CN103279555A - Plant information (PI) point automatic maintaining method and device based on business system - Google Patents
Plant information (PI) point automatic maintaining method and device based on business system Download PDFInfo
- Publication number
- CN103279555A CN103279555A CN2013102290023A CN201310229002A CN103279555A CN 103279555 A CN103279555 A CN 103279555A CN 2013102290023 A CN2013102290023 A CN 2013102290023A CN 201310229002 A CN201310229002 A CN 201310229002A CN 103279555 A CN103279555 A CN 103279555A
- Authority
- CN
- China
- Prior art keywords
- point
- database
- stoichiometric
- data
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310229002.3A CN103279555B (en) | 2013-06-08 | 2013-06-08 | PI point automatic maintenance methods and device based on operation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310229002.3A CN103279555B (en) | 2013-06-08 | 2013-06-08 | PI point automatic maintenance methods and device based on operation system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103279555A true CN103279555A (en) | 2013-09-04 |
CN103279555B CN103279555B (en) | 2017-07-11 |
Family
ID=49062074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310229002.3A Active CN103279555B (en) | 2013-06-08 | 2013-06-08 | PI point automatic maintenance methods and device based on operation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103279555B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103631950A (en) * | 2013-12-13 | 2014-03-12 | 国网上海市电力公司 | Telemetric sample data definition monitoring method for scheduling energy management system (EMS) |
CN104850635A (en) * | 2015-05-24 | 2015-08-19 | 华东电网有限公司 | Auto check and centralized monitoring method for missing data in multi-data source environment |
CN105279275A (en) * | 2015-10-31 | 2016-01-27 | 南京南瑞继保电气有限公司 | Point list configuration method of dispatch master station end |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101867185A (en) * | 2010-06-24 | 2010-10-20 | 宁波电业局 | System and method for automatically maintaining PI measuring point of power system |
CN102184209A (en) * | 2011-04-29 | 2011-09-14 | 中国电力科学研究院 | Simulation data accessing method based on power grid CIM (Common Information Model) interface |
CN102510127A (en) * | 2011-10-21 | 2012-06-20 | 南京南瑞继保电气有限公司 | Method for unifying models of on-line monitored first and secondary equipment of power grid |
CN102637203A (en) * | 2012-03-15 | 2012-08-15 | 广西电网公司电力科学研究院 | Method for processing electric quantity data and monitoring master station for automatic electric energy metering systems |
-
2013
- 2013-06-08 CN CN201310229002.3A patent/CN103279555B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101867185A (en) * | 2010-06-24 | 2010-10-20 | 宁波电业局 | System and method for automatically maintaining PI measuring point of power system |
CN102184209A (en) * | 2011-04-29 | 2011-09-14 | 中国电力科学研究院 | Simulation data accessing method based on power grid CIM (Common Information Model) interface |
CN102510127A (en) * | 2011-10-21 | 2012-06-20 | 南京南瑞继保电气有限公司 | Method for unifying models of on-line monitored first and secondary equipment of power grid |
CN102637203A (en) * | 2012-03-15 | 2012-08-15 | 广西电网公司电力科学研究院 | Method for processing electric quantity data and monitoring master station for automatic electric energy metering systems |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103631950A (en) * | 2013-12-13 | 2014-03-12 | 国网上海市电力公司 | Telemetric sample data definition monitoring method for scheduling energy management system (EMS) |
CN104850635A (en) * | 2015-05-24 | 2015-08-19 | 华东电网有限公司 | Auto check and centralized monitoring method for missing data in multi-data source environment |
CN104850635B (en) * | 2015-05-24 | 2019-02-22 | 华东电网有限公司 | Shortage of data automaticly inspects and centralized monitoring method under a kind of multi-data source environment |
CN105279275A (en) * | 2015-10-31 | 2016-01-27 | 南京南瑞继保电气有限公司 | Point list configuration method of dispatch master station end |
Also Published As
Publication number | Publication date |
---|---|
CN103279555B (en) | 2017-07-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021135177A1 (en) | Construction method and apparatus for energy data warehouse system | |
Pesantez et al. | Using a digital twin to explore water infrastructure impacts during the COVID-19 pandemic | |
CN109800531B (en) | Consistency keeping method for electromechanical equipment digital twin model | |
CN102637203B (en) | Method for processing electric quantity data and monitoring master station for automatic electric energy metering systems | |
CN105426980B (en) | Power distribution network health index assessment engineering application system | |
CN110334274A (en) | Information-pushing method, device, computer equipment and storage medium | |
CN108876019A (en) | A kind of electro-load forecast method and system based on big data | |
CN106292590A (en) | A kind of power plant's coal consumption and carbon emission monitoring method and system | |
CN111091240A (en) | Public institution electric power energy efficiency monitoring system and service method | |
CN103279555A (en) | Plant information (PI) point automatic maintaining method and device based on business system | |
CN104375211A (en) | Weather forecast contour map updating method and system | |
CN107220798A (en) | A kind of construction monitoring and managing method based on BIM | |
CN103218680A (en) | Data analysis and decision making system of water enterprise | |
CN114970926A (en) | Model training method, enterprise operation risk prediction method and device | |
CN109902344B (en) | Device and system for predicting structural performance of middle-small span bridge group | |
CN110674989A (en) | Prediction method, system and equipment for coal bed gas extraction amount and readable storage medium | |
CN106134470B (en) | A kind of DNC integrated management system and method | |
CN111027803A (en) | Construction management method and construction management system | |
CN106647579B (en) | A kind of sewage collecting pipe network information networked control systems and method | |
CN115310923A (en) | Energy management service system and method | |
CN115067194A (en) | Full-pipeline irrigation area measurement and control intelligent irrigation system and method | |
CN115293798A (en) | Method and system for budget management of expropriation project based on BIM + GIS | |
CN115053795A (en) | Data measurement and control method and terminal for irrigation system | |
CN111090710B (en) | Distribution network multi-time scale graph-model abnormal automatic maintenance method | |
CN114119319A (en) | Intelligent water affair management method and system based on distributed small sample algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Free format text: FORMER OWNER: YANTAI HAIYI SOFTWARE CO., LTD. Effective date: 20140527 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Yongcai Inventor after: Yang Qiuyong Inventor after: Huang Haiqing Inventor after: Song Yu Inventor after: Zhang Zhejun Inventor after: Yu Yongzhong Inventor after: Guan Jingtang Inventor after: Luo Yu Inventor after: Liu Shengqiang Inventor after: Du Jiabing Inventor after: Wu Lixian Inventor after: Song Caihua Inventor before: Wang Yongcai Inventor before: Yang Qiuyong Inventor before: Huang Haiqing Inventor before: Song Yu Inventor before: Huan Changwu Inventor before: Di Hongrong Inventor before: Wang Bo Inventor before: Jin Xin Inventor before: Yang Shaojiang Inventor before: Wang Jinhui Inventor before: Zhang Zhejun Inventor before: Yu Yongzhong Inventor before: Guan Jingtang Inventor before: Luo Yu Inventor before: Liu Shengqiang Inventor before: Du Jiabing Inventor before: Wu Lixian Inventor before: Song Caihua |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WANG YONGCAI ZHANG ZHEJUN YU YONGZHONG GUAN JINGTANG LUO YU LIU SHENGQIANG DU JIABING WU LIXIAN SONG CAIHUA YANG QIUYONG HUANG HAIQING SONG YU XUN CHANGWU ZHAI HONGRONG WANG BO JIN XIN YANG SHAOJIANG WANG JINHUI TO: WANG YONGCAI ZHANG ZHEJUN YU YONGZHONG GUAN JINGTANG LUO YU LIU SHENGQIANG DU JIABING WU LIXIAN SONG CAIHUA YANG QIUYONG HUANG HAIQING SONG YU |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140527 Address after: 528000 Fenjiang South Road, Chancheng District, Guangdong, No. 1, No. Applicant after: Foshan Power Supply Bureau, Guangdong Power Grid Corporation Address before: 528000 Fenjiang South Road, Chancheng District, Guangdong, No. 1, No. Applicant before: Foshan Power Supply Bureau, Guangdong Power Grid Corporation Applicant before: Yantai Haiyi Software Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |