CN1995700A CN 200610132425 CN200610132425A CN1995700A CN 1995700 A CN1995700 A CN 1995700A CN 200610132425 CN200610132425 CN 200610132425 CN 200610132425 A CN200610132425 A CN 200610132425A CN 1995700 A CN1995700 A CN 1995700A
Authority
CN
China
Prior art keywords
shield machine
steel bushing
shield
portal
steel sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610132425
Other languages
Chinese (zh)
Other versions
CN100572750C (en
Inventor
何伦
王小军
朱劲峰
邵孟新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hua Qiao construction group Limited by Share Ltd
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CNB2006101324253A priority Critical patent/CN100572750C/en
Publication of CN1995700A publication Critical patent/CN1995700A/en
Application granted granted Critical
Publication of CN100572750C publication Critical patent/CN100572750C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a construction method for origination of shield machine, comprising following procedures that a steel sleeve with the thickness suitable for the cutter disc thickness of shield machine is set at the back of originating portal; before shield origination, rubber water-stop curtain and pressing plate are set at the tail of assembled steel sleeve; when the shield machine is launched and the shield machine enters into the steel sleeve from bracket, the cutter disc of shield machine stops rotating and the shield machine moves forwards; when the head of shield machine enters into the steel sleeve through the rubber water-stop curtain and the cutter tip is against the protective structure, the shield machine stops moving forward temporarily. In the invention the method that the shield machine cuts the portal directly is adopted to dig and a steel sleeve with the thickness suitable for the cutter disc thickness of shield machine is set at the back of originating portal; the position of rubber water-stop curtain is moved to the end of steel sleeve form the portal position and the length of steel sleeve is used to add the distance between cutter disc and rubber water-stop curtain so that incision water pressure is built at the time of shield machine origination at the earliest time; finally the purpose of invention is achieved.

Description

A kind of job practices of shield launching
Technical field
The present invention relates to the realm of building construction, particularly relate to the job practices of the shield launching in the constructing tunnel.
Background technology
In engineering in the past, the method of shield launching all is to adopt earlier the stratum, termination to be reinforced, before shield launching, after the concrete of space enclosing structure in the portal scope, reinforcing bar etc. cut, shield machine just can start, and just can finish the general time of needs about 15 days of cutting of portal.For cooperating overall Construction Plan, when space enclosing structure is constructed, the shield machine material that can directly cut that in left tunnel line portal scope, used (pre-buried in space enclosing structure), during the left line shield launching of this engineering, need not portal is cut, directly the cutting driving can reduce the risk and the saving duration that cut portal.
Summary of the invention
The object of the present invention is to provide a kind of efficient, succinct, shield launching mode of saving the duration, also greatly reduce simultaneously portal is cut existing risk, set up otch hydraulic pressure when making shield launching as early as possible, for controlling ground settlement preferably provides the job practices of the shield launching of effective guarantee.
The objective of the invention is to be achieved through the following technical solutions:
(1), behind the portal that starts, sets up the long steel bushing that adapts with cutter head of shield machine thickness of 500-1000mm, wherein, described steel bushing by more than at least 2, the steel plate workpiece processing of circular arc that about 30-50mm is thick is assembled, adopt bolt to connect between workpiece, each parts adds the weldering ribs with angle steel or steel pipe to be fixed, and prevents to be out of shape in dismounting and the transportation;
(2) make up after the workpiece for the treatment of steel bushing machines, locate to steel bushing, be connected with bolt after between steel bushing and former portal, adding δ=3mm rubber rubber cushion, and fill space between steel bushing bottom and the base plate, to prevent making its distortion after shield machine from entering steel bushing with plain concrete;
(3) before the shield launching, at the end of mounted steel bushing, install the rubber sealing door curtain made of cloth and pressing plate successively earlier;
(4) when shield launching, when shield machine began to enter steel bushing from carriage, the cutterhead of shield machine stopped operating, just shield machine is pushed ahead, treat that the shield machine head enters steel bushing by the rubber sealing door curtain made of cloth, and after its point of a knife withstood space enclosing structure, shield machine halted temporarily;
(5) circulation system of startup shield machine makes its shield machine reach mud and water balance, and rotating cutter-head, the space enclosing structure in the portal scope is directly cut shield launching.
The present invention is owing to adopted shield machine that the method (sew worker's method) that portal directly cuts is tunneled, but owing to need not to cut portal, make the distance between the cutter head of shield machine and the rubber sealing door curtain made of cloth shorten greatly, for the destruction that prevents that cutterhead from producing the door curtain made of cloth when rotating, the present invention adopts and set up a steel bushing that adapts with cutter head of shield machine thickness behind the portal that starts, and the position of the rubber sealing door curtain made of cloth moved to the steel bushing end from portal, utilize the length of steel bushing to increase distance between the cutterhead and the rubber sealing door curtain made of cloth, and set up otch hydraulic pressure as early as possible when making shield launching, reach purpose of the present invention.
Describe realization of the present invention in detail below in conjunction with accompanying drawing:
Description of drawings
Fig. 1 is a constructing structure schematic diagram of the present invention;
Fig. 2 is that the structure of steel bushing of the present invention is formed schematic diagram;
The specific embodiment
As Fig. 1~shown in Figure 2, the job practices of shield launching of the present invention may further comprise the steps:
(1), setting up a 500-1000mm length behind the portal that starts (specifically decides on the thickness of cutterhead, generally be slightly larger than cutterhead thickness,) steel bushing as shown in Figure 21, wherein, described steel bushing 1 by more than at least 2, the steel plate workpiece processing of circular arc that about 30-50mm is thick is assembled, adopt bolt to connect between workpiece, it is fixing that each parts adds weldering ribs 1 with angle steel or steel pipe, prevents to be out of shape in dismounting and the transportation;
(2) make up after the workpiece for the treatment of steel bushing 1 machines, give steel bushing 1 location, be connected with bolt after between steel bushing 1 and former portal, adding δ=3mm rubber rubber cushion, and fill space between steel bushing bottom and the base plate, to prevent making its distortion after shield machine from entering steel bushing with plain concrete;
(3) before the shield launching, at the end of mounted steel bushing 1, at first install the rubber sealing door curtain made of cloth 3 earlier, and then pressing plate 2 is installed, to compress the door curtain made of cloth 3 along periphery.Steel bushing 1, the rubber sealing door curtain made of cloth 3 and pressing plate 2 threes link together by bolt;
(4) when shield launching, when shield machine began to enter steel bushing 1 from carriage, the cutterhead of shield machine stopped operating, just shield machine is pushed ahead, treat that the shield machine head enters steel bushing 1 by the rubber sealing door curtain made of cloth 3, and after its point of a knife withstood space enclosing structure, shield machine halted temporarily;
(5) circulation system of startup shield machine makes its shield machine reach mud and water balance, and rotating cutter-head, the space enclosing structure in the portal scope is directly cut shield launching.

Claims (1)

1, a kind of job practices of shield launching is characterized in that may further comprise the steps:
(1), behind the portal that starts, sets up the long steel bushing (1) that adapts with cutter head of shield machine thickness of 500-1000mm, wherein, described steel bushing (1) by more than at least 2, the steel plate workpiece processing of circular arc that about 30-50mm is thick is assembled, adopt bolt to connect between workpiece, it is fixing that each parts adds weldering ribs (11) with angle steel or steel pipe, prevents to be out of shape in dismounting and the transportation;
(2) make up after the workpiece for the treatment of steel bushing (1) machines, locate to steel bushing, be connected with bolt after between steel bushing (1) and former portal, adding δ=3mm rubber rubber cushion, and fill space between steel bushing (1) bottom and the base plate with plain concrete, to prevent making its distortion after shield machine from entering steel bushing (1);
(3) before the shield launching, at the end of mounted steel bushing (1), install the rubber sealing door curtain made of cloth (3) and pressing plate (2) successively earlier;
(4) when shield launching, when shield machine begins to enter steel bushing (1) from carriage, the cutterhead of shield machine stops operating, just shield machine is pushed ahead, treat that the shield machine head enters steel bushing (1) by the rubber sealing door curtain made of cloth (3), and after its point of a knife withstood space enclosing structure, shield machine temporarily halted;
(5) circulation system of startup shield machine makes its shield machine reach mud and water balance, and rotating cutter-head, the space enclosing structure in the portal scope is directly cut shield launching.
CNB2006101324253A 2006-12-30 2006-12-30 A kind of job practices of shield launching Active CN100572750C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006101324253A CN100572750C (en) 2006-12-30 2006-12-30 A kind of job practices of shield launching

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006101324253A CN100572750C (en) 2006-12-30 2006-12-30 A kind of job practices of shield launching

Publications (2)

Publication Number Publication Date
CN1995700A true CN1995700A (en) 2007-07-11
CN100572750C CN100572750C (en) 2009-12-23

Family

ID=38250874

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006101324253A Active CN100572750C (en) 2006-12-30 2006-12-30 A kind of job practices of shield launching

Country Status (1)

Country Link
CN (1) CN100572750C (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010145529A1 (en) * 2009-06-15 2010-12-23 广东华隧建设股份有限公司 Device used for sealed launching and arrival of shield machine
CN102022119A (en) * 2010-12-15 2011-04-20 广东华隧建设股份有限公司 Shield machine balance originating method
CN101539023B (en) * 2008-03-21 2012-07-04 中铁二局股份有限公司 Shield machine belt pressure chamber opening operation construction method
CN102635364A (en) * 2012-04-25 2012-08-15 中铁三局集团有限公司 Method for originating shield large-angle curve
CN103397892A (en) * 2013-07-15 2013-11-20 中铁十三局集团有限公司 Shield starting tunnel portal extension steel ring
CN103899324A (en) * 2014-04-10 2014-07-02 中铁五局(集团)有限公司 Construction method for balance originating of earth pressure balance shield machine
CN103982194A (en) * 2014-06-04 2014-08-13 北京建筑大学 Method for barrier-free starting of shield tunneling machine
CN104695967A (en) * 2015-01-21 2015-06-10 广东华隧建设股份有限公司 Ring frame beam device for shield launching and mounting method of ring frame beam device
CN105927242A (en) * 2016-07-11 2016-09-07 辽宁北铁建工有限责任公司 Quick starting device and starting method for miniature TBM (tunnel boring machine) rock tunneling machine
CN107060798A (en) * 2017-04-25 2017-08-18 封鸿涛 The increasing resistance stepping guide mechanism and its method of a kind of soil layer driving
CN107747488A (en) * 2017-10-13 2018-03-02 中铁四局集团第四工程有限公司 The construction method of big cross section shape of a hoof shield launching
CN110924961A (en) * 2019-12-06 2020-03-27 中交第三航务工程局有限公司 Construction method for starting shield tunneling machine to pass through existing station

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101539023B (en) * 2008-03-21 2012-07-04 中铁二局股份有限公司 Shield machine belt pressure chamber opening operation construction method
WO2010145529A1 (en) * 2009-06-15 2010-12-23 广东华隧建设股份有限公司 Device used for sealed launching and arrival of shield machine
CN102022119A (en) * 2010-12-15 2011-04-20 广东华隧建设股份有限公司 Shield machine balance originating method
CN102022119B (en) * 2010-12-15 2012-09-05 广东华隧建设股份有限公司 Shield machine balance originating method
CN102635364A (en) * 2012-04-25 2012-08-15 中铁三局集团有限公司 Method for originating shield large-angle curve
CN103397892A (en) * 2013-07-15 2013-11-20 中铁十三局集团有限公司 Shield starting tunnel portal extension steel ring
CN103899324A (en) * 2014-04-10 2014-07-02 中铁五局(集团)有限公司 Construction method for balance originating of earth pressure balance shield machine
CN103982194A (en) * 2014-06-04 2014-08-13 北京建筑大学 Method for barrier-free starting of shield tunneling machine
CN104695967A (en) * 2015-01-21 2015-06-10 广东华隧建设股份有限公司 Ring frame beam device for shield launching and mounting method of ring frame beam device
CN105927242A (en) * 2016-07-11 2016-09-07 辽宁北铁建工有限责任公司 Quick starting device and starting method for miniature TBM (tunnel boring machine) rock tunneling machine
CN107060798A (en) * 2017-04-25 2017-08-18 封鸿涛 The increasing resistance stepping guide mechanism and its method of a kind of soil layer driving
CN107060798B (en) * 2017-04-25 2023-02-03 封鸿涛 Resistance-increasing stepping guide mechanism for soil layer tunneling and method thereof
CN107747488A (en) * 2017-10-13 2018-03-02 中铁四局集团第四工程有限公司 The construction method of big cross section shape of a hoof shield launching
CN107747488B (en) * 2017-10-13 2019-06-18 中铁四局集团第四工程有限公司 The construction method of big cross section shape of a hoof shield launching
CN110924961A (en) * 2019-12-06 2020-03-27 中交第三航务工程局有限公司 Construction method for starting shield tunneling machine to pass through existing station

Also Published As

Publication number Publication date
CN100572750C (en) 2009-12-23

Similar Documents

Publication Publication Date Title
CN100572750C (en) A kind of job practices of shield launching
CN101929344B (en) Method for mounting medium-deep buried water stop of tunnel archwall lining concrete toroidal construction joint
CN109611107B (en) Originating portal capable of being broken rapidly in shield method connection channel construction
CN107387104B (en) Jet shield tunneling machine and tunneling method
CN112324447B (en) Shield equipment capable of realizing underground butt joint and butt joint method
CN111485913A (en) Gob-side entry retaining system and method for roadway-side goaf gangue cementing wall forming
CN1687564A (en) Dismountable type drive unit of shield cutter head inside machine
CN109139028B (en) Arc-cutting shield tunneling machine cutterhead
CN109322672A (en) A kind of positive side maintenance space system of shield machine based on auxiliary pile and method
CN106223971B (en) A kind of development machine and driving method
CN109441469B (en) Self-propelled shield tunneling machine complete equipment fitting free section and tunnel construction method
CN109372526B (en) Novel earth pressure balance shield machine capable of crossing foreign matter obstacle
CN105065011A (en) Construction method of soft soil shield tunneling cutting pile foundation
CN106522972A (en) Tunnel boring machine (TBM) cutterhead and shield jamming processing method
CN103982194A (en) Method for barrier-free starting of shield tunneling machine
CN205936623U (en) Shield constructs quick -witted advancing mechanism
CN209976545U (en) Construction equipment for tunnel connection channel
CN2916305Y (en) Cutter tool for pipe pushing jack
CN108625869B (en) TBM host structure formed by special-shaped tunnel at one time and construction method thereof
CN204283211U (en) Advanced support pipe shed pore-forming system for extremely-broken water-rich weak surrounding rock tunnel
CN108265769B (en) Seamless grooving machine for thin-wall continuous wall and construction process thereof
CN103104265B (en) Advanced lining method and lining equipment used in construction of weak surrounding rock tunnel
CN103662686B (en) A kind of method for making of shaftless conveyor screw
CN109869151A (en) Realize the work compound method of working face mining and protection coal pillar recycling
CN203175572U (en) Fore-lining equipment used for construction of weak surrounding rock tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA TUNNEL CONSTRUCTION CO., LTD. GUANGDONG

Free format text: FORMER OWNER: GUANGDONG PROV. FOUNDATION ENGINEERING CO.

Effective date: 20140410

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140410

Address after: 9, building 510620, industrial building, 101 Tianhe Road, Guangzhou, Guangdong, Tianhe District

Patentee after: China Tunnel Construction Co., Ltd. Guangdong

Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee before: Guangdong Prov. Foundation Engineering Co.

CP03 Change of name, title or address

Address after: 510220 Guangdong city of Guangzhou province Haizhuqu District Yue Xuan Street No. 81 (G-3) 1501-1512, 1604-1607 room

Patentee after: Guangdong Hua Qiao construction group Limited by Share Ltd

Address before: 9, building 510620, industrial building, 101 Tianhe Road, Guangzhou, Guangdong, Tianhe District

Patentee before: China Tunnel Construction Co., Ltd. Guangdong