CN103306272B - In-hole blocking method for chemically grouting deep hole with epoxy resin - Google Patents

In-hole blocking method for chemically grouting deep hole with epoxy resin Download PDF

Info

Publication number
CN103306272B
CN103306272B CN201310264641.3A CN201310264641A CN103306272B CN 103306272 B CN103306272 B CN 103306272B CN 201310264641 A CN201310264641 A CN 201310264641A CN 103306272 B CN103306272 B CN 103306272B
Authority
CN
China
Prior art keywords
hole
grouting
packer
blocking step
closed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310264641.3A
Other languages
Chinese (zh)
Other versions
CN103306272A (en
Inventor
李小勇
周昌茂
张玉莉
童耀
刘强
王�锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Original Assignee
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd filed Critical GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority to CN201310264641.3A priority Critical patent/CN103306272B/en
Publication of CN103306272A publication Critical patent/CN103306272A/en
Application granted granted Critical
Publication of CN103306272B publication Critical patent/CN103306272B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses an in-hole blocking method for chemically grouting a deep hole with epoxy resin. In the in-hole blocking method, a slurry inlet pipe, a hydraulic or pneumatic grouting plug, a connecting ring arranged on the upper part of the grouting plug, a traction steel wire rope, an auxiliary winch, a slurry returning soft pipe, and a slurry returning pipe inside a grouting segment are used. The in-hole blocking method is applicable to chemical grouting of the deep hole which is deeper than 100m; the in-hole blocking method comprises a segmental blocking step, and a blocking step similar to hole opening sealing. Through the in-hole blocking method, the plug burying probability can be reduced and the quality of a grouting project can be ensured.

Description

A kind of method for epoxy resin Deep hole chemical grouting hole internal congestion
Technical field
The present invention relates to a kind of for epoxy grouting hole internal congestion method.Be adapted to the epoxy resin Deep hole chemical grouting hole internal congestion of hole depth more than 100m especially.
Background technology
Epoxy resin is a kind of conventional chemical grouting material, is mainly used in the permanent disposal of Geological Defects within the scope of water-control project dam dam site.This material is after repeatedly improveing, and function admirable, concrete castability is good, but expensive.Epoxy resin is adopted to carry out basement rock chemical grouting, the general construction method adopting " small diameter hole, from top to bottom segmentation block grouting ".Because epoxy resin grout material has higher permeability, in deep hole (hole depth is more than 100m), long-time, high pressure filling process, easily there is " around plug " phenomenon in slurry material, and is not easily found, and in causing hole, " burying plug " accident occurs.Not only the difficulty of accident settlement is comparatively large, also can have influence on construction speed and chemical grouting workmanship simultaneously.。
Summary of the invention
In order to overcome the deficiency adopting traditional simple " from top to bottom segmentation obstruction " construction method, technical problem to be solved by this invention is to provide a kind of chemical grouting hole internal congestion method, can reduce " burying plug " probability, guarantee grouting works quality.
The object of the present invention is achieved like this:
A kind of method for epoxy resin Deep hole chemical grouting hole internal congestion, comprise slurry recovering tube in inlet pipe, hydraulic pressure or air pressure packer, the connecting ring of packer top processing, haulage cable, auxiliary elevator, overfall flexible pipe and grout compartment, it is applicable to carry out the Deep hole chemical grouting of hole depth more than 100m, and it comprises segmentation blocking step and " similar aperture is closed " blocking step;
Described segmentation blocking step is: each grout compartment within hole depth 100m time, adopts φ 76mm borehole, φ 67mm hydraulic pressure or air pressure packer to carry out blocking, packer grouting from top to bottom, carries out time construction of next section after grout compartment grout cures again;
Described " similar aperture is closed " blocking step: hole depth is secondary more than grout compartment each after 100m, adopt φ 56mm-φ 60mm small diameter hole, repeated by packer to be blocked in hole depth 100m place, in following section of elongated hole, slurry recovering tube is in the milk, and slurry recovering tube is down to 20cm place at the bottom of hole;
In above-mentioned segmentation blocking step and " similar aperture is closed " blocking step, in order to strengthen promoting packer ability, after hole depth 60m, inlet pipe adopts rigid pipe to substitute packer flexible pipe, and at packer top processing connecting ring in above-mentioned " similar aperture is closed " blocking step, adopt wire rope traction elevator assisted Extraction to rise and pull out packer;
Epoxy grouting hole internal congestion construction task is completed by said method.
The present invention achieves following technique effect:
(1) adopt φ 67mm hydraulic pressure or the grouting of air pressure packer jam, can 3.5 ~ 4.0MPa grouting pressure be met, do not produce " sliding plug " accident simultaneously;
(2) following section of hole depth 100m employing " method is closed in similar aperture " grouting, and be equipped with elevator assisted Extraction rise pull out packer, decrease Deep hole chemical grouting and bury plug probability;
(3) construct with complete opening " method is closed in aperture " and compare, hole section accounts for slurry and relatively reduces, and has saved material cost;
(4) packer divides into degree of depth reduction, reduces non-cutting time, and efficiency of construction improves;
(5) hole depth 100m is with the secondary repeatedly re grouting of hypomere, and grouting quality is more reliable.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is segmentation blocking step schematic diagram of the present invention;
Fig. 2 is the present invention's " similar aperture is closed " blocking step schematic diagram 1;
Fig. 3 is the present invention's " similar aperture is closed " blocking step schematic diagram 2.
In figure, a represents the scope of operation, and b acts on behalf of hole depth 100 meters of.
Detailed description of the invention
See Fig. 1-3, a kind of method for epoxy resin Deep hole chemical grouting hole internal congestion, comprise slurry recovering tube 7 in inlet pipe 1, hydraulic pressure or air pressure packer 2, the connecting ring 3 of packer top processing, haulage cable 4, auxiliary elevator 5, overfall flexible pipe 6 and grout compartment, it is applicable to carry out the Deep hole chemical grouting of hole depth more than 100m, and it comprises segmentation blocking step and " similar aperture is closed " blocking step;
Described segmentation blocking step is: each grout compartment within hole depth 100m time, adopts φ 76mm borehole, φ 67mm hydraulic pressure or air pressure packer to carry out blocking, packer grouting from top to bottom, carries out time construction of next section after grout compartment grout cures again;
Described " similar aperture is closed " blocking step: hole depth is secondary more than grout compartment each after 100m, adopt φ 56mm-φ 60mm small diameter hole, repeated by packer to be blocked in hole depth 100m place, in following section of elongated hole, slurry recovering tube is in the milk, and slurry recovering tube is down to 20cm place at the bottom of hole;
In above-mentioned segmentation blocking step and " similar aperture is closed " blocking step, in order to strengthen promoting packer ability, after hole depth 60m, inlet pipe adopts rigid pipe to substitute packer flexible pipe, and at packer top processing connecting ring in above-mentioned " similar aperture is closed " blocking step, adopt wire rope traction elevator assisted Extraction to rise and pull out packer;
Epoxy grouting hole internal congestion construction task is completed by said method.

Claims (1)

1. the method for epoxy resin Deep hole chemical grouting hole internal congestion, comprise slurry recovering tube (7) in inlet pipe (1), hydraulic pressure or air pressure packer (2), the connecting ring (3) of packer top processing, haulage cable (4), auxiliary elevator (5), overfall flexible pipe (6) and grout compartment, it is characterized in that, it is applicable to carry out the Deep hole chemical grouting of hole depth more than 100m, and it comprises segmentation blocking step and " similar aperture is closed " blocking step;
Described segmentation blocking step is: each grout compartment within hole depth 100m time, adopts φ 76mm borehole, φ 67mm hydraulic pressure or air pressure packer to carry out blocking, packer grouting from top to bottom, carries out time construction of next section after grout compartment grout cures again;
Described " similar aperture is closed " blocking step: hole depth is secondary more than each grout compartment after 100m, adopt φ 56mm-φ 60mm small diameter hole, packer is repeated be blocked in hole depth 100m place, following section time, in elongated hole, slurry recovering tube is in the milk, and slurry recovering tube is down to 20cm place at the bottom of hole;
In above-mentioned segmentation blocking step and " similar aperture is closed " blocking step, in order to strengthen promoting packer ability, rigid pipe is adopted at hole depth 60m post-grouting inlet pipe beyond the Great Wall (1), and at packer top processing connecting ring in above-mentioned " similar aperture is closed " blocking step, adopt wire rope traction elevator assisted Extraction to rise and pull out packer;
Epoxy grouting hole internal congestion construction task is completed by said method.
CN201310264641.3A 2013-06-28 2013-06-28 In-hole blocking method for chemically grouting deep hole with epoxy resin Active CN103306272B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310264641.3A CN103306272B (en) 2013-06-28 2013-06-28 In-hole blocking method for chemically grouting deep hole with epoxy resin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310264641.3A CN103306272B (en) 2013-06-28 2013-06-28 In-hole blocking method for chemically grouting deep hole with epoxy resin

Publications (2)

Publication Number Publication Date
CN103306272A CN103306272A (en) 2013-09-18
CN103306272B true CN103306272B (en) 2015-04-01

Family

ID=49131959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310264641.3A Active CN103306272B (en) 2013-06-28 2013-06-28 In-hole blocking method for chemically grouting deep hole with epoxy resin

Country Status (1)

Country Link
CN (1) CN103306272B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103837366A (en) * 2014-03-10 2014-06-04 中国水电顾问集团华东勘测设计研究院有限公司 Visible sampling method for fracture network in surrounding rock
CN106149726B (en) * 2016-06-22 2018-03-20 广州市泰利斯固结补强工程有限公司 The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6863475B2 (en) * 2003-04-30 2005-03-08 Shell Oil Company Apparatus for injecting fluids
CN101694094B (en) * 2009-10-23 2012-07-04 中国水利水电第七工程局成都水电建设工程有限公司 Reinforcing and strengthening processing method of chemical grout
KR101001947B1 (en) * 2010-04-10 2010-12-17 토양건영 주식회사 Pile head steal grouting construction method using steal head and double casket packer
CN102808427B (en) * 2012-08-21 2014-08-13 中国水利水电第七工程局成都水电建设工程有限公司 Composite grouting reinforcement anti-seepage treatment technology
CN202925547U (en) * 2012-09-28 2013-05-08 葛洲坝集团基础工程有限公司 Device for reducing occupied volumes of chemical grout in hole and tube

Also Published As

Publication number Publication date
CN103306272A (en) 2013-09-18

Similar Documents

Publication Publication Date Title
CN103821544B (en) Tunneling and underground engineering high-pressure high-flow is dashed forward Water outburst treatment method
CN103603342A (en) Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN103306713B (en) A kind of high prominent coal seam layer-through drilling networking reinforcement means
CN107448214B (en) Large-scale two lane pre-pouring grout method of geological structure crack coal and rock superdeep holes high pressure
CN103883796B (en) Silt particle mud district hand pick formula jacking construction device and method
CN106703873B (en) The method for determining the effective extraction radius of hydraulic flushing in hole
CN205314107U (en) Sectional type slip casting pipe device that foundation stabilization used
CN103742154B (en) A kind of shield tunnel ventilation shaft construction method
CN102926700A (en) Grouting bag type hole packer with multi-section seal
CN109026010A (en) A kind of mine seepage well slip casting type sinking shaft construction method
CN103306272B (en) In-hole blocking method for chemically grouting deep hole with epoxy resin
CN202323950U (en) Rotary casing connecting structure of rotary pile extractor
CN107227740A (en) The construction method that limestone cave cell wall is closed in construction of diaphragm wall
CN105155564A (en) Anti-inrushing construction method for weak water-resisting layer of deep foundation pit
CN104264662A (en) Construction method for deeply embedding hard rock secant pile in soil layer being rich in water
CN102966376B (en) Vacuum negative pressure quick unwatering method for ore body
CN202851052U (en) A delay self-expanding capsule and paste body combination hole sealing device for drilled holes of gas extraction
CN103669333B (en) It is easy to the friction pile of vacuum-dewatering
CN104612748A (en) Coal-mass gas extraction method and device
CN204435330U (en) The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering
CN203879548U (en) Sealing wall for water plugging of mine roadway
CN203717022U (en) Mobile gas extraction device for goaf
CN202832330U (en) Sand mechanism and drilling tool
CN204851153U (en) Moisture unconsolidated formation of high pressure creeps into closure device
CN102979957B (en) Anti-seepage slurry treatment method for horizontal continuous jacking pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant