CN103276715B - A kind of preparation method of sand control brick and desertification control method thereof - Google Patents

A kind of preparation method of sand control brick and desertification control method thereof Download PDF

Info

Publication number
CN103276715B
CN103276715B CN201310141052.6A CN201310141052A CN103276715B CN 103276715 B CN103276715 B CN 103276715B CN 201310141052 A CN201310141052 A CN 201310141052A CN 103276715 B CN103276715 B CN 103276715B
Authority
CN
China
Prior art keywords
sand control
brick
sand
desert
control brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310141052.6A
Other languages
Chinese (zh)
Other versions
CN103276715A (en
Inventor
王海旺
李琛
雷彬
杨蕾
吴长成
张成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University Qinhuangdao Branch
Original Assignee
Northeastern University Qinhuangdao Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University Qinhuangdao Branch filed Critical Northeastern University Qinhuangdao Branch
Priority to CN201310141052.6A priority Critical patent/CN103276715B/en
Publication of CN103276715A publication Critical patent/CN103276715A/en
Application granted granted Critical
Publication of CN103276715B publication Critical patent/CN103276715B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention discloses preparation method and the desertification control method thereof of a kind of sand control brick belonging to ecological environment treatment technical field.The making of this sand control brick is gathered materials on the spot, utilize dust storm and water glass, kaolin, and gypsum mixing, adopt simple preparation technology, thus prepare with low cost, the good sand control brick of intensity, not only cheap, and practical environmental protection, the present invention adopts in the mode of husky sand control, sand control brick is utilized to lay sand control brick covering desert surface by desert areas subregion building paravent with at desert surface and Arid Desert Region, the sand control brick laid can prevent strong wind from sweeping sand and dust, rainwater can be permeated again, keep the humidity of surrounding plants soil, improve vegetative sand control survival rate, and plant trees in conjunction with Arid Desert Region, building paravent, cycle of fixing the sand is long, and what possess is with low cost, the advantages such as simple process, can be extensively layed in desert and Arid Desert Region.

Description

A kind of preparation method of sand control brick and desertification control method thereof
Technical field
The invention belongs to ecological environment treatment technical field, particularly a kind of preparation method of sand control brick and desertification control method thereof.
Background technology
In recent years, sandstorm was becoming increasingly rampant, and the whole nation has 1500 kilometers of railways, 30,000 kilometers of highways and 50,000 kilometers of feed ditch to cause destruction in various degree due to hazards of sand storms.The direct economic loss that China causes because of hazards of sand storms every year reaches 54,000,000,000 yuan, is equivalent to 3 times of provinces and regions, northwest 5 fiscal revenues in 1996.Such as, in in by the end of February, 2013, a strong wind, the madness of sandstorm is attacked, and allow whole Jing-Jin-Tang Region dirt Sramanera overflow, reporter sees, the row of the street employs various protective gear: mouth mask, full head-shield, polybag protect, the pedestrian waited for bus in roadside, has been filled up by sand in whole nostril and face, has been in dyspneic state.The same day, the Environmental Monitoring of Beijing official showed, and PM10 instantaneous value in Pekinese is close to 1000.
Over nearly more than 40 years, desertification is very serious in China, and the trend expanded further is fairly obvious.According to statistics, from the 1950's to the seventies, soil, China desert expands with the speed of average 1560 square kilometres, entered for 20 end of the centurys, annual expansion 2100 square kilometres, predict that the development speed with 1.32% expands by 10 years from now on desertifications, the soil becoming desert every year on average will reach 2370 square kilometres, land resources is reduced very severe day by day, desertification is China's ecological environment problem that particularly west area is the most outstanding, not only seriously affect and annoying this district's industrial and agricultural production and socioeconomic sustainable development, and govern the sustainable development in surrounding area and even the whole nation.In Implementation of Western Development process, the top priority of chemistry pollution prevention Ying Shi China Eco-environment Construction of Western Region.
Technical method at present for sand prevention is also little, and sand control mode comparatively conventional at present has mechanical engineering to fix the sand, vegetative sand control, chemical sand-fixing.But these modes of fixing the sand have certain defect, it is short that the cycle is fixed the sand in such as mechanical engineering, can only as the provisional auxiliary means of fixing the sand of one; Vegetative sand control survival rate is lower; Chemical sand-fixing cost is high and have certain pollution to environment.The most frequently used method is planted trees exactly, expands vegetative coverage area to reach the effect of sand prevention.Be exactly overlay film sand prevention in addition, utilize plastic sheeting to desert and carry out technology covering with desertifying, making the grains of sand not by wind waved and movement, have again the effect of higher water-retaining sand-stabilizing simultaneously.But because desert and desertification ground area are too large, cost is too high, and this method should not be carried out, and at present, overlay film sand prevention is not widely used among reality.Not only can solve the increasingly serious problem of desertification with the method for husky sand control, and greatly reduce cost.Novel sand control brick adopts the theory of " with husky sand control ", and raw material adopts local dust storm, while slowing down Sand Movement speed, protecting existing soil, also significantly reduces cost of production.Be the problem that China one of facing is large with the sand control of sand control brick, sand control Zhuan Yeshi China studies a more direction now, utilizes dust storm to make sand control brick, realizes with husky sand control, cost-saving, increases Feasible degree always.This certainly will will attract the sight of more researchers.
Summary of the invention
The object of this invention is to provide a kind of preparation method and desertification control method thereof of sand control brick, be characterised in that, the making of described sand control brick is gathered materials on the spot, sand control brick is prepared after utilizing dust storm to mix with water glass, kaolin and gypsum, not only cheap, and practical environmental protection, concrete preparation process is as follows:
1) full sized brick is made: will according to mass ratio, kaolin 1.6-2.5g and gypsum 1.6-2.5g is added in every 100g dust storm, fully be uniformly mixed, the amount adding water glass by every 100g dust storm is while stirring 16 ~ 25ml, mixed slip put into mould and flattens, then putting into 30 ~ 60 DEG C, baking oven and dry 4 ~ 10h;
2) shaping: the full sized brick after drying completes sprays waterproof agent; After its drying drying at room temperature atmosphere under maintenance about 1 week.
Described modulus of water glass is 1.5 ~ 2.5.
Described waterproof agent is the benzene emulsion of 10wt% solid content and the organic silicon emulsion of 5wt% solid content, and every block full sized brick sprays 5ml.
Described sand control brick is circular, oval or polygon, and thickness is 5mm-50mm.
Described desertification control method adopts in the mode of husky sand control, sand control brick is utilized to lay novel sand control brick or the husky brick of planting plants combination paving by desert areas subregion building paravent with at desert surface and Arid Desert Region, cover desert surface, the novel sand control brick laid can prevent strong wind from sweeping sand and dust, rainwater can be permeated again, keep the humidity of surrounding plants soil, improve vegetative sand control survival rate, and in conjunction with Arid Desert Region afforestation, building paravent; Thus reach with husky sand control, cost-saving object.
The invention has the beneficial effects as follows that the making of this sand control brick is gathered materials on the spot, not only cheap, and practical environmental protection; The present invention adopts in the mode of husky sand control, sand control brick is utilized to lay novel sand control brick covering desert surface by desert areas subregion building paravent with at desert surface and Arid Desert Region, the novel sand control brick laid can prevent strong wind from sweeping sand and dust, rainwater can be permeated again, keep the humidity of surrounding plants soil, improve vegetative sand control survival rate, thus reach with husky sand control, cost-saving, increase the object of Feasible degree.Utilizing is solve this problem expensive with the feature of husky sand control, and the cycle of fixing the sand long, not easily covered by dust storm, and environmentally safe.Produce in enormous quantities, extensive use.
Detailed description of the invention
The invention provides a kind of preparation method and desertification control method thereof of sand control brick, the making of described sand control brick is gathered materials on the spot, and prepares sand control brick after utilizing dust storm to mix with water glass, kaolin and gypsum, not only cheap, and practical environmental protection.Embodiment of illustrating below is explained.
Embodiment 1
(1) 60g dust storm, 1.2g kaolin and 1.2g gypsum are fully uniformly mixed;
(2) adding modulus of water glass is 1.5 ~ 2.5, and the addition of water glass is 17ml;
(3) mixed slip put into mould and flatten,
(4) put into 40 DEG C, baking oven and dry 8h;
(5) described waterproof agent is the benzene emulsion of 10wt% solid content and the organic silicon emulsion of 5wt% solid content, and every block full sized brick sprays 5ml.
Embodiment 2
(1) 100g dust storm, 1.5g kaolin and 1.4g gypsum are fully uniformly mixed;
(2) adding modulus of water glass is 1.5 ~ 2.5, and the addition of water glass is 23ml;
(3) mixed slip put into mould and flatten,
(4) put into 50 DEG C, baking oven and dry 10h;
(5) described waterproof agent is the benzene emulsion of 10wt% solid content or the organic silicon emulsion of 5wt% solid content, and every block full sized brick sprays 5ml.
Embodiment 3
Described in husky sand control mode, sand control brick is utilized to lay sand control brick by desert areas subregion building paravent with at desert surface and Arid Desert Region, and reserve the sowing hole sowing drought-resistant plant, the sand control brick laid can prevent strong wind from sweeping sand and dust, rainwater can be permeated again, keep the humidity of surrounding plants soil, improve vegetative sand control survival rate, and in conjunction with Arid Desert Region afforestation, building paravent; Cycle of fixing the sand is long, not easily covered by dust storm, and environmentally safe.Thus reach with husky sand control, and cost-saving, increase the object of Feasible degree.

Claims (2)

1. a preparation method for sand control brick, is characterized in that, the making of described sand control brick is gathered materials on the spot, and prepares sand control brick after utilizing dust storm to mix with water glass, kaolin and gypsum, not only cheap, and practical environmental protection, and concrete preparation process is as follows:
1) full sized brick is made: will according to mass ratio, kaolin 1.6-2.5g and gypsum 1.6-2.5g is added in every 100g dust storm, fully be uniformly mixed, the water glass that modulus is 1.5 ~ 2.5 is added while stirring by every 100g dust storm, addition is 16 ~ 25ml, mixed slip put into mould and flattens shaping, then putting into 30 ~ 60 DEG C, baking oven and dry 4 ~ 10h;
2) full sized brick after drying completes sprays the organic silicon emulsion of 5wt% solid content as waterproof agent, every block full sized brick sprays 5ml; After its drying drying at room temperature atmosphere under maintenance 1 week; Namely the permeable husky brick of circle, ellipse or polygon that thickness is 5mm-50mm is obtained.
2. a sand control brick desertification control method, it is characterized in that, the sand control brick desertification control method utilizing preparation method described in claim 1 to make adopts in the mode of husky sand control, to gather materials on the spot, utilize dust storm and water glass, kaolin, and the sand control brick prepared after gypsum mixing, desert areas subregion is built paravent and lay sand control brick at desert surface and Arid Desert Region or be combined with planting plants and spread sand control brick, cover desert surface, the sand control brick laid can prevent strong wind from sweeping sand and dust, rainwater can be permeated again, keep the humidity of surrounding plants soil, improve vegetative sand control survival rate, and plant trees in conjunction with Arid Desert Region, building paravent, thus reach with husky sand control, cost-saving object.
CN201310141052.6A 2013-04-23 2013-04-23 A kind of preparation method of sand control brick and desertification control method thereof Expired - Fee Related CN103276715B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310141052.6A CN103276715B (en) 2013-04-23 2013-04-23 A kind of preparation method of sand control brick and desertification control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310141052.6A CN103276715B (en) 2013-04-23 2013-04-23 A kind of preparation method of sand control brick and desertification control method thereof

Publications (2)

Publication Number Publication Date
CN103276715A CN103276715A (en) 2013-09-04
CN103276715B true CN103276715B (en) 2015-12-23

Family

ID=49059321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310141052.6A Expired - Fee Related CN103276715B (en) 2013-04-23 2013-04-23 A kind of preparation method of sand control brick and desertification control method thereof

Country Status (1)

Country Link
CN (1) CN103276715B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106830875A (en) * 2017-03-16 2017-06-13 中国科学院青海盐湖研究所 A kind of magnesium phosphate cement foam concrete fixes the sand plate and preparation method thereof
CN108934253B (en) * 2017-08-24 2021-09-14 中国科学院西北生态环境资源研究院 Comprehensive improvement method for desert soil
CN108949183B (en) * 2017-08-24 2021-10-08 中国科学院西北生态环境资源研究院 Desert greening method
CN109804888B (en) * 2019-03-19 2023-11-21 东北大学秦皇岛分校 Intelligent desert seedling planting robot and implementation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85104439A (en) * 1985-06-13 1986-12-24 铁道部科学研究院西北研究所 Synthetical sand-prevention method
CN1119173A (en) * 1994-09-24 1996-03-27 倪亚范 Manufacture of desert sand concrete and use
CN1357502A (en) * 2000-06-01 2002-07-10 任文林 Soil-base multicomponent composite material and its product and use
KR20030033455A (en) * 2001-10-23 2003-05-01 주식회사 도우엔지니어즈 Ecology Brick for paving
CN102635105A (en) * 2012-05-09 2012-08-15 张炜 Sand-barren polygonal rectangular cement sand brick

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85104439A (en) * 1985-06-13 1986-12-24 铁道部科学研究院西北研究所 Synthetical sand-prevention method
CN1119173A (en) * 1994-09-24 1996-03-27 倪亚范 Manufacture of desert sand concrete and use
CN1357502A (en) * 2000-06-01 2002-07-10 任文林 Soil-base multicomponent composite material and its product and use
KR20030033455A (en) * 2001-10-23 2003-05-01 주식회사 도우엔지니어즈 Ecology Brick for paving
CN102635105A (en) * 2012-05-09 2012-08-15 张炜 Sand-barren polygonal rectangular cement sand brick

Also Published As

Publication number Publication date
CN103276715A (en) 2013-09-04

Similar Documents

Publication Publication Date Title
CN103276715B (en) A kind of preparation method of sand control brick and desertification control method thereof
CN102926391B (en) Loess slope ecological protection method
CN102031786B (en) Greening vegetation concrete and construction method thereof
CN105569281B (en) A kind of environmental roof greening structure and its construction method
CN104478320B (en) A kind of freeze proof habitat base material for extremely frigid zones and preparation method thereof
CN102337744A (en) Preparation and construction method of BSC (Bio-substrate concrete) biological matrix fine aggregate plant-growing concrete
CN103265957B (en) Erosion resistant matrix suitable for spray seeding for greening
CN102304962A (en) Roof heat-insulation and thermal-proof planting system
CN106555371B (en) Garden large area pervious concrete road construction technique
CN101548615A (en) Porous nest brick 3D green plant technology
CN206740602U (en) A kind of chamber for the ice-covering-proof superficial layer durability test of highway
CN202931889U (en) Palm ecology blanket
CN104863112A (en) Clay-based sand barrier grid manufacturing method
CN207633160U (en) It being capable of the anti-icing sidewalk ground tile of snow melt
CN105503057A (en) Sand-concrete water permeable brick suitable for sponge city construction and preparing method of sand-concrete permeable brick
CN102359114B (en) Method for planting sedum sarmentosum on side slope
CN102369834A (en) Aggregate bio-substrate concrete (BSC) and preparation and construction method thereof
CN106609510A (en) A flexible slope protection device
CN104674615A (en) Concrete curing construction method and curing device
CN105155509A (en) Method for windbreak and sand fixation
CN107365113A (en) A kind of plant cover concrete and preparation method thereof
CN103232712B (en) A kind of hydraulic asphalt and preparation method thereof
CN203856138U (en) Root-puncture-resistant planting roof
CN106517950A (en) Non-sintered water permeable brick and preparation method thereof
CN111910580A (en) Cross revetment capable of protecting vegetation and forming method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223