CN103306272B - In-hole blocking method for chemically grouting deep hole with epoxy resin - Google Patents
In-hole blocking method for chemically grouting deep hole with epoxy resin Download PDFInfo
- Publication number
- CN103306272B CN103306272B CN201310264641.3A CN201310264641A CN103306272B CN 103306272 B CN103306272 B CN 103306272B CN 201310264641 A CN201310264641 A CN 201310264641A CN 103306272 B CN103306272 B CN 103306272B
- Authority
- CN
- China
- Prior art keywords
- hole
- grouting
- packer
- blocking step
- closed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention discloses an in-hole blocking method for chemically grouting a deep hole with epoxy resin. In the in-hole blocking method, a slurry inlet pipe, a hydraulic or pneumatic grouting plug, a connecting ring arranged on the upper part of the grouting plug, a traction steel wire rope, an auxiliary winch, a slurry returning soft pipe, and a slurry returning pipe inside a grouting segment are used. The in-hole blocking method is applicable to chemical grouting of the deep hole which is deeper than 100m; the in-hole blocking method comprises a segmental blocking step, and a blocking step similar to hole opening sealing. Through the in-hole blocking method, the plug burying probability can be reduced and the quality of a grouting project can be ensured.
Description
Technical field
The present invention relates to a kind of for epoxy grouting hole internal congestion method.Be adapted to the epoxy resin Deep hole chemical grouting hole internal congestion of hole depth more than 100m especially.
Background technology
Epoxy resin is a kind of conventional chemical grouting material, is mainly used in the permanent disposal of Geological Defects within the scope of water-control project dam dam site.This material is after repeatedly improveing, and function admirable, concrete castability is good, but expensive.Epoxy resin is adopted to carry out basement rock chemical grouting, the general construction method adopting " small diameter hole, from top to bottom segmentation block grouting ".Because epoxy resin grout material has higher permeability, in deep hole (hole depth is more than 100m), long-time, high pressure filling process, easily there is " around plug " phenomenon in slurry material, and is not easily found, and in causing hole, " burying plug " accident occurs.Not only the difficulty of accident settlement is comparatively large, also can have influence on construction speed and chemical grouting workmanship simultaneously.。
Summary of the invention
In order to overcome the deficiency adopting traditional simple " from top to bottom segmentation obstruction " construction method, technical problem to be solved by this invention is to provide a kind of chemical grouting hole internal congestion method, can reduce " burying plug " probability, guarantee grouting works quality.
The object of the present invention is achieved like this:
A kind of method for epoxy resin Deep hole chemical grouting hole internal congestion, comprise slurry recovering tube in inlet pipe, hydraulic pressure or air pressure packer, the connecting ring of packer top processing, haulage cable, auxiliary elevator, overfall flexible pipe and grout compartment, it is applicable to carry out the Deep hole chemical grouting of hole depth more than 100m, and it comprises segmentation blocking step and " similar aperture is closed " blocking step;
Described segmentation blocking step is: each grout compartment within hole depth 100m time, adopts φ 76mm borehole, φ 67mm hydraulic pressure or air pressure packer to carry out blocking, packer grouting from top to bottom, carries out time construction of next section after grout compartment grout cures again;
Described " similar aperture is closed " blocking step: hole depth is secondary more than grout compartment each after 100m, adopt φ 56mm-φ 60mm small diameter hole, repeated by packer to be blocked in hole depth 100m place, in following section of elongated hole, slurry recovering tube is in the milk, and slurry recovering tube is down to 20cm place at the bottom of hole;
In above-mentioned segmentation blocking step and " similar aperture is closed " blocking step, in order to strengthen promoting packer ability, after hole depth 60m, inlet pipe adopts rigid pipe to substitute packer flexible pipe, and at packer top processing connecting ring in above-mentioned " similar aperture is closed " blocking step, adopt wire rope traction elevator assisted Extraction to rise and pull out packer;
Epoxy grouting hole internal congestion construction task is completed by said method.
The present invention achieves following technique effect:
(1) adopt φ 67mm hydraulic pressure or the grouting of air pressure packer jam, can 3.5 ~ 4.0MPa grouting pressure be met, do not produce " sliding plug " accident simultaneously;
(2) following section of hole depth 100m employing " method is closed in similar aperture " grouting, and be equipped with elevator assisted Extraction rise pull out packer, decrease Deep hole chemical grouting and bury plug probability;
(3) construct with complete opening " method is closed in aperture " and compare, hole section accounts for slurry and relatively reduces, and has saved material cost;
(4) packer divides into degree of depth reduction, reduces non-cutting time, and efficiency of construction improves;
(5) hole depth 100m is with the secondary repeatedly re grouting of hypomere, and grouting quality is more reliable.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is segmentation blocking step schematic diagram of the present invention;
Fig. 2 is the present invention's " similar aperture is closed " blocking step schematic diagram 1;
Fig. 3 is the present invention's " similar aperture is closed " blocking step schematic diagram 2.
In figure, a represents the scope of operation, and b acts on behalf of hole depth 100 meters of.
Detailed description of the invention
See Fig. 1-3, a kind of method for epoxy resin Deep hole chemical grouting hole internal congestion, comprise slurry recovering tube 7 in inlet pipe 1, hydraulic pressure or air pressure packer 2, the connecting ring 3 of packer top processing, haulage cable 4, auxiliary elevator 5, overfall flexible pipe 6 and grout compartment, it is applicable to carry out the Deep hole chemical grouting of hole depth more than 100m, and it comprises segmentation blocking step and " similar aperture is closed " blocking step;
Described segmentation blocking step is: each grout compartment within hole depth 100m time, adopts φ 76mm borehole, φ 67mm hydraulic pressure or air pressure packer to carry out blocking, packer grouting from top to bottom, carries out time construction of next section after grout compartment grout cures again;
Described " similar aperture is closed " blocking step: hole depth is secondary more than grout compartment each after 100m, adopt φ 56mm-φ 60mm small diameter hole, repeated by packer to be blocked in hole depth 100m place, in following section of elongated hole, slurry recovering tube is in the milk, and slurry recovering tube is down to 20cm place at the bottom of hole;
In above-mentioned segmentation blocking step and " similar aperture is closed " blocking step, in order to strengthen promoting packer ability, after hole depth 60m, inlet pipe adopts rigid pipe to substitute packer flexible pipe, and at packer top processing connecting ring in above-mentioned " similar aperture is closed " blocking step, adopt wire rope traction elevator assisted Extraction to rise and pull out packer;
Epoxy grouting hole internal congestion construction task is completed by said method.
Claims (1)
1. the method for epoxy resin Deep hole chemical grouting hole internal congestion, comprise slurry recovering tube (7) in inlet pipe (1), hydraulic pressure or air pressure packer (2), the connecting ring (3) of packer top processing, haulage cable (4), auxiliary elevator (5), overfall flexible pipe (6) and grout compartment, it is characterized in that, it is applicable to carry out the Deep hole chemical grouting of hole depth more than 100m, and it comprises segmentation blocking step and " similar aperture is closed " blocking step;
Described segmentation blocking step is: each grout compartment within hole depth 100m time, adopts φ 76mm borehole, φ 67mm hydraulic pressure or air pressure packer to carry out blocking, packer grouting from top to bottom, carries out time construction of next section after grout compartment grout cures again;
Described " similar aperture is closed " blocking step: hole depth is secondary more than each grout compartment after 100m, adopt φ 56mm-φ 60mm small diameter hole, packer is repeated be blocked in hole depth 100m place, following section time, in elongated hole, slurry recovering tube is in the milk, and slurry recovering tube is down to 20cm place at the bottom of hole;
In above-mentioned segmentation blocking step and " similar aperture is closed " blocking step, in order to strengthen promoting packer ability, rigid pipe is adopted at hole depth 60m post-grouting inlet pipe beyond the Great Wall (1), and at packer top processing connecting ring in above-mentioned " similar aperture is closed " blocking step, adopt wire rope traction elevator assisted Extraction to rise and pull out packer;
Epoxy grouting hole internal congestion construction task is completed by said method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310264641.3A CN103306272B (en) | 2013-06-28 | 2013-06-28 | In-hole blocking method for chemically grouting deep hole with epoxy resin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310264641.3A CN103306272B (en) | 2013-06-28 | 2013-06-28 | In-hole blocking method for chemically grouting deep hole with epoxy resin |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103306272A CN103306272A (en) | 2013-09-18 |
CN103306272B true CN103306272B (en) | 2015-04-01 |
Family
ID=49131959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310264641.3A Active CN103306272B (en) | 2013-06-28 | 2013-06-28 | In-hole blocking method for chemically grouting deep hole with epoxy resin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103306272B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103837366A (en) * | 2014-03-10 | 2014-06-04 | 中国水电顾问集团华东勘测设计研究院有限公司 | Visible sampling method for fracture network in surrounding rock |
CN106149726B (en) * | 2016-06-22 | 2018-03-20 | 广州市泰利斯固结补强工程有限公司 | The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6863475B2 (en) * | 2003-04-30 | 2005-03-08 | Shell Oil Company | Apparatus for injecting fluids |
CN101694094B (en) * | 2009-10-23 | 2012-07-04 | 中国水利水电第七工程局成都水电建设工程有限公司 | Reinforcing and strengthening processing method of chemical grout |
KR101001947B1 (en) * | 2010-04-10 | 2010-12-17 | 토양건영 주식회사 | Pile head steal grouting construction method using steal head and double casket packer |
CN102808427B (en) * | 2012-08-21 | 2014-08-13 | 中国水利水电第七工程局成都水电建设工程有限公司 | Composite grouting reinforcement anti-seepage treatment technology |
CN202925547U (en) * | 2012-09-28 | 2013-05-08 | 葛洲坝集团基础工程有限公司 | Device for reducing occupied volumes of chemical grout in hole and tube |
-
2013
- 2013-06-28 CN CN201310264641.3A patent/CN103306272B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103306272A (en) | 2013-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821544B (en) | Tunneling and underground engineering high-pressure high-flow is dashed forward Water outburst treatment method | |
CN103603342A (en) | Construction method of ultra-long bored concrete pile with large-diameter casing combination | |
CN103306713B (en) | A kind of high prominent coal seam layer-through drilling networking reinforcement means | |
CN107448214B (en) | Large-scale two lane pre-pouring grout method of geological structure crack coal and rock superdeep holes high pressure | |
CN103883796B (en) | Silt particle mud district hand pick formula jacking construction device and method | |
CN106703873B (en) | The method for determining the effective extraction radius of hydraulic flushing in hole | |
CN205314107U (en) | Sectional type slip casting pipe device that foundation stabilization used | |
CN103742154B (en) | A kind of shield tunnel ventilation shaft construction method | |
CN102926700A (en) | Grouting bag type hole packer with multi-section seal | |
CN109026010A (en) | A kind of mine seepage well slip casting type sinking shaft construction method | |
CN103306272B (en) | In-hole blocking method for chemically grouting deep hole with epoxy resin | |
CN202323950U (en) | Rotary casing connecting structure of rotary pile extractor | |
CN107227740A (en) | The construction method that limestone cave cell wall is closed in construction of diaphragm wall | |
CN105155564A (en) | Anti-inrushing construction method for weak water-resisting layer of deep foundation pit | |
CN104264662A (en) | Construction method for deeply embedding hard rock secant pile in soil layer being rich in water | |
CN102966376B (en) | Vacuum negative pressure quick unwatering method for ore body | |
CN202851052U (en) | A delay self-expanding capsule and paste body combination hole sealing device for drilled holes of gas extraction | |
CN103669333B (en) | It is easy to the friction pile of vacuum-dewatering | |
CN104612748A (en) | Coal-mass gas extraction method and device | |
CN204435330U (en) | The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering | |
CN203879548U (en) | Sealing wall for water plugging of mine roadway | |
CN203717022U (en) | Mobile gas extraction device for goaf | |
CN202832330U (en) | Sand mechanism and drilling tool | |
CN204851153U (en) | Moisture unconsolidated formation of high pressure creeps into closure device | |
CN102979957B (en) | Anti-seepage slurry treatment method for horizontal continuous jacking pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |