CN103256455B - 大口径直埋管用隔热滑动支架 - Google Patents
大口径直埋管用隔热滑动支架 Download PDFInfo
- Publication number
- CN103256455B CN103256455B CN201310222600.8A CN201310222600A CN103256455B CN 103256455 B CN103256455 B CN 103256455B CN 201310222600 A CN201310222600 A CN 201310222600A CN 103256455 B CN103256455 B CN 103256455B
- Authority
- CN
- China
- Prior art keywords
- lower tube
- tube clip
- dunnage
- pipe clamp
- roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Thermal Insulation (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
本发明涉及一种大口径直埋管用隔热滑动支架,包括上管夹和下管夹,其特征是:所述上管夹和下管夹均为半圆形,上管夹和下管夹连接构成一个环形结构;所述上管夹和下管夹的内弧面上均设有硬质隔热层,硬质隔热层的一面与上管夹和下管夹的内弧面连接,硬质隔热层的另一面上设置软质隔热层,软质隔热层与芯管相接触;下管夹的外弧面上对称设有两组结构相同的左双滚轮结构和右双滚轮结构。所述隔热滑动支架能够隔断热桥,提高传输效率,减少管夹和芯管间振动,安装方便,受力均匀平稳,滑动顺畅,适合大口径直埋管使用。
Description
技术领域
本发明涉及一种大口径直埋管用隔热滑动支架,尤其是一种≥DN600的直埋管用隔热滑动支架。
背景技术
目前,蒸汽热源的传输通常采用直埋式蒸汽管道,管道内高温蒸汽的流动会使蒸汽管道发生轴向及径向的位移,因此在长距离的管道中需要使用隔热支架来支撑管道。在“钢套钢”直埋式蒸汽管道中通常应用三种支架,分别为导向支架、滑动支架和固定支架,在有吸收管道膨胀变形能力的弯头两段管道中,为了使弯头能够自由地吸收管道的膨胀变形,通常使用滑动支架。滑动支架只限制工作钢管沿管道垂直径向向下的位移,而不限制工作钢管在外保护钢管内沿其它方向自由移动,这样有利于变形的吸收和管道中应力的分散。
现有的≥DN600的直埋管用隔热滑动支架常采用耐高温石棉垫作为隔热层,需要在芯管外缠绕多层才能达到保温要求,其耐温较低,通常只有200℃左右,并且易老化、脱落,隔热层的安装也不方便,费时费力;隔热支架与芯管之间容易产生热桥现象导致热量大量流失,造成能源浪费;另外,在隔热支架底端与外管内壁接触的地方常垫聚四氟乙烯滑块来减小摩擦系数,因其是面接触滑动,摩擦力和噪声较大。所述DN600代表管子的公称直径,DN600钢管的外径在610~630mm之间。
发明内容
本发明的目的是克服现有技术中存在的不足,提供一种大口径直埋管用隔热滑动支架,该隔热滑动支架能够隔断热桥,提高传输效率,减少管夹和芯管间振动,安装方便,受力均匀平稳,滑动顺畅,适合大口径直埋管使用。
按照本发明提供的技术方案,一种大口径直埋管用隔热滑动支架,包括上管夹和下管夹,其特征是:所述上管夹和下管夹均为半圆形,上管夹和下管夹连接构成一个环形结构;所述上管夹和下管夹的内弧面上均设有硬质隔热层,硬质隔热层的一面与上管夹和下管夹的内弧面连接,硬质隔热层的另一面上设置软质隔热层,软质隔热层与芯管相接触;下管夹的外弧面上对称设有两组结构相同的左双滚轮结构和右双滚轮结构。
所述左双滚轮结构包括安装在下管夹外弧面上的第一支撑板和第二支撑板,所述第一支撑板和第二支撑板端部之间设置第一滚轮轴和第二滚轮轴,第一滚轮轴和第二滚轮轴相互平行并处同一水平面设置;在所述第一滚轮轴和第二滚轮轴上分别设有结构相同的第一滚轮和第二滚轮。
所述第一滚轮轴和第二滚轮轴分别通过螺栓固定在第一支撑板和第二支撑板上。
在所述第一支撑板和第二支撑板之间设有胫板。
在所述第一支撑板和第二支撑板的外侧设有肋板,所述肋板与下管夹的外弧面相连接。
本发明具有以下优点:采用圆弧形硬质隔热层设计,隔断了热桥,提高传输效率;增加了软质隔热层,使管夹和芯管结合更加紧密,减少管夹和芯管间振动,提高了耐温性能;采用管夹式设计,安装方便;支架底端采用双滚轮结构,制作简单,受力均匀平稳,滑动顺畅;各部件都做了加强,保证了大口径直埋钢管的正常运行。
附图说明
图1为本发明的结构示意图。
图2为图1的左视图。
具体实施方式
下面结合具体附图对本发明作进一步说明。
如图1、图2所示:所述大口径直埋管用隔热滑动支架包括上管夹1、下管夹2、硬质隔热层3、软质隔热层4、芯管5、左双滚轮结构6、第一支撑板6-1、第二支撑板6-2、第一滚轮轴6-3、第二滚轮轴6-4、第一滚轮6-5、第二滚轮6-6、胫板6-7、肋板6-8、右双滚轮结构7等。
本发明包括上管夹1和下管夹2,所述上管夹1和下管夹2均为半圆形,上管夹1和下管夹2连接构成一个环形结构;所述上管夹1和下管夹2的内弧面上均设有硬质隔热层3,硬质隔热层3的一面与上管夹1和下管夹2的内弧面连接,硬质隔热层3的另一面上设置软质隔热层4,软质隔热层4与芯管5相接触;下管夹2的外弧面上对称设有两组结构相同的左双滚轮结构6和右双滚轮结构7;
以左双滚轮结构6为例,所述左双滚轮结构6包括安装在下管夹2外弧面上的第一支撑板6-1和第二支撑板6-2,所述第一支撑板6-1和第二支撑板6-2端部之间设置第一滚轮轴6-3和第二滚轮轴6-4,第一滚轮轴6-3和第二滚轮轴6-4相互平行并处同一水平面设置;在所述第一滚轮轴6-3和第二滚轮轴6-4上分别设有结构相同的第一滚轮6-5和第二滚轮6-6;
所述第一滚轮轴6-3和第二滚轮轴6-4分别通过螺栓固定在第一支撑板6-1和第二支撑板6-2上;
在所述第一支撑板6-1和第二支撑板6-2之间设有胫板6-7;
在所述第一支撑板6-1和第二支撑板6-2的外侧设有肋板6-8,所述肋板6-8与下管夹2的外弧面相连接;
本发明的工作原理及工作过程:所述上管夹1和下管夹2均选用12mm的钢板,通过定制模具用压机一次成型压制加工而成。所述硬质隔热层3为导热系数在250℃为0.2W/m.K的隔热浇注料浇注在上管夹1和下管夹2的内弧面上所形成;由于输送距离长,提高了出口的温度,加厚了硬质隔热层3的厚度,所述硬质隔热层3的厚度为90mm;并在硬质隔热层3和芯管5间垫入软质隔热层4,所述软质隔热4为硅酸铝针刺毯;支架底端安装两组双滚轮结构,第一滚轮6-5和第二滚轮6-6处于同一水平面,均采用45号钢并进行发黑热处理,增加表面硬度和防锈;设置在第一支撑板6-1和第二支撑板6-2之间的胫板6-7起连接和加固作用;设置在第一支撑板6-1和第二支撑板6-2的外侧的肋板6-8起加固作用。
Claims (1)
1.一种大口径直埋管用隔热滑动支架,包括上管夹(1)和下管夹(2),其特征是:所述上管夹(1)和下管夹(2)均为半圆形,上管夹(1)和下管夹(2)连接构成一个环形结构;所述上管夹(1)和下管夹(2)的内弧面上均设有硬质隔热层(3),硬质隔热层(3)的一面与上管夹(1)和下管夹(2)的内弧面连接,硬质隔热层(3)的另一面上设置软质隔热层(4),软质隔热层(4)与芯管(5)相接触;下管夹(2)的外弧面上对称设有两组结构相同的左双滚轮结构(6)和右双滚轮结构(7);
所述左双滚轮结构(6)包括安装在下管夹(2)外弧面上的第一支撑板(6-1)和第二支撑板(6-2),所述第一支撑板(6-1)和第二支撑板(6-2)端部之间设置第一滚轮轴(6-3)和第二滚轮轴(6-4),第一滚轮轴(6-3)和第二滚轮轴(6-4)相互平行并处同一水平面设置;在所述第一滚轮轴(6-3)和第二滚轮轴(6-4)上分别设有结构相同的第一滚轮(6-5)和第二滚轮(6-6);
所述第一滚轮轴(6-3)和第二滚轮轴(6-4)分别通过螺栓固定在第一支撑板(6-1)和第二支撑板(6-2)上;
在所述第一支撑板(6-1)和第二支撑板(6-2)之间设有胫板(6-7);
在所述第一支撑板(6-1)和第二支撑板(6-2)的外侧设有肋板(6-8),所述肋板(6-8)与下管夹(2)的外弧面相连接;
所述上管夹(1)和下管夹(2)均选用12mm的钢板,通过定制模具用压机一次成型压制加工而成;所述硬质隔热层(3)为导热系数在250℃为0.2W/m.K的隔热浇注料浇注在上管夹(1)和下管夹(2)的内弧面上所形成;所述硬质隔热层(3)的厚度为90mm;所述软质隔热层(4)为硅酸铝针刺毯;所述第一滚轮(6-5)和第二滚轮(6-6)处于同一水平面,均采用45号钢并进行发黑热处理,增加表面硬度和防锈。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310222600.8A CN103256455B (zh) | 2013-06-04 | 2013-06-04 | 大口径直埋管用隔热滑动支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310222600.8A CN103256455B (zh) | 2013-06-04 | 2013-06-04 | 大口径直埋管用隔热滑动支架 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103256455A CN103256455A (zh) | 2013-08-21 |
CN103256455B true CN103256455B (zh) | 2016-01-27 |
Family
ID=48960568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310222600.8A Active CN103256455B (zh) | 2013-06-04 | 2013-06-04 | 大口径直埋管用隔热滑动支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103256455B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103762827B (zh) * | 2013-12-27 | 2017-01-11 | 平安电气股份有限公司 | 流道式变频器壳体支架 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1505578A (en) * | 1976-10-18 | 1978-03-30 | Bruun & Sorensen Ltd | Thermally insulated pipes |
DE3903873A1 (de) * | 1989-02-10 | 1990-08-16 | Fernwaerme Technik Gmbh | Auflager fuer ein thermischer wechselbelastung unterworfenes einzelrohr |
CN2550611Y (zh) * | 2002-07-18 | 2003-05-14 | 上海益能电力工程有限公司 | 直埋钢套管隔热型滚动导向支架 |
CN101666417A (zh) * | 2009-08-28 | 2010-03-10 | 刘毅 | 钢套钢蒸汽保温管道及其滚动支撑机构 |
CN201496668U (zh) * | 2009-08-18 | 2010-06-02 | 无锡金龙补偿器有限公司 | 埋地管双绝热型滚动支座 |
CN201748113U (zh) * | 2010-08-18 | 2011-02-16 | 宜兴市华盛环保管道有限公司 | 架空管道隔热管托 |
CN102734602A (zh) * | 2011-04-07 | 2012-10-17 | 宜兴市宏业保温工程有限公司 | 蒸汽管道隔热支架 |
CN202955421U (zh) * | 2012-11-22 | 2013-05-29 | 淮安四方保温管有限公司 | 蒸汽直埋管隔热低阻力滚动支架 |
CN203421422U (zh) * | 2013-06-04 | 2014-02-05 | 江苏明江机械制造有限公司 | 大口径直埋管用隔热滑动支架 |
-
2013
- 2013-06-04 CN CN201310222600.8A patent/CN103256455B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1505578A (en) * | 1976-10-18 | 1978-03-30 | Bruun & Sorensen Ltd | Thermally insulated pipes |
DE3903873A1 (de) * | 1989-02-10 | 1990-08-16 | Fernwaerme Technik Gmbh | Auflager fuer ein thermischer wechselbelastung unterworfenes einzelrohr |
CN2550611Y (zh) * | 2002-07-18 | 2003-05-14 | 上海益能电力工程有限公司 | 直埋钢套管隔热型滚动导向支架 |
CN201496668U (zh) * | 2009-08-18 | 2010-06-02 | 无锡金龙补偿器有限公司 | 埋地管双绝热型滚动支座 |
CN101666417A (zh) * | 2009-08-28 | 2010-03-10 | 刘毅 | 钢套钢蒸汽保温管道及其滚动支撑机构 |
CN201748113U (zh) * | 2010-08-18 | 2011-02-16 | 宜兴市华盛环保管道有限公司 | 架空管道隔热管托 |
CN102734602A (zh) * | 2011-04-07 | 2012-10-17 | 宜兴市宏业保温工程有限公司 | 蒸汽管道隔热支架 |
CN202955421U (zh) * | 2012-11-22 | 2013-05-29 | 淮安四方保温管有限公司 | 蒸汽直埋管隔热低阻力滚动支架 |
CN203421422U (zh) * | 2013-06-04 | 2014-02-05 | 江苏明江机械制造有限公司 | 大口径直埋管用隔热滑动支架 |
Also Published As
Publication number | Publication date |
---|---|
CN103256455A (zh) | 2013-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2505937A3 (en) | Pipe member equipped with heat insulation core pipeline and u-shaped annularly-distributed pipeline | |
CN203336034U (zh) | 大口径直埋管用隔热导向支架 | |
CN202927375U (zh) | 隔热立管支撑环 | |
CN203421422U (zh) | 大口径直埋管用隔热滑动支架 | |
CN103267174A (zh) | 大口径直埋管用隔热导向支架 | |
CN103256455B (zh) | 大口径直埋管用隔热滑动支架 | |
CN101922596B (zh) | 保温隔热管托 | |
CN201434147Y (zh) | 一种蒸汽管隔热导向滑动型支架 | |
CN202992525U (zh) | 管道绝缘阻燃保冷支架 | |
CN201688028U (zh) | 地埋管道滚动隔热支架 | |
CN203421421U (zh) | 大口径直埋管用平面隔热滑动支架 | |
CN204141133U (zh) | 一种高温耐磨轴向防扭膨胀节 | |
CN103267173A (zh) | 大口径直埋管用平面隔热滑动支架 | |
CN203322644U (zh) | 移动热力管 | |
CN206386623U (zh) | 一种用于高温管道的隔热管夹 | |
CN201723919U (zh) | 一种真空管道 | |
CN201715093U (zh) | 支腿型隔热管托 | |
CN201802995U (zh) | 保温隔热管托 | |
CN103267060A (zh) | 用于隔热支架的双滚轮结构 | |
CN211550732U (zh) | 隔热减阻滑动支座 | |
CN102606849A (zh) | 直管万向导向隔热型支架 | |
CN201748112U (zh) | 直埋管道隔热管托 | |
CN201748113U (zh) | 架空管道隔热管托 | |
CN202914976U (zh) | 一种新型蒸汽直埋管的弯头结构 | |
CN206802638U (zh) | 钢套钢预制保温蒸汽管导向支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Heat insulation sliding support for large diameter directly buried pipe Effective date of registration: 20200813 Granted publication date: 20160127 Pledgee: Wuxi Xishan sub branch of Bank of China Ltd. Pledgor: JIANGSU MINGJIANG MACHINERY MANUFACTURING Co.,Ltd. Registration number: Y2020320010112 |