CN103397721A - Steel plate precast concrete double-plate shear wall - Google Patents

Steel plate precast concrete double-plate shear wall Download PDF

Info

Publication number
CN103397721A
CN103397721A CN2013103503845A CN201310350384A CN103397721A CN 103397721 A CN103397721 A CN 103397721A CN 2013103503845 A CN2013103503845 A CN 2013103503845A CN 201310350384 A CN201310350384 A CN 201310350384A CN 103397721 A CN103397721 A CN 103397721A
Authority
CN
China
Prior art keywords
steel
steel plate
plate
precast concrete
shear walls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103503845A
Other languages
Chinese (zh)
Other versions
CN103397721B (en
Inventor
叶燕华
孙锐
薛洲海
王小平
周晓方
李士东
钱晶
张诗浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GREEN BUILDING RESEARCH CENTER
JIANGSU YUANDA BUILDING TECHNOLOGY CO LTD
Nanjing Tech University
Original Assignee
GREEN BUILDING RESEARCH CENTER
JIANGSU YUANDA BUILDING TECHNOLOGY CO LTD
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GREEN BUILDING RESEARCH CENTER, JIANGSU YUANDA BUILDING TECHNOLOGY CO LTD, Nanjing Tech University filed Critical GREEN BUILDING RESEARCH CENTER
Priority to CN201310350384.5A priority Critical patent/CN103397721B/en
Publication of CN103397721A publication Critical patent/CN103397721A/en
Application granted granted Critical
Publication of CN103397721B publication Critical patent/CN103397721B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The invention discloses a steel plate precast concrete double-plate shear wall which comprises steel plates, anti-sliding keys, profile steels, precast concrete wall pieces, cavities and truss steel bars, wherein the steel plates are arranged at the central positions between the two precast concrete wall pieces, four sides of the steel plates are respectively welded with end column internal profile steels and beam internal steel plates or the profile steels, the anti-sliding keys are arranged on the steel plates, the precast concrete wall pieces and the steel plates are connected into a whole through the truss steel bars and the anti-sliding keys, and concrete is poured in the cavities and the profile steels in the shear wall. The shear wall disclosed by the invention is simple in structure, not only solves the problem of insufficient connection of the upper and lower layers of wall bodies, but also enhances the overall performance of the superposed part of the wall bodies.

Description

The two plate shear walls of steel plate precast concrete
Technical field
The invention belongs to building structure field, relate to the two plate shear walls of a kind of steel plate precast concrete.
Background technology
Along with China's industrialization of construction industry process is constantly pushed ahead, country advocates assembled architecture energetically.The two plate shear walls of precast concrete are new structure of introducing from Germany, in Germany, have applied nearly 20 years, have reached the requirement of standardized designs, suitability for industrialized production and prefabricated construction.Germany is that a few earthquake is national, and this structure is not considered shockproof requirements.And China's earthquake takes place frequently, and must improve and could extensively promote at home this structure.
Mainly there are following problems in the two plate shear walls of precast concrete when application: 1. after rigging out, while building the cavity concrete, while especially selecting self-compacting concrete, the both sides prefabricated panel produces crack, even off normal owing to connecting not enough meeting; 2. lack enough connections between the levels body of wall, larger lateral displacement easily occurs; 3. the overall performance of two plate shear wall superposed surfaces weakens to some extent than full-situ shear wall; 4. the edge member construction is complicated, has extended the duration.
, due to the existence of above-mentioned problems, the two plate shear wall structure propagation and employments at home of this precast concrete have been hindered.
Summary of the invention
The present invention proposes the two plate shear walls of a kind of steel plate precast concrete, can strengthen the overall performance between superposed surfaces, alleviate the difficulty of construction of edge member, can also strengthen levels and connect, make stressed more reasonable, structure is more reliable.
The technical solution used in the present invention is: the two plate shear walls of a kind of steel plate precast concrete, comprise that steel plate, antiskid move key, shaped steel, pre-cast concrete walling sheet, cavity and truss bars, described steel plate is placed in two centers between the pre-cast concrete walling sheet, steel plate four limits respectively with newel post in steel plate or shaped steel welding in shaped steel and beam, be provided with antiskid on steel plate and move key, move key by truss bars and antiskid between described pre-cast concrete walling sheet and steel plate and connect into integral body, concreting in the cavity in described shear wall and shaped steel.
In order to make the rigidity of structure more reasonable and reduce steel using amount, can punch in the steel plate optional position, can also strengthen steel plate and concrete bonding, globality is better.Still need strengthen if the both walls sheet connects, can place at the place of punching truss bars.
, as preferably, can weld stud, reinforcing bar, channel-section steel or steel loop move key as antiskid on steel plate.Can arrange more be arranged symmetrically with the welding antiskid move key, also can adopt unsymmetric form.Antiskid moves key and guarantee enough anchorings in the precast concrete panel of both sides, and takes into account the pre-erection concrete cover.
As preferably, steel plate thickness is between 6~20mm.Described concrete is self-compacting concrete or ordinary concrete.
As preferably, in sleeper, shaped steel adopts closed cross-section, selects round steel pipe, square steel pipe or rectangular steel pipe.The round steel pipe diameter is between 50~158mm, and square steel pipe or the rectangular steel pipe length of side are between 50~160mm.
Why the present invention chooses closed cross-section shaped steel, is due to after steel plate and shaped steel welding, is subject to the restriction of steel plate position, can't add stirrup in sleeper.Closed cross-section is to the effect of concrete Constrained, thereby guaranteed the performance of structure.
Beneficial effect of the present invention:
1, truss bars and the welding antiskid steel plate that moves key can guarantee the overall performance of the two plate shear wall superposed surfaces of precast concrete, improves its collaborative work ability;
2. steel plate or shaped steel welding in steel plate and upper underbeam, can strengthen the connection between levels, prevents slippage, guarantees the overall performance of building.
3. in steel plate and sleeper, shaped steel welds, and can simplify the difficulty of construction of edge member, guarantees the anti-seismic performance of structure.
Description of drawings
Fig. 1 is the horizontal sectional view of shear wall of the present invention.
Fig. 2 is the schematic diagram that punches of invention light plate.
The specific embodiment
The present invention will be further described below in conjunction with the drawings and specific embodiments.
As illustrated in fig. 1 and 2, by truss bars 4 and the anti-shearing key 3 that is welded on steel plate 1, both sides pre-cast concrete walling sheet 5 and steel plate 1 are connected to become integral body.The size of steel plate 1, greater than pre-cast concrete walling sheet 5, is all stretched out pre-cast concrete walling sheet 5, welding during convenient lifting.The surperficial opening holes 7 of steel plate 1, can strengthen steel plate and concrete bonding, reduces simultaneously rolled steel dosage.Shaped steel 2 is completed with substructure at the scene simultaneously, and the edge member of body of wall at the scene formwork and cavity 6 cast-in-place.After body of wall is in place, with steel plate or shaped steel, 2 welding of edge member shaped steel in steel plate 1 and beam.Next at edge member place formwork, then concreting, and preferentially select self-compacting concrete.
Should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.In the present embodiment not clear and definite each ingredient all available prior art realized.

Claims (9)

1. two plate shear walls of a steel plate precast concrete, it is characterized in that: comprise that steel plate, antiskid move key, shaped steel, pre-cast concrete walling sheet, cavity and truss bars, described steel plate is placed in two centers between the pre-cast concrete walling sheet, steel plate four limits respectively with newel post in steel plate or shaped steel welding in shaped steel and beam, be provided with antiskid on steel plate and move key, move key by truss bars and antiskid between described pre-cast concrete walling sheet and steel plate and connect into integral body, concreting in the cavity in described shear wall and shaped steel.
2. the two plate shear walls of steel plate precast concrete according to claim 1, is characterized in that: described surface of steel plate opening holes.
3. the two plate shear walls of steel plate precast concrete according to claim 2, is characterized in that: described hole placement truss bars.
4. two plate shear walls of steel plate precast concrete according to claim 1, it is characterized in that: described steel plate thickness is between 6~20mm.
5. two plate shear walls of steel plate precast concrete according to claim 1, it is characterized in that: it is peg, reinforcing bar, channel-section steel or steel loop that described antiskid moves key.
6. two plate shear walls of steel plate precast concrete according to claim 1, it is characterized in that: described antiskid moves the many rows of key and is symmetrically welded in steel plate or arranges the asymmetric steel plate that is welded in more.
7. two plate shear walls of steel plate precast concrete according to claim 1, it is characterized in that: described concrete is self-compacting concrete or ordinary concrete.
8. two plate shear walls of steel plate precast concrete according to claim 1, it is characterized in that: described shaped steel adopts closed cross-section, selects round steel pipe, square steel pipe or rectangular steel pipe.
9. two plate shear walls of steel plate precast concrete according to claim 8, it is characterized in that: described round steel pipe diameter is between 50~158mm, and square steel pipe or the rectangular steel pipe length of side are between 50~160mm.
CN201310350384.5A 2013-08-12 2013-08-12 Steel plate precast concrete double-plate shear wall Expired - Fee Related CN103397721B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310350384.5A CN103397721B (en) 2013-08-12 2013-08-12 Steel plate precast concrete double-plate shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310350384.5A CN103397721B (en) 2013-08-12 2013-08-12 Steel plate precast concrete double-plate shear wall

Publications (2)

Publication Number Publication Date
CN103397721A true CN103397721A (en) 2013-11-20
CN103397721B CN103397721B (en) 2015-12-23

Family

ID=49561416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310350384.5A Expired - Fee Related CN103397721B (en) 2013-08-12 2013-08-12 Steel plate precast concrete double-plate shear wall

Country Status (1)

Country Link
CN (1) CN103397721B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726594A (en) * 2013-12-30 2014-04-16 北京工业大学 Built-in and multi-cavity double steel plate and concrete filled steel tubular column combined shearing wall and manufacturing method
CN106836555A (en) * 2017-03-01 2017-06-13 华汇工程设计集团股份有限公司 A kind of steel concrete combines precast shear wall plate
CN108104308A (en) * 2017-12-15 2018-06-01 南京工业大学 Repairable multistage energy-consumption dry-type hybrid fabricated concrete shear wall
CN113404188A (en) * 2021-05-20 2021-09-17 上海建工二建集团有限公司 Steel plate truss double-face superposed shear wall and construction method thereof
CN115749059A (en) * 2022-12-29 2023-03-07 中建八局第二建设有限公司 Buckling-restrained steel plate concrete composite wall

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20007312U1 (en) * 2000-04-20 2000-07-27 Filigran Trägersysteme GmbH & Co KG, 31633 Leese Component and lattice girder
JP4758146B2 (en) * 2005-06-07 2011-08-24 株式会社竹中工務店 Multi-story shear wall
CN201358530Y (en) * 2008-12-19 2009-12-09 北京工业大学 Profiled-steel-concrete-punched-steel-plate-concrete combination shear wall
CN101748828B (en) * 2009-12-18 2011-08-10 北京工业大学 Concrete filled steel tube laminated column frame inbuilt steel plate and steel truss interconnected space shear wall
CN101881056B (en) * 2010-06-11 2011-12-07 北京工业大学 Internal division type laminated column frame-bilayer steel plate concrete combined shear wall and manufacturing method thereof
CN201785897U (en) * 2010-09-26 2011-04-06 中国建筑科学研究院 High-strength concrete steel plate composite shear wall
CN201785899U (en) * 2010-09-26 2011-04-06 中国建筑科学研究院 Concrete steel plate combination shear wall with support
CN203487665U (en) * 2013-08-12 2014-03-19 南京工业大学 Steel plate precast concrete double-plate shear wall

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726594A (en) * 2013-12-30 2014-04-16 北京工业大学 Built-in and multi-cavity double steel plate and concrete filled steel tubular column combined shearing wall and manufacturing method
CN103726594B (en) * 2013-12-30 2016-02-17 北京工业大学 Built-in multi-cavity double steel plate and steel core concrete column compound shear wall and the practice
CN106836555A (en) * 2017-03-01 2017-06-13 华汇工程设计集团股份有限公司 A kind of steel concrete combines precast shear wall plate
CN108104308A (en) * 2017-12-15 2018-06-01 南京工业大学 Repairable multistage energy-consumption dry-type hybrid fabricated concrete shear wall
CN108104308B (en) * 2017-12-15 2023-06-09 南京工业大学 Repairable multistage energy consumption dry-type mixed assembled concrete shear wall
CN113404188A (en) * 2021-05-20 2021-09-17 上海建工二建集团有限公司 Steel plate truss double-face superposed shear wall and construction method thereof
CN115749059A (en) * 2022-12-29 2023-03-07 中建八局第二建设有限公司 Buckling-restrained steel plate concrete composite wall

Also Published As

Publication number Publication date
CN103397721B (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN205653944U (en) Prestressed concrete truss superimposed sheet
CN202055373U (en) Combined structure of double-steel-plate sandwich concrete wall and square steel tube concrete
CN103572873B (en) Assembled integral floor and construction method thereof
CN103397721B (en) Steel plate precast concrete double-plate shear wall
CN105544801A (en) Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN203034686U (en) Stiff core concrete-filled steel tube column internally inserted with Y-shaped steel plate
CN201661009U (en) Concrete-filled square steel tubular column
CN203569698U (en) Prestressed concrete beam and concrete-filled steel tube column joint structure
CN203452228U (en) Frame-shear wall architectural structure
CN203307961U (en) Profiled steel embedded column precast concrete double-slab shear wall structure
CN201228393Y (en) Semi-punched core node of hollow sandwich steel tube concrete column and steel girder
CN103485443A (en) Window-shaped-steel-plate concrete shear wall and manufacturing method thereof
CN105569222A (en) Vertical connection technology for precast assembled large panel shear walls with concealed supports
CN101298789B (en) Hollow interlayer steel tube concrete column and girder steel semi-penetrate core node
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
CN202466927U (en) Aligning type double-opening small-size concrete building block
CN103437493A (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN202644385U (en) Aluminum alloy pipe restriction reinforced concrete bridge pier post
CN104153463A (en) Assembled integrated frame system and construction method thereof
CN203334423U (en) Rebar joint structure of prefabricated stacked balcony slab and main body
CN203487665U (en) Steel plate precast concrete double-plate shear wall
CN203393880U (en) Enhanced type reinforced concrete laminated floor slab
CN203856112U (en) Novel profile steel combined overhung floor structure
CN203097040U (en) Antifatigue prestressing force steel-concrete combination beam
CN103243861A (en) Multi-chamber type steel pipe and concrete combined T-shaped column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20170812

CF01 Termination of patent right due to non-payment of annual fee