CN103350081A - Intelligent dust removal system in electric power system intelligent substation construction - Google Patents

Intelligent dust removal system in electric power system intelligent substation construction Download PDF

Info

Publication number
CN103350081A
CN103350081A CN2013103347508A CN201310334750A CN103350081A CN 103350081 A CN103350081 A CN 103350081A CN 2013103347508 A CN2013103347508 A CN 2013103347508A CN 201310334750 A CN201310334750 A CN 201310334750A CN 103350081 A CN103350081 A CN 103350081A
Authority
CN
China
Prior art keywords
sensor
intelligent substation
intelligent
electric power
humidifier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103347508A
Other languages
Chinese (zh)
Inventor
陈昌海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI KENENG POWER ELECTRONICS CO Ltd
State Grid Corp of China SGCC
Original Assignee
HUBEI KENENG POWER ELECTRONICS CO Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI KENENG POWER ELECTRONICS CO Ltd, State Grid Corp of China SGCC filed Critical HUBEI KENENG POWER ELECTRONICS CO Ltd
Priority to CN2013103347508A priority Critical patent/CN103350081A/en
Publication of CN103350081A publication Critical patent/CN103350081A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Selective Calling Equipment (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The invention relates to an intelligent dust removal system in an electric power system intelligent substation construction. The system comprises a comprehensive intelligent substation monitoring platform, a temperature sensor, a humidity sensor, a PM 2.5 sensor, an air conditioner, a humidifier and a cleaning robot, wherein the temperature sensor, the humidity sensor, the PM 2.5 sensor, the air conditioner and the humidifier are respectively arranged in the electric power system intelligent substation construction, and the cleaning robot is arranged in the electric power system intelligent substation construction. The system is characterized in that data transmission is performed between the comprehensive intelligent substation monitoring platform and the temperature sensor, the humidity sensor and the PM2.5 sensor through a network, the temperature sensor and the humidity sensor are respectively used for controlling the on and off of the air conditioner, the humidity sensor is used for controlling the on and off of the humidifier, and the PM2.5 sensor is used for controlling the on and off of the humidifier and the cleaning robot respectively. The manual work is saved and the intelligent dust removal is realized.

Description

Intelligent dedusting system in the intelligent substation of electric power system building
Technical field
The present invention relates to intelligent dedusting system in a kind of intelligent substation of electric power system building.
Background technology
Intelligent substation is the smart machine that adopts advanced, reliable, integrated and environmental protection; be standardized as basic demand with full station information digitalization, communications platform networking, information sharing; automatically finish the basic functions such as information gathering, measurement, control, protection, metering and detection; simultaneously, possess support electrical network in real time automatically control, intelligence regulate, the transformer station of on-line analysis decision-making and the collaborative senior functions such as interactive.And supervisory control of substation is the handling characteristics for the power industry user, in conjunction with Industry Control, safeguard management and digital video etc., utilize the existing Internet resources of electrical network, designed the comprehensive security management system of the networking that integrates remote viewing system, gate control system, fire-fighting system, environment and dynamic monitoring system multifunctional subsystem.The present invention is expansion on this basis, by existing remote viewing monitor supervision platform, only adds some equipment at the station end and links, and reaches the effect of intelligent substation dedusting.
At present the dedusting method in the transformer station is artificial dedusting under the power system, and this mode need to consume a large amount of artificial, and follows the unattended trend of transformer station incompatible with.
Summary of the invention
The problem that purpose of the present invention exists in order to overcome above-mentioned prior art, and intelligent dedusting system in a kind of intelligent substation of electric power system building is provided, the present invention has the artificial and intelligent dedusting of saving.The present invention is by installing a series of sensors and sweeping robot in the intelligent substation of electric power system building, and series sensor linked to each other with the intelligent substation comprehensive monitoring platform, when intelligent substation inner sensor monitoring numerical value surpasses target value (such as PM2.5, temperature, humidity etc.), corresponding humidifier, air-conditioning start automatically, behind the certain hour of interval, sweeping robot begins to clean dust automatically, to reach the effect of intelligent dedusting.
Technical scheme of the present invention is:
Intelligent dedusting system in the intelligent substation of electric power system building, comprise the intelligent substation comprehensive monitoring platform, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier, sweeping robot, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier is installed in respectively in the intelligent substation of electric power system building, sweeping robot is placed in the intelligent substation of electric power system building, it is characterized in that: the intelligent substation comprehensive monitoring platform by network respectively with temperature sensor, humidity sensor, the PM2.5 sensor carries out transfer of data, temperature sensor, humidity sensor is controlled respectively air-conditioning switch, humidity sensor control humidifier switch, the PM2.5 sensor is controlled respectively humidifier switch and sweeping robot switch.
The present invention compares following several large advantage with existing transformer station dedusting pattern: 1. save artificial: transformer station's building dedusting originally is exactly simple to carry out artificial dedusting by special cleaning worker is regularly regular, because transformer station's One's name is legion, that goes down for a long time and consume is manually huge; 2. intelligent dedusting: the original dedusting pattern of transformer station is that run unit is formulated specific dedusting scheme according to the actual conditions of each transformer station and carried out artificial dedusting.The present invention can change present this pattern: a series of sensors and sweeping robot are installed in the intelligent substation of electric power system building, and series sensor linked to each other with the intelligent substation comprehensive monitoring platform, when intelligent substation inner sensor monitoring numerical value surpasses target value (such as PM2.5, temperature, humidity etc.), corresponding humidifier, air-conditioning start automatically, behind the certain hour of interval, sweeping robot begins to clean dust automatically, to reach the effect of intelligent dedusting.
Description of drawings
Fig. 1 is structural representation of the present invention.
The specific embodiment
The invention will be further described by reference to the accompanying drawings.
As shown in Figure 1, the present invention includes the intelligent substation comprehensive monitoring platform, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier, sweeping robot, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier is installed in respectively in the intelligent substation of electric power system building, sweeping robot is placed in the intelligent substation of electric power system building, it is characterized in that: the intelligent substation comprehensive monitoring platform by network respectively with temperature sensor, humidity sensor, the PM2.5 sensor carries out transfer of data, temperature sensor, humidity sensor is controlled respectively air-conditioning switch, humidity sensor control humidifier switch, the PM2.5 sensor is controlled respectively humidifier switch and sweeping robot switch.
Each parts of the present invention all are existing structure.
Intelligent substation comprehensive monitoring platform (hereinafter to be referred as platform) is the information interaction center of whole unattended operation transformer station system (remote viewing part), mainly finishes the command interaction of Surveillance center and station end equipment.Platform arranges environmental index parameter (as: the PM2.5 value of the temperature value of normal operation, the humidity value of normal operation, normal operation) by network to corresponding intelligent substation.When the sensor that is installed in intelligent substation reached predefined index, platform triggered corresponding node, and sent instruction to temperature sensor, humidity sensor, the PM2.5 sensor of intelligent substation.As: the normal working temperature that platform is set the A intelligent substation is that 20-25 degree, humidity are 30%-60%, and PM2.5 is between the 50-150.When the Sensor monitoring of intelligent substation all exceeds standard to preset value, platform will be assigned work order to the interior air-conditioning (dehumidification function is arranged) of standing, humidifier in real time, until monitor value satisfies preset value, quits work just now.After this, sweeping robot begins cleaning works immediately.Owing to basically only have the rubbish within the dust in the intelligent substation, the storage bin of existing sweeping robot can satisfy 1-2 month rubbish storage fully.As long as have operating personnel to arrive in-situ processing in 1-2 month.Clean complete after, sweeping robot is got back to original position charging automatically, to satisfy next cleaning task.Also can issue the cleaning order to sweeping robot to artificial or timing simultaneously.

Claims (1)

1. intelligent dedusting system in the intelligent substation of electric power system building, comprise the intelligent substation comprehensive monitoring platform, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier, sweeping robot, temperature sensor, humidity sensor, the PM2.5 sensor, air-conditioning, humidifier is installed in respectively in the intelligent substation of electric power system building, sweeping robot is placed in the intelligent substation of electric power system building, it is characterized in that: the intelligent substation comprehensive monitoring platform by network respectively with temperature sensor, humidity sensor, the PM2.5 sensor carries out transfer of data, temperature sensor, humidity sensor is controlled respectively air-conditioning switch, humidity sensor control humidifier switch, the PM2.5 sensor is controlled respectively humidifier switch and sweeping robot switch.
CN2013103347508A 2013-06-09 2013-08-02 Intelligent dust removal system in electric power system intelligent substation construction Pending CN103350081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103347508A CN103350081A (en) 2013-06-09 2013-08-02 Intelligent dust removal system in electric power system intelligent substation construction

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201320336040.4 2013-06-09
CN201320336040 2013-06-09
CN2013103347508A CN103350081A (en) 2013-06-09 2013-08-02 Intelligent dust removal system in electric power system intelligent substation construction

Publications (1)

Publication Number Publication Date
CN103350081A true CN103350081A (en) 2013-10-16

Family

ID=49306545

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201320471441.0U Expired - Lifetime CN203484384U (en) 2013-06-09 2013-08-02 Intelligent dedusting system in electric power system intelligent transformer station building
CN2013103347508A Pending CN103350081A (en) 2013-06-09 2013-08-02 Intelligent dust removal system in electric power system intelligent substation construction

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201320471441.0U Expired - Lifetime CN203484384U (en) 2013-06-09 2013-08-02 Intelligent dedusting system in electric power system intelligent transformer station building

Country Status (1)

Country Link
CN (2) CN203484384U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105725931A (en) * 2014-12-11 2016-07-06 小米科技有限责任公司 Method and device for controlling sweeping
WO2022160808A1 (en) * 2021-02-01 2022-08-04 青岛海尔空调器有限总公司 Air-conditioning linkage control method and control apparatus, and air conditioner

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203484384U (en) * 2013-06-09 2014-03-19 国家电网公司 Intelligent dedusting system in electric power system intelligent transformer station building

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100001012A (en) * 2008-06-26 2010-01-06 (주)이지정보기술 System and method for taking care of stall using the intergated module having the multi-sensor
CN101916968A (en) * 2010-07-29 2010-12-15 广州电力设计院 Terminal box
CN102088167A (en) * 2010-11-19 2011-06-08 江苏省电力设计院 Control system for improving operation environment of substation equipment
CN102183939A (en) * 2011-05-27 2011-09-14 江苏凯达电力科技有限公司 Transformer substation indoor environment safety intelligent control system
CN102290719A (en) * 2011-04-22 2011-12-21 陶勤 Partially buried landscape substation and box body structure thereof
CN202134830U (en) * 2011-07-04 2012-02-01 共信电力科技有限公司 Box type transformer substation
CN102436235A (en) * 2011-10-25 2012-05-02 无锡高远电力科技有限公司 Indoor environment safety intelligence control system
CN301916968S (en) * 2011-11-18 2012-05-16 江南大学 Table lamp (536)
CN102520703A (en) * 2011-12-31 2012-06-27 承方 Intelligent environmental control system for transformer substation
CN102929317A (en) * 2012-11-15 2013-02-13 江苏高远电力科技有限公司 Monitoring and controlling system for sealed space environment
CN203484384U (en) * 2013-06-09 2014-03-19 国家电网公司 Intelligent dedusting system in electric power system intelligent transformer station building

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100001012A (en) * 2008-06-26 2010-01-06 (주)이지정보기술 System and method for taking care of stall using the intergated module having the multi-sensor
CN101916968A (en) * 2010-07-29 2010-12-15 广州电力设计院 Terminal box
CN102088167A (en) * 2010-11-19 2011-06-08 江苏省电力设计院 Control system for improving operation environment of substation equipment
CN102290719A (en) * 2011-04-22 2011-12-21 陶勤 Partially buried landscape substation and box body structure thereof
CN102183939A (en) * 2011-05-27 2011-09-14 江苏凯达电力科技有限公司 Transformer substation indoor environment safety intelligent control system
CN202134830U (en) * 2011-07-04 2012-02-01 共信电力科技有限公司 Box type transformer substation
CN102436235A (en) * 2011-10-25 2012-05-02 无锡高远电力科技有限公司 Indoor environment safety intelligence control system
CN301916968S (en) * 2011-11-18 2012-05-16 江南大学 Table lamp (536)
CN102520703A (en) * 2011-12-31 2012-06-27 承方 Intelligent environmental control system for transformer substation
CN102929317A (en) * 2012-11-15 2013-02-13 江苏高远电力科技有限公司 Monitoring and controlling system for sealed space environment
CN203484384U (en) * 2013-06-09 2014-03-19 国家电网公司 Intelligent dedusting system in electric power system intelligent transformer station building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105725931A (en) * 2014-12-11 2016-07-06 小米科技有限责任公司 Method and device for controlling sweeping
WO2022160808A1 (en) * 2021-02-01 2022-08-04 青岛海尔空调器有限总公司 Air-conditioning linkage control method and control apparatus, and air conditioner

Also Published As

Publication number Publication date
CN203484384U (en) 2014-03-19

Similar Documents

Publication Publication Date Title
CN202026140U (en) Distribution type distribution room environment and power distribution comprehensive monitor system
CN104296321B (en) Station house central air-conditioning control system and method
CN205029436U (en) Robot system is patrolled and examined to intelligence in centralized control formula transformer substation
CN104503299A (en) DSP-based transformer station indoor humiture and dust control system
CN109687588B (en) Matrix type intelligent linkage transformer substation inspection method
CN204331448U (en) Switchgear building environmental monitoring system
CN208571704U (en) A kind of intelligent monitor system applied to low-voltage comprehensive distribution box
CN103576650A (en) Operation security monitoring and managing system for airport ground equipment
CN103560590B (en) Electric network intelligent scheduling framework and its implementation
CN104244300A (en) Method and system for achieving base station dynamic environment monitoring
CN207251671U (en) Wisdom piping lane comprehensive management platform
CN103092169A (en) Digital camp device management and control device
CN203484384U (en) Intelligent dedusting system in electric power system intelligent transformer station building
CN102495597A (en) Cabinet environment acquisition and monitoring equipment
CN202014263U (en) Centralized monitoring system for power and environmental equipment of communication base station
CN212846525U (en) Power distribution comprehensive environment monitoring system
CN104617668A (en) System and method for remotely monitoring transformer substation storage battery
CN107482783B (en) Comprehensive intelligent system for monitoring and controlling service power
CN110764562A (en) Granary integrated control system
CN206962527U (en) A kind of transformer station's auxiliary monitoring system
CN101691940A (en) Machine room air quality monitoring system
CN109004744B (en) Intelligent management and control system for monitoring state of distributed substation
CN209298989U (en) A kind of intelligent monitoring and controlling device for substation equipment
CN209543168U (en) A kind of temperature and humidity controlsystem of substation control buildings
CN207459830U (en) A kind of ring-main unit comprehensive monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131016