CN203334423U - Rebar joint structure of prefabricated stacked balcony slab and main body - Google Patents

Rebar joint structure of prefabricated stacked balcony slab and main body Download PDF

Info

Publication number
CN203334423U
CN203334423U CN2013203428939U CN201320342893U CN203334423U CN 203334423 U CN203334423 U CN 203334423U CN 2013203428939 U CN2013203428939 U CN 2013203428939U CN 201320342893 U CN201320342893 U CN 201320342893U CN 203334423 U CN203334423 U CN 203334423U
Authority
CN
China
Prior art keywords
prefabricated
balcony
slab
main body
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013203428939U
Other languages
Chinese (zh)
Inventor
李宁
吴敦军
汪杰
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Yangtze River Urban Architectural Design Co Ltd
Original Assignee
Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yangtze River Urban Architectural Design Co Ltd filed Critical Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority to CN2013203428939U priority Critical patent/CN203334423U/en
Application granted granted Critical
Publication of CN203334423U publication Critical patent/CN203334423U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses a rebar joint structure of a prefabricated stacked balcony slab and a main body. The rebar joint structure comprises a prefabricated balcony slab, a prefabricated frame beam, and a pre-stress plate. The prefabricated balcony slab, the prefabricated frame beam, and the pre-stress plate are integrated in a pouring mode through a balcony cast-in-site pouring stacking layer. The pre-stress plate is integrated with the prefabricated frame beam in a pouring mode through a pre-stress plate cast-in-site layer. Rebars are distributed on a stacking face between a prefabricated balcony base plate and the balcony cast-in-site pouring stacking layer. Compared with the prior art, the rebar joint structure has the advantages of reinforcing the integrality of the connection of the prefabricated stacked balcony slab and the main body, being simple in method, being increased little in manufacture cost, bringing convenience to on-site construction, effectively improving the connection structure of the prefabricated stacked balcony slab, and improving the anti-earthquake performance of a prefabricated assembling building.

Description

The reinforcing bar drawknot structure of a kind of prefabricated superimposed balcony slab and main body
Technical field
The utility model relates to industrialization of construction industry and prefabrication and assembly construction technology, relates in particular to the reinforcing bar drawknot structure of a kind of prefabricated superimposed balcony slab and main body.
Background technology
Prefabricated superimposed balcony slab is the member that prefabricated dwelling house often adopts.The steel bar stress on balcony slab top is located at the in-situ layer of superimposed sheet, and stretches into the in-situ layer anchoring of agent structure laminated floor slab, reaches and bears the function that balcony loading connects agent structure.Prefabricated superimposed balcony slab is compared with cast-in-place balcony slab, only has top reinforcement to be connected with main body.The bottom of superimposed balcony slab is connected with body pillar no-reinforcing-bar.There is like this following point:
1, prefabricated superimposed balcony slab only has top one deck reinforcing bar to be connected with body pillar, and rigidity and the structural design analysis at its bearing place have gap.
2, the globality that balcony is connected with main body is poorer than Bars In Poured Concrete Slab.
3, when outside degree of choosing when larger, may have potential safety hazard under the vertical seismic force effect.
4, the prefabricated superimposed slab balcony had at present is by adopting the bottom muscle reserved, inserting the connectivity problem that the agent structure beam reinforcement cages solves prefabricated superimposed balcony slab and main body.But preformed plate bottom muscle unusual trouble on the making of member, transportation, installation, plate hoisted in position supervisor, be difficult for construction, and construction error is large and MU efficiency is low.
The utility model content
The problems referred to above that the utility model need to solve are for above-mentioned the deficiencies in the prior art, and a kind of good integrity is provided, and method is simple, and the cost increase is very little, are convenient to prefabricated superimposed balcony slab that site operation and anti-seismic performance are high and the reinforcing bar drawknot structure of main body.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
The reinforcing bar drawknot structure of a kind of prefabricated superimposed balcony slab and main body, comprise that prefabricated balcony plate, prefabricated frame are set a roof beam in place, prestressed slab, prefabricated balcony plate, prefabricated frame are set a roof beam in place and prestressed slab is built and is integral by the cast-in-place overlapping layers of balcony, and prestressed slab sets a roof beam in place to build by prestressed slab in-situ layer and prefabricated frame and be integral, the joint face between prefabricated balcony base plate and the cast-in-place overlapping layers of balcony is provided with distribution reinforcement.
The colligation of setting a roof beam in place of distribution reinforcement and prefabricated frame is integral.
The length direction that the length direction of distribution reinforcement and prefabricated frame are set a roof beam in place is perpendicular.
Compared with prior art, the beneficial effects of the utility model are: strengthened the globality that prefabricated superimposed balcony slab is connected with main body, method is simple, the cost increase is very little, be convenient to site operation, effectively improved the connection structure of prefabricated superimposed balcony slab, improve the anti-seismic performance of prefabrication and assembly construction building.
The accompanying drawing explanation
Fig. 1 is the structural representation of the reinforcing bar drawknot structure of prefabricated superimposed balcony slab and main body;
Wherein, 1, prefabricated balcony plate; 2, the cast-in-place overlapping layers of balcony; 3, prefabricated frame is set a roof beam in place; 4, prestressed slab; 5, prestressed slab in-situ layer; 6, steel bar stress; 7, distribution reinforcement.
The specific embodiment
Describe optimal technical scheme of the present utility model in detail below in conjunction with accompanying drawing.
As shown in Figure 1, the reinforcing bar drawknot structure of a kind of prefabricated superimposed balcony slab and main body, comprise that prefabricated balcony plate 1, prefabricated frame set a roof beam in place 3, prestressed slab 4, prefabricated balcony plate 1, prefabricated frame set a roof beam in place 3 and prestressed slab 4 build and be integral by the cast-in-place overlapping layers 2 of balcony, and prestressed slab 4 is set a roof beam in place by prestressed slab in-situ layer 5 and prefabricated frame and 3 built and be integral, the joint face between prefabricated balcony base plate 1 and the cast-in-place overlapping layers of balcony is provided with distribution reinforcement 7.
3 colligations of setting a roof beam in place of distribution reinforcement 7 and prefabricated frame are integral.
Set a roof beam in place 3 length direction of the length direction of distribution reinforcement 7 and prefabricated frame is perpendicular.

Claims (3)

1. the reinforcing bar drawknot structure of a prefabricated superimposed balcony slab and main body, comprise that prefabricated balcony plate (1), prefabricated frame are set a roof beam in place (3), prestressed slab (4), prefabricated balcony plate (1), prefabricated frame are set a roof beam in place (3) and prestressed slab (4) is built and is integral by the cast-in-place overlapping layers of balcony (2), and prestressed slab (4) by prestressed slab in-situ layer (5) and prefabricated frame set a roof beam in place (3) build and be integral, it is characterized in that: the superposed surfaces between prefabricated balcony plate (1) and the cast-in-place overlapping layers of balcony is provided with distribution reinforcement (7).
2. the reinforcing bar drawknot structure of prefabricated superimposed balcony slab and main body according to claim 1 is characterized in that: (3) colligation of setting a roof beam in place of distribution reinforcement (7) and prefabricated frame is integral.
3. the reinforcing bar drawknot structure of prefabricated superimposed balcony slab and main body according to claim 1 is characterized in that: the set a roof beam in place length direction of (3) of length direction and the prefabricated frame of distribution reinforcement (7) is perpendicular.
CN2013203428939U 2013-06-17 2013-06-17 Rebar joint structure of prefabricated stacked balcony slab and main body Expired - Lifetime CN203334423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203428939U CN203334423U (en) 2013-06-17 2013-06-17 Rebar joint structure of prefabricated stacked balcony slab and main body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203428939U CN203334423U (en) 2013-06-17 2013-06-17 Rebar joint structure of prefabricated stacked balcony slab and main body

Publications (1)

Publication Number Publication Date
CN203334423U true CN203334423U (en) 2013-12-11

Family

ID=49703103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203428939U Expired - Lifetime CN203334423U (en) 2013-06-17 2013-06-17 Rebar joint structure of prefabricated stacked balcony slab and main body

Country Status (1)

Country Link
CN (1) CN203334423U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL126507U1 (en) * 2017-07-31 2019-02-11 Pekabex Bet Spolka Akcyjna Precast balcony fastener
CN109695289A (en) * 2018-11-30 2019-04-30 南京长江都市建筑设计股份有限公司 A kind of prefabricated overlapping balcony slab of cracking resistance and its building method
CN112411738A (en) * 2020-10-21 2021-02-26 浙大城市学院 Prefabricated balcony laminated slab and construction method thereof
CN112575906A (en) * 2020-12-11 2021-03-30 中国建筑第五工程局有限公司 Connection node of assembled structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL126507U1 (en) * 2017-07-31 2019-02-11 Pekabex Bet Spolka Akcyjna Precast balcony fastener
CN109695289A (en) * 2018-11-30 2019-04-30 南京长江都市建筑设计股份有限公司 A kind of prefabricated overlapping balcony slab of cracking resistance and its building method
CN109695289B (en) * 2018-11-30 2024-01-23 南京长江都市建筑设计股份有限公司 Crack-resistant prefabricated superposed balcony slab and construction method thereof
CN112411738A (en) * 2020-10-21 2021-02-26 浙大城市学院 Prefabricated balcony laminated slab and construction method thereof
CN112575906A (en) * 2020-12-11 2021-03-30 中国建筑第五工程局有限公司 Connection node of assembled structure

Similar Documents

Publication Publication Date Title
CN205242773U (en) Adopt prefabricated assembled steel - concrete combination beam of cant chisei connection
CN202925762U (en) Novel reinforced concrete superposed beam
CN105064529A (en) Prefabricated and assembled large-board shear wall structure with concealed bracings
CN103572873A (en) Assembled monolithic floor slab and construction method thereof
CN203334423U (en) Rebar joint structure of prefabricated stacked balcony slab and main body
CN203924364U (en) The prestressing force assembling frame structure node syndeton of additional angle steel
CN202227360U (en) Wide-span prestressed concrete pile beam plate structure used for grounds of buildings, workshops, etc.
CN203640084U (en) Superimposed slab shear wall with restorable function
CN202644385U (en) Aluminum alloy pipe restriction reinforced concrete bridge pier post
CN108643429B (en) But height-adjusting's assembled coincide floor
CN103334495A (en) Prefabricated balcony connecting structure with steel trusses
CN103397721B (en) The two plate shear wall of steel plate precast concrete
CN203097012U (en) Assembling interlocking prestressing shear wall system
CN202925730U (en) Assembling integrated type floor
CN108625491B (en) Assembled H profile steel column-isolated footing-concrete collar tie beam L shape connecting node
CN108412036B (en) Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node
CN103938732A (en) Combination joint of prefabricated concrete beam and rectangular concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN204983213U (en) Dark big board shear wall structure that supports in prefabricated assembled area
CN205134660U (en) Light steel concrete slab post structure of prefabricated assembly
CN203487665U (en) Dual plate shear wall with steel plate and prefabricated concrete
CN209742152U (en) Assembled composite shear wall based on self-resetting combined end column slurry anchor shear wall
CN103541478B (en) Lattice superposed beam and plate and construction method thereof
CN106759885A (en) Cold formed steel structure house inner wall structural system
CN102888929A (en) Shearing force prefabricated component for assembled-type hollow grid plate floor system structure
CN111576709A (en) Prefabricated local coincide floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131211