CN103400224B - GIS device repair method and GIS device maintenance aid decision-making system - Google Patents

GIS device repair method and GIS device maintenance aid decision-making system Download PDF

Info

Publication number
CN103400224B
CN103400224B CN201310317847.8A CN201310317847A CN103400224B CN 103400224 B CN103400224 B CN 103400224B CN 201310317847 A CN201310317847 A CN 201310317847A CN 103400224 B CN103400224 B CN 103400224B
Authority
CN
China
Prior art keywords
information
gis device
name plate
gis
state performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310317847.8A
Other languages
Chinese (zh)
Other versions
CN103400224A (en
Inventor
陆国俊
李刚
王劲
覃煜
黄炎光
曲德宇
黄慧红
黄青丹
易鹭
方育阳
吴笃贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
XIAMEN RED PHASE INSTRUMENTS Inc
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XIAMEN RED PHASE INSTRUMENTS Inc, Guangzhou Power Supply Bureau Co Ltd filed Critical XIAMEN RED PHASE INSTRUMENTS Inc
Priority to CN201310317847.8A priority Critical patent/CN103400224B/en
Publication of CN103400224A publication Critical patent/CN103400224A/en
Application granted granted Critical
Publication of CN103400224B publication Critical patent/CN103400224B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of GIS device repair method and a kind of GIS device maintenance aid decision-making system, and its GIS device repair method includes step: obtain respectively and the name plate information of stored GIS equipment, state performance information, assets information;According to described name plate information, described state performance information, described assets information, GIS device is carried out risk assessment and obtain equipment operation risk assessment result;According to described name plate information, described state performance information, assets information, described GIS device is carried out Economic and Efficiency Analysis and obtain Economic and Efficiency Analysis result;The maintenance solution of GIS device is determined according to described risk evaluation result and described Economic and Efficiency Analysis result;Carry out GIS device maintenance according to described maintenance solution, it is possible to reduce the cost of overhaul, improve GIS device utilization rate, save electric power resource.

Description

GIS device repair method and GIS device maintenance aid decision-making system
Technical field
The present invention relates to technical field of electric power, particularly relate to a kind of GIS device repair method, a kind of GIS device maintenance Aid decision-making system.
Background technology
Along with electrical network scale expanding day, power equipment constantly increases sharply and user's constantly carrying power supply quality requirement Height, requires more and more higher to electrical network power supply reliability.(Gas Insulated Switchgear, SF6 gas-insulated is complete for GIS Closed group clutch) equipment is as power system main carriers and High Value Unit, and owing to it has, floor space is little, installation side Just, it is difficult to advantages such as being affected by the external environment, operational reliability is high, dominates switchgear as electrical network and obtained good Application.But owing to this body structure of GIS device is complicated and it is various to manufacture maintenance craft, after once breaking down, have The shortcomings such as the repair time is long, and power failure range is wide, economic impact is huge.At present, also exist in 110kV electric pressure electrical network in a large number Produce in early days GIS device, compared with existing GIS device, produce in early days GIS device manufacturing, install, design, the aspect such as maintenance All there is obvious inferior position, arrive along with these GIS device run aging peak, its probability that breaks down substantially rises, directly Connect and affect safe operation of electric network reliability.How under guaranteeing electrical network power supply reliability and economy, carry out for GIS device Overhaul, technological transformation or replacing maintenance solution provide the instruction of science to have become as electric power enterprise and need asking of solution badly Topic.
In recent years, theoretical along with repair based on condition of component based on equipment state and electric power asset whole life-cycle management philosophy emerging Rise, electric power apparatus examination scheme is had higher requirement.Power equipment is overhauled, not only needs consideration equipment to run State, and need equipment technological transformation expense and system it may happen that the risk of initiation and the economic benefit of maintenance are entered after fault Row assessment.But, GIS device is overhauled by current most of electric power enterprises, is based primarily upon " gas-insulated metal enclosed switchgear Equipment state assessment guidelines Q/GDW448-2010 " and " Cubicle Gas-Insulated Switchgear repair based on condition of component directive/guide Q/ GDW447-2010 "), in conjunction with the operating experience of field engineer, account for using equipment dependability as main criterion Obtaining maintenance solution, maintenance solution mainly includes monitoring cycle, monitoring mode, maintenance cycle, maintenance mode, technological transformation mode Etc., then carry out GIS device maintenance based on the maintenance solution obtained, although this maintenance mode is favorably improved operation of power networks peace Full property and reliability, but the unnecessary cost of overhaul can be increased, reduce GIS device utilization rate and economic benefit, cause electric power to provide The waste in source.
Summary of the invention
It is an object of the invention to provide a kind of GIS device repair method and system, it is possible to reduce the cost of overhaul, improve GIS device utilization rate, saves electric power resource.
The purpose of the present invention is achieved through the following technical solutions:
A kind of GIS device repair method, comprises the steps:
Obtain respectively and the name plate information of stored GIS equipment, state performance information, assets information;
Described GIS device is carried out risk assessment obtain according to described name plate information, described state performance information, assets information Obtain equipment operation risk assessment result;
Described GIS device is carried out economic benefit divide according to described name plate information, described state performance information, assets information Analysis obtains Economic and Efficiency Analysis result;
The maintenance solution of described GIS device is determined according to described risk evaluation result and described Economic and Efficiency Analysis result;
GIS device maintenance is carried out according to described maintenance solution.
According to the scheme of the invention described above method, it is to obtain respectively and the name plate information of stored GIS equipment, state performance Information, assets information, name plate information based on GIS device, state performance information, assets information carry out risk to GIS device to be commented Estimating acquisition equipment operation risk assessment result, GIS is set by name plate information based on GIS device, state performance information, assets information The standby economic benefit that carries out is analyzed obtaining Economic and Efficiency Analysis result, then based on described risk evaluation result and described economic effect Benefit analysis result determines the maintenance solution of GIS device, and carries out the maintenance of described GIS device based on this maintenance solution, due to inspection Repair the acquisition of scheme based on equipment operation risk assessment and Economic and Efficiency Analysis on the basis of, taken into full account GIS device Risk factor and economic benefit, can based on this carry out GIS device maintenance time, reduce the unnecessary cost of overhaul, and carry High GIS device utilization rate, has saved electric power resource, in turn ensure that the reliability of operation of power networks, simultaneously as name plate information, State performance information, assets information obtain respectively, can take into full account the source of class each GIS device Back ground Information and update frequency Rate, improves the reasonability of information acquisition efficiency and setting, and overhaul efficiency is high.
A kind of GIS device maintenance aid decision-making system, including:
Name plate information acquisition module, for obtaining and the name plate information of stored GIS equipment;
State performance data obtaining module, for obtaining and the state performance information of stored GIS equipment;
Assets information acquisition module, for obtaining and the assets information of stored GIS equipment;
Risk evaluation module, is used for according to described name plate information, described state performance information, described assets information GIS Equipment carries out risk assessment and obtains equipment operation risk assessment result;
According to described name plate information, Economic and Efficiency Analysis module, for according to described name plate information, described state performance letter Breath, described assets information carry out Economic and Efficiency Analysis and obtain Economic and Efficiency Analysis result described GIS device;
Maintenance solution determines module, for determining according to described risk evaluation result and described Economic and Efficiency Analysis result The maintenance solution of GIS device.
According to the scheme of the invention described above system, owing to equipment operation risk assessment and Economic and Efficiency Analysis are all based on Described name plate information, described state performance information, described assets information, these information are all objective reality, and due to GIS On the basis of the acquisition of the maintenance solution of equipment is based on equipment operation risk assessment and Economic and Efficiency Analysis, take into full account The risk factor of GIS device and economic benefit, thus, on the one hand, can the optimal maintenance technological transformation of objective acquisition GIS device arrange Execute, it is possible to taken into full account risk factor and the economic benefit of GIS device, can based on this carry out GIS device maintenance time, Reduce the unnecessary cost of overhaul, improve GIS device utilization rate, save electric power resource, in turn ensure that the reliability of operation of power networks, Simultaneously as name plate information, state performance information, assets information obtain respectively, can take into full account that class each GIS device basis is believed The source of breath and renewal frequency, improve the reasonability of information acquisition efficiency and setting, and the efficiency of decision-making is high.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the GIS device repair method embodiment of the present invention;
Fig. 2 is the refinement schematic flow sheet carrying out risk assessment in Fig. 1;
Fig. 3 is to carry out the refinement schematic flow sheet that economic benefit is analyzed in Fig. 1;
Fig. 4 is the refinement schematic flow sheet determining maintenance solution in Fig. 1;
Fig. 5 is the structural representation of GIS device maintenance one embodiment of aid decision-making system of the present invention;
Fig. 6 is the structural representation of GIS device maintenance another embodiment of aid decision-making system of the present invention.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the present invention is further elaborated, but the implementation of the present invention does not limit so.
Step S101: obtain respectively and the name plate information of stored GIS equipment, state performance information, assets information;
May divide in actual management by the management of different production divisions in view of all kinds of GIS device Back ground Informations, come from No system, and the daily renewal frequency of different types of GIS device Back ground Information also can be inconsistent, as name plate information belongs to In running division management, and equipment is once putting into operation, and its equipment state performance information also is relatively fixed, unless there are setting For replacing, change, newly put into operation or information corrigenda, otherwise its equipment state performance information typically will not update;And state Information can belong to testing department's management, its information updating is more frequent, as long as equipment has carries out corresponding inspection, monitoring or test Project, its corresponding status information will be updated;For another example, assets information adheres to Finance Department's management separately, its information updating frequency Rate is between equipment state performance information and Test Information;To sum up, manage for the convenience of the user, and for the information of raising The efficiency obtained and the reasonability of setting, use the mode obtaining all kinds of GIS foundation information respectively;
Wherein, name plate information mainly includes that equipment manufacturer, days of dispatching from the factory, installed date, the operation time limit, design use The information such as life-span, electric pressure, state performance information is the information of reflection GIS device state performance operational factor, mainly includes The information such as equipment fault probability of happening, equipment state evaluation result, equipment operating environment and apparatus of load situation, assets information master GIS device assets value to be included, equipment technology reconstruction expense, personal safety expense, B.O.T.U. megawatt GDP contribution margin etc.;
It addition, the mode obtaining GIS device Back ground Information can be configured according to actual needs, and different types of GIS device Back ground Information can obtain to use same mode, it would however also be possible to employ different modes obtains, and wherein, obtains The mode taking GIS device Back ground Information includes following three kinds:
Mode one: when any type information detected in described name plate information, described state performance information, assets information When there is change, synchronizing the information of corresponding types, this mode is properly termed as event and triggers acquisition mode, will set by all kinds of GIS The condition that the change of standby Back ground Information obtains as the GIS device Back ground Information triggering corresponding types, uses event to trigger and obtains Mode, it can be ensured that the information for subsequent step is real-time latest data information;
Mode two: configuration information synchronizing cycle, according to this synchronizing information cycle to described name plate information, described state performance Information, assets information carry out synchronizing information, according to actual needs, and can be to described name plate information, described state performance information, money Product information arranges the different synchronizing information cycles, and this mode is properly termed as periodically triggering acquisition mode, uses periodically to trigger and obtains Take mode, can avoid when there being large batch of GIS device Back ground Information to need to update, need to take owing to synchronizing mass data Long period and affect the normal use of other function, allow for user and data updated set of time such as systems such as midnights Use the less time period;
Mode three: when receiving activation instruction, according to described activation instruction to described name plate information, described state performance Information, assets information carry out synchronizing information, and using this activation instruction to trigger acquisition mode can according to the needs of user at any time Trigger described name plate information, described state performance information, the acquisition of assets information.
Step S102: according to described name plate information, described state performance information, described assets information to described GIS device Carry out risk assessment and obtain equipment operation risk assessment result;
Which equipment can be had according to described name plate information, described state performance information, assets information assessment GIS device Some consequences that defect, equipment fault the defect fault rate causing fault and equipment fault may cause, such as, Can be according to the manufacturer in name plate information, days of dispatching from the factory, installed date, the operation time limit, design service life, electric pressure Reflect which the information evaluation GIS device of GIS device state performance operational factor has etc. in information and state performance information Equipment deficiency is caused the fault rate of fault by equipment fault defect, further according to the GIS device assets valency in assets information The information acquisition equipment faults such as value, equipment technology reconstruction expense, personal safety expense, B.O.T.U. megawatt GDP contribution margin may Some consequences caused, then the equipment deficiency of comprehensive GIS device, caused by equipment fault defect the fault rate of fault with And the information acquisition equipment operation risk assessment result such as some consequences that may cause of equipment fault;
As in figure 2 it is shown, wherein in an embodiment, according to described name plate information, described state performance information, assets letter Breath carries out risk assessment and obtains equipment operation risk assessment result and can specifically include following steps GIS device:
Step S1021: determine that described GIS sets according to described name plate information, described state performance information, described assets information Standby at the GIS device rate of breakdown then and in following each year and GIS device failure effect;
Assessing administrative standard according to international risks, risk is to be measured by the uncertain of risk and unfavorable result two aspect , the product of the severity of consequence i.e. caused with contingency occurrence probability and accident is to represent risk, it may be assumed that risk (RISK)= Equipment fault probability of happening (P) * equipment fault consequence (C);For GIS device, it is contemplated that made after device fails Become the difference in consequence, can consider in terms of power system loss, equipment loss, personal safety, environmental effect four GIS risk;
Step S1022: GIS device failure effect is carried out money demand elasticity and obtains the currency that GIS device failure effect is corresponding Quantized value, determines equipment operation risk assessment result according to described GIS device rate of breakdown and described money demand elasticity value;
For the ease of weighing GIS device failure effect, GIS device failure effect can be carried out money demand elasticity, i.e. with one Currency values represents GIS device failure effect, it is contemplated that the difference in caused consequence after device fails, can be from power train System loss, equipment loss, personal safety, four aspects of environmental effect carry out money demand elasticity respectively;
For the money demand elasticity of power system loss risk, first evaluate the delivery of possible loss, further according to location The GDP of district's previous year calculates the product electricity ratio that unit quantity of electricity is corresponding with year electricity sales amount, will produce electricity than the confession being multiplied by possible loss Electricity is the currency values of power system loss risk in this assessment;
For the money demand elasticity of equipment loss risk, first according to historical Device repair, count the different extent of damage Maintenance of equipment expense needed for size correspondence, this expense for comprise equipment direct maintenance expense with indirectly cost of labor with test into This, table look-up further according to the possible corresponding extent of damage of equipment and obtain the equipment loss risk quantized value of correspondence;
For the money demand elasticity of personal safety risk, user consider personal safety accident indemnity, enterprise's law entangles Confusingly, the loss of corporate social reputation, the factor such as safety supervision examination, the loss amount of money for different person security incident grades is set, then Table look-up according to the possible corresponding personal safety incident classification of equipment and obtain the personal safety risk quantification value of correspondence;
For the money demand elasticity of environmental effect risk, owing to GIS device accident is mainly manifested in SF6 gas to the impact of environment The leakage of body and the generation of solid waste, therefore, in terms of environmental effect, first set every kilogram of SF6 gas and solid per ton The environmental loss value that garbage is corresponding, the possible gas under the SF6 gas gross being spaced further according to concrete GIS and different faults grade Body leakage rate and solid waste generation amount, weighted sum obtains the environmental effect risk quantification value of correspondence;
After obtaining each money demand elasticity value, equipment operation risk assessment result can be determined by equation below
R ( t ) = P ( t ) Σ 1 4 W i * C i ( t ) * Q i ( t )
Wherein, P (t) is GIS device rate of breakdown, i.e. causes equipment fault probability of happening due to equipment deficiency;WiFor Affect the failure effect weight coefficient of 4 risks;CiT () is the different consequences that equipment fault causes, herein refer to each wind The risk quantification value that danger is corresponding;QiT () is the probability that device fails causes 4 risks, the equipment that is typically based on occurs event Fault statistics result after barrier obtains, and described risk evaluation result includes then and the equipment operation risk value in following each year, Then and the equipment operation risk value in following each year can basis respectivelyDetermine;
Step S103: GIS device is carried out economy according to described name plate information, described state performance information, assets information Benefit is analyzed obtaining Economic and Efficiency Analysis result;
As it is shown on figure 3, wherein in an embodiment, according to described name plate information, described state performance information, assets letter Breath carries out economic benefit and is analyzed obtaining Economic and Efficiency Analysis knot and can specifically include following steps GIS device:
Step S1031: determine that GIS device is then according to described name plate information, described state performance information, assets information And following each year is replaced required fund net present value (NPV);
The computing formula of fund net present value (NPV) is as follows:
Cost NPV = P ( 1 + r ) n
Wherein: CostNPVFor the equipment replacement fund of conversion to net present value (NPV), P is the replacing fund that reality is required then, and r is Clean now rate, n is the time, and for then, n=0, wherein, the maximum of n can determine according to actual needs, the maximum of general n To the installed date of GIS device, to run the time limit, design service life relevant;
Step S1032: obtain described Economic and Efficiency Analysis result according to described fund net present value (NPV);
Described Economic and Efficiency Analysis result includes that GIS device is then and following each year is replaced required fund The corresponding relation of net present value (NPV), usually time and fund net present value (NPV);
Step S104: determine the maintenance of GIS device according to described risk evaluation result and described Economic and Efficiency Analysis result Scheme.
According to more default logical judgment rules, risk evaluation result and Economic and Efficiency Analysis result are carried out logic to sentence The disconnected maintenance solution analyzing acquisition GIS device, the maintenance solution of the GIS device of the present embodiment generally comprises the optimal of GIS device Replacing construction, technological transformation time and technological transformation mode, maintenance cycle and maintenance mode, monitoring cycle, monitoring parameter etc.;As Shown in Fig. 3, wherein in an embodiment, step S104 can specifically be refined as following several step:
Step S1041: calculate GIS device then and the accumulative risk in following each year according to described risk evaluation result Value;
Can be calculated by equation below:
Risk Σn = Σ i = 0 n Risk i
Wherein, RiskΣnFor the accumulative value-at-risk of equipment, RiskiFor the equipment operation risk value of concrete 1 year;
Step S1042: determine the riskpremium net present value (NPV) in GIS device following each year according to described accumulative risk;
Can be calculated by equation below:
ΔRisk Σn - npv = Σ i = 0 n ΔRisk i ( 1 + r ) i
Wherein, Δ RiskΣn-npvThe net present value (NPV) of risk, Δ Risk is added up for following NiFor the risk of concrete 1 year, r For clean now rate;
Step S1043: determine that GIS device exists according to described Economic and Efficiency Analysis result and described riskpremium net present value (NPV) Then and the overall risk expense in following each year;;
Can be calculated by equation below:
Cost Lcc = P ( 1 + r ) n + Σ i = 0 n ΔRisk i ( 1 + r ) i
Wherein, CosLccFor overall risk expense, the overall risk expense in each year in life period of equipment can be calculated according to this formula
Step S1044: determine the maintenance solution of GIS device according to described overall risk expense;
Take and work as CostLccFor the time corresponding during minimum be GIS device most preferably change the time, can be optimal according to this Replacing time and the length working as the section the year before last reasonably arrange the monitoring cycle of GIS device, maintenance cycle (or time), maintenance side Formula, the need of GIS device is undergone technological transformation, best-of-breed technology transformation time or mode etc., general distance most preferably changes year In part the nearest time, it is shorter often to monitor cycle, maintenance cycle, and maintenance mode should use maintenance mode with stronger dynamics, as right GIS device carries out large repairs, in actual applications, it is also possible to consider other factors reasonably arrange GIS device the monitoring cycle, Maintenance cycle (or time), maintenance mode, the need of GIS device is undergone technological transformation, best-of-breed technology transformation time or side Formula etc.;
Step S105: carry out GIS device maintenance according to described maintenance solution;
GIS device maintenance includes being monitored GIS device, keeps in repair, changes, technological transformation etc., due to can be according to inspection Scheme of repairing carries out the replacing of GIS device in the optimal replacing time, had both decreased the unnecessary cost of overhaul, and had improved again GIS device Utilization rate and economic benefit, it is to avoid the waste of electric power resource, meanwhile, optimal change the time before, according to monitoring cycle, maintenance Cycle (or time), maintenance mode, the need of GIS device is undergone technological transformation, best-of-breed technology transformation time or mode enter GIS device is monitored, keeps in repair by row, technological transformation, it is also possible to save unnecessary monitoring, maintenance, technological transformation cost, fall The low cost of overhaul.
After the maintenance solution obtaining GIS device, the checking and graphical representation of user for convenience, it is also possible to bag Include step: described maintenance solution is added to acquisition decision accounting in default report form template, shows or print described decision-making Form;Wherein, show more intuitively future, it is also possible to maintenance solution is being carried out diagrammatic representation, icon is being added to default Report form template in obtain decision accounting.
It is to obtain respectively and the name plate information of stored GIS equipment, state performance information, assets information, based on GIS device Name plate information, state performance information, assets information carry out risk assessment and obtain equipment operation risk assessment knot GIS device Really, name plate information based on GIS device, state performance information, assets information carry out economic benefit to GIS device and are analyzed obtaining Obtain Economic and Efficiency Analysis result, then determine GIS device based on described risk evaluation result and described Economic and Efficiency Analysis result Maintenance solution, and carry out the maintenance of described GIS device based on this maintenance solution, owing to the acquisition of maintenance solution is to transport based on equipment On the basis of row risk assessment and Economic and Efficiency Analysis, take into full account risk factor and the economic benefit of GIS device, permissible When carrying out GIS device maintenance based on this, reduce the unnecessary cost of overhaul, and improve GIS device utilization rate, saved electricity Power resource, in turn ensure that the reliability of operation of power networks, simultaneously as name plate information, state performance information, assets information obtain respectively Take, source and the renewal frequency of class each GIS device Back ground Information can be taken into full account, improve information acquisition efficiency and setting Reasonability, overhaul efficiency is high.
GIS device repair method according to the invention described above, the present invention also provides for a kind of GIS device and overhauls aid decision system System.
Shown in Figure 5, for the structural representation of the GIS device maintenance aid decision-making system embodiment of the present invention.Such as Fig. 5 Shown in, the GIS device maintenance aid decision-making system in the present embodiment includes:
Name plate information acquisition module 201, for obtaining and the name plate information of stored GIS equipment;
State performance data obtaining module 202, for obtaining and the state performance information of stored GIS equipment;
Assets information acquisition module 203, for obtaining and the assets information of stored GIS equipment;
Risk evaluation module 204, for according to described name plate information, described state performance information, described assets information pair GIS device carries out risk assessment and obtains equipment operation risk assessment result;
Economic and Efficiency Analysis module 205, for according to described name plate information, described state performance information, described assets letter Breath carries out Economic and Efficiency Analysis and obtains Economic and Efficiency Analysis result described GIS device;
Maintenance solution determines module 206, for true according to described risk evaluation result and described Economic and Efficiency Analysis result Determine the maintenance solution of GIS device.
According to the scheme in the present embodiment, owing to equipment operation risk assessment and Economic and Efficiency Analysis are all based on described Name plate information, described state performance information, described assets information, these information are all objective reality, and due to GIS device The acquisition of maintenance solution based on equipment operation risk assessment and Economic and Efficiency Analysis on the basis of, taken into full account GIS The risk factor of equipment and economic benefit, thus, on the one hand, can objective acquisition GIS device most preferably overhaul Measures of technical, and Risk factor and the economic benefit of GIS device can be taken into full account, can reduce when carrying out GIS device maintenance based on this The unnecessary cost of overhaul, improves GIS device utilization rate, saves electric power resource, in turn ensure that the reliability of operation of power networks, with Time, owing to name plate information, state performance information, assets information obtain respectively, class each GIS device Back ground Information can be taken into full account Source and renewal frequency, improve the reasonability of information acquisition efficiency and setting, the efficiency of decision-making is high.
Wherein in an embodiment, as shown in Figure 6, the GIS device maintenance aid decision-making system of the present invention, it is also possible to bag Include:
Display module 207, obtains decision accounting for being added to by described maintenance solution and shows in default report form template Show described decision accounting
Print module 208, is used for printing described decision accounting.
Wherein in an embodiment, name plate information acquisition module 201 detect described name plate information occur change time, Described name plate information is carried out synchronizing information, or carry out according to the synchronizing information cycle of the default described name plate information of correspondence right Described name plate information carries out synchronizing information, or according to the activation instruction of the described name plate information of the correspondence received to described nameplate Information carries out synchronizing information;
State performance data obtaining module 202 is when detecting that described state performance information occurs change, to described state Performance information carries out synchronizing information, or carries out institute according to the synchronizing information cycle of default correspondence described state performance information State state performance information and carry out synchronizing information, or according to the activation instruction of the correspondence received described state performance information to institute State state performance information and carry out synchronizing information;
Described assets information, when detecting that described assets information occurs change, is carried out by assets information acquisition module 203 Synchronizing information, or carry out described assets information is carried out letter according to the synchronizing information cycle of the default described assets information of correspondence Breath synchronizes, or according to the activation instruction of the described assets information of the correspondence received, described assets information is carried out synchronizing information.
Wherein in an embodiment, risk evaluation module 204 is according to described state performance information, described state performance letter Breath, assets information determine GIS device at GIS device rate of breakdown and GIS device failure effect then and in following each year, Described GIS device failure effect is carried out money demand elasticity and obtains the money demand elasticity value that GIS device failure effect is corresponding, according to described GIS device rate of breakdown and described money demand elasticity value determine equipment operation risk assessment result;
Economic and Efficiency Analysis module 205 determines according to described state performance information, described state performance information, assets information GIS device, then and following each year is replaced required fund net present value (NPV), obtains institute according to described fund net present value (NPV) State Economic and Efficiency Analysis result.
Maintenance solution determines that module 206 calculates GIS device then and following each year according to described risk evaluation result Accumulative risk, determines GIS device then and the riskpremium net present value (NPV) in following each year according to described accumulative risk, according to described Economic and Efficiency Analysis result and described riskpremium net present value (NPV) determine that GIS device is then and the overall risk expense in following each year With, the maintenance solution of GIS device is determined according to described overall risk expense.
The specific implementation of each module in present system, can be identical with the invention described above method, at this Not repeat in detail.
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed, but also Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that, for those of ordinary skill in the art For, without departing from the inventive concept of the premise, it is also possible to make some deformation and improvement, these broadly fall into the guarantor of the present invention Protect scope.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (6)

1. a GIS device repair method, it is characterised in that comprise the steps:
Obtain respectively and the name plate information of stored GIS equipment, state performance information, assets information;
According to described name plate information, described state performance information, assets information, described GIS device is carried out risk assessment acquisition to set Standby operation risk assessment result;
Described GIS device is carried out Economic and Efficiency Analysis obtain according to described name plate information, described state performance information, assets information Obtain Economic and Efficiency Analysis result;
The maintenance solution of described GIS device is determined according to described risk evaluation result and described Economic and Efficiency Analysis result;
GIS device maintenance is carried out according to described maintenance solution;
Wherein, described according to described name plate information, described state performance information, described assets information, GIS device is carried out risk Assessment acquisition equipment operation risk assessment result includes step:
Determine that described GIS device is then and following each year according to described name plate information, described state performance information, assets information In GIS device rate of breakdown and GIS device failure effect;
Described GIS device failure effect is carried out money demand elasticity and obtains the money demand elasticity value that GIS device failure effect is corresponding, according to Described GIS device rate of breakdown and described money demand elasticity value determine equipment operation risk assessment result;
Wherein, described according to described name plate information, described state performance information, described assets information, described GIS device is carried out Economic and Efficiency Analysis obtains Economic and Efficiency Analysis result and includes step:
Determine that GIS device is then and following each year enters according to described name plate information, described state performance information, assets information Fund net present value (NPV) required for row replacing;
Described Economic and Efficiency Analysis result is obtained according to described fund net present value (NPV);
Wherein, the described maintenance solution determining GIS device according to described risk evaluation result and described Economic and Efficiency Analysis result Comprise the steps:
GIS device is calculated then and the accumulative risk in following each year according to described risk evaluation result;
Determine that GIS device is then and the riskpremium net present value (NPV) in following each year according to described accumulative risk;
Determine that GIS device is then and following each year according to described Economic and Efficiency Analysis result and described riskpremium net present value (NPV) Overall risk expense;
The maintenance solution of GIS device is determined according to described overall risk expense.
GIS device repair method the most according to claim 1, it is characterised in that further comprise the steps of:
Described maintenance solution is added to acquisition decision accounting in default report form template;
Show or print described decision accounting.
GIS device repair method the most according to claim 1 and 2, the mode obtaining GIS device Back ground Information includes following Any one or combination in any in mode:
Mode one: when any type information detected in described name plate information, described state performance information, assets information occurs During change, synchronize the information of corresponding types;
Mode two: configuration information synchronizing cycle, according to this synchronizing information cycle to described name plate information, described state performance letter Breath, assets information carry out synchronizing information;
Mode three: when receiving activation instruction, according to described activation instruction to described name plate information, described state performance letter Breath, assets information carry out synchronizing information.
4. a GIS device maintenance aid decision-making system, it is characterised in that including:
Name plate information acquisition module, for obtaining and the name plate information of stored GIS equipment;
State performance data obtaining module, for obtaining and the state performance information of stored GIS equipment;
Assets information acquisition module, for obtaining and the assets information of stored GIS equipment;
According to described name plate information, described state performance information, assets information, risk evaluation module, for determining that GIS device exists GIS device rate of breakdown and GIS device failure effect then and in following each year, enter described GIS device failure effect Row money demand elasticity obtains the money demand elasticity value that GIS device failure effect is corresponding, according to described GIS device rate of breakdown and institute State money demand elasticity value and determine equipment operation risk assessment result;
According to described name plate information, described state performance information, assets information, Economic and Efficiency Analysis module, for determining that GIS sets Standby then and following each year is replaced required fund net present value (NPV), obtain described economy according to described fund net present value (NPV) Performance analysis result;
Maintenance solution determines module, calculates GIS device then and the accumulation wind in following each year according to described risk evaluation result Danger, determines GIS device then and the riskpremium net present value (NPV) in following each year according to described accumulative risk, according to described economic effect Benefit analysis result and described riskpremium net present value (NPV) determine GIS device then and the overall risk expense in following each year, according to Described overall risk expense determines the maintenance solution of GIS device.
GIS device the most according to claim 4 maintenance aid decision-making system, it is characterised in that also include:
Display module, obtains decision accounting for being added to by described maintenance solution and shows described determining in default report form template Plan form;
Print module, is used for printing described decision accounting.
6. overhaul aid decision-making system according to the GIS device described in claim 4 or 5, it is characterised in that:
Name plate information acquisition module, when detecting that described name plate information occurs change, carries out information same to described name plate information Step, or it is same to carry out that described name plate information carries out information according to the synchronizing information cycle of the default described name plate information of correspondence Step, or according to the activation instruction of the described name plate information of the correspondence received, described name plate information is carried out synchronizing information;
State performance data obtaining module is when detecting that described state performance information occurs change, to described state performance information Carry out synchronizing information, or carry out described state according to the synchronizing information cycle of default correspondence described state performance information Information can carry out synchronizing information, or according to the activation instruction of the correspondence received described state performance information to described state Information can carry out synchronizing information;
Assets information acquisition module, when detecting that described assets information occurs change, carries out information same to described assets information Step, or it is same to carry out that described assets information carries out information according to the synchronizing information cycle of the default described assets information of correspondence Step, or according to the activation instruction of the described assets information of the correspondence received, described assets information is carried out synchronizing information.
CN201310317847.8A 2013-07-25 2013-07-25 GIS device repair method and GIS device maintenance aid decision-making system Active CN103400224B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310317847.8A CN103400224B (en) 2013-07-25 2013-07-25 GIS device repair method and GIS device maintenance aid decision-making system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310317847.8A CN103400224B (en) 2013-07-25 2013-07-25 GIS device repair method and GIS device maintenance aid decision-making system

Publications (2)

Publication Number Publication Date
CN103400224A CN103400224A (en) 2013-11-20
CN103400224B true CN103400224B (en) 2016-12-28

Family

ID=49563841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310317847.8A Active CN103400224B (en) 2013-07-25 2013-07-25 GIS device repair method and GIS device maintenance aid decision-making system

Country Status (1)

Country Link
CN (1) CN103400224B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106127315A (en) * 2016-06-29 2016-11-16 柳州市格罗贸易有限公司 A kind of car inspection and repair method
CN107730088A (en) * 2017-09-20 2018-02-23 国网山东省电力公司济宁供电公司 A kind of controller switching equipment inspection scheme generation method and device based on distribution big data
CN108428010B (en) * 2018-02-12 2021-09-28 中国电力科学研究院有限公司 Method and system for determining direct current receiving end simultaneous-stop maintenance scheme based on power angle stability
CN110489142B (en) * 2019-07-12 2020-05-22 中国人民解放军63961部队 Evaluation method and device for equipment software upgrading, storage medium and terminal
CN110797791B (en) * 2019-11-04 2021-01-26 云南送变电工程有限公司 Method for overhauling lower 500kVGIL tubular bus without accompanying shutdown
CN110866617A (en) * 2019-11-15 2020-03-06 国网天津市电力公司 Maintenance aid decision-making method associated with equipment life cycle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101859409A (en) * 2010-05-25 2010-10-13 广西电网公司电力科学研究院 Power transmission and transformation equipment state overhauling system based on risk evaluation
CN102081765A (en) * 2011-01-19 2011-06-01 西安交通大学 Systematic control method for repair based on condition of electricity transmission equipment
CN102222276A (en) * 2011-05-16 2011-10-19 广东电网公司深圳供电局 State maintenance method and device for secondary equipment of power grid
CN102354918A (en) * 2011-10-09 2012-02-15 广东电网公司电力科学研究院 Method and device for maintaining power transmission and transformation equipment
CN103218758A (en) * 2013-04-28 2013-07-24 广东电网公司电力调度控制中心 Electric power communication device maintaining method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101859409A (en) * 2010-05-25 2010-10-13 广西电网公司电力科学研究院 Power transmission and transformation equipment state overhauling system based on risk evaluation
CN102081765A (en) * 2011-01-19 2011-06-01 西安交通大学 Systematic control method for repair based on condition of electricity transmission equipment
CN102222276A (en) * 2011-05-16 2011-10-19 广东电网公司深圳供电局 State maintenance method and device for secondary equipment of power grid
CN102354918A (en) * 2011-10-09 2012-02-15 广东电网公司电力科学研究院 Method and device for maintaining power transmission and transformation equipment
CN103218758A (en) * 2013-04-28 2013-07-24 广东电网公司电力调度控制中心 Electric power communication device maintaining method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
用净现值分析方法优化电厂检修决策;瞿建国;《江苏电机工程》;20030930;第22卷(第5期);第17-20页 *

Also Published As

Publication number Publication date
CN103400224A (en) 2013-11-20

Similar Documents

Publication Publication Date Title
CN103400224B (en) GIS device repair method and GIS device maintenance aid decision-making system
CN103646358B (en) Meter and the electrical network scheduled overhaul cycle determination method of power equipment time-varying fault rate
CN102063651B (en) Urban power grid risk evaluation system based on on-line data acquisition
CN102663530B (en) HVDC (High Voltage Direct Current) transmission system safe early warning and evaluating system
CN102394496B (en) Electric energy quality comprehensive assessment method of distributed generating system and micro power grid
CN102436226A (en) Online monitoring and condition maintenance management system
CN105894133A (en) Wind turbine component maintenance and spare part demand forecasting method
CN104392391A (en) Power grid running safety risk quantification method
CN102590688B (en) Method for estimating operation condition of sulfur hexafluoride transformers
CN103454516A (en) Intelligent transformer substation secondary equipment health state diagnosis method
CN104299116A (en) Quantitative evaluation method for security risk of operation of power network
CN103150635B (en) Power equipment O&M method
CN102663522B (en) On-line risk evaluation method of power grid
CN103149475A (en) Method and system for fault diagnosis of electrical equipment
CN103440400A (en) Power system short-term risk determination method taking disaster factors into account
CN106815770A (en) It is a kind of to consider abundance and security of system the methods of risk assessment of system
CN103630781B (en) Composite energy supply non-contact on-line monitoring system for active electronic current transformer and data processing method thereof
CN106651643A (en) Power security management and control method for whole process based on distribution and adjustment
CN102737287A (en) Regional power grid on-line power supply risk assessment system
Airoboman et al. Reliability analysis of power system network: A case study of transmission company of Nigeria, Benin City
CN117349624A (en) Electric power energy monitoring method, system, terminal equipment and storage medium
CN112052620A (en) Intelligent monitoring and analyzing system for urban distribution transformer area
Blackmore et al. Improving network reliability through effective asset management
Kerin et al. Dynamic security assessment in system operation and planning—First experiences
Zhichun et al. Active fault analysis of distribution transformer service area based on intelligent transformer terminal unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Co-patentee after: Red phase Limited by Share Ltd

Patentee after: Guangzhou Power Supply Bureau

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Co-patentee before: Xiamen Red Phase Instruments Inc.

Patentee before: Guangzhou Power Supply Bureau

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190619

Address after: 510620 No. 2 Tianhe two road, Tianhe District, Guangzhou, Guangdong

Patentee after: Guangzhou Power Supply Bureau

Address before: 510620 No. 2 Tianhe two road, Tianhe District, Guangzhou, Guangdong

Co-patentee before: Red phase Limited by Share Ltd

Patentee before: Guangzhou Power Supply Bureau

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200916

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.