CN103269124A - System achieving substation misinformation remote signaling scheduling end filtration - Google Patents

System achieving substation misinformation remote signaling scheduling end filtration Download PDF

Info

Publication number
CN103269124A
CN103269124A CN2013101644459A CN201310164445A CN103269124A CN 103269124 A CN103269124 A CN 103269124A CN 2013101644459 A CN2013101644459 A CN 2013101644459A CN 201310164445 A CN201310164445 A CN 201310164445A CN 103269124 A CN103269124 A CN 103269124A
Authority
CN
China
Prior art keywords
signal
remote
switch
signals
data analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101644459A
Other languages
Chinese (zh)
Inventor
卫忠
张麟
张晋
吴俊杰
蔡松柳
唐甬岗
贾优
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN2013101644459A priority Critical patent/CN103269124A/en
Publication of CN103269124A publication Critical patent/CN103269124A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a system achieving substation misinformation remote signaling scheduling end filtration. A data monitoring center can obtain network topological information and real-time remote signaling signals from an SCADA system when a power grid operates; the data monitoring center can investigate on-off action signals separated from the remote signaling signals one by one through set normal signal rules and misinformation signal rules, and carries out correct and false remote signaling attribute identification on analyzed signals; the data monitoring center can conduct recording and statistics on the number of remote signaling signals according with corresponding rules respectively, and carries out output displaying on analysis results of the signals, and the analysis results of the signals are stored in discs to support inquiry and checking confirmation for historical records. The system is arranged on a network node independent of the SCADA system so as to maintain stable operation of the SCADA system.

Description

Realize the system that transformer station's wrong report remote signalling dispatching terminal filters
Technical field
The present invention relates to power system signal remote signalling field, particularly a kind of system that realizes that transformer station's wrong report remote signalling dispatching terminal filters.
Background technology
The remote signalling wrong report is an ancient topic of puzzlement power scheduling department.The reason of remote signalling wrong report is a lot, and the reason of remote signalling contact aspect is arranged, and reason such as the contact wrong of signal collecting device itself also arranged, and the reason of transmission channel etc.Sometimes because the imprecision of dispatching terminal computer system remote signalling acquisition process software also can cause malfunction and the shake of part remote signals.The form of expression of remote signalling wrong report is also varied, the variation repeatedly (often showing as folding signal or action/reset signal occurs in pairs) of same signal or a plurality of signals is arranged, and simultaneously a large amount of signals transmission (a large amount of remote signals that often show as same factory station transmit simultaneously), irregular accidental false positive signal is also arranged.Along with the remote signalling point that inserts in the dispatch automated system is more and more, quantity and the frequency of wrong report remote signalling also can progressively rise.In order to deal with the remote signalling wrong report, relevant departments have taked multiple measure, as the docking point shake, increase anti-shake time-delay, for the reason of transmission channel aspect, adopt shielded twisted-pair cable, and design to find and revise wrong report remote signalling etc. by RTU software.
Power-management centre SCADA system is the strong instrument that the dispatcher monitors operation of power networks and processing accident.Along with the continuous development of computer and network technologies, the function of SCADA system also from strength to strength.On the one hand, come more abundant approximately based on the application software of SCADA platform, for example voltage power-less is controlled automatically, electric network fault analysis and processing etc., on the other hand, demand based on the system integration of IEC61970 standard and electrical network interconnection technique etc. also constantly increases, so the external issue of real time information (remote measure and communication etc.) and receive also more and more general.The application software of real-time response requires and can obtain authentic and valid remote measure and communication information from the SCADA system, and the same requirement of the system integration and interconnection technique is authentic and valid from the signal that the SCADA system obtains, reduce repeating signal, false positive signal to the interference of system as far as possible, avoid taking unnecessary Internet resources.And because a variety of causes also exists various interference signals, especially the remote measure and communication false positive signal in the SCADA dispatching system.The existence of interference signal has very big influence to SCADA system itself and to the access of following other application.
In dispatching terminal SCADA system, also take some measures to filter out part wrong report remote signalling sometimes, for example, filter out the repeated displacement signal by limit switch displacement number of times.But owing to must guarantee the requirement of real-time, the SCADA system is not very perfect to the processing of false positive signal, can only be very preliminary, and most false positive signal can not be identified.Yet along with popularizing of the development of automatic technology and equipment, particularly comprehensive automation, factory's station remote signalling amount is increased sharply the possibility that the increase of semaphore also will cause the false positive signal amount to rise at double.The situation of modal remote signalling wrong report is exactly the interior single switch displacement situation frequently of remote signalling displacement and certain factory station a large amount of in certain factory station.If consider the wrong report situation of guard signal and plug-in strip signal, the possibility that the remote signalling wrong report takes place is just higher.The existence of these false positive signal has caused certain influence to the operation of dispatch automated system inevitably.Remote signals in the SCADA system is analyzed, rejected false positive signal, at present and following SCADA uses and have realistic meaning based on other application of SCADA signal.
Summary of the invention
The purpose of this invention is to provide a kind of system that realizes that transformer station's wrong report remote signalling dispatching terminal filters, receive the operation of power networks data that the SCADA system sends in real time, the remote signals of differentiating wherein switch motion according to the signal processing rule of design belongs to normal signal or false positive signal, auxiliary as to the SCADA system is to safeguard the reliability service of SCADA system and electrical network.
In order to achieve the above object, technical scheme of the present invention provides a kind of system that realizes that transformer station wrong report remote signalling dispatching terminal filters, its comprise that signal connects with lower module:
The data monitoring center, the data-interface visit SCADA system that can arrange by system, the real-time remote signals when obtaining operation of power networks;
Data analysis center can be examined with the rule of setting one by one to each remote signals of obtaining, and the remote signalling attribute-bit of correcting errors of the remote signals after each is analyzed; Described rule comprises respectively two rule-likes at normal signal in the remote signals and false positive signal;
Control data corporation records and adds up the remote signals quantity that meets normal signal rule and false positive signal rule respectively, the analysis result of remote signals is exported demonstration, and deposit to support affirmation is inquired about and verified to historical record.
Described system be arranged at one with the separate server of the network of dispatching terminal SCADA system in, and with carry out unidirectional data between the SCADA system and exchange, namely only obtain corresponding data from the SCADA system, and directly do not send the signal analysis result to the SCADA system.
There are electrical network static information and electrical network dynamic operation information in described data monitoring center from the data that the SCADA system obtains, and is sent to described data analysis center respectively;
Wherein, described electrical network static information comprises the topological relation information of describing the annexation between the electrical network primary equipment; Described electrical network dynamic operation information is included in when real-time remote measure and communication data change and obtains, and the switch changed position information of therefrom separating;
Described data analysis center as signal to be analyzed, uses relevant remote signalling telemetry and power network topology relation information as the subsidiary conditions of rule judgment each switch changed position information of newly receiving, comes the picked up signal analysis result by rule match.
Described system is provided with human-computer interaction device, can export demonstration to the analysis result of remote signals, can also provide respective interface to add external rules to support the user to described data analysis center.
In the rule base of described data analysis center, with repair apparatus and the remote signals that produces of charging equipment not, be defined as normal signal respectively;
In when examination, the real-time storehouse of described data analysis center by the SCADA system obtains the sign board type of equipment and identifies, and all regards the equipment that wherein has maintenance, ground connection, ad hoc inspection and repair attribute as repair apparatus;
Described data analysis center detects also in the identification topological relation, and the equipment that meets the following conditions simultaneously is charging equipment not: namely, the disconnecting link of each side of equipment is in the separating brake position, and each side of equipment all can not search the power supply point in the system.
In the rule base of described data analysis center, with the remote signals that meets the following conditions, be defined as normal signal respectively;
That is, recognize the switch trip item during examination of described data analysis center, with switch failure tripping operation item or with the simultaneous situation of switch events journal item under, judge that the switch trip signal of receiving is normal signal;
Or, recognize the divide-shut brake signal of switch during the examination of described data analysis center, received again simultaneously under the situation of protection actuating signal of switch corresponding device, judge that the divide-shut brake signal of the switch of receiving is normal signal.
In the rule base of described data analysis center, the remote signals with the switchgear of receiving the remote control item in advance produces is defined as normal signal;
Described data analysis center is when examination, the anti-school of the remote control of sense switch and remote control fill order, before the actuating signal of receiving switch, received the remote control item of this switch, think that then the action of this switch is based on the true operation of SCADA system remote control, judge that then the switch actuating signals of receiving is normal signal.
In the rule base of described data analysis center, correspondence is set in following situation correspondence in the rule of normal signal and false positive signal;
That is, described data analysis center is in when examination, and after receiving the switch sub-gate signal, the remote measurement value of obtaining corresponding device again from the SCADA system detects, and when the remote measurement value belongs in the null value scope of setting, judges that the switch sub-gate signal of receiving is normal signal;
It is outer and greater than zero condition that described data analysis center belongs to the null value scope of setting with the remote measurement value, the switch sub-gate signal of receiving as judgement is one of them reason of false positive signal, and need use other false positive signal rule that this switch sub-gate signal is verified simultaneously.
In the rule base of described data analysis center, with the remote signals that meets the following conditions, be defined as false positive signal respectively;
That is, described data analysis center is in when examination, and the setting-up time wide-ultra is crossed the switch actuating signals of setting operation number of times, and being judged as is the false positive signal that transmits repeatedly;
Or described data analysis center is receiving that the switch remote signals with factory's station displacement simultaneously surpasses under the situation of the upper limit, judges that the signal of receiving is false positive signal.
Compared with prior art, the system that realizes that transformer station's wrong report remote signalling dispatching terminal filters of the present invention, its advantage is: among the present invention, be technological core with real-time network topological information and operation of power networks parameter.System is structurally by independently server mode design.Server has the interface with the SCADA system interaction, has separate threads and receives the operation of power networks data that the SCADA system sends in real time, and have other thread to be responsible for the analyzing and processing work of data specially.Human-computer interaction interface and server program integrate, and make application itself compacter and efficient.
The present invention is by classifying to remote signalling wrong report situation common in the area power grid and summing up, in conjunction with the electric grid operating knowledge under the states such as the normal operation of electrical network and fault, maintenance, propose the analysis strategy of the reasonably normal remote signalling of a cover and wrong report remote signalling, thereby can from a large amount of remote signals of obtaining in real time, analyze possible false positive signal.Also the signal analysis rule is pressed normal signal and false positive signal two rule-like settings among the present invention, satisfy the quantity of two rule-likes and the possibility that character is come the wrong report of preliminary judgement signal by signal.System can remedy the deficiency of internal rule by the matching design of internal rule and external rules.
Can obtain whole real-time telemetry remote signalling data of SCADA among the present invention, mainly be the switch changed position signal to be separated analyze, but reserved the analysis interface of guard signal and disconnecting link signal, can insert immediately when needed.It preferred embodiment is independently network node of employing and SCADA system, and the signal analysis result who produces does not send to the server of SCADA system, namely, the remote measure and communication of seeing on dispatcher's work station remains the real time data from the SCADA server, rather than the data after the mistake telemetry system is analyzed.Such benefit is, can reduce newly-increased change of using the SCADA system, no matter is on network configuration or application program, and the SCADA system does not need to make any change, guaranteed the safe and reliable of operation.
Description of drawings
Fig. 1 is the structure principle chart of realizing the system that transformer station's wrong report remote signalling dispatching terminal filters of the present invention.
Embodiment
As shown in Figure 1, the system that realizes that transformer station's wrong report remote signalling dispatching terminal filters of the present invention, the remote signals processing server that is based on the platform independent on the network that is increased to the SCADA dispatching system is set.
This server design adopts and the SCADA dispatching integrated design technology, can share figure, history library, storehouse, device parameter, the network service etc. in real time of SCADA.Can directly visit the various resources of SCADA by the interface native system of standard.System can be joined seamlessly to operation in the SCADA net, has special thread to catch the switch actuating signals of SCADA system and gear signal etc. in real time, and when capturing new remote signalling displacement, the beginning call signal is analyzed thread signal is analyzed.Differentiate echo signal by the signal processing rule of design and belong to normal remote signals or mistake remote signals.The remote signalling analysis result shows by man-machine interface, and provides signal to confirm and functions such as automatic deposit and inquiry.
System of the present invention specifically is provided with data analysis center, control data corporation and the data monitoring center by modularized design, contacts the nucleus module of each module with data analysis center as it.Each module has the entrance and exit of standard, makes things convenient for exchanges data between exchanges data and following possible application.
Described data monitoring center, platform by the standard interface accessing SCADA system that arranges, and then obtain required following data: a class is that the electrical network static information refers to that mainly the annexation between the electrical network primary equipment is topological relation information, these static informations can obtain by the artwork integrated technique of SCADA system, load automatically when program start.Another kind of is that electrical network dynamic operation information is real-time remote measure and communication data, automatically obtain by the data flow mode, instantaneous renewal, namely the present invention can instantaneously capture and start corresponding handling procedure when the real-time telemetry remote signalling data of SCADA system change.
Consider present situation and the on-the-spot actual demand of SCADA system, only the switch changed position signal of SCADA is analyzed among the present invention, still reserved the analysis interface of guard signal and disconnecting link signal, can insert immediately when needed.Therefore, need data monitoring of the present invention center that the switch changed position signal is separated from all remote signalling data; Described data monitoring center is with switch, disconnecting link signal, gear information, and remaining auxiliary remote measure and communication data with information such as power system operating mode, equipment states, are sent to data analysis center respectively.
Described data analysis center when capturing new remote signalling displacement, just begins call signal analysis thread signal is analyzed.The analysis of switch remote signals is a comprehensive process, relate to search and the analysis of power network topology relation, analysis and judgement, the equipment of equipment state, factory station or equipment operational mode moves in rational judgement, the SCADA system to the Signal Processing mode, once with the matching relationship of secondary device etc.Emphasis wherein is the Partial Feature of the normal running of electrical network primary equipment, accident condition, abnormality and false positive signal.
Data analysis center is to the analyzing and processing of signal among the present invention, specific design has special signal processing rule storehouse, signal to be analyzed is the entry condition of rule base, and relevant remote signalling telemetry intelligence (TELINT) is come the picked up signal analysis result as the subsidiary conditions of rule judgment by the coupling of rule.
Normal signal described in the present invention comprises the various remote measure and communication signals that electrical network sends under normal condition, the unusual and fault-signal that electrical network sends under improper and malfunction, and the test signal that under debugging or inspecting state, generates of equipment etc.
When setting normal signal regular among the present invention, need consider repair apparatus; Charging equipment not; YX period go beyond the scope (determining whether to adopt according to field condition); Receive the switchgear of remote control (comprising remote control execution and the success of anti-school) item in advance; Switch changed position and switch failure tripping operation/SOE item exist simultaneously; Switch and protection actuating signal exist simultaneously; The YC=0 of switch separating brake corresponding device; The YC of switch combined floodgate corresponding device〉0; Satisfy self-defined normal remote signalling condition; The situation of normal signal (at gear signal).
1) repair apparatus is the class special installation in the electrical network, and it has following characteristics: (1), each side of equipment is not connected state, and namely each the side point from equipment all can not find power supply point; (2), equipment has the ground connection disconnecting link or earth connection is ground state; (3) may have distinctive mark boards such as ground connection, maintenance or ad hoc inspection and repair on the equipment.In the native system repair apparatus there is special regulatory requirement, this is because repair apparatus may frequently or occasionally send some abnormal operation signals because of the debugging requirements of one's work, these signals are signals of the actual generation of slave station end, though be not false positive signal, if but can not correctly identify then may cause interference to dispatcher's work, so require correct identification to have the equipment of maintenance attribute in this application, the various signals that this kind equipment produces made identification.Obtain the sign board type of equipment among the present invention by the real-time storehouse of SCADA system, all regard all equipment with maintenance, ground connection, ad hoc inspection and repair attribute wherein as repair apparatus, the signal of its generation is attributed to normal signal.Current all repair apparatus can show by man-machine interface.
2) not charging equipment refer to equipment each side tool lock all at open position, be in the not equipment of electriferous state, its signal that produces is the same with repair apparatus, may be debug signal.Not charging equipment judge one is whether the disconnecting link of seeing each side of equipment is in the separating brake position, the 2nd, see from each side of equipment to search power supply point the system.If these two are all satisfied, then equipment is considered to not charging equipment.The judgement of charging equipment will not realize by perfect topological analysis program.
3) switch trip and switch failure tripping operation/switch S OE exist simultaneously; If switch trip and two items of this switch failure tripping operation all exist simultaneously, illustrate that switch is emergency stop valve trip.This rule designs at the common technique of SCADA system.The SOE(sequence of events recording), exactly when remote terminal unit detects the displacement of remote signalling state, the moment, displacement state and the equipment serial number of record remote signalling displacement are formed logout information and are transmitted to main website.As long as alarm shows SOE, illustrate that remote terminal unit at least receives the remote signalling contact action message of a reality.If therefore two items of switch trip and this switch S OE all exist simultaneously, illustrate that RTU is the remote signalling displacement signal of having received switch really.And if the switch tripping operation that has an accident then can produce two items of switch separating brake item and switch failure tripping operation item, this also can be used as the basis for estimation of normal remote signalling.
4) receive the switch of remote control item in advance; If switch is carried out the remote control operation, then can carry out remote control at the SCADA dispatching platform and preset order, the end of standing then returns the anti-school result of remote control, and the success of anti-school then can continue to issue the remote control fill order.If the remote control item of this switch was arranged before receiving switch actuating signals, think that then switch motion is based on the true operation of SCADA remote control, mainly be the anti-school of remote control and the remote control fill order of analyzing switch to the identification of switch remote control item.
5) switch and protection actuating signal exist simultaneously; If both received the divide-shut brake signal of switch within a short period of time, received the protection actuating signal of switch corresponding device again, then switching signal is thought it may is the switch motion that is triggered by guard signal.This rule depends on system to the function of switch and the automatic coupling of guard signal, and namely system analyzes switch or its corresponding device whether this signal belongs to action automatically according to received protection actuating signal.
6) switch separating brake corresponding equipment YC=0; After the switch sub-gate signal is received by system, can from the SCADA system, reach to such an extent that the corresponding equipment remote measurement comprises P automatically, Q, I through after the time-delay of several seconds.If the remote measurement value is 0, think that then this switch actuating signals has certain confidence level.Certainly, the differentiation of null value be not strictness whether see obtained YC=0, but whether see in rational null value scope.
Switch switching signal corresponding equipment YC〉0 also be based on same consideration.
When setting false positive signal regular among the present invention, then need to consider the YC of switch separating brake corresponding device〉0; The repeated signal displacement; Satisfy self-defined mistake remote signalling condition; Situation with factory's simultaneously a large amount of remote signals displacements in station.
1. the YC of switch separating brake corresponding device〉0; If receive the YC that obtains this switch correspondence after switch sub-gate signal and the process time-delay of several seconds still greater than 0, though can not affirm fully that this signal is false positive signal, can be with this switch motion record as one of reason of reporting remote signalling by mistake.
2. repeated displacement signal; This is to design according to the operating feature of electric power system primary equipment under normal and accident condition.When the electrical network normal running, can there be the folding situation repeatedly of same switch, though when equipment debugging, may there be the signal of folding repeatedly at same equipment, can mask by the maintenance attribute of equipment.When power grid accident, because also there is the repeatedly situation of folding of line switching in the existence of ZCH, thereby but rational number of operations restriction can be set according to the rule of ZCH filter out this class signal.The switch actuating signals that surpasses the reasonable operation number of times is all thought the false positive signal that transmits repeatedly.In the system number of operations is restricted to 4 times at present, namely within a short period of time any switch the breaking-closing operating total degree can be above 4 times.
3. with the simultaneously a large amount of remote signals displacements in factory station; This is the more representational false positive signal of a class.Owing to reasons such as RTU dead electricity, RTU reset, often there is this class signal.By the certain upper limit value is set, identify the remote signals that to report by mistake.To count with the switch remote signalling of factory's station displacement simultaneously at present and be set to 12.Surpass 12 the false positive signal of thinking.
The present invention can also carry out external maintenance to rule by the interface mode except handling by internal rule storehouse mode definition signal.The external definition of rule is corresponding with the formulation of internal rule, also divides normal remote signalling rule and the design of mistake remote signalling rule, can according to circumstances formulate flexibly.Custom rule is divided into the definition of object component and auxiliary judgment conditional definition; object component is switch tool and the action attributes etc. thereof of action; the auxiliary judgment condition is relevant basis for estimation; can be other switch, disconnecting link state value, also can be the remote measurement amount of being correlated with and correlation protection information of equipment etc.Custom rule generates the regular expression statement that signal is handled by switchtype and the relevant Rule of judgment of selecting action.Custom rule can be have with or the combination of a plurality of conditional statements of logic, have higher flexibility.The external rules that defines is kept in the database.Regular export interface is provided, strictly all rules need be derived when checking in the tabulation mode the user, can select this function.
Among the present invention, through each switch tool displacement remote signalling that data analysis center is differentiated, all put sign normal or the wrong report remote signalling.Described control data corporation, to the signal after analyzing, statistics meets the number of signals of normal remote signalling and wrong report remote signalling rule respectively, utilizes man-machine interface to show analysis and the statistics of signal.For example, may be displayed on switch tool remote signalling record and the arrangement in chronological order that program run duration system captures.When showing, the result after also will analyzing is saved in the history server of SCADA system, to guarantee not losing of data.Control data corporation can provide special interface for users query history record, and the user can confirm the remote signalling unconfirmed in the historical record.By the statistical function of remote signalling record, can also check the rate of false alarm of switch tool action class remote signals easily in addition.
In the specific embodiment of system of the present invention, be platform with the ripe dispatching automation software of the DF8002 of Dongfang Electronics series, can realize and the integrated design of DF8002 SCADA dispatching platform; Hardware platform uses a high-performance computer; Operating system nucleus is Windows2000 Professional; Database uses relationship type/SQL/ client-server architecture, SYBASE, Oracle, and DB2 and MS SQL Server etc. can directly adopt the commercial data base of SCADA system among the present invention; Network configuration has independently application type for operating in independently network node, and two net designs ensure data reliability; Configuration mode is the stand-alone server application model, and namely the data of telemetry system processing service and man-machine interface realize at same microcomputer by mistake.
The present invention is technological core with real-time network topological information and operation of power networks parameter.System is structurally by independently server mode design.Server has the interface with the SCADA system interaction, has separate threads and receives the operation of power networks data that the SCADA system sends in real time, and have other thread to be responsible for the analyzing and processing work of data specially.Human-computer interaction interface and server program integrate, and make application itself compacter and efficient.
The present invention preferably operates in the network node independently with the SCADA system, and is to carry out unidirectional data to exchange with the SCADA system, namely only obtains the real-time telemetry remote signals from the SCADA system, and the result of analyzing and processing does not send to SCADA.Yet, be to have reserved the outside data-interface of issuing can be provided among the present invention, when actual needs, the analysis result of correcting errors of remote signals can be sent on the network or other platform of SCADA system.Consider that the IEC61970 standard is the cross-platform data exchange standard that generally adopts in the present electric power system, will follow the IEC61970 standard aspect the outbound data issue in the system of the present invention.
Although content of the present invention has been done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple modification of the present invention with to substitute all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (9)

1. a system that realizes that transformer station wrong report remote signalling dispatching terminal filters is characterized in that, comprise that signal connects with lower module:
The data monitoring center, the data-interface visit SCADA system that can arrange by system, the real-time remote signals when obtaining operation of power networks;
Data analysis center can be examined with the rule of setting one by one to each remote signals of obtaining, and the remote signalling attribute-bit of correcting errors of the remote signals after each is analyzed; Described rule comprises respectively two rule-likes at normal signal in the remote signals and false positive signal;
Control data corporation records and adds up the remote signals quantity that meets normal signal rule and false positive signal rule respectively, the analysis result of remote signals is exported demonstration, and deposit to support affirmation is inquired about and verified to historical record.
2. realize the system that transformer station's wrong report remote signalling dispatching terminal filters according to claim 1, it is characterized in that,
Described system be arranged at one with the separate server of the network of dispatching terminal SCADA system in, and with carry out unidirectional data between the SCADA system and exchange, namely only obtain corresponding data from the SCADA system, and directly do not send the signal analysis result to the SCADA system.
3. realize the system that transformer station's wrong report remote signalling dispatching terminal filters according to claim 1, it is characterized in that,
There are electrical network static information and electrical network dynamic operation information in described data monitoring center from the data that the SCADA system obtains, and is sent to described data analysis center respectively;
Wherein, described electrical network static information comprises the topological relation information of describing the annexation between the electrical network primary equipment; Described electrical network dynamic operation information is included in when real-time remote measure and communication data change and obtains, and the switch changed position information of therefrom separating;
Described data analysis center as signal to be analyzed, uses relevant remote signalling telemetry and power network topology relation information as the subsidiary conditions of rule judgment each switch changed position information of newly receiving, comes the picked up signal analysis result by rule match.
4. as described in claim 3, realize the system that transformer station's wrong report remote signalling dispatching terminal filters, it is characterized in that,
Described system is provided with human-computer interaction device, can export demonstration to the analysis result of remote signals, can also provide respective interface to add external rules to support the user to described data analysis center.
5. as described in claim 3, realize the system that transformer station's wrong report remote signalling dispatching terminal filters, it is characterized in that,
In the rule base of described data analysis center, with repair apparatus and the remote signals that produces of charging equipment not, be defined as normal signal respectively;
In when examination, the real-time storehouse of described data analysis center by the SCADA system obtains the sign board type of equipment and identifies, and all regards the equipment that wherein has maintenance, ground connection, ad hoc inspection and repair attribute as repair apparatus;
Described data analysis center detects also in the identification topological relation, and the equipment that meets the following conditions simultaneously is charging equipment not: namely, the disconnecting link of each side of equipment is in the separating brake position, and each side of equipment all can not search the power supply point in the system.
6. as described in claim 3, realize the system that transformer station's wrong report remote signalling dispatching terminal filters, it is characterized in that,
In the rule base of described data analysis center, with the remote signals that meets the following conditions, be defined as normal signal respectively;
That is, recognize the switch trip item during examination of described data analysis center, with switch failure tripping operation item or with the simultaneous situation of switch events journal item under, judge that the switch trip signal of receiving is normal signal;
Or, recognize the divide-shut brake signal of switch during the examination of described data analysis center, received again simultaneously under the situation of protection actuating signal of switch corresponding device, judge that the divide-shut brake signal of the switch of receiving is normal signal.
7. as described in claim 3, realize the system that transformer station's wrong report remote signalling dispatching terminal filters, it is characterized in that,
In the rule base of described data analysis center, the remote signals with the switchgear of receiving the remote control item in advance produces is defined as normal signal;
Described data analysis center is when examination, the anti-school of the remote control of sense switch and remote control fill order, before the actuating signal of receiving switch, received the remote control item of this switch, think that then the action of this switch is based on the true operation of SCADA system remote control, judge that then the switch actuating signals of receiving is normal signal.
8. as described in claim 3, realize the system that transformer station's wrong report remote signalling dispatching terminal filters, it is characterized in that,
In the rule base of described data analysis center, correspondence is set in following situation correspondence in the rule of normal signal and false positive signal;
That is, described data analysis center is in when examination, and after receiving the switch sub-gate signal, the remote measurement value of obtaining corresponding device again from the SCADA system detects, and when the remote measurement value belongs in the null value scope of setting, judges that the switch sub-gate signal of receiving is normal signal;
It is outer and greater than zero condition that described data analysis center belongs to the null value scope of setting with the remote measurement value, the switch sub-gate signal of receiving as judgement is one of them reason of false positive signal, and need use other false positive signal rule that this switch sub-gate signal is verified simultaneously.
9. as described in claim 3, realize the system that transformer station's wrong report remote signalling dispatching terminal filters, it is characterized in that,
In the rule base of described data analysis center, with the remote signals that meets the following conditions, be defined as false positive signal respectively;
That is, described data analysis center is in when examination, and the setting-up time wide-ultra is crossed the switch actuating signals of setting operation number of times, and being judged as is the false positive signal that transmits repeatedly;
Or described data analysis center is receiving that the switch remote signals with factory's station displacement simultaneously surpasses under the situation of the upper limit, judges that the signal of receiving is false positive signal.
CN2013101644459A 2013-05-07 2013-05-07 System achieving substation misinformation remote signaling scheduling end filtration Pending CN103269124A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101644459A CN103269124A (en) 2013-05-07 2013-05-07 System achieving substation misinformation remote signaling scheduling end filtration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101644459A CN103269124A (en) 2013-05-07 2013-05-07 System achieving substation misinformation remote signaling scheduling end filtration

Publications (1)

Publication Number Publication Date
CN103269124A true CN103269124A (en) 2013-08-28

Family

ID=49012738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101644459A Pending CN103269124A (en) 2013-05-07 2013-05-07 System achieving substation misinformation remote signaling scheduling end filtration

Country Status (1)

Country Link
CN (1) CN103269124A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103731319A (en) * 2013-12-26 2014-04-16 国家电网公司 Remote control fault intelligent diagnosing method of distribution network dispatching station
CN103986240A (en) * 2014-05-29 2014-08-13 国网上海市电力公司 Power distribution real-time data validity analytical processing system and method
CN105099823A (en) * 2015-08-06 2015-11-25 江苏省电力公司苏州供电公司 Remote signaling system tester and remote signaling system test method based on remote signaling system tester
CN105554454A (en) * 2015-12-15 2016-05-04 成都交大光芒科技股份有限公司 Visual tele-control monitoring system and method for isolating switch
CN105759783A (en) * 2016-02-03 2016-07-13 中电和瑞科技有限公司 Data processing method and device
CN106775971A (en) * 2016-12-02 2017-05-31 杭州中天微系统有限公司 Data processing equipment
CN109271378A (en) * 2018-09-28 2019-01-25 四川能投云电科技有限公司 A method of filtering scheduling system signal is frequently alarmed
CN112821265A (en) * 2020-12-31 2021-05-18 广东电网有限责任公司 Method and device for automatically shielding and de-shielding signal for overhauling electrical equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006109634A (en) * 2004-10-06 2006-04-20 Nippon Telegr & Teleph Corp <Ntt> Electric appliance operation detector, power monitoring system, and apparatus, method, program, and recording medium for power monitoring
CN101989938A (en) * 2009-08-04 2011-03-23 上海市电力公司 Filtration system and method of mis-telecommand scheduling end of transformer substation
CN102768705A (en) * 2012-07-24 2012-11-07 杭州市电力局 IEC (International Electrotechnical Commission) 61968-based power distribution network model interoperation and functional verification method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006109634A (en) * 2004-10-06 2006-04-20 Nippon Telegr & Teleph Corp <Ntt> Electric appliance operation detector, power monitoring system, and apparatus, method, program, and recording medium for power monitoring
CN101989938A (en) * 2009-08-04 2011-03-23 上海市电力公司 Filtration system and method of mis-telecommand scheduling end of transformer substation
CN102768705A (en) * 2012-07-24 2012-11-07 杭州市电力局 IEC (International Electrotechnical Commission) 61968-based power distribution network model interoperation and functional verification method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103731319A (en) * 2013-12-26 2014-04-16 国家电网公司 Remote control fault intelligent diagnosing method of distribution network dispatching station
CN103986240A (en) * 2014-05-29 2014-08-13 国网上海市电力公司 Power distribution real-time data validity analytical processing system and method
CN103986240B (en) * 2014-05-29 2016-04-06 国网上海市电力公司 A kind of efficiency analysis method of distribution real time data efficiency analysis treatment system
CN105099823A (en) * 2015-08-06 2015-11-25 江苏省电力公司苏州供电公司 Remote signaling system tester and remote signaling system test method based on remote signaling system tester
CN105554454A (en) * 2015-12-15 2016-05-04 成都交大光芒科技股份有限公司 Visual tele-control monitoring system and method for isolating switch
CN105554454B (en) * 2015-12-15 2018-07-13 成都交大光芒科技股份有限公司 Disconnecting switch visualizes Remote monitor and control system and method
CN105759783A (en) * 2016-02-03 2016-07-13 中电和瑞科技有限公司 Data processing method and device
CN105759783B (en) * 2016-02-03 2018-09-07 中电和瑞科技有限公司 A kind of method and device for realizing data processing
CN106775971A (en) * 2016-12-02 2017-05-31 杭州中天微系统有限公司 Data processing equipment
CN106775971B (en) * 2016-12-02 2020-01-31 杭州中天微系统有限公司 Data processing apparatus
CN109271378A (en) * 2018-09-28 2019-01-25 四川能投云电科技有限公司 A method of filtering scheduling system signal is frequently alarmed
CN112821265A (en) * 2020-12-31 2021-05-18 广东电网有限责任公司 Method and device for automatically shielding and de-shielding signal for overhauling electrical equipment

Similar Documents

Publication Publication Date Title
CN103269124A (en) System achieving substation misinformation remote signaling scheduling end filtration
CN103236745A (en) Distinguishing method of misreported remote signaling and correct remote signaling of transformer substation
CN101989938A (en) Filtration system and method of mis-telecommand scheduling end of transformer substation
CN107069954B (en) Substation equipment cloud maintenance system and monitoring system
CN103823433B (en) Method for realizing relay protection equipment on-line monitoring by use of communication process analysis
CN107180314B (en) Operation and maintenance business model modeling method based on primary and secondary system incidence relation
CN109698555B (en) One-key remote inspection system and inspection method for unattended transformer substation
CN103200051B (en) Intelligent substation message emulating is tested and is associated message analysis system and method
CN109639477B (en) Secondary equipment online monitoring and analyzing system and method
CN102354175B (en) Remote I/O (input/output) control system of Modbus fieldbus DI-16-route monitor
CN103218695A (en) Secondary equipment intelligence state evaluation diagnostic system and method thereof
CN105471656A (en) Abstraction method specific to operation and maintenance information model of intelligent substation automation system
CN110456207A (en) A kind of intelligent low-pressure method for diagnosing faults of open air
CN102403798A (en) Intelligent automatic transformer district monitoring method and system based on GIS (geographical information system)
CN103926917A (en) Intelligent transformer substation master control device testing system and method
CN104459378B (en) A kind of intelligent substation method for diagnosing faults
CN105573283B (en) The foundation in substation equipment function association storehouse and the filter method of event correlation information group
CN110991037A (en) Intelligent substation test simulation system based on SCD
CN108053041A (en) Substation associates electrical secondary system anomalous identification and anti-error system and method under scene more
CN106300662A (en) The secondary device on-line monitoring and fault diagonosing system merged based on information physical
CN109581115B (en) Power distribution network low-voltage diagnosis system and diagnosis method
CN106709659A (en) LNG gas station equipment management system
CN101651361A (en) Integrated automation system of substation
CN204613374U (en) A kind of DC earthing pick-up unit of electric system and system
CN116545103A (en) Distribution network branch fault power failure hundred-second sensing method based on minimized acquisition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130828