CN103266769B - 一种球形拱顶盖的施工方法 - Google Patents
一种球形拱顶盖的施工方法 Download PDFInfo
- Publication number
- CN103266769B CN103266769B CN201310205862.3A CN201310205862A CN103266769B CN 103266769 B CN103266769 B CN 103266769B CN 201310205862 A CN201310205862 A CN 201310205862A CN 103266769 B CN103266769 B CN 103266769B
- Authority
- CN
- China
- Prior art keywords
- prefabricated section
- reinforcing bar
- anyhow
- prefabricated
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明涉及一种球形拱顶盖的施工方法,采用如下步骤:制作圆池墙;制作预制块;制作钢筋挂钩;安装预制块;浇筑混凝土;养护,其优点:球顶顶盖采用钢筋钩挂施工,不需任何支撑;施工简单、安全可靠;简化了施工工序,缩短了施工工期;降低了工程成本,提高了经济效益。
Description
技术领域
本发明涉及一种球形拱顶盖的施工方法。
背景技术
目前,圆形建筑拱顶一般采用混凝土现浇砼或预制件拼装的方法进行,但是上述方法均必须在拱顶下方建造拱架,装模,这种支模方法不仅工艺复杂、造价高、工期长,而且对较大空跨的圆形建筑无法实现拱顶,而且施工完毕,还需要进行拆模,因此,有必要对其进行改进。
发明内容
本发明所要解决的技术问题在于,提供一种球形拱顶盖的施工方法,具有施工简单,安全可靠,缩短施工工期等特点。
本发明是这样实现的,一种球形拱顶盖的施工方法,采用如下步骤:
1)制作圆池墙;
2)按照球形拱顶盖直径以及矢跨比,计算出球拱半径、拱高、拱弧长、预制高度、拱圈层数、预制块厚度和宽度;
3)依据步骤2)中的数据,制作预制块,且预制块的下口端设置有钢筋挂钩卡槽;
4)将不同拱圈的预制块按照顺序编号;
5)制作钢筋挂钩:所述钢筋挂钩包括横直杆、设在横直杆前端由横直杆向下弯折直角后成L形的弯钩和设在横直杆后端由横直杆向下弯折直角后形成的下脚杆;或者所述钢筋挂钩包括横直杆、设在横直杆前端的倒T形弯钩和设在横直杆后端由横直杆向下弯折直角后形成的下脚杆;
6)在圆池墙顶部现浇圈梁,并做好登脚斜面,同时预留钢筋挂钩孔眼;
7)在登脚斜面位置打素水泥浆,将第一圈的预制块凹面朝下,且预制块的下口贴合在素水泥浆上;同时将钢筋挂钩的成L形的弯钩或成倒T形的弯钩钩在第一圈预制块的上口,钢筋挂钩的下脚杆在预留钢筋挂钩孔眼内卡紧;依次序安装完第一圈的预制块;
8)接着安装第二圈的预制块:在第一圈的预制块上口位置打素水泥浆,将第二圈的预制块同样凹面朝下,且预制块的下口贴合在第一圈的预制块上口的素水泥浆上,同时将钢筋挂钩的成L形的弯钩或成倒T形的弯钩钩在第二圈的预制块上口,钢筋挂钩的下脚杆在第一圈预制块下口设置的钢筋挂钩卡槽内卡紧;依次序安装完第二圈的预制块;
9)依据步骤8),安装其他拱圈的预制块;
10)浇筑混凝土;
11)养护。
所述的圆池墙采用预制模块内外支模,内外模之间浇筑现浇砼一次成型。
所述的预制模块内模与外模之间的浇筑层中设置有圈钢筋和竖钢筋。
所述的预制块材料中水泥、砂石、石头的直径不超过20mm,砂含泥量不超过3%,且水灰比不超过0.55。
拱圈合拢时安装的预制块其宽度可采用切割机设备修正。
每安装完一个拱圈,校准拱半径,使其误差不超过5mm。
与现有技术相比较,本发明的球形拱顶盖采用预制块悬挂支模,不需要任何支持,而且,预制块模具与现浇砼层形成一体的整体,不需要拆模。本发明的有益效果是:
1、球顶顶盖采用钢筋钩挂施工,不需任何支撑;
2、施工简单、安全可靠;
3、简化了施工工序,缩短了施工工期;
4、降低了工程成本,提高了经济效益。
附图说明
图1是本发明拱顶盖拼装的平面图。
图2是图1中A处局部放大图。
图3是钢筋挂钩的结构示意图。
图4是本发明的拱顶盖拼装的剖面图。
图5是图4中B处局部放大图。
图6是本发明预制块的结构示意图。
图7是装好模板后浇注现浇砼的结构示意图。
具体实施方式
下结合附图及实施例,对本发明作进一步详细说明。
如图1至6所示,在圆池墙顶部现浇圈梁,并做好登脚斜面4,同时预留钢筋挂钩孔眼;在登脚斜面4位置打素水泥浆,将第一圈的预制块1凹面朝下,且预制块1的下口贴合在素水泥浆上;同时将钢筋挂钩钩3在预制块的上口,钢筋挂钩3下脚杆在预留钢筋挂钩孔眼内卡紧;依次序安装完第一圈的预制块;接着安装第二圈的预制块:在第一圈的预制块1上口位置打素水泥浆,将第二圈的预制块1同样凹面朝下,且预制块的下口贴合在第一圈的预制块上口的素水泥浆上,同时将钢筋挂钩3钩在第二圈的预制块上口,钢筋挂钩3下脚杆在第一圈预制块下口设置的钢筋挂钩卡槽2内卡紧;依次序安装完第二圈的预制块1;接着采用相同的方法拼装其他的拱圈预制块1;拼装玩模板后直接浇筑混凝土;不需要拆模,直接养护成型。
如图7所示,所述的圆池墙采用预制模块内外支模,内外模之间浇筑现浇砼一次成型;所述的预制模块内模与外模之间的浇筑层中设置有圈钢筋和竖钢筋。
Claims (6)
1.一种球形拱顶盖的施工方法,其特征在于采用如下步骤:
1)制作圆池墙;
2)按照球形拱顶盖直径以及矢跨比,计算出球拱半径、拱高、拱弧长、预制高度、拱圈层数、预制块厚度和宽度;
3)依据步骤2)中的数据,制作预制块,且预制块的下口端设置有钢筋挂钩卡槽;
4)将不同拱圈的预制块按照顺序编号;
5)制作钢筋挂钩:所述钢筋挂钩包括横直杆、设在横直杆前端由横直杆向下弯折直角后成L形的弯钩和设在横直杆后端由横直杆向下弯折直角后形成的下脚杆;或者所述钢筋挂钩包括横直杆、设在横直杆前端的倒T形弯钩和设在横直杆后端由横直杆向下弯折直角后形成的下脚杆;
6)在圆池墙顶部现浇圈梁,并做好登脚斜面,同时预留钢筋挂钩孔眼;
7)在登脚斜面位置打素水泥浆,将第一圈的预制块凹面朝下,且预制块的下口贴合在素水泥浆上;同时将钢筋挂钩的成L形的弯钩或成倒T形的弯钩钩在第一圈预制块的上口,钢筋挂钩的下脚杆在预留钢筋挂钩孔眼内卡紧;依次序安装完第一圈的预制块;
8)接着安装第二圈的预制块:在第一圈的预制块上口位置打素水泥浆,将第二圈的预制块同样凹面朝下,且预制块的下口贴合在第一圈的预制块上口的素水泥浆上,同时将钢筋挂钩的成L形的弯钩或成倒T形的弯钩钩在第二圈的预制块上口,钢筋挂钩的下脚杆在第一圈预制块下口设置的钢筋挂钩卡槽内卡紧;依次序安装完第二圈的预制块;
9)依据步骤8),安装其他拱圈的预制块;
10)浇筑混凝土;
11)养护。
2.根据权利要求1所述的球形拱顶盖的施工方法,其特征在于所述的圆池墙采用预制模块内外支模,内外模之间浇筑现浇砼一次成型。
3.根据权利要求2所述的球形拱顶盖的施工方法,其特征在于所述的预制模块内模与外模之间的浇筑层中设置有圈钢筋和竖钢筋。
4.根据权利要求1所述的球形拱顶盖的施工方法,其特征在于所述的预制块材料中水泥、砂石、石头的直径不超过20mm,砂含泥量不超过3%,且水灰比不超过0.55。
5.根据权利要求1所述的球形拱顶盖的施工方法,其特征在于拱圈合拢时安装的预制块其宽度可采用切割机设备修正。
6.根据权利要求1所述的球形拱顶盖的施工方法,其特征在于每安装完一个拱圈,校准拱半径,使其误差不超过5mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310205862.3A CN103266769B (zh) | 2013-05-29 | 2013-05-29 | 一种球形拱顶盖的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310205862.3A CN103266769B (zh) | 2013-05-29 | 2013-05-29 | 一种球形拱顶盖的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103266769A CN103266769A (zh) | 2013-08-28 |
CN103266769B true CN103266769B (zh) | 2015-11-11 |
Family
ID=49010423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310205862.3A Expired - Fee Related CN103266769B (zh) | 2013-05-29 | 2013-05-29 | 一种球形拱顶盖的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103266769B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107418890A (zh) * | 2016-05-24 | 2017-12-01 | 罗显平 | 一种闭环曲线坑道式沼气池及其池盖浇筑方法 |
JP7193503B2 (ja) * | 2020-07-13 | 2022-12-20 | 博 桜井 | 食品加熱用窯の天井部分の基礎構造体及びその構築方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2228379A5 (en) * | 1973-05-04 | 1974-11-29 | Jauffret Gilbert | Concrete cylindrical-based spherical building - is formed with pneumatic mould, circular base-sections arc-shaped gangway |
GB2144479A (en) * | 1983-07-18 | 1985-03-06 | Cmgm Pty Ltd | The casting of concrete shells |
CN101225718A (zh) * | 2008-01-30 | 2008-07-23 | 重庆三峰卡万塔环境产业有限公司 | 钢筋混凝土烟囱的施工方法 |
CN101261082A (zh) * | 2007-09-11 | 2008-09-10 | 李朝侠 | 炼锌矿热电炉球形顶的整体浇注及养护方法 |
CN101838957A (zh) * | 2010-05-07 | 2010-09-22 | 柏松平 | 整体式t形外悬臂道路及其施工方法 |
WO2010095968A3 (en) * | 2009-02-19 | 2010-12-02 | Milenko Milinkovic | Prefabricated construction structure which is built from prefabricated ribbed ferocement elements by sandwich type which are effused in moulds |
CN101929245A (zh) * | 2010-08-19 | 2010-12-29 | 江苏华江建筑工程有限公司 | 薄腹梁立式施工方法 |
CN101956458A (zh) * | 2010-11-05 | 2011-01-26 | 中国建筑第八工程局有限公司 | 超长超高单面清水饰面混凝土墙施工方法 |
CN102182315A (zh) * | 2011-03-31 | 2011-09-14 | 中广核工程有限公司 | 一种核电站全天候施工方法及施工装置 |
CN102535844A (zh) * | 2012-02-10 | 2012-07-04 | 中国建筑第八工程局有限公司 | 球形曲面不锈钢幕墙施工工法 |
-
2013
- 2013-05-29 CN CN201310205862.3A patent/CN103266769B/zh not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2228379A5 (en) * | 1973-05-04 | 1974-11-29 | Jauffret Gilbert | Concrete cylindrical-based spherical building - is formed with pneumatic mould, circular base-sections arc-shaped gangway |
GB2144479A (en) * | 1983-07-18 | 1985-03-06 | Cmgm Pty Ltd | The casting of concrete shells |
CN101261082A (zh) * | 2007-09-11 | 2008-09-10 | 李朝侠 | 炼锌矿热电炉球形顶的整体浇注及养护方法 |
CN101225718A (zh) * | 2008-01-30 | 2008-07-23 | 重庆三峰卡万塔环境产业有限公司 | 钢筋混凝土烟囱的施工方法 |
WO2010095968A3 (en) * | 2009-02-19 | 2010-12-02 | Milenko Milinkovic | Prefabricated construction structure which is built from prefabricated ribbed ferocement elements by sandwich type which are effused in moulds |
CN101838957A (zh) * | 2010-05-07 | 2010-09-22 | 柏松平 | 整体式t形外悬臂道路及其施工方法 |
CN101929245A (zh) * | 2010-08-19 | 2010-12-29 | 江苏华江建筑工程有限公司 | 薄腹梁立式施工方法 |
CN101956458A (zh) * | 2010-11-05 | 2011-01-26 | 中国建筑第八工程局有限公司 | 超长超高单面清水饰面混凝土墙施工方法 |
CN102182315A (zh) * | 2011-03-31 | 2011-09-14 | 中广核工程有限公司 | 一种核电站全天候施工方法及施工装置 |
CN102535844A (zh) * | 2012-02-10 | 2012-07-04 | 中国建筑第八工程局有限公司 | 球形曲面不锈钢幕墙施工工法 |
Also Published As
Publication number | Publication date |
---|---|
CN103266769A (zh) | 2013-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013530B (zh) | 基于3d打印的混凝土剪力墙的配筋结构 | |
CN103770218B (zh) | 大型标准构件的节段匹配预制方法 | |
CN106113230B (zh) | 用于梯段预制的非定型、可周转模板体系及其施工方法 | |
CN105386517A (zh) | 一种预制飘窗板及其安装方法 | |
CN103266769B (zh) | 一种球形拱顶盖的施工方法 | |
CN104727552A (zh) | 一种在预制剪力墙上预留给水管槽的施工方法 | |
CN105625187A (zh) | 一种用于大截面斜柱的混凝土的施工方法 | |
CN104727339B (zh) | 电力设备基础两步式施工方法 | |
CN106284428A (zh) | 一种建筑结构后浇带的混凝土立柱支撑方法 | |
CN204098489U (zh) | 一种制作混凝土现浇楼板预留孔的模具 | |
CN102383371A (zh) | 立交桥混凝土外挂悬臂式花坛及其施工方法 | |
CN105525749A (zh) | 变电站事故油池大模板浇筑施工方法 | |
CN105064500A (zh) | 一种阳台梁板内侧填充墙体与主体结构整体浇筑施工方法 | |
CN104947853B (zh) | 一种内置支架式现浇钢筋混凝土柱子及施工方法 | |
CN209703708U (zh) | 一种用于预制构件预埋吊钉的定位装置 | |
CN207526118U (zh) | 用于预埋及封堵放线孔的放线孔模具 | |
CN103266768B (zh) | 球形拱顶盖施工用支模方法 | |
CN106884664B (zh) | 隧道仰拱模板及隧道仰拱填充快速施工方法 | |
CN104911999A (zh) | 深埋锚施工方法 | |
CN103921347A (zh) | 预制t梁肋板钢筋、预应力管道固定抽插式安装模架 | |
CN104908150B (zh) | 一种管道井制作模板及基于工厂化生产管道井的方法 | |
CN208323769U (zh) | 一种装配式汽车箱通用预制组件 | |
JP5290714B2 (ja) | ダムの導流壁の波返し部用プレキャストコンクリート部材及びその製造方法 | |
CN103161311A (zh) | 大口径钢筋混凝土管道横穿桥台的施工方法 | |
JP5574338B2 (ja) | 基礎梁のサイトプレキャスト工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151111 Termination date: 20180529 |
|
CF01 | Termination of patent right due to non-payment of annual fee |