CN103243704B - Shallow mud foundation treatment method - Google Patents

Shallow mud foundation treatment method Download PDF

Info

Publication number
CN103243704B
CN103243704B CN201310159842.7A CN201310159842A CN103243704B CN 103243704 B CN103243704 B CN 103243704B CN 201310159842 A CN201310159842 A CN 201310159842A CN 103243704 B CN103243704 B CN 103243704B
Authority
CN
China
Prior art keywords
drain
band drain
tube sheet
pipe
band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310159842.7A
Other languages
Chinese (zh)
Other versions
CN103243704A (en
Inventor
戴林伟
姚炎明
朱明栋
陈磊
许旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhoushan Ocean Research Center of ZJU
Original Assignee
Zhoushan Ocean Research Center of ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhoushan Ocean Research Center of ZJU filed Critical Zhoushan Ocean Research Center of ZJU
Priority to CN201310159842.7A priority Critical patent/CN103243704B/en
Publication of CN103243704A publication Critical patent/CN103243704A/en
Application granted granted Critical
Publication of CN103243704B publication Critical patent/CN103243704B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a shallow mud foundation treatment method. The method includes: zoning a site to be treated; laying drain boards in a soft soil layer from top to bottom by a floating raft; connecting the ends and middle of the drain boards to a tube drainage system through tube plate connectors; connecting the upper end of the tube drainage system to a vacuum unit; laying woven fabric, geogrid, nonwoven geotextile and seal film on a mud surface from top to bottom; performing vacuum preloading and unloading after requirements are met. The shallow mud foundation treatment method has the advantages that construction period is shortened greatly, vacuum transmission is effective, using sand cushions is avoided, and deformation of the drain boards is reduced greatly.

Description

A kind of shallow mud foundation treatment method
Technical field
The invention belongs to the technical field of the basement process such as construction work, port works, hydraulic engineering, be specifically related to a kind of shallow mud foundation treatment method.
Background technology
At present, in conjunction with the engineering of desilting and dredging of navigation channel and basin, dredging silt becomes the filler of reclaiming land around sea.Because blowing-filling sludge water content is high, compressibilty is large, and bearing capacity is extremely low, is even in flow regime, can not carry the weight of people and simple construction equipment, cannot carry out the construction of sand mat of subgrade, plastic draining board or sand wick.Traditional soft soil foundation process flow has: (1) natural drying; (2) on weak soil, woven cloth, chaste tree fragrant plant and geo-grid etc. are laid, then Cast-in-situ Piles in Sand-filling; (3) set band drain, lay diaphragm seal; (4) vacuum or piling prepressing.
Problems existing: (1) natural drying time is longer, short then 3-4 month, long then more than 1 year, have a strong impact on the progress of subsequent development construction activity; (2) backfill medium coarse sand as drainage blanket, need a large amount of extra large sand, many regional sea sand resources critical shortage, illegal mining sea sand situation is rampant, has a strong impact on sea wall, submerged pipeline and other extra large work facilities; (3) the design treatment degree of depth of blowing-filling sludge formation soft foundation reaches about 20m, and according to Land character requirement, majority will carry out secondary basement process, therefore, adopt the design of advanced treating must cause unnecessary waste in basement process; (4) new hydraulically filled sludge ground water content is large, compressibilty is high, and under load action, after discharging consolidation process, the compression ratio of Soft Soil Layer is up to 15% ~ 40%, causes band drain with soil deformation, even fractures, and greatly affects its drainage performance.
Summary of the invention
The object of the invention is to solve that existing vacuum preloading method exists is long in time limit, need to use the problems such as the distortion of extra large sand, band drain is large in a large number.
Central scope of the present invention: subregion is carried out in pending place; Utilize buoyant raft, in Soft Soil Layer, lay band drain from bottom to top; By tube sheet connector, band drain two ends and central region are connected with pipe drain system; Pipe drain system upper end is connected with vacuum equipment; Woven cloth, geo-grid, non-woven geotextile and sealing film is laid from bottom to top in mud face; Carry out vacuum preloading, unload after meeting the demands.
The inventive method is specifically:
Step 1. subregion: construct pontoon bridge in conjunction with light material with bamboo pole, steel pipe, carries out cut zone along pontoon bridge periphery color steel, lays plastic sheeting formation retaining and enclose curtain inside color steel.
Step 2. envelope wall or ditch construction.
Step 3. place retaining: retaining in cut zone.
Step 4. lays band drain: utilize buoyant raft, and band drain is laid in layering from bottom to top, needs to determine spacing of prefabricated drain and Soft Soil Layer treating depth according to design.
Step 5. pipe drain system is laid: deployment tube connector for substrate in the middle part of band drain two ends and band drain, tube sheet connector is connected with pipe drain system, band drain is inserted Soft Soil Layer down to respective depth together with tube sheet connector, and pipe drain system upper end is connected with vacuum equipment; Tube sheet connector two ends are flat and have scissor-shaped opening, and width can be customized according to plastic draining board specification, and aspect ratio band drain thickness is slightly high; In the middle of tube sheet connector, a cylindric port is arranged in front, in cylindric port, arrange that filtration sponge prevents mud from entering and causes pipe drain system jams, cylindric port is connected with pipe drain system by threeway, and cylindric port latus rectum can be determined according to tee junction latus rectum; In cylindric port both sides near scissor-shaped opening make position, each layout one rubber membrane, when rubber membrane being pulled out after band drain Inserting Tube connector for substrate, tightly entangles band drain; Respectively there is a rubber case at tube sheet connector two ends, allow scissor-shaped opening tightly close up, be drawn in gutter to prevent the silt when construction in later period; This system can make the through whole tube sheet connector of band drain.
Step 6. lays geotextiles: after treating that band drain and pipe drain system are laid, utilize buoyancy of water to lay woven cloth, geo-grid and geotextiles thereon.
Step 7. lays diaphragm seal: under film, arrange probe measurement vacuum, utilizes buoyancy of water to lay diaphragm seal on geotextiles.
Step 8. vacuum preloading, unloads after meeting the demands.
Beneficial effect of the present invention: the present invention's effective reduction of erection time, vacuum transmission effect be good, do not need to use sand cushion, greatly to reduce band drain distortion; Band drain of the present invention is laid convenient, and be convenient to mechanized construction, portion of material is recyclable to be recycled; Tube sheet connector of the present invention solves laying level when carrying out vacuum preloading process to band drain, because vacuum decay causes the problem of middle part vacuum degree deficiency, is applicable to large-area shallow layer foundation process.
Accompanying drawing explanation
Fig. 1 is the sectional drawing of this method treatment of soft foundation.
Fig. 2 is the top view of this method treatment of soft foundation.
Fig. 3 a and Fig. 3 b is the schematic diagram of tube sheet connector.
In figure: 1 diaphragm seal, 2 geotextiles, 3 geo-grid, 4 woven cloth, 5 Soft Soil Layers, 6 flexible pipes, 7 vacuum equipments, 8 pontoon bridges, 9 sealing ditches, 10PVC manages, 11 envelope walls, 12 tube sheet connectors, 13 cylindric ports, 14 filter sponge, 15 rubber membranes, 16 band drains, 17 rubber cases.
Detailed description of the invention
Below in conjunction with example, the invention will be further described
As depicted in figs. 1 and 2, the present invention, specific implementation method step is as follows:
Step (1) sets up pontoon bridge: construct pontoon bridge 8 with bamboo pole, steel pipe in conjunction with light material, and pontoon bridge as pioneer road, can place vacuum equipment simultaneously.
Step (2) subregion: carry out subregion along pontoon bridge periphery color steel, lays plastic sheeting formation retaining and encloses curtain inside color steel.
Step (3) envelope wall 11 (sealing ditch 9) construction.
Step (4) place retaining: with water pump to water filling in cut zone, the depth of water can make the floating movement of buoyant raft be advisable for during construction.
Step (5) lays band drain: utilize buoyant raft, lay plastic draining board 16 from bottom to top, lay one deck band drain 16 on Soft Soil Layer 5 top layer, band drain 16 two ends remain on mud face, Soft Soil Layer 5 treating depth is generally no more than 3m, band drain 16 Lay interval 0.8 to 1.5m.
Step (6) is current, and band drain 16 1 volume that market is sold is about 200m, and deployment tube connector for substrate 12 in the middle part of band drain 16, is connected tube sheet connector 12 with pipe drain system; Band drain 16 is inserted Soft Soil Layer 5 to respective depth together with tube sheet connector 12, see Fig. 3 a and Fig. 3 b.
Band drain 16 two ends are connected with pipe drain system by tube sheet connector 12 by step (7); Band drain 16 is inserted Soft Soil Layer 5 to respective depth together with tube sheet connector 12.
Pipe drain system upper end is connected with vacuum equipment 7 by step (8).
Step (9) lays geotextiles: after treating that band drain 16 and pipe drain system are laid, utilize buoyancy of water to lay woven cloth 4, geo-grid 3 and geotextiles 2 thereon.
Step (10) lays diaphragm seal: under film, arrange probe measurement vacuum, utilize buoyancy of water to lay diaphragm seal 1 on geotextiles 2.
Step (11) vacuum preloading, unloads after meeting the demands.
In above-mentioned steps (6), pipe drain system tubing can adopt the pvc pipe 10 meeting requirement of strength; Pipe drain system top and vacuum equipment 7 connecting place need flexible pipe 6, and reserved certain length.
Above-mentioned steps (6) and (7) middle tube sheet connector 12 total length 20cm; Tube sheet connector 12 two ends are flat and have scissor-shaped opening, and tube sheet connector 12 width can be customized according to band drain 16 specification; The long 7cm of scissor-shaped opening, aspect ratio band drain 16 thickness is slightly high; A cylindric port one 3 is arranged in the middle front of tube sheet connector 12, in cylindric port one 3, arrange that filtration sponge 14 prevents mud from entering and causes pipe drain system jams, cylindric port one 3 is connected with pipe drain system by threeway, and cylindric port one 3 latus rectum can be determined according to tee junction latus rectum; In cylindric port one 3 both sides near scissor-shaped opening make position, each layout one length 12cm rubber membrane 15, when rubber membrane 15 being pulled out after band drain 16 Inserting Tube connector for substrate 12, tightly entangles band drain 16; Respectively there is a rubber case 17 at tube sheet connector 12 two ends, allow scissor-shaped opening tightly close up, be drawn in gutter to prevent the silt when construction in later period; The feature of this device is to make the through whole tube sheet connector 12 of band drain 16.

Claims (1)

1. a shallow mud foundation treatment method, is characterized in that the method comprises the following steps:
Step 1. subregion: construct pontoon bridge in conjunction with light material with bamboo pole, steel pipe, carries out cut zone along pontoon bridge periphery color steel, lays plastic sheeting formation retaining and enclose curtain inside color steel;
Step 2. envelope wall or the construction of sealing ditch;
Step 3. place retaining: retaining in cut zone;
Step 4. lays band drain: utilize buoyant raft, and band drain is laid in layering from bottom to top, needs to determine spacing of prefabricated drain and Soft Soil Layer treating depth according to design;
Step 5. pipe drain system is laid: deployment tube connector for substrate in the middle part of band drain two ends and band drain, tube sheet connector is connected with pipe drain system, band drain is inserted Soft Soil Layer down to respective depth together with tube sheet connector, and pipe drain system upper end is connected with vacuum equipment; Tube sheet connector two ends are flat and have scissor-shaped opening, and width can be customized according to plastic draining board specification, and aspect ratio band drain thickness is slightly high; In the middle of tube sheet connector, a cylindric port is arranged in front, in cylindric port, arrange that filtration sponge prevents mud from entering and causes pipe drain system jams, cylindric port is connected with pipe drain system by threeway, and cylindric port latus rectum can be determined according to tee junction latus rectum; In cylindric port both sides near scissor-shaped opening make position, each layout one rubber membrane, when rubber membrane being pulled out after band drain Inserting Tube connector for substrate, tightly entangles band drain; Respectively there is a rubber case at tube sheet connector two ends, allow scissor-shaped opening tightly close up, be drawn in gutter to prevent the silt when construction in later period; This system can make the through whole tube sheet connector of band drain;
Step 6. lays geotextiles: after treating that band drain and pipe drain system are laid, utilize buoyancy of water to lay woven cloth, geo-grid and geotextiles thereon;
Step 7. lays diaphragm seal: under film, arrange probe measurement vacuum, utilizes buoyancy of water to lay diaphragm seal on geotextiles;
Step 8. vacuum preloading, unloads after meeting the demands.
CN201310159842.7A 2013-05-02 2013-05-02 Shallow mud foundation treatment method Expired - Fee Related CN103243704B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310159842.7A CN103243704B (en) 2013-05-02 2013-05-02 Shallow mud foundation treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310159842.7A CN103243704B (en) 2013-05-02 2013-05-02 Shallow mud foundation treatment method

Publications (2)

Publication Number Publication Date
CN103243704A CN103243704A (en) 2013-08-14
CN103243704B true CN103243704B (en) 2015-03-18

Family

ID=48923556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310159842.7A Expired - Fee Related CN103243704B (en) 2013-05-02 2013-05-02 Shallow mud foundation treatment method

Country Status (1)

Country Link
CN (1) CN103243704B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165156B (en) * 2017-07-07 2022-11-15 交通运输部天津水运工程科学研究所 Construction equipment and construction method for transversely arranging plastic drainage plate
CN108457265B (en) * 2018-01-31 2020-09-15 河海大学 PVA drainage system for rapid drainage of sludge storage yard and use method thereof
CN110845109B (en) * 2019-10-18 2022-05-03 温州大学 Sludge treatment system adopting horizontal drainage plate and geotextile vacuum preloading method and construction method thereof
CN111636403A (en) * 2020-05-29 2020-09-08 中国一冶集团有限公司 Be applicable to pond bottom weak soil rapid solidification drainage device
CN112942298B (en) * 2021-02-02 2022-07-29 阳江市源丰建设工程有限公司 Consolidation method of silt soft foundation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220598A (en) * 2007-11-02 2008-07-16 广州市盛洲实业有限公司 Vacuum preloading method for non-water discharge sand cushion
CN201317936Y (en) * 2008-12-04 2009-09-30 中交第一航务工程勘察设计院有限公司 Drainage structure for vacuum preloading ground treatment in sand drain method
CN102926376A (en) * 2012-11-15 2013-02-13 上海市政工程设计研究总院(集团)有限公司 Treatment method for soft soil foundation in coastal reclamation region

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4596962B2 (en) * 2005-04-14 2010-12-15 五洋建設株式会社 Improved structure of soft ground and its improved construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220598A (en) * 2007-11-02 2008-07-16 广州市盛洲实业有限公司 Vacuum preloading method for non-water discharge sand cushion
CN201317936Y (en) * 2008-12-04 2009-09-30 中交第一航务工程勘察设计院有限公司 Drainage structure for vacuum preloading ground treatment in sand drain method
CN102926376A (en) * 2012-11-15 2013-02-13 上海市政工程设计研究总院(集团)有限公司 Treatment method for soft soil foundation in coastal reclamation region

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
浅层超软土地基真空预压加固技术;曹永华等;《岩土工程学报》;20110831;第33卷;第234-238页 *

Also Published As

Publication number Publication date
CN103243704A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN102587352B (en) Hot-water draining consolidation processing device and hot-water draining consolidating processing method for soft soil foundation
CN101225656B (en) Method for rapidly reinforcing ultra-soft soil superficial layer
CN102817354B (en) Method for dredging soft foundation by dredger fill and reinforcement
CN103243704B (en) Shallow mud foundation treatment method
CN104120710B (en) A kind of highway on soft ground method of vacuum pre-pressed joint serous fluid of dredger fill
CN102535488B (en) Waterproof construction method for bottom plate of high-water-level basement
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
KR100721225B1 (en) Drainage structure for soft ground treatment and dehydration method
CN104775415A (en) Working platform for rapidly reinforcing hydraulic reclamation super-soft soil foundation and construction method
US9649675B2 (en) In-situ capping with no loss of water depth
CN113957913A (en) Construction method of film bag sand filling combined steel sheet pile cofferdam
CN113931209A (en) Large-area deep foundation pit weakly permeable stratum underground water level control method
CN102383408B (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN109083100B (en) River channel excavation construction process after mud blowing and landing
CN207469222U (en) The pre-buried vacuum drainage system in reclamation by pumping filling area
CN209891205U (en) Outer infiltration of foundation ditch lateral wall is dredged and is arranged structure
CN210712967U (en) Impervious anti structure that floats of basement
WO2016114951A1 (en) In-situ capping with no loss of water depth
CN214245855U (en) Water-proof pressure-control anti-floating structure
CN214738650U (en) Multifunctional landscape pool for anti-floating underground drainage
CN212001021U (en) Soft soil foundation reinforcing structure in dredger fill area
CN114263200A (en) Civil construction foundation pit drainage structure and construction method thereof
CN112195980A (en) Water-resisting pressure-controlling anti-floating structure and construction method
CN113585311A (en) Dewatering well arrangement penetrating through deep foundation pit and vacuum dewatering method
CN105862716A (en) Integral well-point plastic drain pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150318

Termination date: 20210502

CF01 Termination of patent right due to non-payment of annual fee