CN104283174A - 66kV安装防舞动相间间隔棒单人线上安装方法 - Google Patents
66kV安装防舞动相间间隔棒单人线上安装方法 Download PDFInfo
- Publication number
- CN104283174A CN104283174A CN201410519110.9A CN201410519110A CN104283174A CN 104283174 A CN104283174 A CN 104283174A CN 201410519110 A CN201410519110 A CN 201410519110A CN 104283174 A CN104283174 A CN 104283174A
- Authority
- CN
- China
- Prior art keywords
- conductor
- rope
- spacer
- line
- personnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/12—Devices for maintaining distance between parallel conductors, e.g. spacer
- H02G7/125—Damping spacers
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明涉及66kV安装防舞动相间间隔棒单人线上安装方法,包括以下步骤:(1)将走线滑车挂在上导线上,将一号传递绳绑扎在间隔棒上端;(2)将间隔棒的下端安装在下导线上;(3)将二号传递绳的一根单绳绑扎在中导线上,地面人员通过对二号传递绳未绑扎那根绳索的拉力将线上人员拉至可安装位置,将间隔棒的顶端安装在中导线上;(4)将二号传递绳的一根绳索绑扎在中导线上,将第二根间隔棒传至线上人员手中;(5)线上人员将间隔棒的顶端安装在上导线;(6)将上导线和中导线分离至可安装位置,由线上电工将间隔棒底端安装在中导线上,单人安装单导线间隔棒全部作业完成。采用本发明有效提高了作业效率,减小人力投入,改变了以往作业复杂繁琐的过程。
Description
技术领域
本发明涉及一种66kV安装相间间隔棒的方法,尤其是涉及一种66kV安装防舞动相间间隔棒单人线上安装方法。
背景技术
传统的66kV安装防舞动相间间隔棒需要三名工作人员在三根导线上同时坐飞车滑至安装位置,不仅浪费人力物力,而且工作效率低。
发明内容
本发明的目的是提供一种66kV安装防舞动相间间隔棒单人线上安装方法,该方法利用飞车,走线滑车,绝缘绳配合完成,一人操作简便快捷,有效提高了作业效率。
为了解决现有技术存在的问题,本发明采用的技术方案是:
66kV安装防舞动相间间隔棒单人线上安装方法,包括以下步骤:
(1)将两个带有传递绳的走线滑车挂在上导线上,将一号传递绳绑扎在间隔棒上端;
(2)线上电工乘坐飞车行至安装位置后,直接将间隔棒的下端安装在下导线上;
(3)下线端安装完成后,线上电工将二号传递绳的一根单绳绑扎在中导线上,地面人员通过对二号传递绳未绑扎那根绳索的拉力将线上人员拉至可安装位置,由线上人员将间隔棒的顶端安装在中导线上,全程一号传递绳始终绑扎在间隔棒上,用于控制间隔棒的安装方向,达到线上人员方便安装的目的,至此,第一根间隔棒的安装工作结束;
(4)当线上人员到达第二根间隔棒的安装位置后,将二号传递绳的一根绳索绑扎在中导线上,地面人员利用一号传递绳将第二根间隔棒传至线上人员手中;
(5)地面人员通过对二号传递绳未绑扎绳索的拉力将上导线和中导线的距离拉近至可安装位置,这时,线上人员将间隔棒的顶端安装在上导线;
(6)间隔棒的上端安装在上导线上后,地面人员通过对已绑扎在中导线的绳索的拉力,将上导线和中导线分离至可安装位置,由线上电工将间隔棒底端安装在中导线上,此时,单人安装单导线间隔棒全部作业完成。
本发明所具有的优点与效果是:
采用本发明方法只需一名工作人员即可实现线上安装,作业人员坐飞车在中导线上作业,一人与地面电工配合即可完成,有效提高了作业效率,减小人力投入,改变了以往作业复杂繁琐的过程。
附图说明
图1为本发明利用本发明发法将间隔棒安装在中导线与下导线之间;
图2为本发明利用本发明发法将间隔棒安装在上导线与中导线之间。
具体实施方式
下面结合附图对本发明作进一步详述:
本发明66kV安装防舞动相间间隔棒单人线上安装方法,包括以下步骤:
如图1所示,(1)将两个走线滑车4、5挂在上导线1上,走线滑车4上带有一号传递绳6,走线滑车5上带有二号传递绳7,将一号传递绳绑扎在间隔棒8的上端,用于控制间隔棒的安装方向,达到线上人员方便安装的目的;二号传递绳应用于提拉导线,来满足间隔棒的安装位置。
(2)线上电工乘坐飞车9行至安装位置后,由于本身及飞车自重的原因,导线的弛度会相应的降低,直接将间隔棒的下端安装在下导线3上;
(3)将间隔棒在下导线安装完成后,线上电工将二号传递绳的一根单绳绑扎在中导线2上,地面人员通过对二号传递绳未绑扎那根绳索的拉力将线上人员拉至可安装位置,由线上人员将间隔棒的顶端安装在中线上,全程一号传递绳始终绑扎在间隔棒上,用于控制间隔棒的安装方向,达到线上人员方便安装的目的,至此,第一根间隔棒的安装工作结束;
(4)当线上人员到达第二根间隔棒的安装位置后,如图2所示,将二号传递绳的一根绳索绑扎在中导线上,地面人员利用一号传递绳将第二根间隔棒传至线上人员手中;
(5)地面人员通过对二号传递绳未绑扎绳索的拉力将上线和中线的距离拉近至可安装位置,这时,线上人员将间隔棒的顶端安装在上导线上,全程一号传递绳始终绑扎在间隔棒上,用于控制间隔棒的方向,便于安装;
(6)间隔棒的上端安装在上导线上后,地面人员通过对已绑扎在中导线的绳索的拉力,将上导线和中导线分离至可安装位置,由线上电工将间隔棒底端安装在中导线上,此时,单人安装单导线间隔棒全部作业完成,
(7)线上人员通过二号传递绳将一号传递绳传至地面,人员回到杆塔上,将飞车传至地面,并携带二号传递绳下塔,作业结束。全程一号传递绳始终绑扎在间隔棒上,用于控制间隔棒的安装方向,达到线上人员方便安装的目的。
Claims (1)
1.66kV安装防舞动相间间隔棒单人线上安装方法,其特征在于包括以下步骤:
(1)将两个带有传递绳的走线滑车挂在上导线上,将一号传递绳绑扎在间隔棒上端;
(2)线上电工乘坐飞车行至安装位置后,直接将间隔棒的下端安装在下导线上;
(3)下线端安装完成后,线上电工将二号传递绳的一根单绳绑扎在中导线上,地面人员通过对二号传递绳未绑扎那根绳索的拉力将线上人员拉至可安装位置,由线上人员将间隔棒的顶端安装在中导线上;
(4)当线上人员到达第二根间隔棒的安装位置后,将二号传递绳的一根绳索绑扎在中导线上,地面人员利用一号传递绳将第二根间隔棒传至线上人员手中;
(5)地面人员通过对二号传递绳未绑扎绳索的拉力将上导线和中导线的距离拉近至可安装位置,这时,线上人员将间隔棒的顶端安装在上导线;
(6)间隔棒的上端安装在上导线上后,地面人员通过对已绑扎在中导线的绳索的拉力,将上导线和中导线分离至可安装位置,由线上电工将间隔棒底端安装在中导线上,此时,单人安装单导线间隔棒全部作业完成。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410519110.9A CN104283174A (zh) | 2014-10-07 | 2014-10-07 | 66kV安装防舞动相间间隔棒单人线上安装方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410519110.9A CN104283174A (zh) | 2014-10-07 | 2014-10-07 | 66kV安装防舞动相间间隔棒单人线上安装方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104283174A true CN104283174A (zh) | 2015-01-14 |
Family
ID=52257800
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410519110.9A Pending CN104283174A (zh) | 2014-10-07 | 2014-10-07 | 66kV安装防舞动相间间隔棒单人线上安装方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104283174A (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111525445A (zh) * | 2020-05-29 | 2020-08-11 | 安徽工程大学 | 一种分裂导线装置 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2376041A (en) * | 2001-05-30 | 2002-12-04 | Balfour Beatty Plc | Mounting ladder on overhead cables |
| CN102969686A (zh) * | 2012-12-14 | 2013-03-13 | 天津理工大学 | 一种高压紧凑型输电线路相间间隔棒防舞动安装配置方法 |
| CN103001141A (zh) * | 2012-09-03 | 2013-03-27 | 辽宁省电力有限公司鞍山供电公司 | 66千伏输电线路上防舞动间隔棒的带电安装方法 |
| CN103199474A (zh) * | 2013-03-15 | 2013-07-10 | 辽宁省电力有限公司辽阳供电公司 | 500kV大截面导线带电安装相间间隔棒的方法 |
-
2014
- 2014-10-07 CN CN201410519110.9A patent/CN104283174A/zh active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2376041A (en) * | 2001-05-30 | 2002-12-04 | Balfour Beatty Plc | Mounting ladder on overhead cables |
| CN103001141A (zh) * | 2012-09-03 | 2013-03-27 | 辽宁省电力有限公司鞍山供电公司 | 66千伏输电线路上防舞动间隔棒的带电安装方法 |
| CN102969686A (zh) * | 2012-12-14 | 2013-03-13 | 天津理工大学 | 一种高压紧凑型输电线路相间间隔棒防舞动安装配置方法 |
| CN103199474A (zh) * | 2013-03-15 | 2013-07-10 | 辽宁省电力有限公司辽阳供电公司 | 500kV大截面导线带电安装相间间隔棒的方法 |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111525445A (zh) * | 2020-05-29 | 2020-08-11 | 安徽工程大学 | 一种分裂导线装置 |
| CN111525445B (zh) * | 2020-05-29 | 2021-04-02 | 安徽工程大学 | 一种分裂导线装置 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104638565A (zh) | ±800千伏直线塔输电线路进入电场等电位带电作业方法 | |
| CN203351105U (zh) | 高压线路检修培训教具 | |
| CN101277002B (zh) | 带电组立10kV双回配电线路砼杆施工方法 | |
| CN105356371A (zh) | 同塔多回输电线路耐张绝缘子串带电更换方法及装置 | |
| CN104022459A (zh) | 一种10kv配电线路杆上吊线器 | |
| CN105932601A (zh) | 架空地线断股修补方法 | |
| CN104242147B (zh) | 一种输电线路遥控航空器放线工艺 | |
| CN202159930U (zh) | 送电线路复导线间距调整器 | |
| CN101908739B (zh) | 电力架空输电线路检修用滑车 | |
| CN105162028A (zh) | 一种220千伏钢管型杆塔带电更换直线绝缘子的方法 | |
| CN103138206A (zh) | 利用ppr管垂吊进行高压架空送电线路更换架空地线装置及方法 | |
| CN203850726U (zh) | 一种10kV配电线路杆上吊线器 | |
| CN103840398B (zh) | 配电水泥杆带电操作平台 | |
| CN104393524B (zh) | 利用架空地线挂滑轮组作业避免搭设跨越架施工方法 | |
| CN103199474B (zh) | 500kV大截面导线带电安装相间间隔棒的方法 | |
| CN206401811U (zh) | 一种跨越带电线路架线施工的跨越网 | |
| CN104836149A (zh) | 一种高压线路分裂导线带电拆除异物工具及拆除异物方法 | |
| CN106300128B (zh) | 一种更换双分裂导线间隔棒提线工具及使用方法 | |
| CN103500966A (zh) | 66kv隔离开关至管母线带电断接引线方法 | |
| CN202308917U (zh) | 一种牵引工具 | |
| CN106229881A (zh) | 进入500/220千伏同塔多回输电线路电场的方法及所用软梯头 | |
| CN103532052A (zh) | 一种adss光缆带电架设简易跨越架及实施方法 | |
| CN205882560U (zh) | 配电带电作业地电位专用循环绳架装置 | |
| CN204011792U (zh) | 咬合型绝缘杆 | |
| CN103904587A (zh) | 带电作业抛绳装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150114 |