CN103291326B - 一种大变形巷道围岩再造承载层控制技术 - Google Patents
一种大变形巷道围岩再造承载层控制技术 Download PDFInfo
- Publication number
- CN103291326B CN103291326B CN201310280508.7A CN201310280508A CN103291326B CN 103291326 B CN103291326 B CN 103291326B CN 201310280508 A CN201310280508 A CN 201310280508A CN 103291326 B CN103291326 B CN 103291326B
- Authority
- CN
- China
- Prior art keywords
- slip casting
- steel pipe
- roadway
- casting steel
- rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明一种大变形巷道围岩再造承载层控制技术,包括有如下步骤:(1)施工巷道围岩基本支护系统作用区;(2)施工巷道两帮下部上下位钻孔,使上下位钻孔水平深度和巷道两帮深部弹性区岩体搭接;(3)布置注浆液输送系统;(4)安装上下位注浆钢管、托板、紧箍卡及带孔密封塞;(5)启动注浆泵,使超细水泥注浆液由注浆软管、注浆钢管进浆孔、注浆钢管流液孔压入巷道两帮下部上下位钻孔四周及围岩基本支护系统作用区、围岩塑性区的裂隙中;(6)当注浆压力与注浆时间达到设定值时,关闭注浆泵停止注浆;(7)去掉注浆软管和带孔密封塞,用实心密封塞封闭注浆钢管进浆孔。(8)以相同方式施工下一组巷道两帮下部上下位再造承载层区。
Description
技术领域
本发明涉及一种大变形巷道围岩控制技术,是一种通过巷道两帮下部上下位打水平钻孔和弹性区岩层搭接、安装上下位注浆钢管、进行高压注浆及密封上下位注浆钢管注浆孔,并通过基本支护系统作用区而使巷道两帮下部形成再造承载层的大变形巷道围岩控制技术。
背景技术
深井巷道围岩稳定是保证人员安全及实现工作面高效回采的基础。在深部高应力作用下,巷道围岩岩性软化特征凸现,在巷道四周围岩中会存在较大范围塑性区而造成巷道大变形,使得巷道支护难度加大及不利维护。而现有巷道基本支护系统,如锚杆-锚索主动支护系统、型钢被动支护系统及锚杆(索)-型钢耦合主被动支护系统均是作用在巷道围岩塑性区内或巷道表面,巷道基本支护系统作用范围以外的塑性岩体很难将巷道开掘及支护后重新分布应力向巷道两帮深部弹性区转移。随着采掘工作进行,巷道围岩塑性区进一步增大的同时,巷道表面位移增加,变形严重。实践表明:巷道即使采用基本支护系统(锚杆、锚索、型钢、巷道围岩注浆加固)进行强力支护,在采掘影响下巷道依然会出现较大变形,并且基本支护系统支护强度的提高会进一步使围岩应力向底板转移,造成巷道底鼓量加大,严重影响巷道在服务期内的正常使用。
深井巷道围岩塑性区范围较大时,巷道周边各岩层承载能力下降,巷道表现出整体收敛及大变形特点,采用目前的基本支护系统难以实现有效控制。如果人为在巷道两帮下部再造承载层,并和巷道两帮深部弹性区岩体搭接,使再造承载层与巷道(两帮及顶板)基本支护系统作用区共同形成类似“Ω”体承载结构,则可以有效承载,减小巷道表面载荷,实现围岩应力由底板转移变为向两帮深部弹性区转移,从而促进巷道围岩稳定。本发明基于巷道围岩应力转移及变形不可抗性,提出一种大变形巷道围岩再造承载层控制技术,用于大变形巷道围岩(特别是对巷道两帮的收敛变形及底鼓)控制,既利于实现施工操作,又可降低支护成本。
发明内容
本发明针对现有大变形巷道基本支护系统(锚杆、锚索、型钢、巷道围岩注浆加固)难以进行有效控制的不足,提出了一种巷道两帮下部上下位再造承载层控制技术。该技术配合巷道围岩基本支护系统使用,其投入成本低,易于操作施工,不仅实现了巷道围岩应力转移,而且减小了巷道收敛变形,促进了巷道围岩稳定。
本发明提供一种大变形巷道围岩再造承载层控制技术。首先根据巷道围岩塑性区范围及围岩应力环境,选择合适的锚杆、锚索基本支护参数,对巷道围岩顶板及两帮进行支护,以形成巷道围岩基本支护系统作用区。
进一步,在巷道围岩基本支护系统作用区两帮下部施工上下位钻孔,施工上下位钻孔孔径大于上下位注浆钢管管径,且使上下位钻孔的水平深度和两帮深部弹性区岩体搭接,保证形成的再造承载层内端部在巷道两帮深部弹性区岩体中。同时,使上下位钻孔距离足够近,以充分保证上下位钻孔中注浆液在高压作用下沿围岩塑性区裂隙的贯通交汇,但不致产生上下位钻孔施工中新增裂隙的贯通。
进一步,在巷道两帮下部设置4个上下位钻孔为一组施工单元,按照各组上下位钻孔位置进行注浆泵的安装与注浆软管的铺设,使注浆泵出液口与注浆软管相接,并进行紧固;在上下位钻孔中安装足够长度的上下位注浆钢管,以保证上下位注浆钢管和两帮深部弹性区岩体搭接,在上下位注浆钢管外端部依次安装托板与紧箍卡,以保证上下位注浆钢管牢固;将带孔密封塞套进注浆软管与注浆钢管进浆孔进行连接,旋转带孔密封塞进行封闭紧固。
进一步,检查各紧固部位后开启注浆泵,使超细水泥注浆液由注浆软管、注浆钢管进浆孔、注浆钢管流液孔压入巷道两帮下部上下位钻孔四周及围岩塑性区裂隙中,控制注浆压力小于两帮深部弹性区岩体强度,大于围岩塑性区岩体残余强度,并根据注浆压力及围岩裂隙扩展进行注浆液浓度的调整,保证注浆液的压入量与在裂隙中的贯通。
进一步,通过注浆泵压力与注浆时间控制围岩中注浆量,把注浆压力控制在设定值,记录注浆时间,并观察注浆管路各紧固部位,以防止浆液的外漏及异常发生。当注浆时间达到预先设定值时,关闭注浆泵停止注浆,表明注浆量的合理与再造承载层的形成。
进一步,从上下位注浆钢管外端部去掉注浆软管和带孔密封塞,用实心密封塞封闭注浆钢管进浆孔,完成一组巷道围岩两帮下部上下位再造承载层施工。
采用相同技术施工下一组巷道两帮下部上下位再造承载层,根据巷道两帮围岩力学性质及应力环境,可适当调整各组巷道两帮下部上下位再造承载层间距及上下位再造承载层位置,以达到经济合理与围岩稳定的优化。
附图说明
图1是实现本发明一种大变形巷道围岩再造承载层控制技术竖向剖面示意图。
图2是实现本发明一种大变形巷道围岩再造承载层控制技术再造承载层上位水平切面示意图。
图中:1为弹性区;2为塑性区;3为巷道基本支护系统作用区;4为巷道;5为锚索;6为锚杆;7为上位钻孔;8为下位钻孔;9为上位注浆钢管;10为再造承载层区;11为注浆钢管流液孔;12为下位注浆钢管;13为注浆钢管进浆孔;14为托板;15为紧箍卡;16为带孔密封塞;17为注浆软管;18为实心密封塞。
具体实施方式
下面结合附图和实例对本发明作进一步详细的描述。
本发明提供了一种大变形巷道围岩再造承载层控制技术。
如图1所示,本发明的具体技术如下:
(1)根据地质资料及巷道4功能要求,选择巷道4的合理位置,确定巷道4围岩塑性区2范围,选择合适的锚杆6、锚索5基本支护参数,对巷道4围岩顶板及两帮进行支护,以形成巷道4围岩基本支护系统作用区3。
(2)在巷道4围岩两帮下部确定上位钻孔7、下位钻孔8的合理位置及钻孔直径大小,采用钻机进行水平深孔打钻。施工过程中要求上位钻孔7、下位钻孔8的孔径大于上位注浆钢管9、下位注浆钢管12的管径,且保证上位钻孔7、下位钻孔8的成孔依次穿过围岩基本支护系统作用区3、围岩塑性区2,并进入弹性区1岩体中,保证形成的再造承载层区10内端部和弹性区1岩体搭接。
(3)根据已施工的一组上位钻孔7和下位钻孔8的位置,在巷道4内进行注浆泵设备安装与注浆软管17铺设,将注浆泵出液口与注浆软管17的一端相接,并用紧固构件进行紧固;在上位钻孔7与下位钻孔8中分别安装足够长度(大于上位钻孔7、下位钻孔8的深度,便于上位注浆钢管9、下位注浆钢管12外端部紧固构件及注浆构件实现)的上位注浆钢管9与下位注浆钢管12,在上位注浆钢管9、下位注浆钢管12外端部依次安装托板14与紧箍卡15,确保注浆液不从上位注浆钢管9或下位注浆钢管12的表面与紧箍卡15间溢出;将带孔密封塞16套进注浆软管17的另一端与上位注浆钢管9、下位注浆钢管12中的注浆钢管进浆孔13进行连接,旋转带孔密封塞16进行封闭紧固。
(4)仔细检查各紧固部位后,计算注浆压力大小、调试注浆泵运转及控液过程。之后启动注浆泵,使超细水泥注浆液由注浆软管17、注浆钢管进浆孔13、注浆钢管流液孔11压入巷道两帮下部上位钻孔7、下位钻孔8的四周及围岩基本支护系统作用区3、围岩塑性区2的裂隙中。
(5)记录注浆时间,观察注浆管路各紧固部位与进行再造承载层区10情况。当注浆压力与注浆时间达到预先设定值时,关闭注浆泵停止注浆,表明注浆量的合理与再造承载层区10的形成。
(6)从上位注浆钢管9、下位注浆钢管12的外端部去掉注浆软管17和带孔密封塞16,用实心密封塞18分别封闭上位注浆钢管9、下位注浆钢管12的注浆钢管进浆孔13,完成一组巷道4两帮下部上下位再造承载层区10的施工;如果下组再造承载层区10围岩实际特性改变,可进行密集或间隔施工,但巷道4围岩基本支护系统作用区3施工方式不变。
本发明的保护范围并不仅仅局限于本实施方式的描述,而是根据权利要求加以限定。
Claims (1)
1.一种大变形巷道围岩再造承载层控制技术,其特征在于,其包括有如下步骤:
(1)施工巷道围岩基本支护系统作用区;(2)施工巷道两帮下部上下位钻孔,使上下位钻孔水平深度和两帮深部弹性区岩层搭接;(3)布置注浆液输送系统;(4)安装上下位注浆钢管、托板、紧箍卡,使注浆软管和注浆钢管进浆口相接,采用带孔密封塞进行封闭;(5)开动注浆泵,使超细水泥注浆液由注浆软管、注浆钢管进浆孔、注浆钢管流液孔压入巷道两帮下部上下位钻孔四周及围岩基本支护系统作用区、围岩塑性区的裂隙中;(6)当注浆压力与注浆时间达到设定值时,关闭注浆泵停止注浆;(7)从上下位注浆钢管外端部去掉注浆软管和带孔密封塞,用实心密封塞封闭注浆钢管进浆孔;(8)采用上述(1)~(7)步骤施工下一组巷道两帮下部上下位再造承载层;其中
(1)施工巷道围岩基本支护系统作用区:根据巷道围岩塑性区范围及所处应力环境,选择合适锚杆、锚索基本支护参数,对巷道围岩顶板及两帮进行支护以形成巷道围岩基本支护系统作用区;
(2)施工巷道两帮下部上下位钻孔,使上下位钻孔水平深度和两帮深部弹性区岩层搭接:施工上下位钻孔孔径大于上下位注浆钢管管径,上下位钻孔水平深度大于围岩塑性区范围,且与两帮深部弹性区岩层搭接,保证注浆液的有效注入与形成承载层的稳定搭接;
(3)布置注浆液输送系统:按照各组上下位钻孔的分布位置进行注浆液输送系统的安装与铺设,主要包括注浆泵的安装及注浆软管的铺设;
(4)安装上下位注浆钢管、托板、紧箍卡,使注浆软管和上下位注浆钢管进浆口相接,采用带孔密封塞进行封闭:在上下位钻孔中安装足够长度的上下位注浆钢管,在上下位注浆钢管外端部依次安装托板与紧箍卡,保证上下位注浆钢管的牢固;将带孔密封塞套进注浆软管与注浆钢管进浆孔进行连接,旋转带孔密封塞封闭;
(5)启动注浆泵,使超细水泥注浆液由注浆软管、注浆钢管进浆孔、注浆钢管流液孔压入巷道两帮下部上下位钻孔四周及围岩基本支护系统作用区、围岩塑性区的裂隙中:这是再造承载层开始阶段,超细水泥注浆液通过注浆泵高压由注浆软管、注浆钢管进浆孔、注浆钢管流液孔注满上下位钻孔,并压入围岩基本支护系统作用区、围岩塑性区的裂隙中;注浆压力小于弹性区岩体强度,大于围岩塑性区岩体残余强度,保证注浆液的压入量与在裂隙中的贯通;
(6)当注浆压力及注浆时间达到设定值时,关闭注浆泵停止注浆:围岩中注浆量的多少取决于注浆压力与注浆时间,当注浆压力与注浆时间达到预先设定值时,表明注浆量的合理与再造承载层的形成,关闭注浆泵停止注浆;
(7)从上下位注浆钢管外端部去掉注浆软管和带孔密封塞,用实心密封塞封闭注浆钢管进浆孔:采用实心密封塞替换带孔密封塞封孔预示着一组巷道围岩两帮下部上下位再造承载层施工的结束;
(8)采用上述(1)~(7)步骤施工下一组巷道两帮下部上下位再造承载层:根据巷道两帮围岩力学性质及应力环境,可适当调整每组巷道两帮下部上下位再造承载层间距及上下位再造承载层位置,具体采用上述(1)~(7)步骤施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310280508.7A CN103291326B (zh) | 2013-07-05 | 2013-07-05 | 一种大变形巷道围岩再造承载层控制技术 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310280508.7A CN103291326B (zh) | 2013-07-05 | 2013-07-05 | 一种大变形巷道围岩再造承载层控制技术 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103291326A CN103291326A (zh) | 2013-09-11 |
CN103291326B true CN103291326B (zh) | 2015-08-19 |
Family
ID=49092788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310280508.7A Expired - Fee Related CN103291326B (zh) | 2013-07-05 | 2013-07-05 | 一种大变形巷道围岩再造承载层控制技术 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103291326B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522243A (zh) * | 2016-10-18 | 2017-03-22 | 中铁局集团有限公司 | 含裂隙岩土地层预应力锚索注浆锚固施工方法 |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103557012B (zh) * | 2013-11-19 | 2016-07-06 | 河南理工大学 | 一种大变形巷道围岩注浆紧固承载结构及施工方法 |
CN103590840A (zh) * | 2013-11-29 | 2014-02-19 | 王威 | 一种底板注浆方法 |
CN103742177B (zh) * | 2013-12-30 | 2016-03-02 | 北京科技大学 | 一种强矿压巷道支护设计方法 |
CN103939118B (zh) * | 2014-03-14 | 2016-05-11 | 中南大学 | 冒落松散岩体内成巷时顶板超前支护的支承装置及其应用 |
CN104234730B (zh) * | 2014-08-29 | 2016-06-01 | 河北工程大学 | 一种用于锚注工艺控制深部巷道极破碎底板快速成孔方法 |
CN105041353B (zh) * | 2015-08-17 | 2017-04-12 | 河南理工大学 | 一种巷道锚网复喷注双叠棚围岩控制技术 |
CN107013228B (zh) * | 2017-05-07 | 2019-03-05 | 中铁十八局集团有限公司 | 一种大断面隧道涌水突泥后拱顶空腔围岩再造方法 |
CN109184761B (zh) * | 2018-10-29 | 2020-03-17 | 河南大有能源股份有限公司耿村煤矿 | 一种解决两面岩体变形增强围岩整体性的方法 |
CN109736855B (zh) * | 2019-01-08 | 2020-08-04 | 贵州大学 | 一种抗底鼓灾害的巷道底部结构及其施工方法 |
CN112963172A (zh) * | 2021-03-08 | 2021-06-15 | 太原理工大学 | 一种深部巷道围岩控制装置及其控制方法 |
CN114000896B (zh) * | 2021-10-12 | 2024-05-07 | 中煤科工开采研究院有限公司 | 深部分区破裂围岩复合注浆加固方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101725362A (zh) * | 2009-12-09 | 2010-06-09 | 中国矿业大学(北京) | 动压软岩巷道基于钢管混凝土支架的复合支护装置 |
CN101967984A (zh) * | 2010-09-03 | 2011-02-09 | 安徽理工大学 | 深井巷道锚网索刚柔耦合支护及围岩整体加固支护方法 |
CN102251781A (zh) * | 2011-04-27 | 2011-11-23 | 中铁二局股份有限公司 | 散粒体围岩隧道导向水平旋喷桩预支护施工方法 |
CN202417548U (zh) * | 2011-11-22 | 2012-09-05 | 淮北市平远软岩支护工程技术有限公司 | 一种预空软岩巷道支护结构 |
CN202673305U (zh) * | 2012-06-29 | 2013-01-16 | 湖南省交通规划勘察设计院 | 用于隧道换拱施工中的施工结构 |
-
2013
- 2013-07-05 CN CN201310280508.7A patent/CN103291326B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101725362A (zh) * | 2009-12-09 | 2010-06-09 | 中国矿业大学(北京) | 动压软岩巷道基于钢管混凝土支架的复合支护装置 |
CN101967984A (zh) * | 2010-09-03 | 2011-02-09 | 安徽理工大学 | 深井巷道锚网索刚柔耦合支护及围岩整体加固支护方法 |
CN102251781A (zh) * | 2011-04-27 | 2011-11-23 | 中铁二局股份有限公司 | 散粒体围岩隧道导向水平旋喷桩预支护施工方法 |
CN202417548U (zh) * | 2011-11-22 | 2012-09-05 | 淮北市平远软岩支护工程技术有限公司 | 一种预空软岩巷道支护结构 |
CN202673305U (zh) * | 2012-06-29 | 2013-01-16 | 湖南省交通规划勘察设计院 | 用于隧道换拱施工中的施工结构 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522243A (zh) * | 2016-10-18 | 2017-03-22 | 中铁局集团有限公司 | 含裂隙岩土地层预应力锚索注浆锚固施工方法 |
CN106522243B (zh) * | 2016-10-18 | 2018-10-09 | 中铁一局集团有限公司 | 含裂隙岩土地层预应力锚索注浆锚固施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103291326A (zh) | 2013-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103291326B (zh) | 一种大变形巷道围岩再造承载层控制技术 | |
CN104612162B (zh) | 一种地铁车站深基坑开挖施工方法 | |
CN101575983B (zh) | 煤矿井下定向压裂增透消突方法及压裂增透消突装置 | |
CN104631438B (zh) | 长螺旋钻孔压灌混凝土抗拔桩施工方法 | |
CN103669346B (zh) | 一种袖筏管及在滑坡治理中的应用 | |
CN105240024B (zh) | 一种平行盾构法扩建施工地铁车站的方法 | |
CN102392677A (zh) | 煤层气储盖层立体缝网改造增透技术 | |
CN102108869B (zh) | 千米立井注浆防治水止浆垫施工方法 | |
CN104775787B (zh) | 一种破碎围岩水力压裂穿层钻孔上仰孔封孔方法 | |
CN109339029B (zh) | 一种既有隧道上方基坑开挖抗隆起变形的施工方法 | |
CN103993594B (zh) | 一种微纳米气泡处理可液化地基装置及操作方法 | |
CN108166483A (zh) | 钻孔灌注桩施工方法 | |
CN103899351A (zh) | 一种处理复杂采空区的充填加固方法 | |
CN103835651A (zh) | 一种单孔定向钻进局部注浆反井钻井工艺 | |
CN108194132A (zh) | 一种墩式连拱式采空区处理方法 | |
CN106837382A (zh) | 一种地铁隧道围岩地面预注浆加固工艺 | |
CN108867673A (zh) | 一种基于抽水帷幕的基坑中地下水治理方法 | |
CN102995647B (zh) | 一种桩孔注浆隔渗的地下水控制方法 | |
CN204311456U (zh) | 基坑加固结构 | |
CN201183950Y (zh) | 无缝钢管自进式锚杆 | |
CN102797448B (zh) | 后退分段式水力致裂方法 | |
CN205576957U (zh) | 桩底桩结构 | |
CN102979105A (zh) | 一种井孔注浆隔渗的地下水控制方法 | |
CN106337418A (zh) | 一种狭小区域深基坑的支护结构及支护方法 | |
CN104879137A (zh) | 超大管棚施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150819 Termination date: 20190705 |
|
CF01 | Termination of patent right due to non-payment of annual fee |