CN103334459B - A kind of technique for the anti-skidding process of cable trench - Google Patents
A kind of technique for the anti-skidding process of cable trench Download PDFInfo
- Publication number
- CN103334459B CN103334459B CN201310303411.3A CN201310303411A CN103334459B CN 103334459 B CN103334459 B CN 103334459B CN 201310303411 A CN201310303411 A CN 201310303411A CN 103334459 B CN103334459 B CN 103334459B
- Authority
- CN
- China
- Prior art keywords
- cable trench
- paint
- layer paint
- technique
- surface layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 53
- 239000003973 paint Substances 0.000 claims abstract description 61
- 239000002344 surface layer Substances 0.000 claims abstract description 24
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 claims abstract description 21
- 230000037452 priming Effects 0.000 claims abstract description 21
- 239000002184 metal Substances 0.000 claims abstract description 18
- 239000010410 layer Substances 0.000 claims abstract description 16
- 239000006004 Quartz sand Substances 0.000 claims abstract description 15
- 230000003746 surface roughness Effects 0.000 claims abstract description 12
- 239000000428 dust Substances 0.000 claims abstract description 6
- 239000012634 fragment Substances 0.000 claims abstract description 6
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 claims abstract description 6
- 239000000843 powder Substances 0.000 claims abstract description 6
- 238000010186 staining Methods 0.000 claims abstract description 6
- 230000001680 brushing effect Effects 0.000 claims description 15
- 239000004922 lacquer Substances 0.000 claims description 6
- 239000004576 sand Substances 0.000 claims description 6
- 239000004593 Epoxy Substances 0.000 claims description 5
- 239000004570 mortar (masonry) Substances 0.000 claims description 5
- 238000010422 painting Methods 0.000 claims description 5
- 238000005498 polishing Methods 0.000 claims description 5
- 244000007853 Sarothamnus scoparius Species 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims description 3
- 239000007921 spray Substances 0.000 claims description 3
- 238000005491 wire drawing Methods 0.000 claims description 3
- 230000007797 corrosion Effects 0.000 abstract description 3
- 238000005260 corrosion Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 230000007547 defect Effects 0.000 description 5
- 238000010276 construction Methods 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a kind of technique for the anti-skidding process of cable trench, cable trench exposed metal portions is polished, worn rust staining also significantly improves Metal Surface Roughness, brush the metal powder grain of remained on surface again, concrete surface is exposed to cable trench, knock the dirt on its surface of removal and significantly improve surface roughness, clear up the fragment dust left over again, be coated with priming paint, intermediate layer paint, surface layer paint more successively, then use quartz sand to carry out ramming process, solidify the anti-skidding process namely completed for 2 hours cable trench.Compared with prior art, the present invention improves the resistance to corrosion of cable trench, and effects on surface carries out the roughness raising that ramming process makes entirety in addition, and then improves security performance.
Description
Technical field
The present invention relates to a kind of cable trench treatment process, especially relate to a kind of technique for the anti-skidding process of cable trench.
Background technology
Reformed and opened up to the outside world since 30 years, the development in Shanghai is maked rapid progress, and the step of urban construction all never slowed down a moment.Originally be positioned at the unlimited well of sidewalk, community or factory, also along with the transformation in the widening of road, old district, progressively become the road surface of slow lane, roadway.In the face of so severe running environment, the unlimited well built according to original design standard wagon flow current under, expose not shockproof defect and not anti-skidding potential safety hazard.Company cable runs the complaint that department all can be subject to several slideways when exercising on unlimited manhole cover plate about non power driven vehicle every year, all can process a collection of unlimited manhole cover plate every year and ring the defect affecting resident and have a rest, and a lot of defect is all cureless repeated defect.In the face of so passive situation, take long-term, stable measure and solution thoroughly, become the task of top priority of unlimited well construction, operation and service work.
Summary of the invention
Object of the present invention be exactly in order to overcome above-mentioned prior art exist defect and the technique for the anti-skidding process of cable trench that a kind of resistance to corrosion is strong, security performance is good is provided.
Object of the present invention can be achieved through the following technical solutions:
For a technique for the anti-skidding process of cable trench, comprise the following steps:
(1) bottom surface polishing: cable trench exposed metal portions is polished, worn rust staining also significantly improves Metal Surface Roughness, brush the metal powder grain of remained on surface again, concrete surface is exposed to cable trench, knock the dirt on its surface of removal and significantly improve surface roughness, then clearing up the fragment dust left over;
(2) priming paint is coated with: repair flat bottom surface with epoxy mortar, and embedding gap of squeegeeing, then utilize the full width brushing of priming paint, then solidify 1 hour;
(3) be coated with intermediate layer paint: full width brushing intermediate layer paint on priming paint face, then solidify 1 hour;
(4) be coated with surface layer paint: full width brushing surface layer paint on the lacquer painting of middle level, then use quartz sand to carry out ramming process, process Post RDBMS 2 hours, namely complete the anti-skidding process to cable trench.
Described priming paint is commercially available yanfloor3600 priming paint.
Described intermediate layer paint is commercially available yanfloorSL9u intermediate layer paint.
Described surface layer paint is commercially available yanfloorSL39u surface layer paint.
Ramming process adopts sand slinger to spray quartz sand to surface layer paint and forms sand face.
Ramming process adopts hand mode of spreading to shed quartz sand to surface layer paint, and every square metre of quartz sand used is 6kg.
Ramming process employing rotary broom is painted at surface layer and is carried out rolling wire drawing.
Compared with prior art, the present invention brushes different types of coating lacquer three times by dividing cable trench, and control hardening time, priming paint, intermediate layer paint and finish paint are merged mutually and realizes respective function, improve the resistance to corrosion of cable trench, effects on surface carries out the roughness raising that ramming process makes entirety in addition, and then improves security performance.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.
Embodiment 1
For a technique for the anti-skidding process of cable trench, comprise the following steps:
(1) bottom surface polishing: cable trench exposed metal portions is polished, worn rust staining also significantly improves Metal Surface Roughness, brush the metal powder grain of remained on surface again, concrete surface is exposed to cable trench, knock the dirt on its surface of removal and significantly improve surface roughness, then clearing up the fragment dust left over;
(2) priming paint is coated with: repair flat bottom surface with epoxy mortar, and embedding gap of squeegeeing, then utilize the full width brushing of commercially available yanfloor3600 priming paint, then solidify 1 hour;
(3) be coated with intermediate layer paint: the yanfloorSL9u intermediate layer paint that full width brushing is commercially available on priming paint face, then solidify 1 hour;
(4) surface layer paint is coated with: the yanfloorSL39u surface layer paint that full width brushing is commercially available on the lacquer painting of middle level, then quartz sand is used to carry out ramming process, mechanical ramming process is adopted in the present embodiment, utilize sand slinger to spray quartz sand to surface layer paint and form sand face, process Post RDBMS 2 hours, namely complete the anti-skidding process to cable trench.
Embodiment 2
For a technique for the anti-skidding process of cable trench, comprise the following steps:
(1) bottom surface polishing: cable trench exposed metal portions is polished, worn rust staining also significantly improves Metal Surface Roughness, brush the metal powder grain of remained on surface again, concrete surface is exposed to cable trench, knock the dirt on its surface of removal and significantly improve surface roughness, then clearing up the fragment dust left over;
(2) priming paint is coated with: repair flat bottom surface with epoxy mortar, and embedding gap of squeegeeing, then utilize the full width brushing of commercially available yanfloor3600 priming paint, then solidify 1 hour;
(3) be coated with intermediate layer paint: the yanfloorSL9u intermediate layer paint that full width brushing is commercially available on priming paint face, then solidify 1 hour;
(4) surface layer paint is coated with: the yanfloorSL39u surface layer paint that full width brushing is commercially available on the lacquer painting of middle level, then quartz sand is used to carry out ramming process, hand mode of spreading is adopted to shed quartz sand to surface layer paint in the present embodiment, every square metre of quartz sand used is 6kg, process Post RDBMS 2 hours, namely complete the anti-skidding process to cable trench.
Embodiment 3
For a technique for the anti-skidding process of cable trench, comprise the following steps:
(1) bottom surface polishing: cable trench exposed metal portions is polished, worn rust staining also significantly improves Metal Surface Roughness, brush the metal powder grain of remained on surface again, concrete surface is exposed to cable trench, knock the dirt on its surface of removal and significantly improve surface roughness, then clearing up the fragment dust left over;
(2) priming paint is coated with; Flat bottom surface is repaiied with epoxy mortar, and embedding gap of squeegeeing, then utilize the full width brushing of commercially available yanfloor3600 priming paint, then solidify 1 hour;
(3) be coated with intermediate layer paint: the yanfloorSL9u intermediate layer paint that full width brushing is commercially available on priming paint face, then solidify 1 hour;
(4) surface layer paint is coated with: the yanfloorSL39u surface layer paint that full width brushing is commercially available on the lacquer painting of middle level, then quartz sand is used to carry out ramming process, adopt rotary broom to paint at surface layer in the present embodiment and carry out rolling wire drawing, process Post RDBMS 2 hours, namely complete the anti-skidding process to cable trench.
Claims (4)
1. for a technique for the anti-skidding process of cable trench, it is characterized in that, this technique comprises the following steps:
(1) bottom surface polishing: cable trench exposed metal portions is polished, worn rust staining also significantly improves Metal Surface Roughness, brush the metal powder grain of remained on surface again, concrete surface is exposed to cable trench, knock the dirt on its surface of removal and significantly improve surface roughness, then clearing up the fragment dust left over;
(2) priming paint is coated with: repair flat bottom surface with epoxy mortar, and embedding gap of squeegeeing, then utilize the full width brushing of priming paint, then solidify 1 hour;
(3) be coated with intermediate layer paint: full width brushing intermediate layer paint on priming paint face, then solidify 1 hour;
(4) be coated with surface layer paint: full width brushing surface layer paint on the lacquer painting of middle level, then use quartz sand to carry out ramming process, process Post RDBMS 2 hours, namely complete the anti-skidding process to cable trench;
Ramming process adopts sand slinger to spray quartz sand to surface layer paint and forms sand face, or adopts hand mode of spreading to shed quartz sand to surface layer paint, and every square metre of quartz sand used is 6kg, or adopts rotary broom to paint at surface layer to carry out rolling wire drawing.
2. a kind of technique for the anti-skidding process of cable trench according to claim 1, is characterized in that, described priming paint is commercially available yanfloor3600 priming paint.
3. a kind of technique for the anti-skidding process of cable trench according to claim 1, is characterized in that, described intermediate layer paint is commercially available yanfloorSL9u intermediate layer paint.
4. a kind of technique for the anti-skidding process of cable trench according to claim 1, is characterized in that, described surface layer paint is commercially available yanfloorSL39u surface layer paint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310303411.3A CN103334459B (en) | 2013-07-18 | 2013-07-18 | A kind of technique for the anti-skidding process of cable trench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310303411.3A CN103334459B (en) | 2013-07-18 | 2013-07-18 | A kind of technique for the anti-skidding process of cable trench |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103334459A CN103334459A (en) | 2013-10-02 |
CN103334459B true CN103334459B (en) | 2016-01-27 |
Family
ID=49242659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310303411.3A Active CN103334459B (en) | 2013-07-18 | 2013-07-18 | A kind of technique for the anti-skidding process of cable trench |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103334459B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610608A (en) * | 2018-12-17 | 2019-04-12 | 江苏中电科电力建设有限公司 | A kind of cable duct water-proof skid-proof construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101143986A (en) * | 2007-08-07 | 2008-03-19 | 何良金 | Terrace paint |
CN101210149A (en) * | 2007-12-21 | 2008-07-02 | 浙江中成建工集团有限公司 | Antiskid ventilating epoxide terrace paint |
CN101914886A (en) * | 2010-08-24 | 2010-12-15 | 龙信建设集团有限公司 | Construction method of wear-resistant non-slip ramp |
CN102838918A (en) * | 2012-09-13 | 2012-12-26 | 上海阳森精细化工有限公司 | Epoxy primer for oil contamination concrete floors and coating process thereof |
-
2013
- 2013-07-18 CN CN201310303411.3A patent/CN103334459B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101143986A (en) * | 2007-08-07 | 2008-03-19 | 何良金 | Terrace paint |
CN101210149A (en) * | 2007-12-21 | 2008-07-02 | 浙江中成建工集团有限公司 | Antiskid ventilating epoxide terrace paint |
CN101914886A (en) * | 2010-08-24 | 2010-12-15 | 龙信建设集团有限公司 | Construction method of wear-resistant non-slip ramp |
CN102838918A (en) * | 2012-09-13 | 2012-12-26 | 上海阳森精细化工有限公司 | Epoxy primer for oil contamination concrete floors and coating process thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103334459A (en) | 2013-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107151511B (en) | A kind of concrete guardrail anti-collision wall breakage renovation agent and renovation technique | |
CN103334459B (en) | A kind of technique for the anti-skidding process of cable trench | |
CN103410071A (en) | Construction method for paving stable sealing layer on steel bridge deck for realizing preventive maintenance | |
CN103790357A (en) | Manufacturing method of hardened and wear-resisting floor system | |
CN107587398A (en) | The construction method of diamond dust ground curing agent | |
CN101723613B (en) | Concrete curing material | |
CN106703220A (en) | Anticorrosion treatment method for annular concrete pole steel plate ring | |
CN107724642A (en) | The construction method of color wearing proof terrace | |
CN104533055B (en) | Aqueous polyurethane elastic terrace | |
CN105274915A (en) | Method for eliminating track system stray current | |
CN108729321B (en) | Prefabricated orthotropic plate steel bridge deck pavement structure and pavement method thereof | |
CN105369904A (en) | Modified acrylic coating concrete anti-corrosion method | |
CN103334458B (en) | A kind of method utilizing reeding process cable channel cover plate | |
CN106381816B (en) | The repair process method of bridge member rebar corrosion class breakage | |
CN103806630B (en) | Floor tile made of steel plate mounting process | |
CN204112186U (en) | Rainwater on road surface treatment system | |
CN109610608A (en) | A kind of cable duct water-proof skid-proof construction method | |
CN109403301B (en) | Method for measuring water and soil conservation function loss | |
CN202544329U (en) | Polyaspartic acid ester polyurea wear-resistant composite floor | |
CN204570415U (en) | A kind of parking lot non-slip ramp | |
CN109989315A (en) | A kind of method for paving on plastics road surface | |
CN205935552U (en) | Novel environmental protection epoxy floor paint composite biocoating structure | |
CN203923960U (en) | Novel concrete guardrail | |
CN104314287A (en) | Anticorrosive, abrasion-proof and rolling-resistant ground for garbage discharging hall, and construction method of anticorrosive, abrasion-proof and rolling-resistant ground | |
CN203285046U (en) | Static plastic spraying profile steel formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |