CN103199474B - 500kV大截面导线带电安装相间间隔棒的方法 - Google Patents
500kV大截面导线带电安装相间间隔棒的方法 Download PDFInfo
- Publication number
- CN103199474B CN103199474B CN201310083026.2A CN201310083026A CN103199474B CN 103199474 B CN103199474 B CN 103199474B CN 201310083026 A CN201310083026 A CN 201310083026A CN 103199474 B CN103199474 B CN 103199474B
- Authority
- CN
- China
- Prior art keywords
- center line
- line
- conductor spacer
- insulating cord
- equipotential electrician
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 125000006850 spacer group Chemical group 0.000 title claims abstract description 53
- 238000009434 installation Methods 0.000 title claims abstract description 35
- 238000000034 method Methods 0.000 title claims abstract description 13
- 239000004020 conductor Substances 0.000 claims description 39
- 238000004519 manufacturing process Methods 0.000 claims description 17
- 238000005096 rolling process Methods 0.000 claims description 14
- 230000016507 interphase Effects 0.000 claims description 7
- 230000005684 electric field Effects 0.000 abstract description 12
- 238000009413 insulation Methods 0.000 abstract description 3
- 238000011017 operating method Methods 0.000 abstract 1
- 230000005540 biological transmission Effects 0.000 description 2
- 238000012827 research and development Methods 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本发明涉及一种500kV大截面导线带电安装相间间隔棒的方法,它包括有以下步骤:①中线的等电位电工携带走线滑车与绝缘绳爬至中线进电场的横担处,将绝缘绳导在下线外侧;②中线、下线的等电位电工进入强电场;③安装第一根间隔棒;④第一根间隔棒安装完成后,上线等电位电工沿进入电场的反方向走线退出强电场,中线等电位电工继续走线与下线等电位电工汇合;⑤安装第二根间隔棒;⑥中线等电位电工与下线等电位电工退出电场,工作结束。本发明采用等电位和地电位相结合的操作方法进行带电安装,填补了500kV带电安装相间防舞动间隔棒这一作业的空白点,提高了500kV线路运行的稳定性,减少停电时间,提高供电可靠性。
Description
技术领域
本发明涉及一种500kV大截面导线带电安装相间间隔棒的方法。
背景技术
现有的输电线路安装防舞动间隔棒工作一般采用停电作业处理,而500kV作为输电线路的重中之重,降低它的停电时间对国家电网的稳定运行无疑是至关重要的,但现行500kV带电安装防舞动间隔棒的工作是一个空白点!因此急需研发一套可行的操作方法。
发明内容
本发明要解决的技术问题是提供一种500kV大截面导线带电安装相间间隔棒的方法。该方法不需要采用停电作业,提高供电可靠性。
为了解决现有技术存在的问题,本发明采用的技术方案是:
500kV大截面导线带电安装相间间隔棒的方法,包括有以下步骤:
①上线的等电位电工携带走线滑车与绝缘绳爬至上线进电场的横担处, 直接进入强电场,中线的等电位电工携带走线滑车与绝缘绳爬至中线进电场的横担处,将绝缘绳导在下线外侧;
②中线、下线的等电位电工进入强电场;
③安装第一根间隔棒:上线和中线的电工同时沿带电导线行至第一根间隔棒的安装位置,上线和中线的滑车及绝缘绳挂好后,地面人员分别将上线的绝缘绳绑扎在第一根间隔棒的上面,中线的绝缘绳绑扎在间隔棒的下面,地面人员使用上线绝缘绳将间隔棒拉至到安装位置后直接安装,待上面安装完毕后,拉中线绝缘绳使间隔棒下面与中线安装位置靠近,直至安装结束;
④第一根间隔棒安装完成后,上线等电位电工沿进入电场的反方向走线退出强电场,中线等电位电工继续走线与下线等电位电工汇合;
⑤安装第二根间隔棒:中线的等电位电工携带走线滑车及绝缘绳沿带电导线行至第二根间隔棒的安装位置,地面人员将中线的绝缘绳绑扎在第二根间隔棒的上面将其拉至到安装位置后直接安装,下线等电位电工利用中线的绝缘绳将间隔棒的下面向下线安装位置靠近,直至安装结束;
⑥中线等电位电工与下线等电位电工退出电场,工作结束。
本发明所具有的优点和效果是:
本发明采用等电位和地电位相结合的操作方法进行带电安装,填补了500kV带电安装相间防舞动间隔棒这一作业的空白点,提高了500kV线路运行的稳定性,减少停电时间,提高供电可靠性。
具体实施方式
本发明500kV大截面导线带电安装相间间隔棒的方法,包括有以下步骤:
①上线的等电位电工携带走线滑车与绝缘绳爬至上线进电场的横担处, 直接进入强电场,中线的等电位电工携带走线滑车与绝缘绳爬至中线进电场的横担处,将绝缘绳导在下线外侧避免绝缘绳与下线产生强烈摩擦。
②上线、中线所使用的工具:走线滑车、绝缘绳及安装间隔棒所用的扳手就位后,中线的等电位电工与下线的等电位电工进入强电场。
③安装第一根间隔棒:第一根间隔棒安装在上线和中线之间,上线和中线的电工进入强电场后,同时沿带电导线行至第一根间隔棒的安装位置,上线和中线的滑车及绝缘绳挂好后地面人员分别将上线绝缘绳绑扎在第一根间隔棒的上面,中线绝缘绳绑扎在间隔棒的下面。地面人员使用上线绝缘绳将间隔棒拉至到安装位置后可直接安装即可,待上面安装完毕后,拉中线绝缘绳使间隔棒下面与中线安装位置靠近,直至安装结束。
④第一根间隔棒安装完成后,上线等电位电工携带走线滑车及绝缘绳沿进入电场的反方向走线直至退出强电场。中线等电位电工继续走线与下线等电位电工汇合。
⑤安装第二根间隔棒:第二根间隔棒安装在中线和下线之间,中线的电工把第一根间隔棒安装好后携带走线滑车及绝缘绳沿带电导线行至第二根间隔棒的安装位置,地面人员将中线绝缘绳绑扎在第二根间隔棒的上面将其拉至到安装位置后可直接安装,即下线电工可不带绝缘绳利用中线的绝缘绳将间隔棒的下面向下线安装位置靠近,直至安装结束。
⑥中线等电位电工与下线等电位电工退出电场,工作结束。
Claims (1)
1.500kV大截面导线带电安装相间间隔棒的方法,其特征在于包括有以下步骤:
①上线的等电位电工携带走线滑车与绝缘绳爬至上线进强电场的横担处,直接进入强电场,中线的等电位电工携带走线滑车与绝缘绳爬至中线进强电场的横担处,将中线的等电位电工携带的绝缘绳导在下线外侧;
②中线、下线的等电位电工进入强电场;
③安装第一根间隔棒:上线的等电位电工和中线的等电位电工同时沿带电导线行至第一根间隔棒的安装位置,上线的等电位电工和中线的等电位电工携带的走线滑车及绝缘绳挂好后,地面人员分别将上线的绝缘绳绑扎在第一根间隔棒的上面,中线的绝缘绳绑扎在第一根间隔棒的下面,地面人员使用上线的绝缘绳将第一根间隔棒拉至到上线的安装位置后直接安装,待第一根间隔棒上面安装完毕后,拉中线的绝缘绳使第一根间隔棒下面与中线安装位置靠近,直至安装结束;
④第一根间隔棒安装完成后,上线的等电位电工沿进入强电场的反方向走线退出强电场,中线的等电位电工继续走线与下线的等电位电工汇合;
⑤安装第二根间隔棒:中线的等电位电工携带走线滑车及绝缘绳沿带电导线行至第二根间隔棒的安装位置,地面人员将中线的绝缘绳绑扎在第二根间隔棒的上面将第二根间隔棒拉至到中线的安装位置后直接安装,下线的等电位电工利用中线的绝缘绳将第二根间隔棒的下面向下线安装位置靠近,直至安装结束;
⑥中线的等电位电工与下线的等电位电工退出强电场,工作结束。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310083026.2A CN103199474B (zh) | 2013-03-15 | 2013-03-15 | 500kV大截面导线带电安装相间间隔棒的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310083026.2A CN103199474B (zh) | 2013-03-15 | 2013-03-15 | 500kV大截面导线带电安装相间间隔棒的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103199474A CN103199474A (zh) | 2013-07-10 |
CN103199474B true CN103199474B (zh) | 2015-05-20 |
Family
ID=48721878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310083026.2A Active CN103199474B (zh) | 2013-03-15 | 2013-03-15 | 500kV大截面导线带电安装相间间隔棒的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103199474B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103545779B (zh) * | 2013-10-31 | 2016-05-25 | 国家电网公司 | 一种高压输电线路防风偏刚性绝缘拉索的安装方法 |
CN103618249B (zh) * | 2013-11-27 | 2017-03-15 | 国家电网公司 | ±500kV同塔双回直流输电线路带电检修工艺 |
CN104283174A (zh) * | 2014-10-07 | 2015-01-14 | 国家电网公司 | 66kV安装防舞动相间间隔棒单人线上安装方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11299028A (ja) * | 1998-04-09 | 1999-10-29 | Furukawa Electric Co Ltd:The | 相間スペーサの点検方法 |
-
2013
- 2013-03-15 CN CN201310083026.2A patent/CN103199474B/zh active Active
Non-Patent Citations (4)
Title |
---|
(2008-9-5)110kV送电线路带电作业操作方法;百度文库;《http://wenku.baidu.com/view/d70040c65fbfc77da269b1f5.html》;20110227;第1、23-25页 * |
500kV同塔双回输电线路带电安装导线相间间隔棒技术探讨;陶留海 等;《2012年供电企业带电作业技术研讨会论文集》;20121231;第85-96页 * |
安徽省电力公司.1.6 带电更换间隔棒(仅限于500kV线路带电作业).《线路运行与检修专业-供电企业现场操作培训考核题库》.中国电力出版社,2007,21-25. * |
软梯法500kv安装间隔棒标准化指导书;百度文库;《http://wenku.baidu.com/link?url=38fW-vNVhnf-bEUspWu241nhdG6nbj2uURLZp9gOXwiOOlS5kPvk4V8m6P1GMQ81mRqSP5St-2JocuUtbFoHadaLYf_fNAcBAkAa_en4cgu》;20121119;第1-7页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103199474A (zh) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102623926B (zh) | 远方等电位滑车及其实现带电进出等电位的方法 | |
CN203734209U (zh) | 电缆旁路带电作业装置 | |
CN102136693B (zh) | 一种实现绞磨吊篮导轨远方进出等电位方法及其装置 | |
CN205646216U (zh) | 绝缘验电装设接地线辅助杆 | |
CN103199474B (zh) | 500kV大截面导线带电安装相间间隔棒的方法 | |
CN202535016U (zh) | Opgw进站光缆安全接地固定组件 | |
CN203260976U (zh) | 电缆终端塔 | |
CN204905469U (zh) | 一种配电线路检修保护接地装置 | |
CN202339977U (zh) | 用于分布式基站的防雷电直流馈电线缆的接地结构 | |
CN205882560U (zh) | 配电带电作业地电位专用循环绳架装置 | |
CN105098694A (zh) | 一种基于配电网典型设计的架空避雷线架设方法 | |
CN202840449U (zh) | 杆塔分流拉线及铜接地结构 | |
CN204156467U (zh) | 一种20kV架空线路杆塔头 | |
CN204343772U (zh) | 四回路电缆下地窄基电缆终端钢管塔 | |
CN203397826U (zh) | 一种变压器安装结构 | |
CN104269231A (zh) | 带电流监测的绝缘子 | |
CN202550399U (zh) | 远方等电位滑车 | |
CN103296613A (zh) | 一种带电作业限位轨道舱 | |
CN203352118U (zh) | 架空输电线路的防雷装置 | |
CN204947482U (zh) | 一种多线缆二次布线引导装置 | |
CN203660276U (zh) | 间隙防雷保护装置 | |
CN204167810U (zh) | 一种防雷支柱绝缘子带电作业剥线支架 | |
CN203931616U (zh) | 一种矿井两用电缆 | |
CN202434935U (zh) | 变电站opgw光缆接地装置 | |
CN203134401U (zh) | 强磁场用电源线 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |