CN103290871B CN201310262658.5A CN201310262658A CN103290871B CN 103290871 B CN103290871 B CN 103290871B CN 201310262658 A CN201310262658 A CN 201310262658A CN 103290871 B CN103290871 B CN 103290871B
Authority
CN
China
Prior art keywords
reinforcing bar
ditch
guiding ditch
spill
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310262658.5A
Other languages
Chinese (zh)
Other versions
CN103290871A (en
Inventor
黄春生
王文彪
王丽梅
陆海英
凡春
王尚平
李金剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201310262658.5A priority Critical patent/CN103290871B/en
Publication of CN103290871A publication Critical patent/CN103290871A/en
Application granted granted Critical
Publication of CN103290871B publication Critical patent/CN103290871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a guide ditch construction method. The guide ditch construction method comprises the following steps that (1) a concrete cushion is poured on the ground inside a duludubi adventure region body room; (2) the cushion on the ground of the body room is cut, filled and cushioned through a cutting machine according to a guide ditch digging wire; (3) a plurality of vertical steel ribs (4) are installed on bottom portion cushion concrete; (4) a brick tetal membrane is constructed on the lateral wall of the guide ditch; (5) ground processing is conducted on the periphery of the top of the guide ditch; (6) a concave guide ditch steel rib is installed in the guide ditch; (7) a plurality of built-in fitting box irons are fixedly installed in the concave opening of the concave guide ditch steel rib at intervals; (8) a guide ditch template is installed on the concave guide ditch steel rib, and concrete is poured. By the adoption of the method, reverse excavation construction is adopted, and therefore high-formwork support construction of a body structure and guide ditch rainy season construction can be avoided.

Description

A kind of guiding ditch construction method
Technical field
The present invention relates to recreational facilities tunnel construction method, particularly relate to the tunnel construction method of the guiding ditch of recreational facilities track.
Background technology
All kinds of theme items of recreation in Disneyland always make people so enchanted by the scenery as to forget to return, start in recent years to build the experience district just as 3D " Disney ", the beep ratio adventure district in district is experienced at these, base form is pile foundation, main body is reinforced concrete structure, beep is positioned at beep than adventure district body chamber below ground, comprising guiding ditch, fork pit and service pit than adventure track.The ditch length that wherein leads runs through whole beep than adventure track, so the construction quality of guiding ditch affects the construction quality of fork pit and service pit.
Summary of the invention
The object of the present invention is to provide a kind of structure simple, construction cost is low, applicability is strong, avoids the one guiding ditch construction method of crossed construction.
A kind of guiding ditch construction method, it comprises the following steps:
(1) at beep ratio adventure main body flooring, district casting concrete bed course;
(2) on concrete cushion ground, cutting machine is adopted to carry out ground cushion cutting in body chamber by guiding ditch excavation wire, guiding ditch excavation is carried out after completing, the guiding ditch end, hole, adopts rammed earth, then pave at the end, hole rubble tamping, then build bottom cushion concrete on described rubble;
(3) on described bottom cushion concrete, move towards interval by guiding ditch and many vertical reinforcements are installed, and apply watertight composition bottom multiple tracks on described blinding concrete;
(4) build brick fetal membrane by laying bricks or stones at guiding ditch sidewall, described brick fetal membrane smears cement mortar, described cement mortar applies multiple tracks sidewall watertight composition;
(5) around top, guiding ditch hole, hole top rammed earth is adopted, then pave on the plain soil in top, hole and cheat top rubble and tamp, on the rubble of top, described hole, build top, hole blinding concrete again, and on the blinding concrete of top, described hole, apply top, multiple tracks hole watertight composition;
(6) spill guiding ditch reinforcing bar is installed in described guiding ditch, lower floor's reinforced bar support of the bottom reinforcement bars of described spill guiding ditch reinforcing bar is arranged on the watertight composition of bottom, the outer reinforcement of the sidewall reinforcing bar of spill guiding ditch reinforcing bar is supported on sidewall watertight composition, the concave top of described spill guiding ditch reinforcing bar extends to form left and right bending end respectively to left and right sides, and described left and right bending end bottom support is on the watertight composition of top, hole;
(7) in the concave-shaped openings of described spill guiding ditch reinforcing bar, interval fixedly mounts multiple built-in fitting channel-section steel, built-in fitting channel-section steel comprises the horizontal channel-section steel arranged in the horizontal direction and the vertical channel-section steel being vertically fixed on the horizontal channel-section steel left and right sides, the top bars that described level trough bracing members is arranged on spill guiding ditch reinforcing bar bottom reinforcement bars is welded to connect with the lead bottom reinforcement bars of ditch reinforcing bar of vertical reinforcement and spill, the internal layer reinforcing bar that described vertical channel-section steel is adjacent to the sidewall reinforcing bar being arranged on spill guiding ditch reinforcing bar is connected with the lead sidewall reinforcement welding of ditch reinforcing bar of spill,
(8) on spill guiding ditch reinforcing bar, guiding ditch template is installed, casting concrete, between horizontal channel-section steel and bottom watertight composition, form the trench floor that leads, between the vertical channel-section steel in left and right and sidewall watertight composition, form the ditch side plate that leads, the left and right bending end and top, hole watertight composition of spill guiding ditch reinforcing bar form guiding ditch top board, and the concave-shaped openings of the spill guiding ditch reinforcing bar described in built-in fitting channel-section steel surrounds forms the passage installed for equipment.
The invention has the advantages that: construction cost is low, structure is simple, firmly easy for installation.Guiding ditch length runs through whole beep than adventure track, so the construction quality of guiding ditch affects the construction quality of fork pit and service pit.For guaranteeing main body scaffold stability and safety, guiding ditch is on the basis that beep has completed than adventure main body frame, again at beep ratio adventure main body flooring, district casting concrete bed course, take anti-excavation construction, carry out ground cushion in body chamber with cutting machine by guiding ditch hole excavation wire and cut.So both can avoid agent structure high-formwork construction, the hole rainy season construction of guiding ditch can be avoided again; Described guiding ditch hole bottom reinforcement bars, guiding ditch hole sidewall reinforcing bar install multiple built-in fitting channel-section steel at spacing intervals by guiding ditch trend, and the described horizontal channel-section steel of built-in fitting channel-section steel and two vertical channel-section steels are cheated reinforcement welding with guiding ditch respectively and are connected.And described built-in fitting channel-section steel two vertical channel-section steels are separately installed with bolt, and each bolt is cheated sidewall reinforcement welding with guiding ditch respectively and is connected.The horizontal channel-section steel of built-in fitting channel-section steel described in each and two vertical channel-section steels are welded and fixed with L shape reinforcing bar respectively, and lead with the spill respectively top bars of ditch reinforcing bar bottom reinforcement bars and vertical reinforcement and spill of described L shape reinforcing bar leads the internal layer bar connecting of sidewall reinforcing bar of ditch reinforcing bar.These make built-in fitting channel-section steel installation site precisely, securely.The process of casting concrete also securely.
Accompanying drawing explanation
Fig. 1 be adopt of the present invention a kind of lead ditch construction method structure guiding ditch move towards floor map;
Fig. 2 is the scheme of installation of a kind of ditch construction method that leads of the present invention.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
One guiding ditch construction method of the present invention as shown in drawings, it comprises the following steps: (1) is at beep ratio adventure main body flooring, district casting concrete bed course, (2) on concrete cushion ground, adopt cutting machine to excavate wire by guiding ditch 10 and carry out ground cushion cutting in body chamber, carry out guiding ditch 10 after completing to excavate, the guiding ditch end, hole, adopts element soil 1 compacting, then pave at the end, hole rubble 2 tamping, then build bottom cushion concrete 3 on described rubble 2, (3) on described bottom cushion concrete 3, move towards interval by guiding ditch and many vertical reinforcements are installed, and apply watertight composition 4 bottom multiple tracks on described blinding concrete 3, (4) build brick fetal membrane 7 by laying bricks or stones at guiding ditch sidewall, described brick fetal membrane 7 smears cement mortar 9, described cement mortar applies multiple tracks sidewall watertight composition 11, (5) around top, guiding ditch hole, adopt the plain native 1-1 compacting in top, hole, then pave on the plain soil in top, hole and cheat top rubble 2-2 and tamp, on the rubble of top, described hole, build top, hole blinding concrete 3-3 again, and apply multiple tracks hole top watertight composition 4-4 on the blinding concrete 3-3 of top, described hole, (6) spill guiding ditch reinforcing bar is installed in described guiding ditch, lower floor's reinforced bar support of the bottom reinforcement bars 5 of described spill guiding ditch reinforcing bar is arranged on the watertight composition 4 of bottom, the outer reinforcement of the sidewall reinforcing bar of spill guiding ditch reinforcing bar is supported on sidewall watertight composition, the concave top of described spill guiding ditch reinforcing bar extends to form left and right bending end respectively to left and right sides, and described left and right bending end bottom support is on the watertight composition 4-4 of top, hole, (7) in the concave-shaped openings of described spill guiding ditch reinforcing bar, interval fixedly mounts multiple built-in fitting channel-section steel, built-in fitting channel-section steel comprises the horizontal channel-section steel arranged in the horizontal direction and the vertical channel-section steel 6-2 being vertically fixed on the horizontal channel-section steel 6-1 left and right sides, the top bars that described level trough bracing members is arranged on spill guiding ditch reinforcing bar bottom reinforcement bars 5 is welded to connect with the lead bottom reinforcement bars 5 of ditch reinforcing bar of vertical reinforcement and spill, the internal layer reinforcing bar that described vertical channel-section steel 6-2 is adjacent to the sidewall reinforcing bar being arranged on spill guiding ditch reinforcing bar is connected with the lead sidewall reinforcement welding of ditch reinforcing bar of spill, (8) on spill guiding ditch reinforcing bar, guiding ditch template is installed, casting concrete, between horizontal channel-section steel 6-1 and bottom watertight composition, form the trench floor that leads, between the vertical channel-section steel 6-2 in left and right and sidewall watertight composition, form the ditch side plate that leads, the left and right bending end and top, hole watertight composition 4-4 of spill guiding ditch reinforcing bar form guiding ditch top board, and the concave-shaped openings of the spill guiding ditch reinforcing bar described in built-in fitting channel-section steel surrounds forms the passage installed for equipment.
Preferred each horizontal channel-section steel 6-1 and vertical channel-section steel 6-2 is welded and fixed with L shape reinforcing bar 8-1,8-2 respectively, and lead with the spill respectively top bars of ditch reinforcing bar bottom reinforcement bars 5 and vertical reinforcement and spill of described L shape reinforcing bar 8-1,8-2 leads the internal layer bar connecting of sidewall reinforcing bar of ditch reinforcing bar.Built-in fitting channel-section steel installation site can be made so precisely, securely.
Preferably on described vertical channel-section steel 6-2, be provided with bolt 13, lead with the spill respectively sidewall reinforcement welding of ditch reinforcing bar of each bolt is connected.Further can make built-in fitting channel-section steel installation site precisely, securely like this, can not displacement during casting concrete.
Embodiment 1
(1) at beep ratio adventure main body flooring, district casting concrete bed course, (2) on described concrete cushion ground, adopt cutting machine to excavate wire by guiding ditch 10 and carry out ground cushion cutting in body chamber, carry out guiding ditch 10 after completing to excavate, the guiding ditch end, hole, adopts element soil 1 compacting, then pave at the end, hole rubble 2 tamping, then build bottom cushion concrete 3 on described rubble 2, (3) on described bottom cushion concrete 3, move towards interval by guiding ditch and many vertical reinforcements are installed, and apply watertight composition 4 bottom multiple tracks on described blinding concrete 3, (4) build brick fetal membrane 7 by laying bricks or stones at guiding ditch sidewall, described brick fetal membrane 7 smears cement mortar 9, described cement mortar applies multiple tracks sidewall watertight composition 11, (5) around top, guiding ditch hole, adopt the plain native 1-1 compacting in top, hole, then pave on the plain soil in top, hole and cheat top rubble 2-2 and tamp, on the rubble of top, described hole, build top, hole blinding concrete 3-3 again, and apply multiple tracks hole top watertight composition 4-4 on the blinding concrete 3-3 of top, described hole, (6) spill guiding ditch reinforcing bar is installed in described guiding ditch, lower floor's reinforced bar support of the bottom reinforcement bars 5 of described spill guiding ditch reinforcing bar is arranged on the watertight composition 4 of bottom, the outer reinforcement of the sidewall reinforcing bar of spill guiding ditch reinforcing bar is supported on sidewall watertight composition, the concave top of described spill guiding ditch reinforcing bar extends to form left and right bending end respectively to left and right sides, and described left and right bending end bottom support is on the watertight composition 4-4 of top, hole, (7) in the concave-shaped openings of described spill guiding ditch reinforcing bar, interval fixedly mounts multiple built-in fitting channel-section steel, built-in fitting channel-section steel comprises the horizontal channel-section steel arranged in the horizontal direction and the vertical channel-section steel 6-2 being vertically fixed on the horizontal channel-section steel 6-1 left and right sides, the top bars that described level trough bracing members is arranged on spill guiding ditch reinforcing bar bottom reinforcement bars 5 is welded to connect with the lead bottom reinforcement bars 5 of ditch reinforcing bar of vertical reinforcement and spill, the internal layer reinforcing bar that described vertical channel-section steel 6-2 is adjacent to the sidewall reinforcing bar being arranged on spill guiding ditch reinforcing bar is connected with the lead sidewall reinforcement welding of ditch reinforcing bar of spill, each horizontal channel-section steel 6-1 and vertical channel-section steel 6-2 is welded and fixed with L shape reinforcing bar 8-1,8-2 respectively, and lead with the spill respectively top bars of ditch reinforcing bar bottom reinforcement bars 5 and vertical reinforcement and spill of described L shape reinforcing bar 8-1,8-2 leads the internal layer bar connecting of sidewall reinforcing bar of ditch reinforcing bar.Described vertical channel-section steel 6-2 is provided with bolt 13, and lead with the spill respectively sidewall reinforcement welding of ditch reinforcing bar of each bolt is connected.(8) on spill guiding ditch reinforcing bar, guiding ditch template is installed, casting concrete, between horizontal channel-section steel 6-1 and bottom watertight composition, form the trench floor that leads, between the vertical channel-section steel 6-2 in left and right and sidewall watertight composition, form the ditch side plate that leads, the left and right bending end and top, hole watertight composition 4-4 of spill guiding ditch reinforcing bar form guiding ditch top board, and the concave-shaped openings of the spill guiding ditch reinforcing bar described in built-in fitting channel-section steel surrounds forms the passage installed for equipment.
This method is adopted: construction cost is low, and structure is simple, firmly easy for installation through construction.Guiding ditch length runs through whole beep than adventure track, so the construction quality of guiding ditch affects the construction quality of fork pit and service pit.For guaranteeing main body scaffold stability and safety, guiding ditch is on the basis that beep has completed than adventure main body frame, again at beep ratio adventure main body flooring, district casting concrete bed course, take anti-excavation construction, carry out ground cushion in body chamber with cutting machine by guiding ditch hole excavation wire and cut.So both can avoid agent structure high-formwork construction, the hole rainy season construction of guiding ditch can be avoided again; Described guiding ditch hole bottom reinforcement bars, guiding ditch hole sidewall reinforcing bar install multiple built-in fitting channel-section steel at spacing intervals by guiding ditch trend, and the described horizontal channel-section steel of built-in fitting channel-section steel and two vertical channel-section steels are cheated reinforcement welding with guiding ditch respectively and are connected.And described built-in fitting channel-section steel two vertical channel-section steels are separately installed with bolt, and each bolt is cheated sidewall reinforcement welding with guiding ditch respectively and is connected.The horizontal channel-section steel of built-in fitting channel-section steel described in each and two vertical channel-section steels are welded and fixed with L shape reinforcing bar respectively, and lead with the spill respectively top bars of ditch reinforcing bar bottom reinforcement bars and vertical reinforcement and spill of described L shape reinforcing bar leads the internal layer bar connecting of sidewall reinforcing bar of ditch reinforcing bar.These make built-in fitting channel-section steel installation site precisely, securely.The process of casting concrete also securely.

Claims (3)

1. lead a ditch construction method, it is characterized in that it comprises the following steps:
(1) at beep ratio adventure main body flooring, district casting concrete bed course;
(2) on concrete cushion ground, cutting machine is adopted to carry out ground cushion cutting in body chamber by guiding ditch excavation wire, guiding ditch excavation is carried out after completing, the guiding ditch end, hole, adopts rammed earth, then pave at the end, hole rubble tamping, then build bottom cushion concrete on described rubble;
(3) on described bottom cushion concrete, move towards interval by guiding ditch and many vertical reinforcements are installed, and apply watertight composition bottom multiple tracks on described blinding concrete;
(4) build brick fetal membrane by laying bricks or stones at guiding ditch sidewall, described brick fetal membrane smears cement mortar, described cement mortar applies multiple tracks sidewall watertight composition;
(5) around top, guiding ditch hole, hole top rammed earth is adopted, then pave on the plain soil in top, hole and cheat top rubble and tamp, on the rubble of top, described hole, build top, hole blinding concrete again, and on the blinding concrete of top, described hole, apply top, multiple tracks hole watertight composition;
(6) spill guiding ditch reinforcing bar is installed in described guiding ditch, lower floor's reinforced bar support of the bottom reinforcement bars of described spill guiding ditch reinforcing bar is arranged on the watertight composition of bottom, the outer reinforcement of the sidewall reinforcing bar of spill guiding ditch reinforcing bar is supported on sidewall watertight composition, the concave top of described spill guiding ditch reinforcing bar extends to form left and right bending end respectively to left and right sides, and described left and right bending end bottom support is on the watertight composition of top, hole;
(7) in the concave-shaped openings of described spill guiding ditch reinforcing bar, interval fixedly mounts multiple built-in fitting channel-section steel, built-in fitting channel-section steel comprises the horizontal channel-section steel arranged in the horizontal direction and the vertical channel-section steel being vertically fixed on the horizontal channel-section steel left and right sides, the top bars that described level trough bracing members is arranged on spill guiding ditch reinforcing bar bottom reinforcement bars is welded to connect with the lead bottom reinforcement bars of ditch reinforcing bar of vertical reinforcement and spill, the internal layer reinforcing bar that described vertical channel-section steel is adjacent to the sidewall reinforcing bar being arranged on spill guiding ditch reinforcing bar is connected with the lead sidewall reinforcement welding of ditch reinforcing bar of spill,
(8) on spill guiding ditch reinforcing bar, guiding ditch template is installed, casting concrete, between horizontal channel-section steel and bottom watertight composition, form the trench floor that leads, between the vertical channel-section steel in left and right and sidewall watertight composition, form the ditch side plate that leads, the left and right bending end and top, hole watertight composition of spill guiding ditch reinforcing bar form guiding ditch top board, and the concave-shaped openings of the spill guiding ditch reinforcing bar described in built-in fitting channel-section steel surrounds forms the passage installed for equipment.
2. guiding ditch construction method according to claim 1, it is characterized in that: each horizontal channel-section steel and vertical channel-section steel are welded and fixed with L shape reinforcing bar respectively, lead with the spill respectively top bars of ditch reinforcing bar bottom reinforcement bars and vertical reinforcement and spill of described L shape reinforcing bar leads the internal layer bar connecting of sidewall reinforcing bar of ditch reinforcing bar.
3. guiding ditch construction method according to claim 1 and 2, is characterized in that: on described vertical channel-section steel, be provided with bolt, and lead with the spill respectively sidewall reinforcement welding of ditch reinforcing bar of each bolt is connected.
CN201310262658.5A 2013-06-26 2013-06-26 Guide ditch construction method Active CN103290871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310262658.5A CN103290871B (en) 2013-06-26 2013-06-26 Guide ditch construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310262658.5A CN103290871B (en) 2013-06-26 2013-06-26 Guide ditch construction method

Publications (2)

Publication Number Publication Date
CN103290871A CN103290871A (en) 2013-09-11
CN103290871B true CN103290871B (en) 2015-03-25

Family

ID=49092361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310262658.5A Active CN103290871B (en) 2013-06-26 2013-06-26 Guide ditch construction method

Country Status (1)

Country Link
CN (1) CN103290871B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064500B (en) * 2015-07-17 2017-05-17 中如建工集团有限公司 Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN110031173B (en) * 2018-07-16 2020-09-15 中建六局土木工程有限公司 High-precision heavy rail embedded part construction method
CN110886299A (en) * 2019-10-31 2020-03-17 中冶天工集团有限公司 Pipeline channel easy to construct and top plate pouring method thereof
CN113136876A (en) * 2021-03-19 2021-07-20 中国建筑第八工程局有限公司 Construction method of pipe trench

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886393A (en) * 2010-07-03 2010-11-17 朱奎 Construction method of combined foundation ditch support
CN102644219A (en) * 2012-04-06 2012-08-22 中国石油天然气第一建设公司 Construction process of large equipment hoisting tail sliding rail capable of reducing friction coefficient

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100770164B1 (en) * 2007-07-23 2007-10-25 (주)종합건축사사무소 라인건축 Drainage structure of parking lot facilities for building

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886393A (en) * 2010-07-03 2010-11-17 朱奎 Construction method of combined foundation ditch support
CN102644219A (en) * 2012-04-06 2012-08-22 中国石油天然气第一建设公司 Construction process of large equipment hoisting tail sliding rail capable of reducing friction coefficient

Also Published As

Publication number Publication date
CN103290871A (en) 2013-09-11

Similar Documents

Publication Publication Date Title
CN105649113B (en) The structure and construction method of a kind of basement post-pouring zone
CN105951848B (en) Ultra-deep foundation pit supports Non-intermittent combined type transformational structure and construction method
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN105545323B (en) The construction method of cut-and-cover tunnel lining cutting
CN203807904U (en) Lightweight bridgehead roadbed of bubble-mixed lightweight soil and expandable polystyrene (EPS) combined block
CN105544575B (en) A kind of bottom concrete construction method under water of use steel truss reinforcement
CN207512745U (en) A kind of caisson device and its foundation pit structure
CN103290871B (en) Guide ditch construction method
CN104060781A (en) Cast-in-situ cranked slab stair without seams at stair sections and construction method
CN108239995A (en) A kind of open cut is without column Metro Station Structure
CN107724189A (en) A kind of box road structure of railway engineering thin-walled
CN111749288B (en) Load-reducing heightening structure of existing retaining wall and construction method thereof
CN207003723U (en) High-rise assembled single row of holes precast shear wall and its assembling structure
KR101145393B1 (en) Big Block Type Reinforced Retaining Wall
CN105735323B (en) The inverse deep footing groove enclosing structure for making to combine with Percussion Piles of spray anchor and its construction method
CN205444201U (en) Reinforced concrete waist rail structure
CN205296209U (en) Prestressed anchorage cable assembled stake siding wall protective structure
CN107503355B (en) Externally-arranged rear-inserted steel type double-row pile foundation pit supporting system and construction method thereof
CN108797636A (en) A kind of upper font retaining wall structure and its construction method
CN105756377B (en) A kind of swimming pool and its construction method
CN209652963U (en) Mold for assembly concrete hypogee sole plate
KR20140037658A (en) Hybrid wall for supporting reinforced base of rail track and constructing method thereof
CN105350547A (en) Method applicable to inter-pile soil support of slope protection pile
CN211872447U (en) Side wide roadbed structure
CN109098720A (en) Precast combined underground structure product and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20180914

Granted publication date: 20150325

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20190618

Granted publication date: 20150325

PD01 Discharge of preservation of patent