CN103255909A - Wall connecting attachment device of construction engineering outer wall scaffold - Google Patents

Wall connecting attachment device of construction engineering outer wall scaffold Download PDF

Info

Publication number
CN103255909A
CN103255909A CN2013101805111A CN201310180511A CN103255909A CN 103255909 A CN103255909 A CN 103255909A CN 2013101805111 A CN2013101805111 A CN 2013101805111A CN 201310180511 A CN201310180511 A CN 201310180511A CN 103255909 A CN103255909 A CN 103255909A
Authority
CN
China
Prior art keywords
wall
scaffold
attachment device
bolt
construction engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101805111A
Other languages
Chinese (zh)
Inventor
杨本荣
史立平
顾金山
周圣领
周九洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG DAXIN ENINEERING CO Ltd
Original Assignee
NANTONG DAXIN ENINEERING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG DAXIN ENINEERING CO Ltd filed Critical NANTONG DAXIN ENINEERING CO Ltd
Priority to CN2013101805111A priority Critical patent/CN103255909A/en
Publication of CN103255909A publication Critical patent/CN103255909A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)

Abstract

The invention discloses a wall connecting attachment device of a construction engineering outer wall scaffold. The wall connecting attachment device of the construction engineering outer wall scaffold comprises a steel plate, wherein the left face and the right face of the steel plate are welded with a steel tube and a bolt respectively, and a fixing nut and a gasket are installed on the bolt. When the wall connecting attachment device of the construction engineering outer wall scaffold is used, the bolt penetrates into a bolt hole of a concrete structure, and is fastened through the gasket and the nut on the opposite surface, and the steel tube and the construction engineering outer wall scaffold are connected through a fastener. The wall connecting attachment device of the construction engineering outer wall scaffold is reasonable in structure and convenient to construct, a concrete structure construction template is directly used for forming the bolt hole in an opposite-pulling mode, the bolt hole does not need to be pre-buried, structure construction subsequent operation such as masonry, door and window installation and decoration cannot be influenced, potential safety hazards caused by disassembly of wall connecting pieces in subsequent construction are effectively avoided, meanwhile, the wall connecting pieces can be repeatedly used, cost is remarkably reduced, and the problem of leakage, caused by the facts that the construction engineering outer wall scaffold is disassembled and holes are plugged after the decoration is accomplished, of the outer wall is solved.

Description

Company's wall attachment device of construction project exterior wall scaffold
Technical field
The present invention relates to a kind of company's wall attachment device of construction project exterior wall scaffold.
Background technology
At present, be connected with building for the construction work scaffold, because the simple structure of scaffold, can not independently keep self firm, in order to guarantee the firm of himself, the main method that adopts is embedded steel tube or with scaffolding steel pipe and building member employing armful on building member, methods such as folder, scaffold closely is connected with building, guarantee the stability of scaffold, but, the defective of this method is apparent, and it is in follow-up building by laying bricks or stones, door and window is installed, in the decoration construction stage, often must remove repacking again, because construction work is larger, the moulding complexity, the constructor is many, therefore, the problem that scaffold connecting spare is arbitrarily removed by operating personnel often appears, cause scaffold stability to have open defect, because the accident that scaffold stability causes caving in happens occasionally, have to arrange a large amount of manpower for the safety that guarantees scaffold on the building site and supervise.
Summary of the invention
The object of the present invention is to provide a kind of rational in infrastructure, company's wall attachment device of easy construction, effective construction project exterior wall scaffold.
Technical solution of the present invention is:
A kind of company's wall attachment device of construction project exterior wall scaffold is characterized in that: comprise steel plate, weld with steel pipe and bolt respectively on the two sides, the left and right sides of steel plate, dress hold-down nut and pad on the bolt; During use, bolt penetrates from the bolt hole of concrete structure, uses pad and nut fastening over there, and steel pipe is connected with fastener with scaffold.
The length of steel plate is 70mm, the wide 70mm of being, the thick 5mm of being.Diameter of steel tube is 48mm, and the diameter of bolt is 12mm.
The present invention is rational in infrastructure, easy construction, directly utilize concrete structure construction template split bolt hole, do not need pre-buried, do not influence structure construction follow-up build, install operations such as door and window, finishing by laying bricks or stones, effectively avoid removing the potential safety hazard that wall-connecting piece causes because of follow-up construction, wall-connecting piece is reusable simultaneously, cost significantly reduces, and has reduced simultaneously because specializing in and has removed the exterior wall leakage problem that scaffold shutoff hole causes after finishing.
The present invention can not only not influence workman's normal operating, and it is fastening to take full advantage of the through-wall bolt hole of building structure, can dismantle the back turnover and use, and has avoided because pre-buried and steel pipe loss that cause, and reality has reduced steel pipe consumption.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples.
Fig. 1 is the structural representation of one embodiment of the invention.
The specific embodiment
A kind of company's wall attachment device of construction project exterior wall scaffold comprises steel plate 1, and weld with steel pipe 2 and bolt 3 respectively on the two sides, the left and right sides of steel plate, dress hold-down nut 4 and pad 5 on the bolt; During use, bolt penetrates from the bolt hole of concrete structure, uses pad and nut fastening over there, and steel pipe is connected with fastener with scaffold.
The length of steel plate is 70mm, the wide 70mm of being, the thick 5mm of being.Diameter of steel tube is 48mm, and the diameter of bolt is 12mm.

Claims (3)

1. company's wall attachment device of a construction project exterior wall scaffold is characterized in that: comprise steel plate, the two sides, the left and right sides of steel plate respectively with steel pipe and bolt welding, dress hold-down nut and pad on the bolt; During use, bolt penetrates from the bolt hole of concrete structure, uses pad and nut fastening over there, and steel pipe is connected with fastener with scaffold.
2. company's wall attachment device of construction project exterior wall scaffold according to claim 1 is characterized in that: the length of steel plate be 70mm, wide for 70mm, thickly be 5mm.
3. company's wall attachment device of construction project exterior wall scaffold according to claim 1 and 2, it is characterized in that: diameter of steel tube is 48mm, the diameter of bolt is 12mm.
CN2013101805111A 2013-05-16 2013-05-16 Wall connecting attachment device of construction engineering outer wall scaffold Pending CN103255909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101805111A CN103255909A (en) 2013-05-16 2013-05-16 Wall connecting attachment device of construction engineering outer wall scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101805111A CN103255909A (en) 2013-05-16 2013-05-16 Wall connecting attachment device of construction engineering outer wall scaffold

Publications (1)

Publication Number Publication Date
CN103255909A true CN103255909A (en) 2013-08-21

Family

ID=48960092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101805111A Pending CN103255909A (en) 2013-05-16 2013-05-16 Wall connecting attachment device of construction engineering outer wall scaffold

Country Status (1)

Country Link
CN (1) CN103255909A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264971A (en) * 2014-09-05 2015-01-07 中冶交通(沈阳)建设工程有限公司 Finalization scaffold wall connecting piece and using method
CN105604311A (en) * 2016-03-28 2016-05-25 沙洲职业工学院 Rigid wall connection part of scaffold
CN106245899A (en) * 2016-10-09 2016-12-21 上海宏金设备工程有限公司 A kind of to drawing wall-connecting piece
CN108005372A (en) * 2018-01-11 2018-05-08 江西国金建设集团有限公司 A kind of setting assembling type suspension scaffold
CN109441093A (en) * 2018-12-17 2019-03-08 江苏省华建建设股份有限公司 Casing wall-through pull rod formula connects wall fixed Combination device and its construction method of installation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB821514A (en) * 1955-02-09 1959-10-07 Sidney Kent Arnold Improvements in or relating to brackets for scaffolding and the like
JPS5659965A (en) * 1979-10-17 1981-05-23 Saito Mitsugi Wall connecting method for scaffold fixture
CN202627475U (en) * 2012-05-10 2012-12-26 南通海洲建设集团有限公司 Scaffold wall connecting member
CN202658872U (en) * 2012-06-12 2013-01-09 中城建第六工程局集团有限公司 Tool connecting tube of building scaffold
CN202706508U (en) * 2012-06-25 2013-01-30 南通四建集团有限公司 Overhanging strength bearing steel beam construction member of scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB821514A (en) * 1955-02-09 1959-10-07 Sidney Kent Arnold Improvements in or relating to brackets for scaffolding and the like
JPS5659965A (en) * 1979-10-17 1981-05-23 Saito Mitsugi Wall connecting method for scaffold fixture
CN202627475U (en) * 2012-05-10 2012-12-26 南通海洲建设集团有限公司 Scaffold wall connecting member
CN202658872U (en) * 2012-06-12 2013-01-09 中城建第六工程局集团有限公司 Tool connecting tube of building scaffold
CN202706508U (en) * 2012-06-25 2013-01-30 南通四建集团有限公司 Overhanging strength bearing steel beam construction member of scaffold

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264971A (en) * 2014-09-05 2015-01-07 中冶交通(沈阳)建设工程有限公司 Finalization scaffold wall connecting piece and using method
CN105604311A (en) * 2016-03-28 2016-05-25 沙洲职业工学院 Rigid wall connection part of scaffold
CN105604311B (en) * 2016-03-28 2017-09-01 沙洲职业工学院 A kind of scaffold rigid connecting wall part
CN106245899A (en) * 2016-10-09 2016-12-21 上海宏金设备工程有限公司 A kind of to drawing wall-connecting piece
CN108005372A (en) * 2018-01-11 2018-05-08 江西国金建设集团有限公司 A kind of setting assembling type suspension scaffold
CN109441093A (en) * 2018-12-17 2019-03-08 江苏省华建建设股份有限公司 Casing wall-through pull rod formula connects wall fixed Combination device and its construction method of installation

Similar Documents

Publication Publication Date Title
CN103255909A (en) Wall connecting attachment device of construction engineering outer wall scaffold
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN202248831U (en) Flying ring used for lacing diagonal steel wire rope and building structure
CN202577939U (en) Reusable overhanging I-beam fixing device
CN202596148U (en) Reusable cantilever scaffold anchoring compression ring
CN205153515U (en) Overhanging bearing frame makes up positioner
CN201704954U (en) Formwork opposite-pulling device for pouring waterproof walls
CN202969895U (en) L-type flat iron wall connector for fastening scaffold
CN206220467U (en) It is a kind of it is non-it is embedding can turnover type outer scaffold wall connector
CN204001802U (en) A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms
CN103074997B (en) Steel tube scaffold wall connecting piece
CN203603444U (en) Steel pipe scaffold wall connecting piece
CN103556813B (en) Steel pipe scaffold wall-connecting piece
CN202644967U (en) Scaffold tool type wall connecting piece
CN202380708U (en) Sleeve shaping member and boundary tunnel opening shaping protection device
CN203769083U (en) Steel tube fixer
CN205840298U (en) Scaffold exterior wall connector
CN205063315U (en) Outer wall scaffold connecting piece
CN209179465U (en) To pull-up screw rod wall-connecting piece
CN112814364A (en) External scaffold wall connecting piece and using method thereof
CN204418379U (en) A kind of prefabricated component syndeton
CN103114725A (en) Chuck type split bolt formwork erecting method
CN103089007A (en) Cast-in-place concrete floor punching pipe seal template device and using method
CN204081468U (en) A kind of shear-wall strengthening formwork structure
CN203213319U (en) Water stopping steel plate fixing device in building construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130821