受热、体积膨胀,从而把冰层胀破,同时通过持续供应的热空气把残余的冰融化,使除冰时间缩短至少15%。并且温室硫化硅橡胶涂料RTV层具有憎水憎冰性,能够减缓雨雪在高压输电线缆表面的积聚,起到防止结冰的作用。同时,温室硫化硅橡胶涂料RTV层还具有光谱吸热能力,能够更好的利用太阳能产生热量,进而提高高压输电线缆表面的温度,也能够防止高压输电线缆表面结冰的问题。本发明所述的高压输电线缆的除冰方法适用于为铺设在气温比较低、容易结冰地域的套有树脂基复合材料套管的高压输电线缆除冰。
附图说明
图1是待除冰的高压输电线缆的截面示意图。
图2是实现一种高压输电线缆的除冰方法的装置结构图。
具体实施方式
具体实施方式一:参照图1和图2具体说明本实施方式,本实施方式所述的一种高压输电线缆的除冰方法,该方法中待除冰的高压输电线缆包括:电缆芯6和树脂基复合材料套管8,树脂基复合材料套管8套在电缆芯6的外侧,电缆芯6和树脂基复合材料套管8之间留有空隙,该空隙为风道7,树脂基复合材料套管8的壁厚为3mm,该树脂基复合材料套管8的内径比电缆芯6的外径大7mm至9mm之间;
将空气热源1的热空气出口与风机2的进气口相连通,将风机2的出风口与高压输电线缆5的风道7相连通,开启空气热源1使热空气通过风机2吹入风道7,树脂基复合材料套管8遇到吹入风道7的热空气产生张力,体积膨胀,从而把冰层涨破,同时树脂基复合材料套管8的温度升高,能够把残余的冰融化,达到除冰的目的。
树脂基复合材料套管8具有传热性和热膨胀性,所以除冰时树脂基复合材料套管8的热膨胀力会把部分覆冰胀破,结合空气源空气热源持续供应的热空气除冰,使本方法比常规的除冰方法具有更高的效率。
具体实施方式二:本实施方式是对具体实施方式一所述的一种高压输电线缆的除冰方法作进一步说明,本实施方式中,风机2的出风口与风道7之间通过固定在高压电缆塔身上的输气管道相连通。
具体实施方式三:本实施方式是对具体实施方式一所述的一种高压输电线缆的除冰方法作进一步说明,本实施方式中,空气热源1为含发电机的空气源热泵。
系统的热量由空气热源1供应,高效节能,绿色环保,拥有较高的供热效率;操作简单,安全可靠。
具体实施方式四:本实施方式是对具体实施方式一所述的一种高压输电线缆的除冰方法作进一步说明,本实施方式中,热空气的温度在30°至40°之间。
具体实施方式五:本实施方式是对具体实施方式一所述的一种高压输电线缆的除冰方法作进一步说明,本实施方式中,通入热空气的时间在40分钟至50分钟之间。
具体实施方式六:本实施方式是对具体实施方式一所述的一种高压输电线缆的除冰方法作进一步说明,本实施方式中,将空气热源1固定在第一移动撬装3上,将风机2固定在第二移动撬装4上,用于移动空气热源1和风机2。
将地面设备空气热源1和风机2固定在移动撬装上,方便移动作业。
具体实施方式七:本实施方式是对具体实施方式一所述的一种高压输电线缆的除冰方法作进一步说明,本实施方式中,树脂基复合材料套管8的外表面涂有一层温室硫化硅橡胶涂料RTV层9。
当阳光照射在温室硫化硅橡胶涂料RTV层9上时,温室硫化硅橡胶涂料RTV层9吸热,表面温度升高,使其表面不易结冰,同时温室硫化硅橡胶涂料RTV层9的憎水憎冰性使其表面不易于覆冰,达到防冰的目的。
一种高压输电线缆的除冰方法的原理:除冰装置对高压线进行除冰时,首先开启发电机,然后开启空气热源1和风机2,通过风机2把热空气送入高压输电线缆5的内部。当树脂基复合材料套管8遇到高温空气时,会使树脂基复合材料套管8产生张力,体积膨胀,从而把冰层胀破,同时通过持续供应的热空气把残余的冰融化,达到除冰的目的。所述温室硫化硅橡胶涂料RTV层9具有憎水憎冰性,能够减缓雨雪在高压输电线缆表面的积聚;进而起到防止结冰的作用。同时,温室硫化硅橡胶涂料RTV层9还具有光谱吸热能力,能够更好的利用太阳能产生热量,进而提高高压输电线缆5表面的温度,也能够防止高压输电线缆5表面结冰的问题。
Claims (7)
1.一种高压输电线缆的除冰方法,其特征在于,该方法中待除冰的高压输电线缆包括:电缆芯(6)和树脂基复合材料套管(8),树脂基复合材料套管(8)套在电缆芯(6)的外侧,电缆芯(6)和树脂基复合材料套管(8)之间留有空隙,该空隙为风道(7),树脂基复合材料套管(8)的壁厚为3mm,该树脂基复合材料套管(8)的内径比电缆芯(6)的外径大7mm至9mm之间;
将空气热源(1)的热空气出口与风机(2)的进气口相连通,将风机(2)的出风口与高压输电线缆(5)的风道(7)相连通,开启空气热源(1)使热空气通过风机(2)吹入风道(7),树脂基复合材料套管(8)遇到吹入风道(7)的热空气产生张力,体积膨胀,从而把冰层涨破,同时树脂基复合材料套管(8)的温度升高,能够把残余的冰融化,达到除冰的目的。
2.根据权利要求1所述的一种高压输电线缆的除冰方法,其特征在于,风机(2)的出风口与风道(7)之间通过固定在高压电缆塔身上的输气管道相连通。
3.根据权利要求1所述的一种高压输电线缆的除冰方法,其特征在于,空气热源(1)为含发电机的空气源热泵。
4.根据权利要求1所述的一种高压输电线缆的除冰方法,其特征在于,热空气的温度在30°至40°之间。
5.根据权利要求1所述的一种高压输电线缆的除冰方法,其特征在于,通入热空气的时间在40分钟至50分钟之间。
6.根据权利要求1所述的一种高压输电线缆的除冰方法,其特征在于,将空气热源(1)固定在第一移动撬装(3)上,将风机(2)固定在第二移动撬装(4)上,用于移动空气热源(1)和风机(2)。
7.根据权利要求1所述的一种高压输电线缆的除冰方法,其特征在于,树脂基复合材料套管(8)的外表面涂有一层温室硫化硅橡胶涂料RTV层(9)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310344268.2A CN103401201B (zh) | 2013-08-08 | 2013-08-08 | 一种高压输电线缆的除冰方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310344268.2A CN103401201B (zh) | 2013-08-08 | 2013-08-08 | 一种高压输电线缆的除冰方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103401201A true CN103401201A (zh) | 2013-11-20 |
CN103401201B CN103401201B (zh) | 2016-01-20 |
Family
ID=49564774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310344268.2A Expired - Fee Related CN103401201B (zh) | 2013-08-08 | 2013-08-08 | 一种高压输电线缆的除冰方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103401201B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104466865A (zh) * | 2014-12-01 | 2015-03-25 | 国网上海市电力公司 | 一种中空高压线热流体融冰系统 |
CN104597783A (zh) * | 2014-12-01 | 2015-05-06 | 国网上海市电力公司 | 一种热流体融冰系统智能自动控制系统 |
CN106504932A (zh) * | 2016-11-25 | 2017-03-15 | 云南电网有限责任公司电力科学研究院 | 一种户外高压隔离开关防护装置 |
CN107591766A (zh) * | 2017-09-20 | 2018-01-16 | 国家电网公司 | 一种防鸟线缆除冰装置及其除冰方法 |
CN113035429A (zh) * | 2021-02-06 | 2021-06-25 | 安徽铁信光电科技有限公司 | 一种阻燃通信电缆 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08124429A (ja) * | 1994-10-19 | 1996-05-17 | Furukawa Electric Co Ltd:The | 融氷雪電線 |
CN101286380A (zh) * | 2008-02-25 | 2008-10-15 | 林绍华 | 管道式高压线及其除冰方法 |
CN201181605Y (zh) * | 2008-03-10 | 2009-01-14 | 昆山火凤凰线缆有限公司 | 架空光/电缆融雪化冰装置 |
CN101872948A (zh) * | 2009-04-22 | 2010-10-27 | 张根祥 | 高压输电线热气流式融冰方法 |
-
2013
- 2013-08-08 CN CN201310344268.2A patent/CN103401201B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08124429A (ja) * | 1994-10-19 | 1996-05-17 | Furukawa Electric Co Ltd:The | 融氷雪電線 |
CN101286380A (zh) * | 2008-02-25 | 2008-10-15 | 林绍华 | 管道式高压线及其除冰方法 |
CN201181605Y (zh) * | 2008-03-10 | 2009-01-14 | 昆山火凤凰线缆有限公司 | 架空光/电缆融雪化冰装置 |
CN101872948A (zh) * | 2009-04-22 | 2010-10-27 | 张根祥 | 高压输电线热气流式融冰方法 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104466865A (zh) * | 2014-12-01 | 2015-03-25 | 国网上海市电力公司 | 一种中空高压线热流体融冰系统 |
CN104597783A (zh) * | 2014-12-01 | 2015-05-06 | 国网上海市电力公司 | 一种热流体融冰系统智能自动控制系统 |
CN104466865B (zh) * | 2014-12-01 | 2017-05-10 | 国网上海市电力公司 | 一种中空高压线热流体融冰系统 |
CN106504932A (zh) * | 2016-11-25 | 2017-03-15 | 云南电网有限责任公司电力科学研究院 | 一种户外高压隔离开关防护装置 |
CN107591766A (zh) * | 2017-09-20 | 2018-01-16 | 国家电网公司 | 一种防鸟线缆除冰装置及其除冰方法 |
CN107591766B (zh) * | 2017-09-20 | 2019-01-29 | 国网河北省电力有限公司赵县供电分公司 | 一种防鸟线缆除冰装置及其除冰方法 |
CN113035429A (zh) * | 2021-02-06 | 2021-06-25 | 安徽铁信光电科技有限公司 | 一种阻燃通信电缆 |
Also Published As
Publication number | Publication date |
---|---|
CN103401201B (zh) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103401201B (zh) | 一种高压输电线缆的除冰方法 | |
CN101325322A (zh) | 换流站交流进线融冰接线方案 | |
CN104032645A (zh) | 一种热循环桥面防冻解冻系统 | |
CN203366837U (zh) | 一种高压输电线缆及针对该输电线缆的除冰装置 | |
CN105977895A (zh) | 一种输变电线路冬季用的融冰装置及方法 | |
CN206625943U (zh) | 一种用于风力发电机的叶片防冰除冰装置 | |
CN103701080A (zh) | 利用输电线路负荷电流融冰的方法 | |
CN204244102U (zh) | 一种电力输电线路10kv 电力电缆融冰装置 | |
CN202332338U (zh) | 一种除冰雪的输电线缆 | |
CN203366831U (zh) | 一种防冻雨输电线 | |
CN212583885U (zh) | 风电叶片防冰融冰装置 | |
CN101286380A (zh) | 管道式高压线及其除冰方法 | |
CN210068398U (zh) | 风力发电机叶片和风力发电机组 | |
CN201465640U (zh) | 一种发热除冰电缆 | |
CN103669163A (zh) | 蓄能式循环热流体融雪化冰系统 | |
CN205304093U (zh) | 一种新型多功能架空输电线悬挂物清理装置 | |
CN204326667U (zh) | 电杆除冰装置 | |
CN209212265U (zh) | 一种寒区铁路隧道复合加热保温层装置 | |
CN203947384U (zh) | 热循环桥面防冻解冻系统 | |
CN102280848A (zh) | 一种带太阳能光伏发电系统向化冰雪装置供电的电缆线 | |
CN203021880U (zh) | 智能铁路隧道融冰装置 | |
CN201561593U (zh) | 一种设有抗冻除雪装置的太阳能热水器 | |
CN104992743A (zh) | 除冰碳纤维高低压架空电缆 | |
CN203055574U (zh) | 一种露天电力设备防冰网 | |
CN204459591U (zh) | 一种自来水管道保温装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160120 Termination date: 20160808 |
|
CF01 | Termination of patent right due to non-payment of annual fee |