CN103243353A - Electrolytic tank rim bus tripod support structure - Google Patents

Electrolytic tank rim bus tripod support structure Download PDF

Info

Publication number
CN103243353A
CN103243353A CN2012100222525A CN201210022252A CN103243353A CN 103243353 A CN103243353 A CN 103243353A CN 2012100222525 A CN2012100222525 A CN 2012100222525A CN 201210022252 A CN201210022252 A CN 201210022252A CN 103243353 A CN103243353 A CN 103243353A
Authority
CN
China
Prior art keywords
shaped steel
electrolyzer
steel crossbeam
crossbeam
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100222525A
Other languages
Chinese (zh)
Inventor
邓中华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2012100222525A priority Critical patent/CN103243353A/en
Publication of CN103243353A publication Critical patent/CN103243353A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a kind of electrolytic cell periphery busbar tripod supporting structures, it includes i shaped steel crossbeam (1), one end of i shaped steel crossbeam (1) is connect by first segment contact plate (4) with pot shell (7), one end of angle steel diagonal brace (2) is connect by second node plate (3) with pot shell (7), and the other end is connected to the lower end of i shaped steel crossbeam (1) by third gusset plate (5); Cross-over block (6) is located at the upper end of i shaped steel crossbeam (1). Angle steel diagonal brace (2) angle with horizontal plane is
Figure DEST_PATH_IMAGE002
. The present invention has many advantages, such as investment reduction and easy for construction, quick, and structure is simple, easy to make, with low investment.

Description

The all edges generating line tripods of electrolyzer supporting structure
Technical field
The present invention relates to all edges generating line supporting structures of a kind of electrolyzer.
Background technology
At present, in countries in the world, gone into operation or in the electrolytic aluminium factory of building, in potroom factory building inside, the bus of electrolyzer periphery all adopts the Steel Concrete supporting structure to support.Be that 400kA, design production capacity are that the potroom of 300kt/ is example with estimated current intensity, by statistics electrolyzer week the edges generating line buttress to need label be the about 5500M3 of concrete of C20, reinforcing bar and steel are about 330t altogether, about 4,700,000 yuan of this part investment cost.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of and can save great amount of investment, can accelerate speed of application again, shorten the electrolyzer week edges generating line tripod supporting structure of completion time of project.Advantages such as that this structure has is simple in structure, easy to make, reduced investment are to solve the problem that prior art exists.
The present invention constitutes like this: it comprises the i shaped steel crossbeam, one end of i shaped steel crossbeam is connected with the electrolyzer pot shell by the first node plate, one end of angle steel diagonal brace is connected with the electrolyzer pot shell by the Section Point plate, and its other end is connected the lower end of i shaped steel crossbeam by the 3rd gusset plate; Cross-over block is located at the upper end of i shaped steel crossbeam.
Angle steel diagonal brace and horizontal plane angle are
Figure 2012100222525100002DEST_PATH_IMAGE002
The present invention has advantages such as saving investment and easy construction, quick, simple in structure, easy to make, reduced investment.According to the required vertical power of bus buttress that the technology specialty provides, calculate the needed size of each member and weld size in the tripod supporting, then tripod directly is welded on the pot shell of electrolyzer.Be that 400kA, design production capacity are that the potroom of 300kt/ is example with estimated current intensity still, adopt the tripod supporting structure, electrolyzer week the edges generating line buttress only need the about 255t of steel, about 1,950,000 yuan of investment cost.Compare with adopting the Steel Concrete supporting structure, can save ten thousand yuan of investment 470-195=275.So not only can save design routinely fully and required amount of concrete, and save most of steel, convenient construction shortens the completion time of project again.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is arranged in synoptic diagram, the floor plan synoptic diagram of electrolyzer upper periphery for the present invention." trivet supporting structure " among the figure is all edges generating line tripods of electrolyzer of the present invention supporting structure.
Embodiment
Embodiments of the invention: the required vertical power of bus buttress that provides according to the technology specialty, according to Structure Calculation, from i shaped steel I18~I28 model, choose i shaped steel crossbeam 1 in the tripod supporting structure, from angle steel L50x5~L100x8 model, choose angle steel diagonal brace 2, again according to the size of member, calculate first node plate 4, Section Point plate 3, the 3rd gusset plate 5 needed size and weld sizes, guaranteeing angle steel diagonal brace 2 and horizontal plane angle
Figure 283184DEST_PATH_IMAGE002
Situation under, end with i shaped steel crossbeam 1 welds by first node plate 4 and electrolyzer pot shell 7 earlier, one end of angle steel diagonal brace 2 is by Section Point plate 3 and 7 welding of electrolyzer pot shell, and its other end is welded on the lower end of i shaped steel crossbeam 1 by the 3rd gusset plate 5; The i shaped steel crossbeam 1 upper support bus position that at last cross-over block 6 is laid in has so just formed electrolyzer week edges generating line tripod supporting structure.

Claims (2)

  1. An electrolyzer week edges generating line tripod supporting structure, it comprises i shaped steel crossbeam (1), it is characterized in that: an end of i shaped steel crossbeam (1) is connected with electrolyzer pot shell (7) by first node plate (4), one end of angle steel diagonal brace (2) is connected with electrolyzer pot shell (7) by Section Point plate (3), and its other end is connected the lower end of i shaped steel crossbeam (1) by the 3rd gusset plate (5); Cross-over block (6) is located at the upper end of i shaped steel crossbeam (1).
  2. Electrolyzer according to claim 1 week edges generating line tripod supporting structure, it is characterized in that: angle steel diagonal brace (2) with horizontal plane angle is
    Figure 2012100222525100001DEST_PATH_IMAGE002
CN2012100222525A 2012-02-01 2012-02-01 Electrolytic tank rim bus tripod support structure Pending CN103243353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100222525A CN103243353A (en) 2012-02-01 2012-02-01 Electrolytic tank rim bus tripod support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100222525A CN103243353A (en) 2012-02-01 2012-02-01 Electrolytic tank rim bus tripod support structure

Publications (1)

Publication Number Publication Date
CN103243353A true CN103243353A (en) 2013-08-14

Family

ID=48923224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100222525A Pending CN103243353A (en) 2012-02-01 2012-02-01 Electrolytic tank rim bus tripod support structure

Country Status (1)

Country Link
CN (1) CN103243353A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1453170A (en) * 1973-09-28 1976-10-20 Vmw Ranshofen Berndorf Ag Aluminium electrolysis cell
US4500401A (en) * 1983-12-27 1985-02-19 Great Lakes Carbon Corporation Anode retraction device for a Hall-Heroult cell equipped with inert anodes
CN200992580Y (en) * 2006-12-31 2007-12-19 东北大学设计研究院(有限公司) Large-sized electrolytic tank side additional device
CN201128771Y (en) * 2007-11-29 2008-10-08 贵阳铝镁设计研究院 Supporting structure for bus surrounding electrobath
CN201195760Y (en) * 2008-05-16 2009-02-18 东北大学设计研究院(有限公司) Aluminum cell around negative bar bracket
CN201581144U (en) * 2009-12-15 2010-09-15 甘肃华鹭铝业有限公司 Aluminum electrolysis direct current supply system rectifier transformer valve lateral bus waterproofing device
CN202465899U (en) * 2012-02-01 2012-10-03 贵阳铝镁设计研究院有限公司 Electrolytic bath peripheral bus tripod supporting structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1453170A (en) * 1973-09-28 1976-10-20 Vmw Ranshofen Berndorf Ag Aluminium electrolysis cell
US4500401A (en) * 1983-12-27 1985-02-19 Great Lakes Carbon Corporation Anode retraction device for a Hall-Heroult cell equipped with inert anodes
CN200992580Y (en) * 2006-12-31 2007-12-19 东北大学设计研究院(有限公司) Large-sized electrolytic tank side additional device
CN201128771Y (en) * 2007-11-29 2008-10-08 贵阳铝镁设计研究院 Supporting structure for bus surrounding electrobath
CN201195760Y (en) * 2008-05-16 2009-02-18 东北大学设计研究院(有限公司) Aluminum cell around negative bar bracket
CN201581144U (en) * 2009-12-15 2010-09-15 甘肃华鹭铝业有限公司 Aluminum electrolysis direct current supply system rectifier transformer valve lateral bus waterproofing device
CN202465899U (en) * 2012-02-01 2012-10-03 贵阳铝镁设计研究院有限公司 Electrolytic bath peripheral bus tripod supporting structure

Similar Documents

Publication Publication Date Title
CN203401246U (en) Assembling and welding device for T section bar
CN205058277U (en) Prefabricated T girder iron muscle mould
CN103437563B (en) A kind of mounting method for large steel-strctrue building steel frame
CN202465899U (en) Electrolytic bath peripheral bus tripod supporting structure
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN103243353A (en) Electrolytic tank rim bus tripod support structure
CN206319559U (en) A kind of height can consecutive variations braced bar system
CN201195760Y (en) Aluminum cell around negative bar bracket
CN203568689U (en) Steel structure for wall-sleeving cantilever crane
CN203568222U (en) Side wall reinforcing structure of rectangular coal scuttle
CN211642947U (en) Detachable stack extraction platform shelf
CN203905008U (en) Diagonal brace supporting structure for superior angle of foundation pit
CN204299146U (en) A kind of chimney top operating platform
CN203247703U (en) Steel structural plant frame
CN203284886U (en) Connection node structure of rectangular steel pipe column and I-shaped steel beam
CN202163585U (en) Mounting frame for movable deck of roll-on-roll-off ship
CN205259215U (en) Open trench tunnel open type major structure side wall bailey frame formwork
CN204780483U (en) A frock that is used for on tub truss fixed interim structure
CN206504010U (en) A kind of omnipotent assembling support
CN203905010U (en) Fill block structure for supporting of superior angle of foundation pit
CN205355710U (en) Cable testing bridge dysmorphism is curved to be led to
CN203947455U (en) A kind of Deep Water Steel structure bridging constructional device
CN202074500U (en) Vertical type combined rack
CN202559358U (en) Pile bottom grouting device
CN201800024U (en) Motor maintenance assistant frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130814

RJ01 Rejection of invention patent application after publication