Three grades of drop types slide cartridges
Technical field
A kind of three grades of drop types slide of the present invention cartridge is suitable for the bigger vertical concrete hauling operation of the discrepancy in elevation.
Background technology
In Hydraulic and Hydro-Power Engineering, in the construction of most of power stations, often adopt stage diversion, stage construction, before first stage of the project finished substantially, and the second stage of the project is about to begin, the concrete construction of the second stage of the project was the matter of utmost importance that needs to be resolved hurrily.The following several schemes of employing generally: frame founds the temporary steel trestle, adopts the ferry transhipment or directly the sieve system of mixing is changed and adjourn the second phase bank.But above scheme all exists defective steel trestle bridge pier in various degree can influence interim navigation in vent flow and factory building electricity and the overfall dam hole; Ferry is subjected to the influence of ferry draft, and the concrete haulage time is long, and transport capacity is limited bigger; Sieve is mixed system resettlement and is subjected to the second stage of coastal feature restriction serious, and land expropriation cost and sieve to mix the removal expense of system quite high.
Summary of the invention
For solving the problems of the technologies described above, the invention provides a kind of three grades of drop types slide cartridge, be a kind of big drop transmission and concrete transmission device, at the bigger vertical concrete design of transportation of the discrepancy in elevation.Whole transhipment flow process is convenient and swift, easy and simple to handle, can guarantee construction speed, and is safe and reliable.
Above-mentioned purpose of the present invention is to realize by such technical scheme: three grades of drop types slide cartridges comprise first order storage bin hopper, second level storage bin hopper, third level storage bin hopper, fixed support; Described first order storage bin hopper, second level storage bin hopper, third level storage bin hopper are installed on the fixed support from top to bottom successively.Be provided with the first slide tube between described first order storage bin hopper and the second level storage bin hopper, be provided with the second slide tube between described second level storage bin hopper and the third level storage bin hopper, the fixed support bottom is provided with the load-bearing pedestal, and described first order storage bin hopper, second level storage bin hopper, third level storage bin hopper all are equipped with controllable switch valve and attached vibrator.
Described fixed support comprises: upper steel column, bottom steel post, crossbeam and diagonal brace are formed by connecting.
Described first discharging opening that slips tube arranges that along the second level storage bin hopper inwall axis of the described second slide tube is consistent with the dead in line of second level storage bin hopper, third level storage bin hopper.
Described second level storage bin hopper is a buffering bucket, is used to cushion the kinetic energy that concrete is fallen by eminence, and storage bin hopper blanking side inside, the second level is provided with liner.
Described load-bearing pedestal by: supporting steel pipe and dowel welding fixing after, form with concreting.
Be provided with material receiving between described third level storage bin hopper and the ground.
Described fixed support is provided with the steel stair, and the steel stair lead to second level storage bin hopper, third level storage bin hopper.
Described first order storage bin hopper, second level storage bin hopper, third level storage bin hopper are equipped with inspection platform.
A kind of three grades of drop types slide of the present invention cartridge by adopting the design of three grades of storage bin hoppers, is eliminated in the blanking process to greatest extent, and the separation of gathering materials that causes because of the discrepancy in elevation is excessive prevents that segregation from taking place.Whole transhipment flow process is convenient and swift, easy and simple to handle, can guarantee construction speed, and is safe and reliable.
Description of drawings
Fig. 1 is apparatus of the present invention master TV structure schematic diagram.
Fig. 2 is apparatus of the present invention first order storage bin hopper structural representation.
Fig. 3 is apparatus of the present invention second level storage bin hopper structural representation.
Fig. 4 is apparatus of the present invention third level storage bin hopper structural representation.
The specific embodiment
Shown in Fig. 1 ~ 4, three grades of drop types slide cartridges comprise first order storage bin hopper 1, second level storage bin hopper 2, third level storage bin hopper 3, fixed support; Described first order storage bin hopper 1, second level storage bin hopper 2, third level storage bin hopper 3 are installed on the fixed support by steel I-beam 14 from top to bottom successively.
Be provided with first a slide tube 5-1 between described first order storage bin hopper 1 and the second level storage bin hopper 2, first height that slips tube 5-1 is 12 ~ 14m, and described first discharging opening that slips a 5-1 is arranged along second level storage bin hopper 2 inwalls.Be provided with second a slide tube 5-2 between described second level storage bin hopper 2 and the third level storage bin hopper 3, the high 4 ~ 6m of the second slide tube 5-2, the axis of described second a slide 5-2 is consistent with the dead in line of second level storage bin hopper 2, third level storage bin hopper 3.Described second level storage bin hopper 2 is a buffering bucket, is used to cushion the kinetic energy that concrete is fallen by eminence, and storage bin hopper 2 blanking side inside in the second level are provided with liner 12, and described liner 12 usefulness crushing engine jaws add weldering and form.
Described first order storage bin hopper 1, second level storage bin hopper 2, third level storage bin hopper 3 are equipped with the inspection platform 7 of band steel guard rail.Link to each other with building, connecting portion concreting 8 is fixing.Described inspection platform 7 is three layers of inspection platform of band guardrail, and its position is arranged in the charging aperture of second level storage bin hopper 2, the charging aperture and the discharging opening of third level storage bin hopper 3, and described inspection platform 7 usefulness protective screenings protect.
The fixed support bottom is provided with load-bearing pedestal 11.A first slide tube 5-1, second a slide tube 5-2 adopt 140 channel-section steels to be fixed on the fixed support.Described load-bearing pedestal 11 by: supporting steel pipe and dowel welding fixing after, form with concreting.
The outside, bottom of described first order storage bin hopper 1, second level storage bin hopper 2, third level storage bin hopper 3 all is equipped with two vibrators 4.Described first order storage bin hopper 1, second level storage bin hopper 2, third level storage bin hopper 3 are equipped with controllable switch valve 10.The same time, only allow one of them valve open.
Described first order storage bin hopper 1, second level storage bin hopper 2, third level storage bin hopper 3 storing amounts are 12-15m
3Described first a slide tube 5-1, second a slide tube 5-2 diameter are: 500mm.
Described fixed support comprises: the bottom steel post 6 of the wall thickness 10mm of four diameters 377 supports, two same specification upper steel upright supports, and whole support bracket fastened crossbeam and diagonal brace adopt 140 channel-section steels to support.Described fixed support is provided with steel stair 9, and steel stair 9 lead to second level storage bin hopper 2, third level storage bin hopper 3.Whole device highly is 20m-22m.
Be provided with material receiving 13 between described third level storage bin hopper 3 and the ground.Its bell mouth is to concrete delivery truck 15, and it highly is 1.2m, external transportation highway.As shown in Figure 4.
Implementation step:
Pour concrete into first order storage bin hopper 1, after unsnatching material, open the valve of first order storage bin hopper 1 bottom, concrete is fallen a side of the crushing engine jaw of second level storage bin hopper 2 by the first slide tube 5-1, utilize storage bin hopper 2 buffering concrete in the second level to fall the impact force of generation by eminence, open the valve of second level storage bin hopper 2 then, make the concrete third level storage bin hopper 3 of packing into, behind third level storage bin hopper 3 chargeds, open the valve of third level storage bin hopper 3, concrete is discharged into concrete delivery truck 15.