CN103397892A - Shield starting tunnel portal extension steel ring - Google Patents

Shield starting tunnel portal extension steel ring Download PDF

Info

Publication number
CN103397892A
CN103397892A CN2013102944484A CN201310294448A CN103397892A CN 103397892 A CN103397892 A CN 103397892A CN 2013102944484 A CN2013102944484 A CN 2013102944484A CN 201310294448 A CN201310294448 A CN 201310294448A CN 103397892 A CN103397892 A CN 103397892A
Authority
CN
China
Prior art keywords
plate
ring flat
steel loop
steel ring
loop body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102944484A
Other languages
Chinese (zh)
Inventor
刘尧庆
沙权贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 13th Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN2013102944484A priority Critical patent/CN103397892A/en
Publication of CN103397892A publication Critical patent/CN103397892A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a shield starting tunnel portal extension steel ring. The shield starting tunnel portal extension steel ring is characterized in that the steel ring comprises a steel ring body (1) with the width of at least 45mm, one end of the steel ring body (1) is connected with a first ring plate (2), the internal diameter of the first ring plate (2) is equal to that of the steel ring body (1), the external diameter of the first ring plate (2) is larger than the diameter of the steel ring body (1), and a second ring plate (3) is fixedly connected with the first ring plate (2), twice as thick as the first ring plate (2) and embedded in the wall of a tunnel portal. The shield starting tunnel portal extension steel ring is simple in structure and skillful in design, avoids dust pollution caused by manual pile breaking and can improve working efficiency of a shield machine.

Description

The shield launching portal extends steel loop
Technical field
The present invention relates to a kind of shield launching portal supplementary structure, particularly a kind of shield launching portal extends steel loop.
Background technology
In subway shield tunnel construction, starting of shield machine is a considerable link, in construction in the past, because the distance between portal sealing and face is very near, for the cutterhead that makes shield machine when carrying out broken pile, can not damage the cord rubber tile, usually will adopt manually-operated mode that face is abolished 60cm before broken pile dark, to guarantee the space of cutterhead rotation.But, artificial broken pile construction can produce a large amount of dust, and because plate in the station of missing the stop seals often, dust can't be discharged smoothly, make the air quality in station sharply descend, have a strong impact on workman's construction environment, also can affect the assembly working of technique on shield machine's station-crossing simultaneously, thereby seriously delay the progress of technique on shield machine's station-crossing construction.Therefore need now a kind of new structure that can address the above problem or device.
Summary of the invention
The present invention is in order to solve the existing above-mentioned deficiency of prior art, propose a kind of simple in structure, design ingenious, the dust pollution of avoiding artificial broken pile to cause, and the shield launching portal that can improve the shield machine operating efficiency extends steel loop.
Technical solution of the present invention is: a kind of shield launching portal extends steel loop, it is characterized in that: described steel loop comprises steel loop body 1, the width of steel loop body 1 is at least 45mm, one end of steel loop body 1 is connected with the first ring flat-plate 2, the internal diameter of the first ring flat-plate 2 is identical with steel loop body 1, and the external diameter of the first ring flat-plate 2, greater than the diameter of steel loop body 1, is fixedly connected with the second ring flat-plate 3 with the first ring flat-plate 2, the thickness of the second ring flat-plate 3 is the twice of the first ring flat-plate 2 thickness, and the second ring flat-plate 3 is embedded in the portal body of wall.
Be evenly distributed with a plurality of gussets 4 on described steel loop body 1, and differ 15 degree between adjacent gusset 4 on circumference.
The thickness of described steel loop body 1 and the first ring flat-plate 2 is 10mm, the internal diameter of the diameter of steel loop body 1, the first ring flat-plate 2 and the second ring flat-plate 3 is 6500mm, and the external diameter of the first ring flat-plate 2 and the second ring flat-plate 3 is 6800mm, and the thickness of gusset 4 is 20mm, length is 450mm, and width is 115mm.
The present invention compared with the existing technology, has following advantage:
The shield launching portal of this kind of form of structure extends steel loop, it is simple in structure, design is ingenious, it is for the existing defect of existing construction technology, be provided with an outward extending steel loop on portal, so just exempted artificial broken pile working procedure in traditional work progress, fundamentally solve the problem of the interior dust in station in the work progress that misses the stop, when improving workman's construction operation environment, can also improve the construction speed of technique on shield machine's station-crossing; Can also reduce simultaneously the cost of shield-tunneling construction in the mode of portal extension steel loop replacement Traditional Man broken pile, and site operation is convenient; Therefore can say that portal extends steel loop and have higher practicality in subway shield tunnel construction, be particularly suitable for applying in the art, its market prospects are very wide.
Description of drawings
Fig. 1 is the front view of the embodiment of the present invention.
Fig. 2 is the lateral view of the embodiment of the present invention.
The specific embodiment
Below in conjunction with description of drawings the specific embodiment of the present invention.As shown in Figure 1 and Figure 2: a kind of shield launching portal extends steel loop, it comprises steel loop body 1, the width of this steel loop body 1 is at least 45mm, the internal diameter that one end of steel loop body 1 is connected with the first ring flat-plate 2, the first ring flat-plates 2 is identical with steel loop body 1, and the external diameter of the first ring flat-plate 2 is greater than the diameter of steel loop body 1, form a step-like ring flat-plate, the thickness that is fixedly connected with the second ring flat-plate 3, the second ring flat-plates 3 with the first ring flat-plate 2 is the twice of the first ring flat-plate 2 thickness, and the second ring flat-plate 3 is embedded in the portal body of wall., in order to strengthen bulk strength, also be evenly distributed with a plurality of gussets 4 on steel loop body 1, and differ 15 degree between adjacent gusset 4 on circumference.The thickness of above-mentioned steel loop body 1 and the first ring flat-plate 2 is 10mm, therefore the thickness of the second ring flat-plate 3 is 20mm, the internal diameter of the diameter of steel loop body 1, the first ring flat-plate 2 and the second ring flat-plate 3 is 6500mm, the external diameter of the first ring flat-plate 2 and the second ring flat-plate 3 is 6800mm, the thickness of gusset 4 is 20mm, length is 450mm, and width is 115mm.
The shield launching portal of the embodiment of the present invention extends steel loop, pre-buried the second ring flat-plate 3 in the portal body of wall, and be fixedly connected sequentially thus the first ring flat-plate 2 and steel loop body 1, be in the consideration of bulk strength, also be provided with gusset 4 on steel loop body 1, gusset 4 simultaneously with steel loop body 1 be connected ring flat-plate 2 and be connected, its existence is equivalent to the protruding annular canister of portal body of wall, this annular canister provides space for the cutterhead rotation of shield machine, has therefore also avoided the variety of problems that in the traditional handicraft, artificial broken pile construction produces.

Claims (3)

1. a shield launching portal extends steel loop, it is characterized in that: described steel loop comprises steel loop body (1), the width of steel loop body (1) is at least 45mm, one end of steel loop body (1) is connected with the first ring flat-plate (2), the internal diameter of the first ring flat-plate (2) is identical with steel loop body (1), the external diameter of the first ring flat-plate (2) is greater than the diameter of steel loop body (1), be fixedly connected with the second ring flat-plate (3) with the first ring flat-plate (2), the thickness of the second ring flat-plate (3) is the twice of the first ring flat-plate (2) thickness, and the second ring flat-plate (3) is embedded in the portal body of wall.
2. shield launching portal according to claim 1 extends steel loop, it is characterized in that: be evenly distributed with a plurality of gussets (4) on described steel loop body (1), and differ 15 degree between adjacent gusset (4) on circumference.
3. shield launching portal according to claim 2 extends steel loop, it is characterized in that: the thickness of described steel loop body (1) and the first ring flat-plate (2) is 10mm, the internal diameter of the diameter of steel loop body (1), the first ring flat-plate (2) and the second ring flat-plate (3) is 6500mm, the external diameter of the first ring flat-plate (2) and the second ring flat-plate (3) is 6800mm, the thickness of gusset (4) is 20mm, length is 450mm, and width is 115mm.
CN2013102944484A 2013-07-15 2013-07-15 Shield starting tunnel portal extension steel ring Pending CN103397892A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102944484A CN103397892A (en) 2013-07-15 2013-07-15 Shield starting tunnel portal extension steel ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102944484A CN103397892A (en) 2013-07-15 2013-07-15 Shield starting tunnel portal extension steel ring

Publications (1)

Publication Number Publication Date
CN103397892A true CN103397892A (en) 2013-11-20

Family

ID=49561584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102944484A Pending CN103397892A (en) 2013-07-15 2013-07-15 Shield starting tunnel portal extension steel ring

Country Status (1)

Country Link
CN (1) CN103397892A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005450A (en) * 2019-04-19 2019-07-12 中铁第四勘察设计院集团有限公司 A kind of subway station and shield tunnel interface waterproof construction and construction method
CN112983445A (en) * 2021-03-11 2021-06-18 中铁三局集团华东建设有限公司 Water-rich sand layer shield launching method and device based on portal extension ring device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1995700A (en) * 2006-12-30 2007-07-11 广东省基础工程公司 Shield launching construction method
CN101487394A (en) * 2009-02-11 2009-07-22 中铁三局集团有限公司 External slip-casting pipe type tunnel shielding portal construction method
CN201330606Y (en) * 2008-12-16 2009-10-21 上海隧道工程股份有限公司 Base for tunnel shield to enter hole
CN101749026A (en) * 2010-02-10 2010-06-23 中铁三局集团有限公司 Grid reinforcing method of shield receiving or starting end head and shield receiving method
CN102011596A (en) * 2010-11-29 2011-04-13 中铁三局集团有限公司 Shield originating or receiving end tunnel portal maintenance process
JP2011241639A (en) * 2010-05-20 2011-12-01 Kajima Corp Junction structure of vertical shaft mouth part
CN203420713U (en) * 2013-07-15 2014-02-05 中铁十三局集团有限公司 Shield launching tunnel portal extension steel ring

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1995700A (en) * 2006-12-30 2007-07-11 广东省基础工程公司 Shield launching construction method
CN201330606Y (en) * 2008-12-16 2009-10-21 上海隧道工程股份有限公司 Base for tunnel shield to enter hole
CN101487394A (en) * 2009-02-11 2009-07-22 中铁三局集团有限公司 External slip-casting pipe type tunnel shielding portal construction method
CN101749026A (en) * 2010-02-10 2010-06-23 中铁三局集团有限公司 Grid reinforcing method of shield receiving or starting end head and shield receiving method
JP2011241639A (en) * 2010-05-20 2011-12-01 Kajima Corp Junction structure of vertical shaft mouth part
CN102011596A (en) * 2010-11-29 2011-04-13 中铁三局集团有限公司 Shield originating or receiving end tunnel portal maintenance process
CN203420713U (en) * 2013-07-15 2014-02-05 中铁十三局集团有限公司 Shield launching tunnel portal extension steel ring

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005450A (en) * 2019-04-19 2019-07-12 中铁第四勘察设计院集团有限公司 A kind of subway station and shield tunnel interface waterproof construction and construction method
CN110005450B (en) * 2019-04-19 2024-05-03 中铁第四勘察设计院集团有限公司 Waterproof structure for subway station and shield tunnel interface and construction method
CN112983445A (en) * 2021-03-11 2021-06-18 中铁三局集团华东建设有限公司 Water-rich sand layer shield launching method and device based on portal extension ring device
CN112983445B (en) * 2021-03-11 2023-08-25 中铁三局集团华东建设有限公司 Water-rich sand layer shield starting method and device based on tunnel portal extension ring device

Similar Documents

Publication Publication Date Title
CN204783026U (en) It prevents rotary device initiatively to articulate formula shield structure single cylinder hydro -cylinder
CN205779496U (en) A kind of tower reversed balancing flange
CN203420713U (en) Shield launching tunnel portal extension steel ring
CN102889085B (en) Tunneling construction method for shield tunneling machine
CN206955150U (en) Edge banding machine turns round production line
CN204489958U (en) The upset dust collector of cement package bags
CN204584993U (en) A kind of multi-port sand-blasting machine
CN103397892A (en) Shield starting tunnel portal extension steel ring
CN204489352U (en) The dust collector of cement package bags
CN203403888U (en) Impact-type tunneling machine
CN205011079U (en) Closed dust removal dummy car
CN203655316U (en) Top isolating device for coal mine filling bracket
CN104028505A (en) Dust collection device for injection product
CN205633899U (en) Clear coal device of scraper conveyor scraper blade
CN203547742U (en) Telescopic part of heading machine
CN203946597U (en) A kind of cutting machine feeding device
CN204436382U (en) A kind of energy-efficient mining apparatus
CN204200081U (en) It is a kind of that nutation type is semi-automatic changes bar hydraulic rock drilling machine
CN204307705U (en) A kind of pulverizer with dust-absorbing function
CN203938209U (en) Mobile discharge mouth sealing device
CN203257462U (en) Ultra-thin coal seam filling mining hydraulic support high-speed throwing device
CN205171325U (en) Cold aggregate dust collector in pitch station
CN203223221U (en) Shovel plate for heading machine
CN106703817A (en) Construction method for reducing damaged segments and offset deformation by small-radius curved shield tunneling
CN202451168U (en) Dustproof throwing jet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131120