CN103266548B - Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof - Google Patents

Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof Download PDF

Info

Publication number
CN103266548B
CN103266548B CN201310220765.1A CN201310220765A CN103266548B CN 103266548 B CN103266548 B CN 103266548B CN 201310220765 A CN201310220765 A CN 201310220765A CN 103266548 B CN103266548 B CN 103266548B
Authority
CN
China
Prior art keywords
solidification
layer
concrete
stiffened edge
macadam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310220765.1A
Other languages
Chinese (zh)
Other versions
CN103266548A (en
Inventor
刘春才
王理忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Orangestone Hardscape Co ltd
Original Assignee
Scape Orange Stone Ecological Art Ground Science And Technology Co Ltd In Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scape Orange Stone Ecological Art Ground Science And Technology Co Ltd In Beijing filed Critical Scape Orange Stone Ecological Art Ground Science And Technology Co Ltd In Beijing
Priority to CN201310220765.1A priority Critical patent/CN103266548B/en
Publication of CN103266548A publication Critical patent/CN103266548A/en
Application granted granted Critical
Publication of CN103266548B publication Critical patent/CN103266548B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a scatteredly paved gravel solidified ground surface structure and a manufacturing method thereof. The ground surface structure comprises thin wood plates which are distributed in a latticed mode, reinforcing edges and bearing ground surfaces, wherein the reinforcing edges are surrounded at the outer sides of the whole lattices of the thin wood plates; the bearing ground surfaces are filled in lattices formed by the thin wood plates; the bearing ground surfaces comprise solidified gravel layers and concrete layers which are sequentially arrayed from top to bottom; hole cavities which run through the concrete layers and the solidified gravel layers are formed on the bearing ground surfaces; the surfaces of the solidified gravel layers are covered with gravel packing, and is filled into the hole cavities; and the surface of the gravel packing is level with the surfaces of the reinforcing edges. The thin wood plate lattices provided by the invention can be of various shapes; in the embodiment, square lattices are adopted for the convenience of understanding, besides the square lattices, the thin wood plate lattices can be manufactured to be other polygons according to the sizes of the thin wood plates or the actual requirements of customers.

Description

A kind of loose paving rubble solidification earth construction and preparation method thereof
Technical field
Invention belongs to building material technical field, is specifically related to a kind of loose paving rubble solidification earth construction and preparation method thereof.
Background technology
The sight spot of carrying out tourism development at present in some ruins and cultural relics and historic sites is a lot, and in these traces, some underground historical relic is excavated out not yet completely, and even the embedding location of some historical relics is not also determined.After more early stage historic sites are developed to tourist attractions, these ground, historic site adopt simple concrete to form usually.Inconvenience is very brought to the detection in later stage and excavation historical relics in rigid pavement, and rigid pavement is the structure of sealing, waterproof airtight, change original ground surface environment, and the historical relics of underground are when external environment flip-flop, be subject to irremediable destruction because of environment change possibly.The road surface of loose paving rubble was selected afterwards in the project of ruins, rubble fall apart the style in floor file face and ruins project style closely, the less stable in floor file face but rubble falls apart, is travelling through long vehicle, easily forms wheel and is absorbed in and the problem such as ground aggregate slip.
Summary of the invention
Hindering later stage cultural relic excavation exploitation to make up road surface, above-mentioned traces, changing ground surface environment brings destruction defect to historical relic, the present invention proposes a kind of loose paving rubble solidification earth construction and preparation method thereof.
The technical scheme of this structure is: a kind of loose paving rubble solidification earth construction, described earth construction comprises the veneer distributed as net shape, be enclosed in the stiffened edge outside veneer integral grid and be filled in the carrying ground of the grid inside that veneer is formed, described carrying ground comprises the solidification macadam and layer of concrete that are arranged in order from top to bottom, carrying ground has the vestibule running through layer of concrete and solidification macadam, solidification macadam surface coverage has crushed rock filler, crushed rock filler covers solidification macadam surface and is filled in vestibule, and the surface of crushed rock filler flushes with stiffened edge surface.In the technical program, (1) road surface is separated into multiple separate carrying ground by veneer, at later stage cultural relic excavation or when exploring, using veneer as line of cut, along veneer, this carrying ground can be cut out separately, cutting panels of wood step is simple and convenient, can not concrete be cut to, conveniently the excavation of later stage underground historical relic is explored, and the veneer later stage may degenerate, need not cut and can take out separately certain block carrying ground, not affect the exploitation in later stage; (2) road surface has vestibule, and fill rubble in vestibule, rubble is the structure of water-permeable and air permeable, in use ensures the consistent of ground surface environment, prevents underground historical relic because ground environment change causes damaging; (3) this ground structure periphery is provided with stiffened edge; ensure that rubble can not spill outside stiffened edge; protection external environment; vestibule top is fixed with solidification macadam; solidification macadam outward appearance and crushed rock filler is close, also ensure that to have at the crushed rock filler on road surface simultaneously and slides that to expose ground outward appearance when macadam is solidified in below consistent a little playing carrying effect.
Described stiffened edge comprises stiffened edge layer of concrete and stiffened edge solidification macadam, stiffened edge layer of concrete to be centered around outside veneer and to maintain an equal level with layer of concrete height, and stiffened edge solidification macadam is fixed on above stiffened edge layer of concrete and upper surface is fair with filling surface.In the technical program, stiffened edge solidification macadam outward appearance and crushed rock filler is close, ensures that road surface is overall consistent, and solidifies rubble surface irregularity, add frictional resistance, prevent crushed rock filler from sliding into outside stiffened edge further.
Described stiffened edge layer of concrete, layer of concrete material are identical, and stiffened edge solidification macadam, solidification macadam material are identical.In the technical program, adopt same material to ensure the simple and direct of construction, and same material outward appearance is consistent, ensures the attractive in appearance of road surface.
Described vestibule top is interconnected.Vestibule is interconnected between top, makes overall road surface seem more neat and artistic.
Also leveling layer and basic unit is equipped with successively below carrying ground, stiffened edge and veneer.In construction, lay leveling layer and basic unit according to actual needs, ensure that stablizing of road structure is smooth.
A laying method for above-mentioned loose paving rubble solidification earth construction, the method comprises the following steps:
(1) basic unit is laid;
(2) fixing peripheral template in basic unit;
(3) leveling layer is laid by the basic unit inside template;
(4) veneer and mould is laid, leveling layer puts mould, multiple arrangement of molds is placed on leveling layer, between adjacent mould, fix veneer simultaneously, after treating die layout, fix row's veneer again in mould outermost, make the veneer between the veneer in outside and mould form network, and between template and outside veneer, leave the space of pouring into a mould stiffened edge;
(5) lay layer of concrete and stiffened edge layer of concrete, in the template laid and mould, fluid concrete forms layer of concrete and stiffened edge layer of concrete, and layer of concrete is identical with stiffened edge layer of concrete height, all lower than die surface 3cm;
(6) solidification macadam and stiffened edge solidification macadam is laid, lay solidification macadam and stiffened edge solidification macadam respectively at layer of concrete and stiffened edge concrete surface, and stiffened edge solidification Ballast Layer Height and template is fair and higher than solidifying macadam 3cm;
(7) take out mould, after above each layer all coagulation forming, take out mould and template, form vestibule type road surface preliminary structure;
(8) crushed rock filler is filled, after until above-mentioned each layer, drying reaches intensity all, fill in solidification macadam surface and vestibule and compacting rubble formation crushed rock filler, and it is identical to make crushed rock filler surface and stiffened edge solidify Ballast Layer Height, completes the laying of earth construction.
In said method, described mould scribbles release agent before laying.In the technical program, adopt release agent to be convenient to later stage mould and template taking-up, avoid road surface to be damaged by delivery before finish-drying.
The height of described veneer is identical with the height of mould, and lower than the height of template.In the technical program, after construction completes, veneer height is lower than stiffened edge height, what ensure that road surface manifests is crushed rock filler, veneer length and width is identical with mould, ensures that road surface can directly be cut open along veneer by the later stage, avoids destruction to change solidifying soil layer and solidification macadam.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram of one embodiment of the present invention;
Fig. 2 is the cross-sectional schematic of the earth construction in the present invention's veneer grid;
In figure, 1, veneer; 2, stiffened edge; 21, stiffened edge layer of concrete; 22, stiffened edge solidification macadam; 3, ground is carried; 31, macadam is solidified; 32, layer of concrete; 33, vestibule; 34, crushed rock filler; 4, leveling layer; 5, basic unit.
Detailed description of the invention
For ease of the understanding of technical solution of the present invention, be introduced below in conjunction with concrete embodiment.As Fig. 1, a kind of loose paving rubble solidification earth construction, described earth construction comprises the veneer 1 distributed as net shape, be enclosed in the stiffened edge 2 outside veneer integral grid and be filled in the carrying ground 3 of the grid inside that veneer is formed, described carrying ground comprises the solidification macadam 31 and layer of concrete 32 that are arranged in order from top to bottom, carrying ground has the vestibule 33 running through layer of concrete and solidification macadam, solidification macadam surface coverage has crushed rock filler 34, crushed rock filler covers solidification macadam surface and is filled in vestibule, and the surface of crushed rock filler flushes with stiffened edge surface.In the present embodiment, described stiffened edge comprises stiffened edge layer of concrete 21 and stiffened edge solidification macadam 22, stiffened edge layer of concrete to be centered around outside veneer and to maintain an equal level with layer of concrete height, and stiffened edge solidification macadam is fixed on above stiffened edge layer of concrete and upper surface is fair with filling surface.Described stiffened edge layer of concrete, layer of concrete material are identical, and stiffened edge solidification macadam, solidification macadam material are identical.Described vestibule top is interconnected.Leveling layer 4 and basic unit 5 is also equipped with successively below carrying ground, stiffened edge and veneer.
A laying method for above-mentioned loose paving rubble solidification earth construction, the method comprises the following steps:
(1) basic unit is laid;
(2) fixing peripheral template in basic unit;
(3) leveling layer is laid by the basic unit inside template;
(4) veneer and mould is laid, leveling layer puts mould, multiple arrangement of molds is placed on leveling layer, between adjacent mould, fix veneer simultaneously, after treating die layout, fix row's veneer again in mould outermost, make the veneer between the veneer in outside and mould form network, and between template and outside veneer, leave the space of pouring into a mould stiffened edge;
(5) lay layer of concrete and stiffened edge layer of concrete, in the template laid and mould, fluid concrete forms layer of concrete and stiffened edge layer of concrete, and layer of concrete is identical with stiffened edge layer of concrete height, all lower than die surface 3cm;
(6) solidification macadam and stiffened edge solidification macadam is laid, lay solidification macadam and stiffened edge solidification macadam respectively at layer of concrete and stiffened edge concrete surface, and stiffened edge solidification Ballast Layer Height and template is fair and higher than solidifying macadam 3cm;
(7) take out mould, after above each layer all coagulation forming, take out mould and template, form vestibule type road surface preliminary structure;
(8) crushed rock filler is filled, after until above-mentioned each layer, drying reaches intensity all, fill in solidification macadam surface and vestibule and compacting rubble formation crushed rock filler, and it is identical to make crushed rock filler surface and stiffened edge solidify Ballast Layer Height, completes the laying of earth construction.
In laying construction, mould scribbles release agent before laying.The height of veneer is identical with the height of mould, and lower than the height of template.When laying, veneer is placed on leveling layer together with mould, maintains an equal level below veneer with below mould, and top and die top maintain an equal level.
Veneer grid of the present invention as various shape, can adopt square net for convenience of understanding in the present embodiment, except square net, can also make other polygons according to veneer size or client's actual needs.
In the present invention, basic unit adopts graded sand and stone/sandy gravel level rubble/graded broken stone compacting to form, and leveling layer adopts medium coarse sand to lay and forms, and ensures its air-and water-permeable.
The above; for better case study on implementation of the present invention; not the present invention is imposed any restrictions, every above embodiment is done according to the technology of the present invention essence any simple modification, change and equivalent structure change, all still belong in the protection domain of technical solution of the present invention.

Claims (8)

1. a loose paving rubble solidification earth construction, it is characterized in that, described earth construction comprises the veneer (1) distributed as net shape, be enclosed in the stiffened edge (2) outside veneer integral grid and be filled in the carrying ground (3) of the grid inside that veneer is formed, described carrying ground comprises the solidification macadam (31) and layer of concrete (32) that are arranged in order from top to bottom, carrying ground has the vestibule (33) running through layer of concrete and solidification macadam, solidification macadam surface coverage has crushed rock filler (34), crushed rock filler covers solidification macadam surface and is filled in vestibule, and the surface of crushed rock filler flushes with stiffened edge surface.
2. loose paving rubble solidification earth construction according to claim 1, it is characterized in that, described stiffened edge comprises stiffened edge layer of concrete (21) and stiffened edge solidification macadam (22), stiffened edge layer of concrete to be centered around outside veneer and to maintain an equal level with layer of concrete height, and stiffened edge solidification macadam is fixed on above stiffened edge layer of concrete and upper surface is fair with filling surface.
3. loose paving rubble solidification earth construction according to claim 1, it is characterized in that, described stiffened edge layer of concrete, layer of concrete material are identical, and stiffened edge solidification macadam, solidification macadam material are identical.
4. loose paving rubble solidification earth construction according to claim 1, it is characterized in that, described vestibule top is interconnected.
5. loose paving rubble solidification earth construction according to claim 1, is characterized in that, below carrying ground, stiffened edge and veneer, be also equipped with leveling layer (4) and basic unit (5) successively.
6. a laying method for loose paving rubble solidification earth construction described in claim 1, it is characterized in that, the method comprises the following steps:
(1) basic unit is laid;
(2) fixing peripheral template in basic unit;
(3) leveling layer is laid by the basic unit inside template;
(4) veneer and mould is laid, leveling layer puts mould, multiple arrangement of molds is placed on leveling layer, between adjacent mould, fix veneer simultaneously, after treating die layout, fix row's veneer again in mould outermost, make the veneer between the veneer in outside and mould form network, and between template and outside veneer, leave the space of pouring into a mould stiffened edge;
(5) lay layer of concrete and stiffened edge layer of concrete, in the template laid and mould, fluid concrete forms layer of concrete and stiffened edge layer of concrete, and layer of concrete is identical with stiffened edge layer of concrete height, all lower than die surface 3cm;
(6) solidification macadam and stiffened edge solidification macadam is laid, lay solidification macadam and stiffened edge solidification macadam respectively at layer of concrete and stiffened edge concrete surface, and stiffened edge solidification Ballast Layer Height and template is fair and higher than solidifying macadam 3cm;
(7) take out mould, after above each layer all coagulation forming, take out mould and template, form vestibule type road surface preliminary structure;
(8) crushed rock filler is filled, after until above-mentioned each layer, drying reaches intensity all, fill in solidification macadam surface and vestibule and compacting rubble formation crushed rock filler, and it is identical to make crushed rock filler surface and stiffened edge solidify Ballast Layer Height, completes the laying of earth construction.
7. the laying method of loose paving rubble solidification earth construction according to claim 6, it is characterized in that, described mould scribbles release agent before laying.
8. loose paving rubble solidification earth construction laying method according to claim 6, it is characterized in that, the height of described veneer is identical with the height of mould, and lower than the height of template.
CN201310220765.1A 2013-06-05 2013-06-05 Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof Active CN103266548B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310220765.1A CN103266548B (en) 2013-06-05 2013-06-05 Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310220765.1A CN103266548B (en) 2013-06-05 2013-06-05 Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN103266548A CN103266548A (en) 2013-08-28
CN103266548B true CN103266548B (en) 2015-07-15

Family

ID=49010202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310220765.1A Active CN103266548B (en) 2013-06-05 2013-06-05 Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN103266548B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030653B (en) * 2020-07-13 2021-11-02 中国港湾工程有限责任公司 Cement stabilized macadam construction process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3802790A (en) * 1970-03-25 1974-04-09 J Blackburn Methods for producing pavement-like sites
CN1171475A (en) * 1997-06-24 1998-01-28 王兴飞 Antislip colour coverplate of grund stone for protecting tree and its manufacture method
US20080113161A1 (en) * 2006-11-13 2008-05-15 Bomanite Corporation Former for pavement-like sites, method of making same, method of using same, and resulting pavement-like site
CN101418540A (en) * 2008-12-11 2009-04-29 周水林 Construction method of polyethylene grass planting land
CN102296511A (en) * 2011-07-20 2011-12-28 北京中景橙石建筑科技有限公司 Cellular permeable concrete ground structure for grass growing and production method thereof
CN203295916U (en) * 2013-06-05 2013-11-20 北京中景橙石建筑科技有限公司 Scattered broken stone cured road surface structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3802790A (en) * 1970-03-25 1974-04-09 J Blackburn Methods for producing pavement-like sites
CN1171475A (en) * 1997-06-24 1998-01-28 王兴飞 Antislip colour coverplate of grund stone for protecting tree and its manufacture method
US20080113161A1 (en) * 2006-11-13 2008-05-15 Bomanite Corporation Former for pavement-like sites, method of making same, method of using same, and resulting pavement-like site
CN101418540A (en) * 2008-12-11 2009-04-29 周水林 Construction method of polyethylene grass planting land
CN102296511A (en) * 2011-07-20 2011-12-28 北京中景橙石建筑科技有限公司 Cellular permeable concrete ground structure for grass growing and production method thereof
CN203295916U (en) * 2013-06-05 2013-11-20 北京中景橙石建筑科技有限公司 Scattered broken stone cured road surface structure

Also Published As

Publication number Publication date
CN103266548A (en) 2013-08-28

Similar Documents

Publication Publication Date Title
CN104264557B (en) One is partly filled out and is partly dug ecological road structure and construction method
CN105297571B (en) A kind of mud stone filled-up ground structure and its construction method
CN203212964U (en) Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment
CN206143577U (en) Ecological garden view road that permeates water
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN106049217A (en) Assembly type permeable pavement paving c, block bodies and paving structure
CN206828898U (en) A kind of roadbed for filling high liquid limit soil
CN103343502A (en) Road construction method and road
CN206438358U (en) A kind of highway soft soil widening of subgrade ruggedized construction
CN107100047A (en) Suitable for the rock salt bittern road structure and construction method in playa area
CN110946036A (en) Laying structure and method for planting soil of urban green land street trees
CN103266548B (en) Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof
CN206800092U (en) The soft base combined type of coastal tidal, which is changed, fills out structure and Roadbed by offshore soft clay
KR101019181B1 (en) Structure of pavement using road block
CN105297572A (en) Permafrost fill construction method
CN203295916U (en) Scattered broken stone cured road surface structure
KR20110100805A (en) Pavement road including a plurality of water-permeable layers and water-bearing layers and pavement method of the road
CN213173170U (en) Highway gangue roadbed structure
CN108004865A (en) Based on the air brick and ventilating layer embankment for strengthening forced convection cooling-down effect
CN211446421U (en) Structure for controlling settlement of high-liquid limit soil high-fill roadbed
CN103898824B (en) The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board
CN208777096U (en) Based on the air brick and ventilating layer embankment for strengthening forced convection cooling effect
RU2516603C1 (en) Road structure
CN207227880U (en) A kind of cheuch phase weak soil combined type, which is changed, fills out structure and cheuch is mutually soft soil roadbed
CN206680982U (en) The Treatment of Expansive Soil Embankment structure that the improvement of cored method is reinforced

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: BEIJING ORANGESTONE ECOLOGICAL ART GROUP TECHNOLOG

Free format text: FORMER OWNER: BEIJING ZHONGJING ORANGE STONE CONSTRUCTION TECHNOLOGY CO., LTD.

Effective date: 20150608

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Chuncai

Inventor after: Wang Lizhong

Inventor before: Wang Lizhong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG LIZHONG TO: LIU CHUNCAI WANG LIZHONG

TA01 Transfer of patent application right

Effective date of registration: 20150608

Address after: 100070, No. 5, No. two, No. 188, South Fourth Ring Road, Beijing, Fengtai District, building 6 (Park)

Applicant after: BEIJING ORANGESTONE ECOLOGICAL ART GROUND TECHNOLOGY Co.,Ltd.

Address before: 100070, No. five, No. two, No. 188, South Fourth Ring Road, Beijing, Fengtai District, China, 6 floors

Applicant before: ORANGESTONE CONSTRUCTION TECHNOLOGY Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 100070, No. 5, No. 2, No. 188, South Fourth Ring Road, Beijing, Fengtai District, building 6 (Park)

Patentee after: BEIJING ORANGESTONE HARDSCAPE CO.,LTD.

Address before: 100070, No. 5, No. two, No. 188, South Fourth Ring Road, Beijing, Fengtai District, building 6 (Park)

Patentee before: BEIJING ORANGESTONE ECOLOGICAL ART GROUND TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Scatteredly paved gravel solidified ground surface structure and manufacturing method thereof

Effective date of registration: 20181030

Granted publication date: 20150715

Pledgee: China Merchants Bank Limited by Share Ltd. Beijing branch

Pledgor: BEIJING ORANGESTONE HARDSCAPE CO.,LTD.

Registration number: 2018990001013

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221018

Granted publication date: 20150715

Pledgee: China Merchants Bank Limited by Share Ltd. Beijing branch

Pledgor: BEIJING ORANGESTONE HARDSCAPE CO.,LTD.

Registration number: 2018990001013

PC01 Cancellation of the registration of the contract for pledge of patent right