CN103256923A - BIM (Building Information Modeling)-based surveying, mapping and lofting system - Google Patents

BIM (Building Information Modeling)-based surveying, mapping and lofting system Download PDF

Info

Publication number
CN103256923A
CN103256923A CN2013101322099A CN201310132209A CN103256923A CN 103256923 A CN103256923 A CN 103256923A CN 2013101322099 A CN2013101322099 A CN 2013101322099A CN 201310132209 A CN201310132209 A CN 201310132209A CN 103256923 A CN103256923 A CN 103256923A
Authority
CN
China
Prior art keywords
mapping
bim
terminal
electro
control unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101322099A
Other languages
Chinese (zh)
Inventor
邢磊
于晓明
赵民琪
陆兰馨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SHANGAN M&E DESIGN OFFICE CO Ltd
Original Assignee
SHANGHAI SHANGAN M&E DESIGN OFFICE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SHANGAN M&E DESIGN OFFICE CO Ltd filed Critical SHANGHAI SHANGAN M&E DESIGN OFFICE CO Ltd
Priority to CN2013101322099A priority Critical patent/CN103256923A/en
Publication of CN103256923A publication Critical patent/CN103256923A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The invention relates to a BIM-based surveying, mapping and lofting system. The system comprises a processor, a BIM data storage unit, a displayer, a terminal controller and a surveying and mapping terminal, wherein the processor is respectively connected with the BIM data storage unit, the displayer and the terminal controller, and the surveying and mapping terminal is connected with the terminal controller. In comparison with the prior art, the system provided by the invention has the advantages that the error rate of a project is reduced, the accuracy, reliability and high efficiency of construction operations are improved, the overall construction cost is lowered, and guarantees are provided for deepening of electromechanical pipelines.

Description

Mapping setting-out system based on BIM
Technical field
The present invention relates to a kind of mapping setting-out system, especially relate to a kind of mapping setting-out system based on BIM.
Background technology
In building operation project implementation process, whether the enforcement degree of mapping setting-out can carry out decisive role smoothly to whole project.Accurately, whether careful mapping setting-out work not only is related to an engineering can be smoothly by the figure construction, but also provides important techniques to guarantee to construction quality, for work such as quality check provide ways and means.
Along with the progress of society and carrying out of green construction, the on-the-spot backguy setting-out of traditional workman can't have been satisfied the social demand of high speed development fully.Moreover, situation such as traditional mapping setting-out needs a large amount of manually surveying and drawing at the scene and data statistics, thereby causes installation procedure, working interface confusion, and engineering efficient is lower.In addition, have deviation unavoidably in the dynamo-electric building structure construction that be installed early stage and the design drawing, deviation takes care of the pence, and gently then increases installation difficulty, and is heavy then can't carry out the electromechanics installation by figure.
Summary of the invention
Purpose of the present invention is exactly to provide a kind of mapping setting-out system based on BIM for the defective that overcomes above-mentioned prior art existence.
Purpose of the present invention can be achieved through the following technical solutions:
A kind of mapping setting-out system based on BIM, comprise processor, BIM data-carrier store, display, terminal control unit and mapping terminal, described processor connects BIM data-carrier store, display and terminal control unit respectively, and described mapping terminal is connected with terminal control unit.
Described mapping terminal comprises GPS, electronic theodolite, electro-optical distance instrument, microprocessor and reflecting prism, and described GPS, electronic theodolite and electro-optical distance instrument all are connected with microprocessor, and described reflecting prism is over against the electro-optical distance instrument setting.
Described electro-optical distance instrument is impulse method stadimeter or ranging phase method instrument.
Wireless network by 2.4GHz between described terminal control unit and the mapping terminal is connected.
Compared with prior art, the present invention has the following advantages:
One, the utilization of on-the-spot surveying and mapping technology among electromechanical pipeline in-depth, prefabricated and construction, the meticulous mapping by the scene and the comparison of electromechanical model are that electromechanical pipeline is deepened and provided safeguard.
Two, use on-the-spot surveying and mapping technology that the information of deepen drawing is reflected to the working-yard comprehensively, rapidly, exactly, guarantee accuracy, reliability and the high efficiency of construction operation.
Three, saved a large amount of manually-operated links, efficiency and economic benefit are obviously improved; Avoided the artificial mistake that in operating process, occurs during record data simultaneously.
Four, the automaticity height, function is many, precision good: guarantee the accuracy of design and installation, one-time success rate improve to be installed, minimizing is done over again, thereby has reduced loss.
Five, construction costs and a large amount of resources have been saved.
Six, carry out for each big departmental cooperation, project effective guarantee is provided, integrated application and the supporting running of gordian techniquies such as round Realization BIM basis modeling, collision detection, on-the-spot mapping, prefabricated processing, field lofting installation, create novel mode of operation technically in the practice, the departmental cooperation that breaks traditions disconnects, and technology such as can't land at problem.Real efficient, the green integrated construction of unit in charge of construction of realizing effectively lowers engineering cost, increases work efficiency, and reduces project risk.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of mapping terminal.
Embodiment
The present invention is described in detail below in conjunction with the drawings and specific embodiments.
Embodiment
As shown in Figure 1, a kind of mapping setting-out system based on BIM, comprise processor 1, BIM data-carrier store 2, display 3, terminal control unit 4 and mapping terminal 5, processor 1 connects BIM data-carrier store 2, display 3 and terminal control unit 4 respectively, mapping terminal 5 is connected with terminal control unit 4, and the wireless network by 2.4GHz connects between the two.This radio network technique is a kind of short range wireless transmission technology, works to obtain bigger usable range and stronger antijamming capability under the 2.4GHz frequency range.
The concrete structure of mapping terminal 5 as shown in Figure 2, comprise GPS51, electronic theodolite 52, electro-optical distance instrument 53, microprocessor 54 and reflecting prism 55, GPS51, electronic theodolite 52 and electro-optical distance instrument 53 all are connected with microprocessor 54, and reflecting prism 55 arranges over against electro-optical distance instrument 53.Wherein, electro-optical distance instrument 53 can adopt impulse method stadimeter or ranging phase method instrument.
The invention enables the BIM technology can better instruct site operation, the in-depth design better plays a role, the present invention uses on-the-spot surveying and mapping technology among electromechanical pipeline in-depth, the prefabricated and construction, and the comparison of electromechanical model is that electromechanical pipeline is deepened and provided safeguard in the meticulous mapping by the scene and the BIM data.

Claims (4)

1. mapping setting-out system based on BIM, it is characterized in that, comprise processor, BIM data-carrier store, display, terminal control unit and mapping terminal, described processor connects BIM data-carrier store, display and terminal control unit respectively, and described mapping terminal is connected with terminal control unit.
2. a kind of mapping setting-out system based on BIM according to claim 1, it is characterized in that, described mapping terminal comprises GPS, electronic theodolite, electro-optical distance instrument, microprocessor and reflecting prism, described GPS, electronic theodolite and electro-optical distance instrument all are connected with microprocessor, and described reflecting prism is over against the electro-optical distance instrument setting.
3. a kind of mapping setting-out system based on BIM according to claim 2 is characterized in that described electro-optical distance instrument is impulse method stadimeter or ranging phase method instrument.
4. a kind of mapping setting-out system based on BIM according to claim 1 is characterized in that, the wireless network by 2.4GHz between described terminal control unit and the mapping terminal is connected.
CN2013101322099A 2013-04-16 2013-04-16 BIM (Building Information Modeling)-based surveying, mapping and lofting system Pending CN103256923A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101322099A CN103256923A (en) 2013-04-16 2013-04-16 BIM (Building Information Modeling)-based surveying, mapping and lofting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101322099A CN103256923A (en) 2013-04-16 2013-04-16 BIM (Building Information Modeling)-based surveying, mapping and lofting system

Publications (1)

Publication Number Publication Date
CN103256923A true CN103256923A (en) 2013-08-21

Family

ID=48960995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101322099A Pending CN103256923A (en) 2013-04-16 2013-04-16 BIM (Building Information Modeling)-based surveying, mapping and lofting system

Country Status (1)

Country Link
CN (1) CN103256923A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104776835A (en) * 2015-03-20 2015-07-15 深圳市华颖泰科电子技术有限公司 Surveying and mapping all-in-one (AIO) machine compensation device, compensation system, and compensation method
CN107192381A (en) * 2017-05-24 2017-09-22 中国建筑局(集团)有限公司 A kind of surveying and locating method of any disorder space structure
CN107421520A (en) * 2017-09-28 2017-12-01 杭州睿兴栋宇建筑科技有限公司 A kind of finishing actinobacillus device and method based on BIM technology
CN111007881A (en) * 2019-11-25 2020-04-14 重庆建工机电安装工程有限公司 BIM-based rail transit electromechanical installation engineering system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120066178A1 (en) * 2010-03-09 2012-03-15 Vela Systems, Inc. Systems and methods for construction field management and operations with building information modeling
CN202304829U (en) * 2011-09-26 2012-07-04 上海兴润电力电缆发展有限公司 Line data measuring device for power cable
CN102819622A (en) * 2011-06-10 2012-12-12 上海市电力公司 System device for establishing building information model (BIM)
CN203274749U (en) * 2013-04-16 2013-11-06 上海上安机电设计事务所有限公司 BIM (Building Information Modeling)-based mapping and lofting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120066178A1 (en) * 2010-03-09 2012-03-15 Vela Systems, Inc. Systems and methods for construction field management and operations with building information modeling
CN102819622A (en) * 2011-06-10 2012-12-12 上海市电力公司 System device for establishing building information model (BIM)
CN202304829U (en) * 2011-09-26 2012-07-04 上海兴润电力电缆发展有限公司 Line data measuring device for power cable
CN203274749U (en) * 2013-04-16 2013-11-06 上海上安机电设计事务所有限公司 BIM (Building Information Modeling)-based mapping and lofting device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈威 等: ""基于BIM的自动化测量在陈翔路地道工程中的应用"", 《土木建筑工程信息技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104776835A (en) * 2015-03-20 2015-07-15 深圳市华颖泰科电子技术有限公司 Surveying and mapping all-in-one (AIO) machine compensation device, compensation system, and compensation method
CN107192381A (en) * 2017-05-24 2017-09-22 中国建筑局(集团)有限公司 A kind of surveying and locating method of any disorder space structure
CN107421520A (en) * 2017-09-28 2017-12-01 杭州睿兴栋宇建筑科技有限公司 A kind of finishing actinobacillus device and method based on BIM technology
CN107421520B (en) * 2017-09-28 2023-10-31 杭州睿兴栋宇建筑科技有限公司 Decoration paying-off device and method based on BIM technology
CN111007881A (en) * 2019-11-25 2020-04-14 重庆建工机电安装工程有限公司 BIM-based rail transit electromechanical installation engineering system and method
CN111007881B (en) * 2019-11-25 2023-04-11 重庆建工机电安装工程有限公司 BIM-based rail transit electromechanical installation engineering system and method

Similar Documents

Publication Publication Date Title
CN103256923A (en) BIM (Building Information Modeling)-based surveying, mapping and lofting system
CN103020426B (en) A kind of short-cut method of rectangular slab Plate with Inclined Center Crack propagation life of fatigue prediction
CN111023966A (en) Tunnel measurement and control method based on combination of three-dimensional laser scanner and BIM
CN109813310B (en) Underground operation equipment positioning method, device and system and storage medium
Zhang et al. BIM-based investigation of total energy consumption in delivering building products
JP6224659B2 (en) Construction work support program, construction work support apparatus, construction work support method, and construction work support system
CN102306225A (en) Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel
CN106777779B (en) Railway culvert design method based on BIM
CN103236194A (en) Auxiliary learning method by utilizing reminding and push functions of intelligent operating system
CN105045815A (en) Data collecting method and apparatus
CN109839112B (en) Underground operation equipment positioning method, device and system and storage medium
CN109253717A (en) A kind of mining area surface sedimentation 3 D laser scanning surface subsidence monitoring sets station method
CN114266097A (en) Three-dimensional information model design method and equipment for railway turnout
CN107255442A (en) Large scale hydraulic generator stator based on laser tracking technology installs measuring method
CN105354878A (en) Electronic map data making method and apparatus
CN203274749U (en) BIM (Building Information Modeling)-based mapping and lofting device
CN204740347U (en) Pile location auxiliary system based on RTK technique
CN203949840U (en) The mud system safety testing device that flows
CN104318610A (en) Method for large-space three-dimensional entity paying off
Hajian et al. As-built documentation of structural components for reinforced concrete construction quality control with 3D laser scanning
CN109812260A (en) For the directional well trajectory design method and system of offshore exploration, electronic equipment
Zhou et al. Development and Application of a Revit-ANSYS Model Transformation Interface
CN103871108A (en) Simulation method for full steel structure lifting process based on 3D (third-dimensional) visualization technology
CN113793008A (en) Method and system for generating construction progress plan of building project, storage medium and terminal
CN102704494A (en) Sequence excavation top ring beam sharing device of adjacent foundation pits

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130821