CN202644385U - Aluminum alloy pipe restriction reinforced concrete bridge pier post - Google Patents

Aluminum alloy pipe restriction reinforced concrete bridge pier post Download PDF

Info

Publication number
CN202644385U
CN202644385U CN 201220183361 CN201220183361U CN202644385U CN 202644385 U CN202644385 U CN 202644385U CN 201220183361 CN201220183361 CN 201220183361 CN 201220183361 U CN201220183361 U CN 201220183361U CN 202644385 U CN202644385 U CN 202644385U
Authority
CN
China
Prior art keywords
alloy pipe
bridge pier
aluminium
reinforced concrete
aluminum alloy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220183361
Other languages
Chinese (zh)
Inventor
杨勇
党炎龙
邢豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN 201220183361 priority Critical patent/CN202644385U/en
Application granted granted Critical
Publication of CN202644385U publication Critical patent/CN202644385U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to an aluminum alloy pipe restriction reinforced concrete bridge pier post, which comprises a bridge pier base, a bridge pier post upper part cover beam and an aluminum alloy pipe, wherein the aluminum alloy pipe is positioned between the bridge pier base and the bridge pier post upper part cover beam, a plurality of vertical steel bars with the same direction as the pipe length direction and a plurality of transverse steel bars parallel to the pipe surface are arranged in the aluminum alloy pipe, and concrete is cast among the vertical steel bars, the transverse steel bars and the inner wall of the aluminum alloy pipe. The external aluminum alloy pipe does not directly take part in the vertical stress of the bridge pier post and only restricts the internal reinforced concrete in the transverse direction, so the deformation capability and the anti-shock capability of the reinforced concrete bridge pier post are improved. Because of good anti-corrosion performance and good appearance effect of the aluminum alloy pipe, the durability and the appearance effect of the pier post can also be obviously improved. During the construction, the aluminum alloy pipe can also be used as a template for reaching the effects of template saving and construction convenience, and the aluminum alloy pipe restriction reinforced concrete bridge pier post can be applicable to the bridge pier post components of bridges including railway bridges, highway bridges, municipal engineering bridges and the like and has good application prospects.

Description

Aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud
Technical field
The utility model belongs to the bridge engineering field, relates to reinforced concrete structure, relates in particular to a kind of aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud.
Background technology
As the crucial primary structure member of bridge construction, bridge pier seismic design and durability Design are bridge engineering field important subject all the time.The present bridge pier of China mainly adopts reinforced concrete structure, should be noted that, reinforced concrete bridge pier is in that to have the rigidity of structure large, fatigue behaviour is good, when good the and cost of normability rationally waits feature performance benefit, also a little less than the ubiquity stirrup restraint, ductility is on the low side, the shortcomings such as the low and poor seismic behavior of shear strength, serious seismic damage occurs because bridge pier non-deformability and ductility are on the low side easily, at recent domestic repeatedly in the earthquake, all have reinforced concrete bridge pier to destroy earthquake phenomenon serious and that be difficult to repair and occur, reconstruction work has caused very large difficulty after earthquake centre disaster relief and rescue and the calamity over the ground.Therefore, when making great efforts raising and improving traditional seismic performance of reinforced concrete bridge piers, the bridge pier form of innovative development new high-efficiency and the novel bridge pier pier stud Seismic Design Method that develops also day by day become current bridge engineering circle and pay close attention to one of problem and study hotspot.
In building construction under steel core concrete column, steel tube concrete superposed column and the concrete filled steel tube constraint large quantity research of reinforced concrete post and the application background, concrete pier of steel tube, steel tube concrete superposed bridge pier and steel tube confined concrete bridge pier at home and abroad bridge engineering have also obtained some and have applied.Wherein, the external reinforced concrete bridge pier of steel tube confined concrete bridge pier steel pipe is outside, the longitudinal stress of serve as template in the construction stage, not participating in bridge pier directly in operational phase is subjected to lateral deflection unstability flexing too early effectively to prevent steel pipe, only steel concrete is played the horizontal restrain effect, can significantly improve deformability, energy-dissipating property and the ductility of bridge pier, have good anti-seismic performance.
Summary of the invention
In order to overcome the shortcoming of above-mentioned prior art, the purpose of this utility model is to provide a kind of aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud, on steel tube confined concrete post and steel tube confined concrete pier footing, give full play to the good anti-corrosive durability energy of aluminium-alloy pipe, innovation has proposed aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud, when effectively bringing into play steel tube confined concrete bridge pier advantage, make a bridge pier durability difficult problem obtain fine solution, in bridge construction especially coastal waters and coastal bridge structure, have highly significant performance advantage.
In order to achieve the above object, the technical solution adopted in the utility model is:
Aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud, comprise bridge pier basis 6, bridge pier top bent cap 5 and the aluminium-alloy pipe between the two 1, be provided with the many piece longitudinal reinforcements 2 consistent with the pipe range direction in the aluminium-alloy pipe 1, and the many piece transverse reinforcements 3 parallel with the pipe face, between longitudinal reinforcement 2, transverse reinforcement 3 and aluminium-alloy pipe 1 inwall, built concrete 4.
Also many transverse reinforcements 3 can be arranged on a plane parallel with aluminium-alloy pipe 1 pipe face, every transverse reinforcement 3 is all consistent with aluminium-alloy pipe 1 outer contour shape, and every transverse reinforcement 3 all is closure state.
Leave certain distance between the end face on described aluminium-alloy pipe 1 and bridge pier basis 6, described longitudinal reinforcement 2 is inserted in the bridge pier basis 6.
Leave certain distance between described aluminium-alloy pipe 1 and the bridge pier top bent cap 5.
The concrete steps that realize this structure are:
(1) determines aluminium-alloy pipe diameter and wall thickness according to designing requirement;
(2) arrange reinforcing bar according to the longitudinal reinforcement of designing requirement and lateral tie form of reinforcement and quantity;
(3) carry out pouring concrete by the concrete strength of designing requirement and vibrate, behind some strength, namely form aluminium-alloy pipe confined concrete bridge pier until the maintenance of aluminium-alloy pipe inner concrete;
(4) aluminium-alloy pipe and bridge pier basis end face is reserved certain distance;
(5) aluminium-alloy pipe and bridge pier top bent cap are reserved certain distance;
(6) aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud section form can be the various cross sectional shapes such as square, circle and round end type.
Compare with traditional reinforced concrete bridge pier, the utility model patent has the following advantages:
(1) anti-seismic performance is good: because the bridge pier inner concrete is subject to the horizontal restrain of external aluminium compo pipe, the concrete deformation ability is significantly improved, especially for the concrete of higher-strength grade, owing to be subject to good constraint, the high-strength concrete deformability is greatly improved, and pier stud ultimate deformation ability, ductility and energy dissipation capacity all can significantly improve, therefore, have good anti-seismic performance, can effectively prevent and avoid bridge pier under large shake, heavy damage to occur and collapse.
(2) excellent in durability: in aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud, owing to place the aluminium-alloy pipe of pier stud outside to have good decay resistance, the endurance quality of bridge pier obtains fine raising, can effectively solve the crucial difficult problem of bridge pier durability Design;
(3) appearance effect is good: because aluminium-alloy pipe itself has preferably appearance effect, aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud need not to carry out outer list processing, can have good appearance effect, application has remarkable performance advantage for bridge especially Municipal bridge;
(4) save template: during the construction of aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud, aluminium-alloy pipe can play the construction formwork effect, can save template material and recruitment, easy construction;
(5) recovery rate is high: aluminum alloy materials has very high recovery rate, can realize nearly 90% recovery under low cost recovery, and composite energy-saving environment protection demand and sustainable development need.
In addition, aluminium-alloy pipe constraint reinforced concrete bridge pier has also that processing and fabricating is convenient, weight is light and the advantage such as convenient transportation.In general, aluminium-alloy pipe constraint reinforced concrete structure is suitable for bridge pier very much, has superperformance advantage and wide application prospect.
Description of drawings
Fig. 1 is the utility model embodiment one structural representation.
Fig. 2 is the viewgraph of cross-section of Fig. 1 bridge pier.
Fig. 3 is the utility model embodiment two structural representations.
Fig. 4 is the viewgraph of cross-section of Fig. 3 bridge pier.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further details.
Embodiment one: circular cross-section aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud
Referring to Fig. 1 and Fig. 2, a kind of aluminium-alloy pipe of circular cross-section constraint reinforced concrete bridge pier pier stud comprises circular aluminium-alloy pipe 1, longitudinal reinforcement 2, transverse reinforcement 3 and concrete 4.At first determine diameter and diameter, quantity and the position of wall thickness, longitudinal reinforcement 2 and transverse reinforcement 3 and the strength grade of aluminium-alloy pipe inner concrete 4 of aluminium-alloy pipe 1 according to designing requirement.Transverse reinforcement 3 can have one or more on a plane of aluminium-alloy pipe 1, consistent with aluminium-alloy pipe 1 outer contour shape, namely is closed reinforcing bar circle state.After 3 colligations become reinforcing cage with transverse reinforcement with longitudinal reinforcement 2, again aluminium-alloy pipe 1 is fixedly mounted, adopt pumping method to build vibrated concrete 4 by designing requirement.Treat that it is aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud that concrete 4 reaches some strength.Wherein, leave certain distance between the end face on aluminium-alloy pipe 1 and bridge pier basis 6, also leave certain distance between aluminium-alloy pipe 1 and the bridge pier top bent cap 5.Thereby do not allow aluminium-alloy pipe participate in longitudinal stress directly, make aluminium-alloy pipe 1 only carry out horizontal restrain to the concrete 4 in the pier stud.
Embodiment two: square-section aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud
Referring to Fig. 3 and Fig. 4, a kind of aluminium-alloy pipe of square-section retrains the reinforced concrete bridge pier pier stud, comprises aluminium-alloy pipe 1, longitudinal reinforcement 2, transverse reinforcement 3 and the concrete 4 of rectangle.At first determine diameter and diameter, quantity and the position of wall thickness, longitudinal reinforcement 2 and transverse reinforcement 3 and the strength grade of aluminium-alloy pipe inner concrete 4 of aluminium-alloy pipe 1 according to designing requirement.Transverse reinforcement 3 can have one or more on a plane of aluminium-alloy pipe 1, consistent with aluminium-alloy pipe 1 outer contour shape, is closed rectangle reinforcing bar round attitude.After 3 colligations become reinforcing cage with transverse reinforcement with longitudinal reinforcement 2, again aluminium-alloy pipe 1 is fixedly mounted, adopt pumping method to build vibrated concrete 4 by designing requirement.Treat that it is aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud that concrete 4 reaches some strength.Wherein, leave certain distance between the end face on aluminium-alloy pipe 1 and bridge pier basis 6, also leave certain distance between aluminium-alloy pipe 1 and the bridge pier top bent cap 5.Thereby do not allow aluminium-alloy pipe participate in longitudinal stress directly, make aluminium-alloy pipe 1 only carry out horizontal restrain to the concrete 4 in the pier stud.
The utility model comprises that also the aluminium-alloy pipe of the various section forms such as round end type and ellipse retrains reinforced concrete bridge pier pier stud form.

Claims (6)

1. aluminium-alloy pipe retrains the reinforced concrete bridge pier pier stud, comprise bridge pier basis (6), bridge pier top bent cap (5) and the aluminium-alloy pipe between the two (1), it is characterized in that, be provided with the many piece longitudinal reinforcements (2) consistent with the pipe range direction in the aluminium-alloy pipe (1), and the many piece transverse reinforcements (3) parallel with the pipe face, between longitudinal reinforcement (2), transverse reinforcement (3) and aluminium-alloy pipe (1) inwall, built concrete (4).
2. aluminium-alloy pipe according to claim 1 retrains the reinforced concrete bridge pier pier stud, it is characterized in that, on a plane parallel with aluminium-alloy pipe (1) pipe face many transverse reinforcements (3) are arranged, every transverse reinforcement (3) is all consistent with aluminium-alloy pipe (1) outer contour shape, and every transverse reinforcement (3) all is closure state.
3. aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud according to claim 1 is characterized in that, leaves certain distance between the end face on described aluminium-alloy pipe (1) and bridge pier basis (6).
4. according to claim 1 or 4 described aluminium-alloy pipes constraint reinforced concrete bridge pier pier studs, it is characterized in that described longitudinal reinforcement (2) is inserted in the bridge pier basis (6).
5. aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud according to claim 1 is characterized in that, leaves certain distance between described aluminium-alloy pipe (1) and the bridge pier top bent cap (5).
6. aluminium-alloy pipe constraint reinforced concrete bridge pier pier stud according to claim 1 is characterized in that the cross section of described bridge pier is circular.
CN 201220183361 2012-04-26 2012-04-26 Aluminum alloy pipe restriction reinforced concrete bridge pier post Expired - Fee Related CN202644385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220183361 CN202644385U (en) 2012-04-26 2012-04-26 Aluminum alloy pipe restriction reinforced concrete bridge pier post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220183361 CN202644385U (en) 2012-04-26 2012-04-26 Aluminum alloy pipe restriction reinforced concrete bridge pier post

Publications (1)

Publication Number Publication Date
CN202644385U true CN202644385U (en) 2013-01-02

Family

ID=47413515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220183361 Expired - Fee Related CN202644385U (en) 2012-04-26 2012-04-26 Aluminum alloy pipe restriction reinforced concrete bridge pier post

Country Status (1)

Country Link
CN (1) CN202644385U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290996A (en) * 2013-06-26 2013-09-11 南京信息工程大学 High-strength aluminum alloy square tube beam and manufacturing method thereof
CN107083822A (en) * 2017-03-10 2017-08-22 哈尔滨工业大学深圳研究生院 The concrete filled steel tube new type of component and its processing method of a kind of steel tube confinement
CN108824227A (en) * 2018-08-28 2018-11-16 南京林业大学 A kind of aluminum alloy coiled materials reinforcing pillarwork
CN109870150A (en) * 2019-03-19 2019-06-11 中国电建集团贵阳勘测设计研究院有限公司 A kind of field surface observation pier structure
CN110094015A (en) * 2018-01-29 2019-08-06 中铁城际规划建设有限公司 A kind of complex beam-column structure of construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290996A (en) * 2013-06-26 2013-09-11 南京信息工程大学 High-strength aluminum alloy square tube beam and manufacturing method thereof
CN103290996B (en) * 2013-06-26 2015-08-19 南京信息工程大学 A kind of High-strength aluminum alloy square tube beam preparation method
CN107083822A (en) * 2017-03-10 2017-08-22 哈尔滨工业大学深圳研究生院 The concrete filled steel tube new type of component and its processing method of a kind of steel tube confinement
CN110094015A (en) * 2018-01-29 2019-08-06 中铁城际规划建设有限公司 A kind of complex beam-column structure of construction
CN108824227A (en) * 2018-08-28 2018-11-16 南京林业大学 A kind of aluminum alloy coiled materials reinforcing pillarwork
CN109870150A (en) * 2019-03-19 2019-06-11 中国电建集团贵阳勘测设计研究院有限公司 A kind of field surface observation pier structure

Similar Documents

Publication Publication Date Title
CN101581115B (en) Mixed steel-concrete composite frame structure
CN201972268U (en) Combined shear wall of steel pipe concrete columns and double steel plates
CN204282199U (en) Pile-column concrete hollow pile bridge pier structure
CN202644385U (en) Aluminum alloy pipe restriction reinforced concrete bridge pier post
CN103122676B (en) Bight reinforced steel pipe concrete superposed column and the practice
CN101748861A (en) Polyvinyl chloride (PVC) pipe reinforced concrete and steel pipe concrete laminated member
CN101701485A (en) Hollow steel pipe-reinforced concrete superimposed member
CN103485443B (en) A kind of window shape steel plate concrete shear wall and preparation method thereof
CN107060096B (en) The Super High turret structure system of honeycomb boundling arrangement hexagon cylinder
CN102003042A (en) Spiral-stirrup square steel tube concrete column and manufacturing method thereof
CN203238534U (en) Ultrahigh concrete-filled steel tube lattice pier
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN201627136U (en) Superposed member of PVC pipe reinforced concrete and steel pipe concrete
CN102635063A (en) Post-tensioned prestressing steel pipe high-strength concrete superposition bridge pier and construction method thereof
CN202644384U (en) Aluminum alloy pipe restricting type steel concrete pier column
CN203334423U (en) Rebar joint structure of prefabricated stacked balcony slab and main body
CN206512924U (en) A kind of aluminium-alloy pipe constrains SFCB reinforced concrete posts
CN203559502U (en) Window-shaped steel plate concrete shear wall
CN102635064A (en) Pre-tensioned prestressing steel pipe high-strength concrete superposition bridge pier and construction method thereof
CN202831232U (en) Connected node of protracting inner diaphragm steel girder and concrete-filled steel-tubular columns containing a pipe coat
CN202644387U (en) Prestress steel pipe high strength concrete laminated pier in pre-tensioning method
CN202644386U (en) Post-tensioned method prestressed steel pipe high-strength concrete composite bridge pier
CN107476438B (en) Repairable super high-rise structure and construction method
CN203007933U (en) Compound reinforcing bar non-round concrete precast pile
CN205205847U (en) Frame construction of stake cushion cap

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102

Termination date: 20130426