CN103306492A - 混凝土病梁的加固方法 - Google Patents

混凝土病梁的加固方法 Download PDF

Info

Publication number
CN103306492A
CN103306492A CN2013102213188A CN201310221318A CN103306492A CN 103306492 A CN103306492 A CN 103306492A CN 2013102213188 A CN2013102213188 A CN 2013102213188A CN 201310221318 A CN201310221318 A CN 201310221318A CN 103306492 A CN103306492 A CN 103306492A
Authority
CN
China
Prior art keywords
concrete
steel
supporting plate
groove
concrete beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102213188A
Other languages
English (en)
Other versions
CN103306492B (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jiayuan Horticultural Landscape Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310221318.8A priority Critical patent/CN103306492B/zh
Publication of CN103306492A publication Critical patent/CN103306492A/zh
Application granted granted Critical
Publication of CN103306492B publication Critical patent/CN103306492B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

本发明公开了一种混凝土病梁的加固方法,其特征是混凝土梁上部设置负筋,负筋直径为22~25mm,混凝土梁下部设置两皮主筋,主筋直径为22~25mm,混凝土梁下部设置凹槽,凹槽深度为50~60mm,凹槽宽度和长度为70~80mm,钢筋马凳锚入凹槽,凹槽内填塞高强环氧树脂砂浆,钢筋马凳直径为28mm,钢筋马凳和箍筋焊接,钢筋马凳设置间距为500~550mm,混凝土梁下面为加固体,加固体采用膨胀混凝土,加固体下面设置钢托板,混凝土梁上部设置钢盖板,钢盖板和钢托板之间采用预应力撑杆进行联接。预应力张拉完毕后钢托板和预应力撑杆外围设置喷射混凝土,喷射混凝土厚度为30~40mm,喷射混凝土强度为C30。

Description

混凝土病梁的加固方法
技术领域
本发明涉及一种增层构件,特别涉及一种混凝土病梁的加固方法。
背景技术
在实际工程中,常常因为设计不周、施工质量差、施工现场管理不善等原因,导致钢筋混凝土梁受弯构件承载力不足,引起承载力不足的原因还有火灾使钢筋混凝土梁的混凝土及钢筋强度降低等等。混凝土病梁加固的目的就是要通过加固施工达到修复、补强、提高承载力、增强使用功能、满足使用要求,因此,因此,采用合理可靠的结构形式对混凝土病梁进行加固尤为重要。
发明内容
本发明所要解决的技术问题是提供一种安全性能好的混凝土病梁的加固方法。
本发明中混凝土病梁加固构造包括箍筋、负筋、主筋、加固体、钢筋马凳、钢托板、钢盖板、高强环氧树脂砂浆、预应力撑杆、喷射混凝土、预应力锚具、混凝土梁,混凝土梁上部设置负筋,负筋直径为22~25mm,混凝土梁下部设置两皮主筋,主筋直径为22~25mm,混凝土梁下部设置凹槽,凹槽深度为50~60mm,凹槽宽度和长度为70~80mm,钢筋马凳锚入凹槽,凹槽内填塞高强环氧树脂砂浆,钢筋马凳直径为28mm,钢筋马凳和箍筋焊接,钢筋马凳设置间距为500~550mm,混凝土梁下面为加固体,加固体采用膨胀混凝土,膨胀混凝土强度为C30或者C30以上,膨胀混凝土厚度为50~60mm,加固体下面设置钢托板,钢托板厚度为8~10mm,混凝土梁上部设置钢盖板,钢盖板厚度为8~10mm,钢盖板和钢托板之间采用预应力撑杆进行联接。预应力锚具采用握裹式锚具,预应力撑杆直径为18~20mm,混凝土楼板预留孔洞,混凝土楼板预留孔洞的直径为22~24mm,预应力撑杆穿过混凝土楼板预留孔洞,预应力撑杆和混凝土楼板预留孔洞的空隙待预应力张拉完毕后用高强建筑密封胶封闭,预应力张拉完毕后钢托板和预应力撑杆外围设置喷射混凝土,喷射混凝土厚度为30~40mm,喷射混凝土强度为C30。
本发明通过钢筋马凳的设置来加强加固体和原混凝土构件的整体性,加固体和原混凝土构件形成整体后增大了受力钢筋的有效高度,提高了结构体的抗弯能力。
加固体采用膨胀混凝土可以有效减少混凝土梁和加固体收缩率,避免混凝土梁和加固体出现裂缝。
膨胀混凝土下表面设置钢托板进行预应力张拉,通过钢托板和预应力钢板的握裹力来提升构件的承载力。
本发明中钢托板直接作为加固体膨胀混凝土的底模,节约了混凝土加固需要的模板,具有一定的经济效益。本发明预应力撑杆采用电热法张拉,选用三相低压变压器,变压器应装有可变电阻,同时应带有冷却设备,从电热变压器接到预应力撑杆上的电线采用绝缘软铜丝绞线。
预应力撑杆在膨胀混凝土浇捣完毕后进行第一次通电加热,通电加热5min,建立初始应力。24小时后进行第二次通电加热,通电加热10min,建立预应力。
传统张拉方法是利用千斤顶进行张拉,对于混凝土梁加固而言,由于千斤顶位置难以放置,即使放在垫板上也容易出现应力松弛现象,从而导致预应力损失。基于混凝土梁的加固特点,本发明采用通电加热张拉,有效地保证了预应力的张拉效果,确保加固体和混凝土梁形成整体,同时也显著提高了结构体的承载能力。
对本发明施加预应力的加固梁和无施加预应力的加固梁进行了对比模型试验,无施加预应力的加固梁在荷载加至12kN时加固后构件基本处于线弹性状态,荷载-挠度曲线基本为直线。当荷载大于12kN小于18kN时,无施加预应力的加固梁荷载-挠度曲线基本为曲线,进入弹塑性区域。无施加预应力的加固梁在荷载大于18kN时出现开裂,初始裂缝出现在跨中部位,为正弯曲裂缝,荷载-挠度曲线的斜率开始变小,表明结构的刚度开始下降。而施加预应力的加固梁进入线弹性状态的荷载为13kN,与无施加预应力的加固梁相差不大,但是施加预应力的加固梁的弹塑性区域明显比无施加预应力的加固梁大,施加预应力的加固梁只是在荷载加至26kN时才出现开裂,说明施加预应力的加固梁进入塑性开裂的范围明显扩大。
本发明具有安全可靠、经济合理、力学性能强的特点。
附图说明
图1为混凝土病梁加固构造示意图。
附图标记:1、箍筋,2、负筋,3、主筋,4、加固体,5、钢筋马凳,6、钢托板,7、钢盖板,8、高强环氧树脂砂浆,9、预应力撑杆,10、喷射混凝土,11、预应力锚具,12、混凝土梁。
具体实施方式
以下结合附图对本实施例进行详细描述。
图1为混凝土病梁加固构造示意图,混凝土病梁加固构造包括箍筋1、负筋2、主筋3、加固体4、钢筋马凳5、钢托板6、钢盖板7、高强环氧树脂砂浆8、预应力撑杆9、喷射混凝土10、预应力锚具11、混凝土梁12,混凝土梁12上部设置负筋2,负筋2直径为22mm,混凝土梁12下部设置两皮主筋3,主筋3直径为22mm,混凝土梁12下部设置凹槽,凹槽深度为50mm,凹槽宽度和长度为70mm,钢筋马凳5锚入凹槽,凹槽内填塞高强环氧树脂砂浆8,钢筋马凳5直径为28mm,钢筋马凳5和箍筋1焊接,钢筋马凳5设置间距为500mm,混凝土梁12下面为加固体4,加固体4采用膨胀混凝土,膨胀混凝土强度为C35,膨胀混凝土厚度为55mm,加固体4下面设置钢托板6,钢托板6厚度为10mm,混凝土梁12上部设置钢盖板7,钢盖板7厚度为10mm,钢盖板7和钢托板6之间采用预应力撑杆9进行联接。预应力锚具11采用握裹式锚具,预应力撑杆9直径为18mm,混凝土楼板预留孔洞,混凝土楼板预留孔洞的直径为22mm,预应力撑杆9穿过混凝土楼板预留孔洞,预应力撑杆9和混凝土楼板预留孔洞的空隙待预应力张拉完毕后用高强建筑密封胶封闭,预应力张拉完毕后钢托板6和预应力撑杆9外围设置喷射混凝土10,喷射混凝土10厚度为35mm,喷射混凝土10强度为C30。
本实施例中钢托板6直接作为加固体膨胀混凝土的底模。本实施例中预应力撑杆9采用电热法张拉,选用三相低压变压器,变压器应装有可变电阻,同时应带有冷却设备,从电热变压器接到预应力撑杆9上的电线采用绝缘软铜丝绞线。
预应力撑杆9在膨胀混凝土浇捣完毕后进行第一次通电加热,通电加热5min,建立初始应力。24小时后进行第二次通电加热,通电加热10min,建立预应力。

Claims (4)

1.一种混凝土病梁的加固方法,其特征是加固构造包括箍筋、负筋、主筋、加固体、钢筋马凳、钢托板、钢盖板、高强环氧树脂砂浆、预应力撑杆、喷射混凝土、预应力锚具、混凝土梁,混凝土梁上部设置负筋,负筋直径为22~25mm,混凝土梁下部设置两皮主筋,主筋直径为22~25mm,混凝土梁下部设置凹槽,凹槽深度为50~60mm,凹槽宽度和长度为70~80mm,钢筋马凳锚入凹槽,凹槽内填塞高强环氧树脂砂浆,钢筋马凳直径为28mm,钢筋马凳和箍筋焊接,钢筋马凳设置间距为500~550mm,混凝土梁下面为加固体,加固体采用膨胀混凝土,膨胀混凝土强度为C30或者C30以上,膨胀混凝土厚度为50~60mm,加固体下面设置钢托板,钢托板厚度为8~10mm,混凝土梁上部设置钢盖板,钢盖板厚度为8~10mm,钢盖板和钢托板之间采用预应力撑杆进行联接;预应力锚具采用握裹式锚具,预应力撑杆直径为18~20mm,混凝土楼板预留孔洞,混凝土楼板预留孔洞的直径为22~24mm,预应力撑杆穿过混凝土楼板预留孔洞,预应力撑杆和混凝土楼板预留孔洞的空隙待预应力张拉完毕后用高强建筑密封胶封闭,预应力张拉完毕后钢托板和预应力撑杆外围设置喷射混凝土,喷射混凝土厚度为30~40mm,喷射混凝土强度为C30。
2.根据权利要求1所示的混凝土病梁的加固方法,其特征是钢托板直接作为加固体膨胀混凝土的底模。
3.根据权利要求1所示的混凝土病梁的加固方法,其特征是预应力撑杆采用电热法张拉,选用三相低压变压器,变压器应装有可变电阻,同时应带有冷却设备,从电热变压器接到预应力撑杆上的电线采用绝缘软铜丝绞线。
4.根据权利要求1所示的混凝土病梁的加固方法,其特征是预应力撑杆在膨胀混凝土浇捣完毕后进行第一次通电加热,通电加热5min,建立初始应力;24小时后进行第二次通电加热,通电加热10min,建立预应力。
CN201310221318.8A 2013-05-29 2013-05-29 混凝土病梁的加固方法 Expired - Fee Related CN103306492B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310221318.8A CN103306492B (zh) 2013-05-29 2013-05-29 混凝土病梁的加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310221318.8A CN103306492B (zh) 2013-05-29 2013-05-29 混凝土病梁的加固方法

Publications (2)

Publication Number Publication Date
CN103306492A true CN103306492A (zh) 2013-09-18
CN103306492B CN103306492B (zh) 2015-08-26

Family

ID=49132174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310221318.8A Expired - Fee Related CN103306492B (zh) 2013-05-29 2013-05-29 混凝土病梁的加固方法

Country Status (1)

Country Link
CN (1) CN103306492B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672685A (zh) * 2016-01-18 2016-06-15 天津城建大学 一种环抱式预应力柱脚组件
CN105696805A (zh) * 2016-03-10 2016-06-22 叶长青 砖柱加固方法
CN107227861A (zh) * 2017-07-30 2017-10-03 叶长青 混凝土楼板加固结构
CN110952795A (zh) * 2019-12-03 2020-04-03 中冶建筑研究总院有限公司 一种空间结构弯曲压杆的加固结构和加固方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1162266A (ja) * 1997-08-18 1999-03-05 Takenaka Komuten Co Ltd 既存建築物の耐震補強方法
JPH11270146A (ja) * 1998-03-20 1999-10-05 Yahagi Construction Co Ltd 既設梁体の補強工法
JP2000204769A (ja) * 1999-01-07 2000-07-25 Sekisui Chem Co Ltd コンクリ―トの補強工法
CN101761238A (zh) * 2010-01-02 2010-06-30 朱奎 一种加固混凝土构件施工方法
CN201747077U (zh) * 2010-08-19 2011-02-16 朱奎 一种有裂缝混凝土梁的加固构造
CN202831669U (zh) * 2012-08-13 2013-03-27 黄智辉 钢筋混凝土套加固梁

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1162266A (ja) * 1997-08-18 1999-03-05 Takenaka Komuten Co Ltd 既存建築物の耐震補強方法
JPH11270146A (ja) * 1998-03-20 1999-10-05 Yahagi Construction Co Ltd 既設梁体の補強工法
JP2000204769A (ja) * 1999-01-07 2000-07-25 Sekisui Chem Co Ltd コンクリ―トの補強工法
CN101761238A (zh) * 2010-01-02 2010-06-30 朱奎 一种加固混凝土构件施工方法
CN201747077U (zh) * 2010-08-19 2011-02-16 朱奎 一种有裂缝混凝土梁的加固构造
CN202831669U (zh) * 2012-08-13 2013-03-27 黄智辉 钢筋混凝土套加固梁

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672685A (zh) * 2016-01-18 2016-06-15 天津城建大学 一种环抱式预应力柱脚组件
CN107191004B (zh) * 2016-03-10 2019-06-04 叶长青 砖柱加固施工方法
CN105696805A (zh) * 2016-03-10 2016-06-22 叶长青 砖柱加固方法
CN107191004A (zh) * 2016-03-10 2017-09-22 叶长青 砖柱加固施工方法
CN105696805B (zh) * 2016-03-10 2017-11-28 叶长青 砖柱加固方法
CN109853983A (zh) * 2017-07-30 2019-06-07 叶长青 混凝土楼板加固施工构造
CN107227861A (zh) * 2017-07-30 2017-10-03 叶长青 混凝土楼板加固结构
CN109853981A (zh) * 2017-07-30 2019-06-07 叶长青 混凝土楼板加固施工方法
CN109853982A (zh) * 2017-07-30 2019-06-07 叶长青 混凝土楼板加固施工技术
CN109881910A (zh) * 2017-07-30 2019-06-14 叶长青 楼板加固结构
CN107227861B (zh) * 2017-07-30 2019-06-28 叶长青 混凝土楼板加固结构
CN109881910B (zh) * 2017-07-30 2021-06-29 叶长青 楼板加固结构
CN110952795A (zh) * 2019-12-03 2020-04-03 中冶建筑研究总院有限公司 一种空间结构弯曲压杆的加固结构和加固方法

Also Published As

Publication number Publication date
CN103306492B (zh) 2015-08-26

Similar Documents

Publication Publication Date Title
CN103088920B (zh) 一种先张法预应力叠合梁结构体系及其施工方法
CN103306492A (zh) 混凝土病梁的加固方法
CN103321444B (zh) 混凝土楼板加固施工方法
CN103994034B (zh) 一种预应力混凝土-钢组合风力发电塔架连接装置
CN205024882U (zh) 预制装配式型钢混凝土剪力墙
CN208668683U (zh) 内置预应力筋钢管混凝土边框内藏钢板组合剪力墙
CN103306493B (zh) 建筑物结构的加固方法
CN105863046A (zh) 一种预制装配式梁柱节点连接工艺
CN204060020U (zh) 一种钢筋混凝土柱加固结构
CN108678225A (zh) 内置预应力筋钢管混凝土边框内藏钢板组合剪力墙及作法
CN104863124B (zh) 一种利用灌注桩桩间土承载力的装置及方法
CN102363957A (zh) 一种后张预应力复合抗拔桩
CN204703320U (zh) 一种纤维增强水泥钢丝网架现浇外模复合保温系统
CN104652430A (zh) 复合配筋部分预应力混凝土实心方桩及其制作方法
CN104110097B (zh) 一种端部增强型钢骨混凝土叠合梁
CN103061452B (zh) 一种抗震型预应力预制梁
CN206319597U (zh) 一种悬挑钢梁支模装置
CN109138280A (zh) 一种混凝土垫块及其在控制钢筋间距、楼板厚度中的应用
CN203755302U (zh) 先张法预应力混凝土桩
CN204456656U (zh) 一种焊接箍筋配合钢棒钢骨混凝土柱
CN103850253A (zh) 先张法预应力混凝土桩、生产方法及桩与承台的连接方法
CN108301560A (zh) 一种内置高强角钢的钢管混凝土柱及其施工方法
CN202831382U (zh) 一种抗震型预应力预制梁
CN211472142U (zh) 一种转体斜拉桥桥墩及其加固装置
CN106930437B (zh) 一种内置水平斜撑的钢筋混凝土剪力墙

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: Jingshan Hill street in Wenzhou city in Zhejiang province 325000 Rong Road No. 39

Applicant after: Zhu Kui

Address before: 325000 snow mountain apartment No. 12, Lucheng District, Zhejiang, Wenzhou

Applicant before: Zhu Kui

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191127

Address after: 313000 1-C, building 1, No. 656, Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province

Patentee after: Huzhou xinbeilian Network Technology Co.,Ltd.

Address before: Jingshan Hill street in Wenzhou city in Zhejiang province 325000 Rong Road No. 39

Patentee before: Zhu Kui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191216

Address after: 314200 Building 2, Gaofeng Road, industrial park, Caoqiao street, Pinghu City, Jiaxing City, Zhejiang Province

Patentee after: ZHEJIANG JIAYUAN HORTICULTURAL LANDSCAPE CO.,LTD.

Address before: 313000 1-C, building 1, No. 656, Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: Huzhou xinbeilian Network Technology Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826