CN103701080A - 利用输电线路负荷电流融冰的方法 - Google Patents

利用输电线路负荷电流融冰的方法 Download PDF

Info

Publication number
CN103701080A
CN103701080A CN201410005733.4A CN201410005733A CN103701080A CN 103701080 A CN103701080 A CN 103701080A CN 201410005733 A CN201410005733 A CN 201410005733A CN 103701080 A CN103701080 A CN 103701080A
Authority
CN
China
Prior art keywords
ice
melting
transmission line
wire
steel core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410005733.4A
Other languages
English (en)
Inventor
刘刚
赵学增
梁岩
陈永辉
刘建军
吴坚
张竟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology Shenzhen
Heilongjiang University of Science and Technology
State Grid Corp of China SGCC
Jixi Power Supply Co of State Grid Heilongjiang Electric Power Co Ltd
Original Assignee
Harbin Institute of Technology Shenzhen
Heilongjiang University of Science and Technology
State Grid Corp of China SGCC
Jixi Power Supply Co of State Grid Heilongjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology Shenzhen, Heilongjiang University of Science and Technology, State Grid Corp of China SGCC, Jixi Power Supply Co of State Grid Heilongjiang Electric Power Co Ltd filed Critical Harbin Institute of Technology Shenzhen
Priority to CN201410005733.4A priority Critical patent/CN103701080A/zh
Publication of CN103701080A publication Critical patent/CN103701080A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

利用输电线路负荷电流融冰的方法,属于高压输配电领域。本发明解决了现有的融冰装置和融冰方法在融冰时不能保证输电电路正常供电的问题。利用输电线路负荷电流融冰的方法,融冰导线包括高阻钢芯和外层导体,位于所述输电线路端部的融冰导线末端的高阻钢芯和外层导体并联连接之后与现有输电线路的输电线连接;位于分段耐张杆塔一侧的融冰导线的高阻钢芯和外层导体同时与位于该分段耐张杆塔的分段开关的进线端连接,该分段开关的出线端与位于分段耐张杆塔另一侧的融冰导线的外层导体连接,所述方法为:将位于所述融冰导线的电力输入端一侧的分段开关打开,开始融冰,融冰结束后,将该分段开关闭合。本发明适用于冰冻地区输电线路的融冰。

Description

利用输电线路负荷电流融冰的方法
技术领域
本发明属于高压输配电领域。
背景技术
近几年受温室效应影响异常气候多发,电力输电线路覆冰问题日益突发,人们一直在不断的研究探索防治线路覆冰的方法。目前国内外已采用的除冰方法有短路融冰法、调整负荷融冰法和10KV电容补偿融冰法等。因受电网结构、主变容量、融冰电压限制实际应用成功案例很少,10KV电容补偿融冰在220KV以上超长线路不能满足要求,短路融冰法效果比较好但装置贵、技术复杂在220KV及以下电网应用普及困难。这些融冰方法融冰时线路都需要停电,所需融冰电源容量大,短路融冰二相导线融冰需要电源容量在30万KW~60万KW,相当于一座中型发电厂的发电容量。一般小电网都没有这样的能力,而线路覆冰的特点大多都不是全线都覆冰,只是在特殊气象段覆冰,而上述融冰方法只能应用于全线导线加热,没有分段选择的能力,消耗能源大对电网冲击大。
用《不停电自动融冰用架空导线》融冰目前技术还不成熟,他的问题是融冰时减小导线载流截面后,导线发热量仍不能满足国家电网公司2012年颁发的输电线路电流融冰技术标准的要求,例如国家电网规定LGJ-300导线在温度为-5℃、风速为5米/秒时,最大融冰电流和最小融冰电流分别为1486.87A和660.4A,每千米导线功耗为P为:
P=I2*r W/km
LGJ-300导线每米直流电阻值r为:
r=0.0935Ω/km,
计算获得单位导线最大功耗为206W/m,最小功耗为40.7W/m。
以LGJ-300导线为例,取其经济电流密度为0.8,载流量为300×0.8=240A。融冰时导线载流截面减少3/4,相当于每千米直流电阻增加4倍,则每千米直流电阻值为:
0.0935Ω×4=0.374Ω/km,
每米导线融冰输出功率为:
2402×0.375÷1000=21.5w/m,
该值小于国家电网公司要求的LGJ-300导线最小功率40.7w/m,不能满足线路融冰所需功率要求,即现有的融冰方法在应用时无法保证输电线路正常供电,伴随着电力网的发展而不断的增多,输电线路怎样有效的解决这一问题已成为世界性的问题。
2008年1月我国南部七省的冰冻灾害造成电网大面积倒杆、断线部分地区电网处于崩溃和瘫痪状态。上述的这些融冰措施由于存在这些问题发挥不了应有的作用。这场冰冻灾害造成的直接的经济损失高达上千亿,给人们的生产、生活带来极大的影响,其间接的经济损失和社会影响是无法估量的。
发明内容
本发明为了解决现有的融冰装置和融冰方法在融冰时不能保证输电电路正常供电的问题,提出了利用输电线路负荷电流融冰的方法。
利用输电线路负荷电流融冰的方法,所述输电线路包括融冰导线和多根水泥秆、多根分段耐张杆塔和多个分段开关,相邻分段耐张杆塔之间架接有一根融冰导线;每根分段耐张杆塔上固定一个分段开关;融冰导线包括高阻钢芯和外层导体,高阻钢芯和外层导体之间设置有绝缘层,位于所述输电线路端部的融冰导线末端的高阻钢芯和外层导体并联连接之后与现有输电线路的输电线连接;位于分段耐张杆塔一侧的融冰导线的高阻钢芯和外层导体同时与位于该分段耐张杆塔的分段开关的进线端连接,该分段开关的出线端与位于分段耐张杆塔另一侧的融冰导线的外层导体连接,所述方法为:
对两根分段耐张杆塔之间的融冰导线进行融冰时,将位于所述融冰导线的电力输入端一侧的分段开关打开,开始融冰,融冰结束后,将该分段开关闭合。
将融冰导线装设在易发生导线覆冰的输电线路上,替代原普通常规导线,并配合装设分段开关,正常供电是分段开关在合位导线内钢芯和外导体同时输送电流,需要进行导线融冰时拉开融冰分段开关,将高阻钢芯融冰导线外层导体部分断开,这时融冰导线内部高阻值钢芯输送全部负荷电流,高阻钢芯直流电阻值较大,钢芯将产生导线融冰所需要的热量,达到导线融冰的目的。它能够在系统不改变正常运行方式下,不增加线路传输电流。保持向用户供电的同时对电力架空输电线路进行分段和有选择性的融冰。避免覆冰对架空电力线路的危害。
利用高阻钢芯融冰导线结合分段分段开关将其分段装设在易覆冰输电线路上,能够方便,灵活,可靠地实现在电力系统正常供电运行状态下,不改变运行方式,不改变接线,不需加大线路正常符合电流,在不中断向用户供电的情况下,安全快速地完成电力线路导线的融冰。该融冰输电线路需要的融冰导线和分段开关接线简单,可靠性高,使用寿命长,实施成本和维护费用低。
附图说明
图1是具体实施方式一所述的分段开关的电气连接示意图,其中A表示现有输电线路应用的普通导线的电阻,B表示外层导体的内阻,C表示高阻钢芯的内阻;
图2是具体实施方式一所述的输电线路的纵向断面示意图;
图3是具体实施方式二所述的输电线路的纵向断面示意图。
具体实施方式
具体实施方式一:参见图1和图2说明本实施方式,本实施方式所述的利用输电线路负荷电流融冰的方法,所述输电线路包括融冰导线3、多根分段耐张杆塔4和多个分段开关1,相邻分段耐张杆塔之间架接有一根融冰导线3;每根分段耐张杆塔上固定一个分段开关1;融冰导线3包括高阻钢芯和外层导体,高阻钢芯和外层导体之间设置有绝缘层,位于所述输电线路端部的融冰导线3末端的高阻钢芯和外层导体并联连接之后与现有输电线路的输电线连接;位于分段耐张杆塔一侧的融冰导线3的高阻钢芯和外层导体同时与位于该分段耐张杆塔的分段开关1的进线端连接,该分段开关1的出线端与位于分段耐张杆塔另一侧的融冰导线3的外层导体连接,所述方法为:
对两根分段耐张杆塔之间的融冰导线3进行融冰时,将位于所述融冰导线3的电力输入端一侧的分段开关1打开,开始融冰,融冰结束后,将该分段开关1闭合。
本实施方式所述的分段耐张杆塔4之间的距离作为一个融冰段,距离的确定方法为:为保证线路在融冰期间线路能正常供电,融冰段线路电压降不能过大,应控制在线路额定电压5%之内,可依据融冰线路正常供电负荷电流值,和融冰导线3的钢芯电阻值计算确定融冰分段线路长度。
如果需要融冰的线路比较长,可以在相邻的两根耐张杆塔4之间设置有一根或多根输水泥柱2,用于支撑融冰导线3。
具体实施方式二:参见图3说明本实施方式,本实施方式是对具体实施方式一所述的利用输电线路负荷电流融冰的方法的进一步限定,它还包括多个开关增强绝缘柱5-1和多个开关安装横担5-2,每个开关增强绝缘柱5-1的一端固定在一个开关安装横担5-2上,一根分段耐张杆塔4的底端,所述开关增强绝缘磁柱5-1的另一端固定在开关安装横担5-2的顶端。
本实施方式中将分段开关1装设在开关增强绝缘柱5-1上,用来提高开关对地绝缘水平与融冰线路相同。
具体实施方式三:本实施方式是对具体实施方式一或二所述的利用输电线路负荷电流融冰的方法的进一步限定,所述分段开关1采用的是10~35KV电压等级开关或刀闸。
本实施方式所述的开关的电压等级是依据线路融冰时允许电压降值确定的,开关断口承担融冰时导线钢芯与外导体间的电压差值。
工作原理:
正常供电运行时开关是闭合状态,高阻钢芯3-1和外层导体3-2并联共同输送负荷电流。高阻钢芯3-1和外层导体3-24之间是绝缘的。当某一融冰段需要融冰时,将仅连接了该段融冰导线3的外层导体的分段开关1打开,这时该段融冰导线3的外层导体3-2即被断开停止输送电流,这时线路正常供电电流全部流经高阻钢芯3-1,使高阻钢芯3-1产生导线融冰所需热能融化导线外覆冰。融冰结束,合上分段开关1结束融冰工作,该段融冰导线3恢复正常工作状态。

Claims (2)

1.利用输电线路负荷电流融冰的方法,其特征在于,所述输电线路包括融冰导线(3)、多根分段耐张杆塔(4)和多个分段开关(1),相邻分段耐张杆塔之间架接有一根融冰导线(3);每根分段耐张杆塔上固定一个分段开关(1);融冰导线(3)包括高阻钢芯和外层导体,高阻钢芯和外层导体之间设置有绝缘层,位于所述输电线路端部的融冰导线(3)末端的高阻钢芯和外层导体并联连接之后与现有输电线路的输电线连接;位于分段耐张杆塔一侧的融冰导线(3)的高阻钢芯和外层导体同时与位于该分段耐张杆塔的分段开关(1)的进线端连接,该分段开关(1)的出线端与位于分段耐张杆塔另一侧的融冰导线(3)的外层导体连接,所述方法为:
对两根分段耐张杆塔之间的融冰导线(3)进行融冰时,将位于所述融冰导线(3)的电力输入端一侧的分段开关(1)打开,开始融冰,融冰结束后,将该分段开关(1)闭合。
2.根据权利要求1所述的利用输电线路负荷电流融冰的方法,其特征在于,所述分段开关(1)采用的是10~35KV电压等级开关或刀闸。
CN201410005733.4A 2014-01-07 2014-01-07 利用输电线路负荷电流融冰的方法 Pending CN103701080A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410005733.4A CN103701080A (zh) 2014-01-07 2014-01-07 利用输电线路负荷电流融冰的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410005733.4A CN103701080A (zh) 2014-01-07 2014-01-07 利用输电线路负荷电流融冰的方法

Publications (1)

Publication Number Publication Date
CN103701080A true CN103701080A (zh) 2014-04-02

Family

ID=50362525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410005733.4A Pending CN103701080A (zh) 2014-01-07 2014-01-07 利用输电线路负荷电流融冰的方法

Country Status (1)

Country Link
CN (1) CN103701080A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104332928A (zh) * 2014-11-20 2015-02-04 国家电网公司 分裂导线经济电流防冰除冰方法
CN106655040A (zh) * 2017-02-21 2017-05-10 国网山东省电力公司邹城市供电公司 高压输电线缆支架系统
CN109174829A (zh) * 2018-07-23 2019-01-11 中国电力科学研究院有限公司 基于热风除雪装置的特高压设备远程除雪方法
CN112102984A (zh) * 2020-09-02 2020-12-18 永州电力勘测设计院有限公司 新型钢芯融冰绝缘导线及其融冰系统和方法
CN113708327A (zh) * 2021-08-18 2021-11-26 海南电网有限责任公司海口供电局 一种实现不停电融冰的装置、线路导线及融冰方法
WO2023284014A1 (zh) * 2021-07-14 2023-01-19 四川大学 一种用于耐张塔的无源无损单相防冰融冰控制设备

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4925991B1 (zh) * 1969-05-29 1974-07-04
CN2130295Y (zh) * 1992-05-09 1993-04-21 能源部武汉高压研究所 输电线路导线不停电自动熔冰装置
JP2008154438A (ja) * 2006-12-15 2008-07-03 Michio Takaoka 架空送電線の着氷雪の除去
CN101286382A (zh) * 2008-04-11 2008-10-15 浙江科技学院 输电线冰雪去除方法
CN101350234A (zh) * 2008-09-12 2009-01-21 程永忠 外层绝缘单线圆线同心绞架空导线及自动融冰装置
CN101552444A (zh) * 2008-04-02 2009-10-07 达特默斯大学托管会 用于电力线电缆的除冰系统和除冰方法
CN101714418A (zh) * 2008-10-08 2010-05-26 特变电工股份有限公司 一种融冰雪导线及使用该导线融冰雪的方法
CN202434987U (zh) * 2011-12-27 2012-09-12 塔城电力有限责任公司 一种输电线融冰装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4925991B1 (zh) * 1969-05-29 1974-07-04
CN2130295Y (zh) * 1992-05-09 1993-04-21 能源部武汉高压研究所 输电线路导线不停电自动熔冰装置
JP2008154438A (ja) * 2006-12-15 2008-07-03 Michio Takaoka 架空送電線の着氷雪の除去
CN101552444A (zh) * 2008-04-02 2009-10-07 达特默斯大学托管会 用于电力线电缆的除冰系统和除冰方法
CN101286382A (zh) * 2008-04-11 2008-10-15 浙江科技学院 输电线冰雪去除方法
CN101350234A (zh) * 2008-09-12 2009-01-21 程永忠 外层绝缘单线圆线同心绞架空导线及自动融冰装置
CN101714418A (zh) * 2008-10-08 2010-05-26 特变电工股份有限公司 一种融冰雪导线及使用该导线融冰雪的方法
CN202434987U (zh) * 2011-12-27 2012-09-12 塔城电力有限责任公司 一种输电线融冰装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
肖明训等: "复合导线融冰技术及装置", 《水电能源科学》, vol. 28, no. 4, 30 April 2010 (2010-04-30), pages 130 - 132 *
肖明训等: "架空导线不停电全自动融冰技术及装置", 《水电能源科学》, vol. 26, no. 5, 31 October 2008 (2008-10-31), pages 182 - 184 *
陈庚: "复合导线自动融冰装置的原理和设计", 《湖南大学学报》, vol. 10, no. 3, 31 December 1983 (1983-12-31), pages 1 - 9 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104332928A (zh) * 2014-11-20 2015-02-04 国家电网公司 分裂导线经济电流防冰除冰方法
CN104332928B (zh) * 2014-11-20 2016-08-24 国家电网公司 分裂导线经济电流防冰除冰方法
CN106655040A (zh) * 2017-02-21 2017-05-10 国网山东省电力公司邹城市供电公司 高压输电线缆支架系统
CN106655040B (zh) * 2017-02-21 2018-03-06 国网山东省电力公司邹城市供电公司 高压输电线缆支架系统
CN109174829A (zh) * 2018-07-23 2019-01-11 中国电力科学研究院有限公司 基于热风除雪装置的特高压设备远程除雪方法
CN109174829B (zh) * 2018-07-23 2021-08-24 中国电力科学研究院有限公司 基于热风除雪装置的特高压设备远程除雪方法
CN112102984A (zh) * 2020-09-02 2020-12-18 永州电力勘测设计院有限公司 新型钢芯融冰绝缘导线及其融冰系统和方法
WO2023284014A1 (zh) * 2021-07-14 2023-01-19 四川大学 一种用于耐张塔的无源无损单相防冰融冰控制设备
CN113708327A (zh) * 2021-08-18 2021-11-26 海南电网有限责任公司海口供电局 一种实现不停电融冰的装置、线路导线及融冰方法

Similar Documents

Publication Publication Date Title
CN102255274B (zh) 一种架空地线和复合光纤地线的直流融冰方法
CN101689757B (zh) 适用于分裂导线输电线路的熔冰装置及其方法
CN100511899C (zh) 换流站交流进线融冰接线方案
CN101710683A (zh) 利用分裂导线传输电流智能循环的防冰方法
CN101394073A (zh) 输配电线路防覆冰除融冰方法及设备
CN101242087A (zh) 输电线路融冰的方法
CN102148486B (zh) 一种电力输电线路工频在线防冰融冰方法
CN102227074B (zh) 输电线路在运除冰防冻系统
CN106384989A (zh) 一种对输电线路架空地线进行直流融冰的装置及方法
CN108923365B (zh) 一种适用于带电在线融冰的输电线路导线及其使用方法
CN103151746A (zh) 一种可融冰复合架空地线的内循环融冰方法
CN101350234B (zh) 外层绝缘单线圆线同心绞架空导线及自动融冰装置
CN203689973U (zh) 高阻值钢芯融冰导线
CN103730201A (zh) 高阻值钢芯融冰导线
CN104880620A (zh) 一种超高压分裂子导线融冰的试验平台
CN103337824A (zh) 特高压直流输电线路分段直流融冰系统
CN112102984A (zh) 新型钢芯融冰绝缘导线及其融冰系统和方法
CN206364479U (zh) 一种对输电线路架空地线进行直流融冰的装置
CN105262001A (zh) 输电线路架空地线的融冰方法
CN104716613B (zh) 基于500kV输电线路的融冰方法
CN103151745A (zh) 一种双侧可融冰复合架空地线串联融冰的方法
CN103457225B (zh) 基于液流电池的交流融冰方法
CN102931621B (zh) 配电线路交流融冰装置
CN209200626U (zh) 一种基于地线开耐张方式及地线耐张绝缘子的架空地线
CN204143947U (zh) 一种能够利用经济电流防冰除冰的分裂导线结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140402