CN103350081A - Intelligent dust removal system in electric power system intelligent substation construction - Google Patents
Intelligent dust removal system in electric power system intelligent substation construction Download PDFInfo
- Publication number
- CN103350081A CN103350081A CN2013103347508A CN201310334750A CN103350081A CN 103350081 A CN103350081 A CN 103350081A CN 2013103347508 A CN2013103347508 A CN 2013103347508A CN 201310334750 A CN201310334750 A CN 201310334750A CN 103350081 A CN103350081 A CN 103350081A
- Authority
- CN
- China
- Prior art keywords
- sensor
- intelligent substation
- intelligent
- electric power
- humidifier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Selective Calling Equipment (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The invention relates to an intelligent dust removal system in an electric power system intelligent substation construction. The system comprises a comprehensive intelligent substation monitoring platform, a temperature sensor, a humidity sensor, a PM 2.5 sensor, an air conditioner, a humidifier and a cleaning robot, wherein the temperature sensor, the humidity sensor, the PM 2.5 sensor, the air conditioner and the humidifier are respectively arranged in the electric power system intelligent substation construction, and the cleaning robot is arranged in the electric power system intelligent substation construction. The system is characterized in that data transmission is performed between the comprehensive intelligent substation monitoring platform and the temperature sensor, the humidity sensor and the PM2.5 sensor through a network, the temperature sensor and the humidity sensor are respectively used for controlling the on and off of the air conditioner, the humidity sensor is used for controlling the on and off of the humidifier, and the PM2.5 sensor is used for controlling the on and off of the humidifier and the cleaning robot respectively. The manual work is saved and the intelligent dust removal is realized.
Description
Technical field
The present invention relates to intelligent dedusting system in a kind of intelligent substation of electric power system building.
Background technology
Intelligent substation is the smart machine that adopts advanced, reliable, integrated and environmental protection; be standardized as basic demand with full station information digitalization, communications platform networking, information sharing; automatically finish the basic functions such as information gathering, measurement, control, protection, metering and detection; simultaneously, possess support electrical network in real time automatically control, intelligence regulate, the transformer station of on-line analysis decision-making and the collaborative senior functions such as interactive.And supervisory control of substation is the handling characteristics for the power industry user, in conjunction with Industry Control, safeguard management and digital video etc., utilize the existing Internet resources of electrical network, designed the comprehensive security management system of the networking that integrates remote viewing system, gate control system, fire-fighting system, environment and dynamic monitoring system multifunctional subsystem.The present invention is expansion on this basis, by existing remote viewing monitor supervision platform, only adds some equipment at the station end and links, and reaches the effect of intelligent substation dedusting.
At present the dedusting method in the transformer station is artificial dedusting under the power system, and this mode need to consume a large amount of artificial, and follows the unattended trend of transformer station incompatible with.
Summary of the invention
The problem that purpose of the present invention exists in order to overcome above-mentioned prior art, and intelligent dedusting system in a kind of intelligent substation of electric power system building is provided, the present invention has the artificial and intelligent dedusting of saving.The present invention is by installing a series of sensors and sweeping robot in the intelligent substation of electric power system building, and series sensor linked to each other with the intelligent substation comprehensive monitoring platform, when intelligent substation inner sensor monitoring numerical value surpasses target value (such as PM2.5, temperature, humidity etc.), corresponding humidifier, air-conditioning start automatically, behind the certain hour of interval, sweeping robot begins to clean dust automatically, to reach the effect of intelligent dedusting.
Technical scheme of the present invention is:
Intelligent dedusting system in the intelligent substation of electric power system building, comprise the intelligent substation comprehensive monitoring platform, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier, sweeping robot, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier is installed in respectively in the intelligent substation of electric power system building, sweeping robot is placed in the intelligent substation of electric power system building, it is characterized in that: the intelligent substation comprehensive monitoring platform by network respectively with temperature sensor, humidity sensor, the PM2.5 sensor carries out transfer of data, temperature sensor, humidity sensor is controlled respectively air-conditioning switch, humidity sensor control humidifier switch, the PM2.5 sensor is controlled respectively humidifier switch and sweeping robot switch.
The present invention compares following several large advantage with existing transformer station dedusting pattern: 1. save artificial: transformer station's building dedusting originally is exactly simple to carry out artificial dedusting by special cleaning worker is regularly regular, because transformer station's One's name is legion, that goes down for a long time and consume is manually huge; 2. intelligent dedusting: the original dedusting pattern of transformer station is that run unit is formulated specific dedusting scheme according to the actual conditions of each transformer station and carried out artificial dedusting.The present invention can change present this pattern: a series of sensors and sweeping robot are installed in the intelligent substation of electric power system building, and series sensor linked to each other with the intelligent substation comprehensive monitoring platform, when intelligent substation inner sensor monitoring numerical value surpasses target value (such as PM2.5, temperature, humidity etc.), corresponding humidifier, air-conditioning start automatically, behind the certain hour of interval, sweeping robot begins to clean dust automatically, to reach the effect of intelligent dedusting.
Description of drawings
Fig. 1 is structural representation of the present invention.
The specific embodiment
The invention will be further described by reference to the accompanying drawings.
As shown in Figure 1, the present invention includes the intelligent substation comprehensive monitoring platform, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier, sweeping robot, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier is installed in respectively in the intelligent substation of electric power system building, sweeping robot is placed in the intelligent substation of electric power system building, it is characterized in that: the intelligent substation comprehensive monitoring platform by network respectively with temperature sensor, humidity sensor, the PM2.5 sensor carries out transfer of data, temperature sensor, humidity sensor is controlled respectively air-conditioning switch, humidity sensor control humidifier switch, the PM2.5 sensor is controlled respectively humidifier switch and sweeping robot switch.
Each parts of the present invention all are existing structure.
Intelligent substation comprehensive monitoring platform (hereinafter to be referred as platform) is the information interaction center of whole unattended operation transformer station system (remote viewing part), mainly finishes the command interaction of Surveillance center and station end equipment.Platform arranges environmental index parameter (as: the PM2.5 value of the temperature value of normal operation, the humidity value of normal operation, normal operation) by network to corresponding intelligent substation.When the sensor that is installed in intelligent substation reached predefined index, platform triggered corresponding node, and sent instruction to temperature sensor, humidity sensor, the PM2.5 sensor of intelligent substation.As: the normal working temperature that platform is set the A intelligent substation is that 20-25 degree, humidity are 30%-60%, and PM2.5 is between the 50-150.When the Sensor monitoring of intelligent substation all exceeds standard to preset value, platform will be assigned work order to the interior air-conditioning (dehumidification function is arranged) of standing, humidifier in real time, until monitor value satisfies preset value, quits work just now.After this, sweeping robot begins cleaning works immediately.Owing to basically only have the rubbish within the dust in the intelligent substation, the storage bin of existing sweeping robot can satisfy 1-2 month rubbish storage fully.As long as have operating personnel to arrive in-situ processing in 1-2 month.Clean complete after, sweeping robot is got back to original position charging automatically, to satisfy next cleaning task.Also can issue the cleaning order to sweeping robot to artificial or timing simultaneously.
Claims (1)
1. intelligent dedusting system in the intelligent substation of electric power system building, comprise the intelligent substation comprehensive monitoring platform, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier, sweeping robot, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier is installed in respectively in the intelligent substation of electric power system building, sweeping robot is placed in the intelligent substation of electric power system building, it is characterized in that: the intelligent substation comprehensive monitoring platform by network respectively with temperature sensor, humidity sensor, the PM2.5 sensor carries out transfer of data, temperature sensor, humidity sensor is controlled respectively air-conditioning switch, humidity sensor control humidifier switch, the PM2.5 sensor is controlled respectively humidifier switch and sweeping robot switch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103347508A CN103350081A (en) | 2013-06-09 | 2013-08-02 | Intelligent dust removal system in electric power system intelligent substation construction |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320336040.4 | 2013-06-09 | ||
CN201320336040 | 2013-06-09 | ||
CN2013103347508A CN103350081A (en) | 2013-06-09 | 2013-08-02 | Intelligent dust removal system in electric power system intelligent substation construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103350081A true CN103350081A (en) | 2013-10-16 |
Family
ID=49306545
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320471441.0U Expired - Lifetime CN203484384U (en) | 2013-06-09 | 2013-08-02 | Intelligent dedusting system in electric power system intelligent transformer station building |
CN2013103347508A Pending CN103350081A (en) | 2013-06-09 | 2013-08-02 | Intelligent dust removal system in electric power system intelligent substation construction |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320471441.0U Expired - Lifetime CN203484384U (en) | 2013-06-09 | 2013-08-02 | Intelligent dedusting system in electric power system intelligent transformer station building |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN203484384U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105725931A (en) * | 2014-12-11 | 2016-07-06 | 小米科技有限责任公司 | Method and device for controlling sweeping |
WO2022160808A1 (en) * | 2021-02-01 | 2022-08-04 | 青岛海尔空调器有限总公司 | Air-conditioning linkage control method and control apparatus, and air conditioner |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203484384U (en) * | 2013-06-09 | 2014-03-19 | 国家电网公司 | Intelligent dedusting system in electric power system intelligent transformer station building |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100001012A (en) * | 2008-06-26 | 2010-01-06 | (주)이지정보기술 | System and method for taking care of stall using the intergated module having the multi-sensor |
CN101916968A (en) * | 2010-07-29 | 2010-12-15 | 广州电力设计院 | Terminal box |
CN102088167A (en) * | 2010-11-19 | 2011-06-08 | 江苏省电力设计院 | Control system for improving operation environment of substation equipment |
CN102183939A (en) * | 2011-05-27 | 2011-09-14 | 江苏凯达电力科技有限公司 | Transformer substation indoor environment safety intelligent control system |
CN102290719A (en) * | 2011-04-22 | 2011-12-21 | 陶勤 | Partially buried landscape substation and box body structure thereof |
CN202134830U (en) * | 2011-07-04 | 2012-02-01 | 共信电力科技有限公司 | Box type transformer substation |
CN102436235A (en) * | 2011-10-25 | 2012-05-02 | 无锡高远电力科技有限公司 | Indoor environment safety intelligence control system |
CN301916968S (en) * | 2011-11-18 | 2012-05-16 | 江南大学 | Table lamp (536) |
CN102520703A (en) * | 2011-12-31 | 2012-06-27 | 承方 | Intelligent environmental control system for transformer substation |
CN102929317A (en) * | 2012-11-15 | 2013-02-13 | 江苏高远电力科技有限公司 | Monitoring and controlling system for sealed space environment |
CN203484384U (en) * | 2013-06-09 | 2014-03-19 | 国家电网公司 | Intelligent dedusting system in electric power system intelligent transformer station building |
-
2013
- 2013-08-02 CN CN201320471441.0U patent/CN203484384U/en not_active Expired - Lifetime
- 2013-08-02 CN CN2013103347508A patent/CN103350081A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100001012A (en) * | 2008-06-26 | 2010-01-06 | (주)이지정보기술 | System and method for taking care of stall using the intergated module having the multi-sensor |
CN101916968A (en) * | 2010-07-29 | 2010-12-15 | 广州电力设计院 | Terminal box |
CN102088167A (en) * | 2010-11-19 | 2011-06-08 | 江苏省电力设计院 | Control system for improving operation environment of substation equipment |
CN102290719A (en) * | 2011-04-22 | 2011-12-21 | 陶勤 | Partially buried landscape substation and box body structure thereof |
CN102183939A (en) * | 2011-05-27 | 2011-09-14 | 江苏凯达电力科技有限公司 | Transformer substation indoor environment safety intelligent control system |
CN202134830U (en) * | 2011-07-04 | 2012-02-01 | 共信电力科技有限公司 | Box type transformer substation |
CN102436235A (en) * | 2011-10-25 | 2012-05-02 | 无锡高远电力科技有限公司 | Indoor environment safety intelligence control system |
CN301916968S (en) * | 2011-11-18 | 2012-05-16 | 江南大学 | Table lamp (536) |
CN102520703A (en) * | 2011-12-31 | 2012-06-27 | 承方 | Intelligent environmental control system for transformer substation |
CN102929317A (en) * | 2012-11-15 | 2013-02-13 | 江苏高远电力科技有限公司 | Monitoring and controlling system for sealed space environment |
CN203484384U (en) * | 2013-06-09 | 2014-03-19 | 国家电网公司 | Intelligent dedusting system in electric power system intelligent transformer station building |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105725931A (en) * | 2014-12-11 | 2016-07-06 | 小米科技有限责任公司 | Method and device for controlling sweeping |
WO2022160808A1 (en) * | 2021-02-01 | 2022-08-04 | 青岛海尔空调器有限总公司 | Air-conditioning linkage control method and control apparatus, and air conditioner |
Also Published As
Publication number | Publication date |
---|---|
CN203484384U (en) | 2014-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202026140U (en) | Distribution type distribution room environment and power distribution comprehensive monitor system | |
CN104296321B (en) | Station house central air-conditioning control system and method | |
CN205029436U (en) | Robot system is patrolled and examined to intelligence in centralized control formula transformer substation | |
CN104503299A (en) | DSP-based transformer station indoor humiture and dust control system | |
CN109687588B (en) | Matrix type intelligent linkage transformer substation inspection method | |
CN204331448U (en) | Switchgear building environmental monitoring system | |
CN208571704U (en) | A kind of intelligent monitor system applied to low-voltage comprehensive distribution box | |
CN103576650A (en) | Operation security monitoring and managing system for airport ground equipment | |
CN103560590B (en) | Electric network intelligent scheduling framework and its implementation | |
CN104244300A (en) | Method and system for achieving base station dynamic environment monitoring | |
CN207251671U (en) | Wisdom piping lane comprehensive management platform | |
CN103092169A (en) | Digital camp device management and control device | |
CN203484384U (en) | Intelligent dedusting system in electric power system intelligent transformer station building | |
CN102495597A (en) | Cabinet environment acquisition and monitoring equipment | |
CN202014263U (en) | Centralized monitoring system for power and environmental equipment of communication base station | |
CN212846525U (en) | Power distribution comprehensive environment monitoring system | |
CN104617668A (en) | System and method for remotely monitoring transformer substation storage battery | |
CN107482783B (en) | Comprehensive intelligent system for monitoring and controlling service power | |
CN110764562A (en) | Granary integrated control system | |
CN206962527U (en) | A kind of transformer station's auxiliary monitoring system | |
CN101691940A (en) | Machine room air quality monitoring system | |
CN109004744B (en) | Intelligent management and control system for monitoring state of distributed substation | |
CN209298989U (en) | A kind of intelligent monitoring and controlling device for substation equipment | |
CN209543168U (en) | A kind of temperature and humidity controlsystem of substation control buildings | |
CN207459830U (en) | A kind of ring-main unit comprehensive monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131016 |