CN103278394A - 一种管体接口密封和液压循环的综合试验装置 - Google Patents

一种管体接口密封和液压循环的综合试验装置 Download PDF

Info

Publication number
CN103278394A
CN103278394A CN2013102032708A CN201310203270A CN103278394A CN 103278394 A CN103278394 A CN 103278394A CN 2013102032708 A CN2013102032708 A CN 2013102032708A CN 201310203270 A CN201310203270 A CN 201310203270A CN 103278394 A CN103278394 A CN 103278394A
Authority
CN
China
Prior art keywords
barricade
hydraulic cylinder
base
deflection
baffle wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102032708A
Other languages
English (en)
Other versions
CN103278394B (zh
Inventor
谷兴海
习杰
孔鹏雁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxing Hebei Engineering Technology Co Ltd
Original Assignee
Xinxing Hebei Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxing Hebei Engineering Technology Co Ltd filed Critical Xinxing Hebei Engineering Technology Co Ltd
Priority to CN201310203270.8A priority Critical patent/CN103278394B/zh
Publication of CN103278394A publication Critical patent/CN103278394A/zh
Application granted granted Critical
Publication of CN103278394B publication Critical patent/CN103278394B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种管体接口密封和液压循环的综合实验装置,属于管体检测设备领域,具体包括方形的底座,底座的两端固设有前挡墙和后挡墙,前挡墙和后挡墙之间由拉杆连接,在前挡墙的中部设有顶推液压缸,顶推液压缸的伸缩端安装有活动端堵,在底座的中间部位设有压下机构和偏转液压缸,压下机构和偏转液压缸置于前挡墙和后挡墙之间。本发明能够同时对球墨铸铁管进行接口密封检测和液压循环试验实验,避免了一实验一装置的缺陷,提高了设备的利用率,方便了人员的操作。

Description

一种管体接口密封和液压循环的综合试验装置
技术领域
本发明涉及一种用于球墨铸铁管接口密封和液压循环的综合实验装置,属于管体检测设备领域。
背景技术
在新技术、新材料不断涌现的今天,球墨铸铁管是其他新材料难以完全替代的管材,在供水、输气工程领域里仍占有重要地位。
我国在上世纪八十年代以前,在 给水工程中使用的压力管主要是钢管、承插铸铁管、钢筋砼管等管材,此后,离心球墨铸铁管工业发展十分迅速。特别是它的机械性质几乎与钢管相同,甚至还要高,拉伸强度比石棉水泥管、聚乙烯管、玻璃纤维加强管和预应力混凝土管都高,且防腐蚀,目前它广泛应用于城镇的供水、输气中,与人们的生产、生活息息相关,发达国家球墨铸铁管的使用率在 95%以上。
由于球墨铸铁管本身的管材特点,从设计制造上均对施工安装提出了相应的规范要求。比如GB/T 13295-2008《水及燃气管道用球墨铸铁管、管件和附件》GB/T 17457-2009《球墨铸铁管和管件 水泥砂浆内衬》ISO 16132-2004《球墨铸铁管和配件 水泥灰浆衬套的封装层》。
随着人们对球墨铸铁管性能要求的不断提高,对其性能试验的装置研发提上日程,如《铸管用型式试验机的研制开发》。目前,对球墨铸铁管所要求的实验检验很多,大部分实验装置是单独分开的,即一试验一装置,这样不但降低了设备利用率而且占用大量的场地。同时也无法适应新的试验要求,如文献《球墨铸铁管水泥砂浆内衬水性环氧封面图层的性能研究》所述液压循环试验等。
发明内容
本发明要解决的技术问题是提供一种管体接口密封和液压循环的综合试验装置,该装置能够同时对球墨铸铁管进行接口密封检测和液压循环试验实验,避免了一实验一装置的缺陷,提高了设备的利用率,方便了人员的操作。
为解决上述技术问题,本发明所采取的技术方案是:一种管体接口密封和液压循环的综合实验装置,其特征在于包括方形的底座,所述底座的两端固设有前挡墙和后挡墙,所述前挡墙和后挡墙之间由拉杆连接,在前挡墙的中部设有顶推液压缸,顶推液压缸的伸缩端安装有活动端堵,在底座的中间部位设有压下机构和偏转液压缸,所述压下机构和偏转液压缸置于前挡墙和后挡墙之间。
对上述结构作进一步说明,所述前挡墙和后挡墙之间通过四根拉杆连接,四根栏杆分布于挡墙的四个角。本发明中的四根拉杆与前后挡墙固定,分布于四个角,在实验过程中,顶推液压缸施加压力时,保证压力能够均匀的作用于球墨铸铁管,使前后挡墙不会变形,并改善底座受力,提高检测装置的可靠性。
对上述结构作进一步说明,所述压下机构包括两个固定于底座两侧的门形框架,所述框架上的水平横担上设有可上下移动的压杆。本发明中的压下机构与底座固定连接,能够对铸铁管施加下压力,因此设计了门形的框架,在不影响内部铸铁管检测的前提下,使其能够缓慢均匀施加向下的压力。
对上述结构作进一步说明,所述偏转液压缸为两个,相对设置于底座的两侧,两个偏转液压缸垂直于管体轴线水平放置。偏转液压缸与底座固定连接,可以使待测铸管在水平面前后摆动,通过两侧的偏转油缸对铸铁管的连接部分施加压力,抵消实验过程中产生的侧偏力,避免损坏铸铁管。
采用上述技术方案所产生的有益效果在于:本发明采用顶推液压缸和偏转液压缸提高设备的自动化程度和可控性,加长原试验装置的长度、集成压下机构以增加设备的适应性,采用拉杆结构改善底座受力。本发明能适用于接口密封和液压循环综合试验提高了设备利用率,采用拉杆结构改善系统的受力、提高了可靠性。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细的说明。
图1是本发明的总体结构原理图;
图2是图1的俯视图;
其中:1、前挡墙,2、顶推液压缸,3、活动端堵,4、拉杆,5、压下机构,6、底座,7、后挡墙,8、偏转液压缸。
具体实施方式
根据附图1和2可知,本发明具体公开了一种管体接口密封和液压循环的综合实验装置,主要用于球墨铸铁管接口密封性检测和液压循环实验。具体结构包括方形的底座6,所述底座6的两端固设有前挡墙1和后挡墙7,所述前挡墙1和后挡墙7之间由四根拉杆4连接,四根栏杆4分布于挡墙的四个角,在前挡墙1的中部设有顶推液压缸2,顶推液压缸2的伸缩端安装有活动端堵3,在底座6的中间部位设有压下机构5和偏转液压缸8,偏转液压缸8为两个,相对设置于底座6的两侧,两个偏转液压缸8垂直与管体轴线水平放置,压下机构5和偏转液压缸8置于前挡墙1和后挡墙7之间。
压下机构5包括两个固定于底座6两侧的门形框架,所述框架上的水平横担上设有可上下移动的压杆。
在图1中,前挡墙1、后挡墙7固定安装于底座6上,并通过拉杆4连接;顶推液压缸2与前挡墙1固定连接,对活动端堵3产生顶推作用;活动端堵3安装于底座6上,并能在其上左右滑动;拉杆4左端与前挡墙1固定连接,右端与后挡墙7固定连接;压下机构5与底座6固定连接,能够对铸管产生压下力;偏转液压缸8与底座6固定连接,可以在水平面能前后摆动。
其工作过程简述如下:
首先把带检测的球墨铸铁管置于本发明的前后挡墙之间,利用顶推液压缸2的活动端堵3和后挡墙上的固定端堵把铸铁管前后口密封,固定端堵上设有液体打压口,用于注入液体,把铸铁管连接处与压下机构5和偏转液压缸8的位置对齐。
当进行内部正、负压下接口密封试验时,顶推液压缸2顶推活动端堵3压紧铸管,然后开始打压试验;需要偏转的时候,启动偏转液压缸8到合适位置,压紧铸管然后打压。
当进行外部正压力下接口密封试验时,采用压下机构5产生剪切力,进行外部正压力下接口密封试验。
当进行液压循环试验时,将整根铸管放到试验装置上,顶推液压缸2顶推活动端堵3压紧铸管,然后开始按照国家标准GB/T 13295-2008和GB/T 17457-2009规定的步骤进行液压循环试验。

Claims (4)

1.一种管体接口密封和液压循环的综合实验装置,其特征在于包括方形的底座(6),所述底座(6)的两端固设有前挡墙(1)和后挡墙(7),所述前挡墙(1)和后挡墙(7)之间由拉杆(4)连接,在前挡墙(1)的中部设有顶推液压缸(2),顶推液压缸(2)的伸缩端安装有活动端堵(3),在底座(6)的中间部位设有压下机构(5)和偏转液压缸(8),所述压下机构(5)和偏转液压缸(8)置于前挡墙(1)和后挡墙(7)之间。
2.根据权利要求1所述的一种管体接口密封和液压循环的综合实验装置,其特征在于所述前挡墙(1)和后挡墙(7)之间通过四根拉杆(4)连接,四根栏杆(4)分布于挡墙的四个角。
3.根据权利要求1所述的一种管体接口密封和液压循环的综合实验装置,其特征在于所述压下机构(5)包括两个固定于底座(6)两侧的门形框架,所述框架上的水平横担上设有可上下移动的压杆。
4.根据权利要求1所述的一种管体接口密封和液压循环的综合实验装置,其特征在于所述偏转液压缸(8)为两个,相对设置于底座(6)的两侧,两个偏转液压缸(8)垂直于管体轴线水平放置。
CN201310203270.8A 2013-05-28 2013-05-28 一种管体接口密封和液压循环的综合试验装置 Active CN103278394B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310203270.8A CN103278394B (zh) 2013-05-28 2013-05-28 一种管体接口密封和液压循环的综合试验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310203270.8A CN103278394B (zh) 2013-05-28 2013-05-28 一种管体接口密封和液压循环的综合试验装置

Publications (2)

Publication Number Publication Date
CN103278394A true CN103278394A (zh) 2013-09-04
CN103278394B CN103278394B (zh) 2015-06-03

Family

ID=49060978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310203270.8A Active CN103278394B (zh) 2013-05-28 2013-05-28 一种管体接口密封和液压循环的综合试验装置

Country Status (1)

Country Link
CN (1) CN103278394B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109682544A (zh) * 2019-02-19 2019-04-26 南通盛立德金属材料科技有限公司 汽车冷却器冷凝水管密封性检测装置
CN110376069A (zh) * 2019-07-31 2019-10-25 河南智安工程检测有限公司 一种用于多口径塑料管材耐内压试验的密封设备
CN111044273A (zh) * 2019-11-22 2020-04-21 芜湖新兴铸管有限责任公司 顶管模拟顶推型式试验方法
CN111751219A (zh) * 2020-06-17 2020-10-09 江苏成盛交通工程有限公司 一种桥梁栏杆强度测试装置
CN112378600A (zh) * 2020-10-28 2021-02-19 广东电网有限责任公司佛山供电局 一种顶管管节密封性能测试装置及方法
CN115031902A (zh) * 2022-08-12 2022-09-09 成都晟泽美塑业科技有限公司 一种燃气管道接头气密性试验检测装置及气密性测试方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06221952A (ja) * 1993-01-27 1994-08-12 Kurimoto Ltd 管の水圧試験機
CN2493925Y (zh) * 2001-08-17 2002-05-29 国统国际股份有限公司 可挠管平衡式动态试水台
CN2674431Y (zh) * 2004-01-18 2005-01-26 新兴铸管股份有限公司 双工位铸管水压试验机
CN201569609U (zh) * 2009-11-12 2010-09-01 芜湖新兴铸管有限责任公司 一种铸铁管水压试验机
CN201844907U (zh) * 2010-11-09 2011-05-25 四川国统混凝土制品有限公司 Pccp成品管试压机
CN202599616U (zh) * 2012-05-03 2012-12-12 中国石化集团南京化学工业有限公司化工机械厂 管内壁密封试压工装
CN202735033U (zh) * 2012-06-12 2013-02-13 福建省产品质量检验研究院 给水管材连接密封试验设备
CN203298939U (zh) * 2013-05-28 2013-11-20 新兴河北工程技术有限公司 一种管体接口密封和液压循环的综合试验装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06221952A (ja) * 1993-01-27 1994-08-12 Kurimoto Ltd 管の水圧試験機
CN2493925Y (zh) * 2001-08-17 2002-05-29 国统国际股份有限公司 可挠管平衡式动态试水台
CN2674431Y (zh) * 2004-01-18 2005-01-26 新兴铸管股份有限公司 双工位铸管水压试验机
CN201569609U (zh) * 2009-11-12 2010-09-01 芜湖新兴铸管有限责任公司 一种铸铁管水压试验机
CN201844907U (zh) * 2010-11-09 2011-05-25 四川国统混凝土制品有限公司 Pccp成品管试压机
CN202599616U (zh) * 2012-05-03 2012-12-12 中国石化集团南京化学工业有限公司化工机械厂 管内壁密封试压工装
CN202735033U (zh) * 2012-06-12 2013-02-13 福建省产品质量检验研究院 给水管材连接密封试验设备
CN203298939U (zh) * 2013-05-28 2013-11-20 新兴河北工程技术有限公司 一种管体接口密封和液压循环的综合试验装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中华人民共和国国家质量监督检验检疫总局 等: "《中华人民共和国国家标准 GB/T13295-2008》", 13 May 2008, article "水及燃气管道用球磨铸铁管、管件和附件", pages: 53-60 *
中华人民共和国国家质量监督检验检疫总局 等: "《中华人民共和国国家标准GB/T 17457-2009/ISO4179:2005》", 30 October 2009, article "球磨铸铁管和管件水泥砂浆内衬", pages: 1-7 *
王海玲 等: "铸管用型式试验机的研制开发", 《铸造技术》, no. 5, 31 May 2009 (2009-05-31), pages 707 - 710 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109682544A (zh) * 2019-02-19 2019-04-26 南通盛立德金属材料科技有限公司 汽车冷却器冷凝水管密封性检测装置
CN110376069A (zh) * 2019-07-31 2019-10-25 河南智安工程检测有限公司 一种用于多口径塑料管材耐内压试验的密封设备
CN111044273A (zh) * 2019-11-22 2020-04-21 芜湖新兴铸管有限责任公司 顶管模拟顶推型式试验方法
CN111751219A (zh) * 2020-06-17 2020-10-09 江苏成盛交通工程有限公司 一种桥梁栏杆强度测试装置
CN111751219B (zh) * 2020-06-17 2023-05-12 成盛建设集团有限公司 一种桥梁栏杆强度测试装置
CN112378600A (zh) * 2020-10-28 2021-02-19 广东电网有限责任公司佛山供电局 一种顶管管节密封性能测试装置及方法
CN115031902A (zh) * 2022-08-12 2022-09-09 成都晟泽美塑业科技有限公司 一种燃气管道接头气密性试验检测装置及气密性测试方法
CN115031902B (zh) * 2022-08-12 2022-11-08 成都晟泽美塑业科技有限公司 一种燃气管道接头气密性试验检测装置及气密性测试方法

Also Published As

Publication number Publication date
CN103278394B (zh) 2015-06-03

Similar Documents

Publication Publication Date Title
CN103278394B (zh) 一种管体接口密封和液压循环的综合试验装置
CN202125080U (zh) 混凝土散热装置
CN204922375U (zh) 一种顶压式管道内衬修复系统
CN208294567U (zh) 一种适用于井下浇筑墙的柔模袋式模具的固定装置
CN105042272A (zh) 一种顶压式管道内衬修复系统
CN203298939U (zh) 一种管体接口密封和液压循环的综合试验装置
CN105372134A (zh) 一种增压系统集成式钢管水压试验机充水装置
CN202708461U (zh) 一种管道堵漏器
CN204416673U (zh) 地源热泵灌浆管道提管机
CN202362121U (zh) 非金属管道水压渗漏检验装置
CN104908157A (zh) 一种超高性能混凝土复合管道制备方法
CN204828989U (zh) 一种输送乳化液的高压钢管
CN203797226U (zh) 一种大口径非金属膨胀节
CN108239993B (zh) 一种钢筋混凝土排水管密封式注浆管成型定位装置及其使用方法
CN205192863U (zh) 一种增压系统集成式钢管水压试验机充水设备
CN202140711U (zh) 一种快速密封接头
CN205048071U (zh) Cipp管道修复辅助装置
CN204062245U (zh) 一种埋地排水管玻璃钢卡箍接头
CN203082450U (zh) Pccp工程事故备用管
CN202469300U (zh) 一种两根灌浆管之间的连接结构
CN106369239A (zh) 高分子材料复合管线耐高压伸缩式管接头及其连接方法
CN202195232U (zh) 一种管道局部破损修复组件
CN204333870U (zh) 实用管道密封堵头
CN109129880A (zh) 一种钢筋混凝土排水管密封式注浆管成型定位装置及其使用方法
CN210946738U (zh) 一种水工隧洞环向预应力混凝土衬砌锚具槽填充的施工装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 056000 No. 2 Century Avenue, Handan Economic Development Zone, Hebei

Applicant after: Xinxing Hebei Engineering Technology Co., Ltd.

Address before: 056107 No. 99, harmony street, Handan Economic Development Zone, Hebei

Applicant before: Xinxing Hebei Engineering Technology Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant