CN204001802U - A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms - Google Patents

A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms Download PDF

Info

Publication number
CN204001802U
CN204001802U CN201420440214.6U CN201420440214U CN204001802U CN 204001802 U CN204001802 U CN 204001802U CN 201420440214 U CN201420440214 U CN 201420440214U CN 204001802 U CN204001802 U CN 204001802U
Authority
CN
China
Prior art keywords
transverse tube
fence assembly
vertical rod
elbow
installation portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420440214.6U
Other languages
Chinese (zh)
Inventor
刘辉
文润友
肖云
陈伟恒
张勤
陈利平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201420440214.6U priority Critical patent/CN204001802U/en
Application granted granted Critical
Publication of CN204001802U publication Critical patent/CN204001802U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of fence assembly and adopt this fence assembly and the construction protection railing that forms, described guard rail is combined by some section guard assemblies, comprises at least two vertical rods, the clamp that is arranged on turnably every rod end of arranging along axis, at least one transverse tube and at least one detachable band iron that is arranged on all vertical rods middle part that are placed in vertical rod top and join with vertical rod; Described clamp is made up of upper clamping part and lower installation portion, and described transverse tube runs through clamping part, and is fixedly connected with upper clamping part, and described rod end is socketed in lower installation portion, and is connected with lower installation portion by screw; Be equipped with elbow integrated with it at transverse tube two ends, the outside bending of end of described elbow, with transverse tube shape in an angle, and the elbow bending direction at two ends is contrary.The construction protection railing that the utility model obtains has simple in structure, the easy for installation and reusable advantage of energy.

Description

A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms
Technical field
The utility model relates to a kind of building site temporary guard rail, particularly a kind of fence assembly and adopts this fence assembly and the construction protection railing that forms.
Background technology
In the work progress of engineering construction, the various unlimited edge in construction operation place all needs to carry out security protection, and with preventive works, personnel fall from eminence, causes workman's casualty accident and unnecessary loss.
Generally, facing bound defence rail is field fabrication, measures and faces limit size, then got steel pipe material, is then welded at the scene, wastes time and energy.Face limit, limit situation difference because various, face also difference of bound defence rail size, after a place is used, demolition also cannot recycle after coming, and when dismounting, removes with gas welding, and waste material, wastes man-hour.In order to address this problem, China national Department of Intellectual Property announced on April 27th, 2011, notification number is a kind of edge-protection adjustable railing for building construction of 201809989, and on October 3rd, 2012 bulletin, notification number is a kind of building operations guard rail of 202467229, above-mentioned two kinds of railings have all adopted the mode of joint to connect transverse tube and vertical rod, can realize dismounting, after being convenient to, again utilize.But it is firm not that above-mentioned two kinds of guard rails connect, meanwhile, all longer after two kinds of guard rails connect, when installation, manpower consumption is larger, and the difficult installation in corner, simultaneously, the angle of different corners is all different, and also not identical to the flexibility requirement of bend pipe, its recycling rate of waterused is not high enough.
Utility model content
The purpose of this utility model is in order to solve existing guard rail complex structure, installs inconvenient and can not reuse and provide a kind of simple in structure, easy for installation and can be reusable a kind ofly execute fence assembly and adopt this fence assembly and the construction protection railing that forms.
To achieve these goals, a kind of fence assembly that the utility model is designed, it is characterized in that, it comprises at least two vertical rods, the clamp that is arranged on turnably every rod end of arranging along axis, at least one transverse tube and at least one detachable band iron that is arranged on all vertical rods middle part that are placed in vertical rod top and join with vertical rod; Described clamp is made up of upper clamping part and lower installation portion, and described transverse tube runs through clamping part, and is fixedly connected with upper clamping part, and described rod end is socketed in lower installation portion, and is connected with lower installation portion by screw; Be equipped with elbow integrated with it at transverse tube two ends, the outside bending of end of described elbow, with transverse tube shape in an angle, and the elbow bending direction at two ends is contrary.
Further, in order to realize the setting angle of clamping transverse tube and adjusting transverse tube, described upper clamping part is C font, and its middle part opening portion forms the through hole of clamping transverse tube; Described lower installation portion is made up of two corresponding clamping plate, forms a mounting groove matching with vertical rod between clamping plate.
Further, in order to make fence assembly more attractive in appearance, described band iron parallels with transverse tube.
Further, for fixing vertical rod, be socketed with base at the low side of vertical rod, described base is fixedly connected with stair by swell fixture.
A kind of construction protection railing, is characterized in that, described railing is made up of some sections of above-mentioned fence assemblies, and every section guard assembly is arranged on stair side, between the elbow of adjacent two section guard assemblies, has gap.
Further, in order to increase security performance, prevent from dropping staff or the instrument gap between fence assembly, the gap forming between described fence assembly is between 5cm ~ 20cm.
Compared with prior art, the fence assembly that the utility model obtains and adopt this fence assembly and the construction protection railing tool that forms has the following advantages:
1, guard rail is combined by multiple fence assemblies that are arranged on stair, when mounted, only needs after the multiple fence assemblies of assembling, then fence assembly is fixedly mounted on stair, more convenient, save trouble and labor.
2, each fence assembly is all detachable, makes to lease convenient, meanwhile, can also realize again the effect of recycling.
Brief description of the drawings
Fig. 1 is the mounting structure schematic diagram of construction protection railing in embodiment;
Fig. 2 is the structural representation of clamp in embodiment.
In figure: vertical rod 1, clamp 2, upper clamping part 21, lower installation portion 22, through hole 23, mounting groove 24, transverse tube 3, band iron 4, elbow 5, base 6.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Embodiment:
The fence assembly that the present embodiment provides, as shown in Figure 1 and Figure 2, it comprise along axis arrange two vertical rods 1, be arranged on turnably the clamp 2 on every vertical rod 1 top, a transverse tube 3 and a detachable band iron 4 that is arranged on two vertical rod 1 middle parts that is placed in vertical rod 1 top and joins with vertical rod 1; Described clamp 2 is made up of upper clamping part 21 and lower installation portion 22, after described transverse tube 3 runs through clamp 2, is fixedly connected with, and described vertical rod 1 top is socketed in lower installation portion 22, and is connected with lower installation portion 22 by screw; Be equipped with elbow 5 integrated with it at transverse tube 3 two ends, the outside bending of end of described elbow 5, with transverse tube 3 shapes in an angle, and elbow 5 bending directions at two ends are contrary; Described band iron 4 parallels with transverse tube 3.
In the time of concrete installation, above-mentioned transverse tube 3 and elbow 5 can be set to freestanding, when installation, only need transverse tube 3 be connected with elbow 5 by clamp 2, and described elbow 5 is identical with the connected mode of clamp 2 with connected mode and the transverse tube 3 of clamp 2, does not just do to apply to state at this.
For vertical rod 1 is fixed on stair, be socketed with base 6 at the low side of vertical rod 1, described base 6 is fixedly connected with stair by swell fixture.
In this implementation column, described upper clamping part 21 is C font, and its middle part opening portion forms the through hole 23 of clamping transverse tube 3; Described lower installation portion 22 is made up of two corresponding clamping plate, forms a mounting groove 24 matching with vertical rod 1 between clamping plate, when installation, determines the angle between lower installation portion 22 and vertical rod 1 according to the gradient of on-the-spot stair, finally fixes clamp 2 by screw.
In the specific implementation, can multiple installing holes be set in the upper end of vertical rod 1, and then be convenient to adjust the position of clamp 2.Meanwhile, the upper clamping part 21 in clamp 2 can also be arranged to turnably, lower installation portion 22 is arranged to form of sleeve, is directly socketed in vertical rod 1.Adopt the clamp 2 of this form convenient in the time of socket transverse tube 3, only transverse tube 3 need to be put into the through hole of clamp 2, then rotate upper clamping part 21 and carry out adjusting angle, finally with screw, upper clamping part 21 is locked, what make that transverse tube 3 is connected with upper clamping part 21 is more firm.
As shown in Figure 1, in the time of installation guard rail, only some sections of above-mentioned fence assemblies need be arranged on stair.In the process of installing, can adjust clamp 2 angles by the gradient of stair, thereby make transverse tube 3 consistent with the gradient of horizontal plane and the gradient of stair.
In the time of concrete installation, elbow 5 opposite directions between adjacent two fence assemblies, and form certain gap, described gap is between 5cm ~ 20cm.
Finally it should be noted that, above embodiment is only in order to the technical solution of the utility model to be described but not restriction technologies scheme, although applicant has been described in detail the utility model with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, those are modified to the technical solution of the utility model or are equal to replacement, and do not depart from aim and the scope of the technical program, all should be encompassed in the middle of claim scope of the present utility model.

Claims (6)

1. a fence assembly, it is characterized in that, it comprises at least two vertical rods (1), the clamp (2) that is arranged on turnably every vertical rod (1) top of arranging along axis, at least one transverse tube (3) and at least one detachable band iron (4) that is arranged on all vertical rods (1) middle part that are placed in vertical rod (1) top and join with vertical rod (1); Described clamp (2) is made up of upper clamping part (21) and lower installation portion (22), described transverse tube (3) is fixedly connected with after running through clamp (2), described vertical rod (1) top is socketed in lower installation portion (22), and is connected with lower installation portion (22) by screw; Be equipped with elbow integrated with it (5) at transverse tube (3) two ends, the outside bending of end of described elbow (5), with transverse tube (3) shape in an angle, and the elbow at two ends (5) bending direction is contrary.
2. fence assembly according to claim 1, is characterized in that, described upper clamping part (21) is C font, and its middle part opening portion forms the through hole (23) of clamping transverse tube (3); Described lower installation portion (22) is made up of two corresponding clamping plate, forms a mounting groove (24) matching with vertical rod (1) between clamping plate.
3. fence assembly according to claim 1 and 2, is characterized in that, described band iron (4) parallels with transverse tube (3).
4. fence assembly according to claim 1 and 2, is characterized in that, is socketed with base (6) at the low side of vertical rod (1), and described base (6) is fixedly connected with stair by swell fixture.
5. a construction protection railing, is characterized in that, described railing is made up of the fence assembly described in any one in some sections of the claims 1-4, and every section guard assembly is arranged on stair side, between the elbow (5) of adjacent two section guard assemblies, has gap.
6. construction protection railing according to claim 5, is characterized in that, the gap forming between described fence assembly is between 5cm ~ 20cm.
CN201420440214.6U 2014-08-06 2014-08-06 A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms Expired - Fee Related CN204001802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420440214.6U CN204001802U (en) 2014-08-06 2014-08-06 A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420440214.6U CN204001802U (en) 2014-08-06 2014-08-06 A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms

Publications (1)

Publication Number Publication Date
CN204001802U true CN204001802U (en) 2014-12-10

Family

ID=52041825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420440214.6U Expired - Fee Related CN204001802U (en) 2014-08-06 2014-08-06 A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms

Country Status (1)

Country Link
CN (1) CN204001802U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839933A (en) * 2016-05-19 2016-08-10 中铁十七局集团第三工程有限公司 Simple safety guard rail
CN113279592A (en) * 2021-04-07 2021-08-20 标龙建设集团有限公司 Protector is used in civil engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839933A (en) * 2016-05-19 2016-08-10 中铁十七局集团第三工程有限公司 Simple safety guard rail
CN113279592A (en) * 2021-04-07 2021-08-20 标龙建设集团有限公司 Protector is used in civil engineering

Similar Documents

Publication Publication Date Title
CN204212399U (en) Flip-shell is to clasp
CN204001802U (en) A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms
CN203271096U (en) Operating platform
CN103967042B (en) Mounting correction tool for protection corner angle of frame column and manufacturing method thereof
CN104372928A (en) Cantilever type scaffold assembly
CN104179362A (en) Building site guardrail fast to mount and demount
CN103046761A (en) Adjustable side protective railing
CN105804418A (en) Prefabricated wallboard fixed supporting system and construction method
CN202209046U (en) Wall connecting rod for external scaffold
CN202157581U (en) Foundation-pit limb shaping protection device
CN203497150U (en) Scaffold for hatch coaming of ship
CN203669398U (en) Tool type standardized and telescopic construction portal protection apparatus
CN203640390U (en) Hard safety rail capable of being quickly assembled and disassembled
CN105587132A (en) Building guardrail for civil engineering
CN204139631U (en) The guard rail of building site fast demountable
CN206987410U (en) A kind of adjustable guard rail fixed mount
CN203783170U (en) Detachable protective shed
CN202090616U (en) Protective device for stairs during construction
CN206829589U (en) A kind of recyclable scaffold wall connecting piece
CN204040556U (en) A telescopic graduation two electronic box protection canopy
CN102926554A (en) Steel hanging seat template supports and construction method thereof
CN204163365U (en) A kind of overhanging scaffold assembly
CN203684644U (en) Scaffold installation element
CN207944783U (en) A kind of construction fixture type protective fence
CN103031960B (en) Profile steel welding wind-proof shed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20160806

CF01 Termination of patent right due to non-payment of annual fee