CN103195012B - Terrain manufacture rack for ecological river channel model - Google Patents
Terrain manufacture rack for ecological river channel model Download PDFInfo
- Publication number
- CN103195012B CN103195012B CN201310112233.6A CN201310112233A CN103195012B CN 103195012 B CN103195012 B CN 103195012B CN 201310112233 A CN201310112233 A CN 201310112233A CN 103195012 B CN103195012 B CN 103195012B
- Authority
- CN
- China
- Prior art keywords
- installing plate
- girder
- locator
- stand
- landform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention relates to a terrain manufacture rack for an ecological river channel model. The track comprises a frame and at least two positioners. The frame comprises at least two parallel main beams located on the same altitude, and each main beam is provided with scales. Each positioner comprises a connection piece connected with the corresponding main beam, a U-shaped installation plate hinged at the first end portion of the connection piece to rotate around the connection piece, an indicator arranged on the U-shaped installation plate and rotating with the U-shaped installation plat and a fixing wedge used for fixing a section plate into an inner cavity of the U-shaped installation plate. A section line of the section plate is determined by adjusting the axial direction and the angle position of the positioners on the main beams. The manufacture rack has the advantages of being simple in structure, simple to operate and accurate in location, not requiring a large amount of manpower, not requiring conducting special training on workers and ensuring structure stability of the section plate in the positioning process.
Description
Technical field
The present invention relates to hydraulic engineering technical field, the landform particularly relating to a kind of ecological riverway model makes stand.
Background technology
In hydraulic engineering technical field, river model test dwindles into physical model according to river course form and water flow sediment movement feature by similarity criterion, in order to a kind of research means of simulating riverway water flow sediment movement and river bed change situation.The quality that landform in river model makes is directly connected to success or failure and the precision of model testing, and especially the geometry guide of analogue formation is too small, the landform fine difference inverting of river model can be caused to truly have to actual conditions and change greatly.
Along with the raising that people require natural environment, river course research is progressively transitioned into reduction river channel natural looks by original to curve cut-off, river cross-section Regularization etc., is increased river cross-section Morphological Diversity and habitat of fish diversity etc.So need the river course plain bending form of simulation, section deep trouth shoal form has certain diversity.Therefore, just need in river model making to increase sectional board quantity and improve sectional board to place precision, thus considerably increase the difficulty of river model making.
At present, the landform of river model makes and mainly river course is divided into several sections.According to the size reducing rear river course, the surface undulation changing unit in river course is signed on three-ply board, then three-ply board is cut into section configuration, complete the making of sectional board.During concrete operations, be vertically inserted on the sand drift of tiling by sectional board, utilize section line position and level gauge to position, then with model sasnd, consolidation is filled and led up in sectional board position, uniform application forms landform, and river model completes.The shortcoming of this preparation method is that the location of sectional board needs many people to operate simultaneously, its complicated operation and difficulty higher, cause manufacturing process to waste time and energy.In addition, due to the sectional board thinner thickness that three-ply board is made, easily deform in position fixing process, because this reducing the making precision of river model mesorelief.
Summary of the invention
The structure that technical problem to be solved of the present invention is to provide is simple, fast and accurate for positioning, carries out special training without the need to a large amount of manpower with to personnel, ensures the Stability Analysis of Structures of sectional board in position fixing process.
According to the present invention, provide a kind of landform of ecological riverway model to make stand, comprise frame and at least two locators.Frame comprise at least two mutual parallel and be in the girder of same elevation, each girder is equipped with scale.Each locator comprises: the connector be connected with girder matched; U-shaped installing plate, U-shaped installing plate is articulated with the first end of connector can rotate around connector; Be arranged on the pointer that U-shaped installing plate also can rotate with U-shaped installing plate; For sectional board being fixed on the fixed wedge in the inner chamber of U-shaped installing plate.Wherein, the section line by regulating the axis of locator on girder and angle position to determine sectional board.
In one embodiment, frame comprises the crossbeam be connected with many girder sliding-contact formulas, and it at least connects two locators.
In one embodiment, be equipped with longitudinal register groove above girder and crossbeam, it is for holding dimensional scales part.
In one embodiment, the second end of connector is provided with the suspension groove for engaging with the sidewall of locating slot, thus locator is suspended in frame.
In one embodiment, the installation end of U-shaped installing plate is provided with pivot, and it is inserted in the hollow ring portion at the first end place being located at connector to realize hinged cooperation.
In one embodiment, when locator is connected to girder, the sensing of pointer is parallel with installing plate.
In one embodiment, when locator is connected to crossbeam, the sensing of pointer is vertical with installing plate.
In one embodiment, fixed wedge is U-shaped wedge, and for being fixed between locator and sectional board.
In one embodiment, be provided with dimensional scales part outside the U-shaped of installing plate, it is for locating the elevation of sectional board.
In one embodiment, also comprise can the supporting leg of support girder up and down for stand
According to the invention has the beneficial effects as follows: the structure making stand according to the landform of ecological riverway model of the present invention is simple, simple to operate, the three-dimensional localization quickly and accurately of sectional board can be realized, to the change of natural, ecological river topography greatly, section complicated situation has stronger compliance, environmental hydro science can be met, Ecological waterscape etc. are to river course flexibility and the multifarious demand of section, achieve bending, divide the branch of a river, the making of the river topography of the complex situations such as shoal and deep trouth replace, save a large amount of manpower and special training is carried out to personnel, also improve stability and the positioning precision of sectional board structure simultaneously.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further described.
Fig. 1 is the structure chart making stand according to the landform of ecological riverway model of the present invention.
Fig. 2 shows the locator making stand according to the landform of ecological riverway model of the present invention.
Fig. 3 shows the fixed wedge making stand according to the landform of ecological riverway model of the present invention.
Detailed description of the invention
Be described principle of the present invention and feature below in conjunction with accompanying drawing, example, only for explaining the present invention, is not intended to limit scope of the present invention.
Fig. 1 shows and makes stand 100 according to the landform of ecological riverway model of the present invention.This making stand 100 comprises frame 50, it comprise at least two mutual parallel and be in the girder 1 of same elevation.This stand 100 also comprises the supporting leg 4 for liftably support girder 1.The quantity of supporting leg 4 is determined according to the length of girder 1, ensures that girder 1 can not bend.The crossbeam 2 be connected with many girders 1 sliding-contact formula is provided with above girder 1.Crossbeam 2 is mainly used in the narrower region that sectional board 5 length is less than the distance between adjacent girder 1.Wherein, all girders 1 and crossbeam 2 are equipped with scale, and object is the quick position facilitating sectional board 5.Easy understand, supporting leg 4 realizes the process of its lifting by adjustment bolt 12.
In this embodiment, above girder 1 and crossbeam 2, be equipped with longitudinal register groove 11, it is for holding dimensional scales part (not shown).This dimensional scales part is preferably tape measure.This structure also conveniently realizes the connection of locator 3 and girder 1 or crossbeam 2, as shown in Figure 1 and Figure 2.
As shown in Figure 2, this making stand 100 also comprises locator 3, and it comprises the connector 7 be connected with girder 1 matched.The second end 22 of this connector 7 is provided with the suspension groove 10 for engaging with the sidewall of locating slot 11, thus locator is suspended in frame.The first end 25 of this connector 7 is provided with hollow ring portion 24.The pivot 23 being located at installation end 21 place of U-shaped installing plate 9 is inserted into this hollow ring portion 24 and is formed hinged, and U-shaped installing plate 9 can be rotated around connector 7.Be provided with pointer 6 at the installation end 21 of U-shaped installing plate 9, this pointer 6 together can rotate with installing plate 9 with U-shaped.The inner chamber of U-shaped installing plate 9 is shown in Fig. 1 for installing sectional board 5().Sectional board 5 is fixed in the inner chamber of U-shaped installing plate 9 by the fixed wedge 13 filled between sectional board 5 and U-shaped installing plate 9.In order to strengthen the Stability Analysis of Structures of U-shaped installing plate 9, outside it, be such as welded with ribs 8.Conveniently in the location in elevation direction, outside U-shaped installing plate 9, be also provided with dimensional scales part (not shown).This dimensional scales part is such as tape measure, and it is arranged in the edge outside installing plate 9, and scale place and installing plate 9 coincident, thus convenient location sectional board elevation.Due to, this sectional board 5 is arranged in the inner chamber of U-shaped installing plate 9, can decrease the distortion of self, thus ensures the stability of sectional board 5 structure.
In this embodiment, as shown in Figure 1, the pointer 6 of locator 3 has two kinds to be distributed with two kinds of situations.A kind of situation is locator 3 when being connected to girder 1, and the sensing of pointer 6 is parallel with installing plate 9.Another kind of situation is locator 3 when being connected to crossbeam 2, and the sensing of pointer 6 is vertical with installing plate 9.The design of this spline structure is to ensure that pointer 6 points to scale place always.
According to the present invention, every block sectional board 5 is at least fixed by two locators 3, the section line then by regulating the axis of locator 3 on girder 1 or crossbeam 2 and angle position to determine sectional board.
Landform according to ecological riverway model of the present invention makes stand 100.Concrete steps in operation are as follows:
The first step, installation frame 50.First according to the test drawing of ecological riverway, in the lab, the river location of selected ecological model, according to axis, river course along selecting two main lines again.Selected main line is installed girder 1, and it is consistent for tentatively adjusting supporting leg 4 height by adjustment bolt 12, and then is finely tuned by level gauge, ensures be parallel to each other between these many girders 1 and be in same elevation.If experimental simulation river course is wider, the quantity of girder 1 can be increased in order to ensure the stability of sectional board 5.In addition, when sectional board 5 length to be installed is less than the distance between adjacent girder 1, needs crossbeam 2 to be connected with girder 1 sliding-contact formula, and then sectional board 5 is arranged on crossbeam 2, thus make up the defect that girder 1 can not locate shorter sectional board.
Second step, sectional board 5 is located.According to section line position, determine the position of sectional board 5 in frame 50 to be installed.Then the locator 3 being used for locating this sectional board 5 is arranged on different girders 1 respectively, then adjusts the position on locator 3 place girder 1 by pointer 6, the line of each locator 3 is overlapped with section line.The sectional board to be installed 5 completed marks the position of locator 3, is arranged on the inner chamber of locator 3, then adjust the elevation of sectional board 5 by the dimensional scales part outside U-shaped installing plate 9.After elevation is adjusted, between U-shaped installing plate 9 and sectional board to be installed 5, fill in fixed wedge 13, complete the three-dimensional localization in river model of sectional board.Easy understand, sectional board 5 be arranged on the operating procedure of crossbeam 2 and the above-mentioned step being arranged on girder 1 similar, belong to that the art personnel are readily appreciated that, no further details to be given herein.
Finally, with model sasnd, consolidation is filled and led up in the position of sectional board 5, uniform application forms landform.When after sectional board 5 fixation, remove this making stand 100, the landform completing this river model (ecological riverway model) makes.
Therefore, the landform of the ecological riverway model of the application of the invention makes stand 100, the three-dimensional localization quickly and accurately of sectional board can be realized, to the change of natural, ecological river topography greatly, section complicated situation has stronger compliance, environmental hydro science can be met, Ecological waterscape etc. are to river course flexibility and the multifarious demand of section, achieve bending, divide the branch of a river, shoal deep trouth replaces the making of the landform of the complex situations such as river course, save a large amount of manpower and special training is carried out to personnel, also improve stability and the positioning precision of sectional board structure simultaneously.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (10)
1. the landform of ecological riverway model makes a stand, comprising:
Frame, comprise at least two mutual parallel and be in the girder of same elevation, each described girder is equipped with scale,
At least two locators, each locator comprises: the connector be connected with described girder matched; U-shaped installing plate, described U-shaped installing plate is articulated with the first end of described connector can rotate around described connector; Be arranged on the pointer that described U-shaped installing plate also can rotate with described U-shaped installing plate; For sectional board being fixed on the fixed wedge in the inner chamber of described U-shaped installing plate,
Wherein, the section line by regulating the axis of described locator on described girder and angle position to determine sectional board.
2. landform according to claim 1 makes stand, and it is characterized in that, described frame comprises the crossbeam that girder sliding-contact formula described with many is connected, and it at least connects two locators.
3. landform according to claim 2 makes stand, and it is characterized in that, be equipped with longitudinal register groove above described girder and crossbeam, it is for holding dimensional scales part.
4. landform according to claim 3 makes stand, and it is characterized in that, the second end of described connector is provided with the suspension groove for engaging with the sidewall of described locating slot, thus locator is suspended in frame.
5. the landform according to any one of claim 1 to 4 makes stand, and it is characterized in that, the installation end of described U-shaped installing plate is provided with pivot, and it is inserted in the hollow ring portion at the first end place being located at described connector to realize hinged cooperation.
6. the landform according to any one of claim 1 to 4 makes stand, and it is characterized in that, when described locator is connected to described girder, the sensing of described pointer is parallel with described installing plate.
7. landform according to claim 2 makes stand, and it is characterized in that, when described locator is connected to described crossbeam, the sensing of described pointer is vertical with described installing plate.
8. the landform according to any one of claim 1 to 4 makes stand, and it is characterized in that, described fixed wedge is U-shaped wedge, and for being fixed between described locator and sectional board.
9. the landform according to any one of claim 1 to 4 makes stand, and it is characterized in that, be provided with dimensional scales part outside the U-shaped of described installing plate, it is for locating the elevation of sectional board.
10. the landform according to any one of claim 1 to 4 makes stand, and it is characterized in that, described stand also comprises the supporting leg that can support described girder up and down.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310112233.6A CN103195012B (en) | 2013-04-02 | 2013-04-02 | Terrain manufacture rack for ecological river channel model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310112233.6A CN103195012B (en) | 2013-04-02 | 2013-04-02 | Terrain manufacture rack for ecological river channel model |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195012A CN103195012A (en) | 2013-07-10 |
CN103195012B true CN103195012B (en) | 2015-04-08 |
Family
ID=48717817
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310112233.6A Active CN103195012B (en) | 2013-04-02 | 2013-04-02 | Terrain manufacture rack for ecological river channel model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195012B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103759917B (en) * | 2014-01-13 | 2016-07-06 | 河海大学 | A kind of combination type river course analog and single-piece thereof |
CN109024463B (en) * | 2018-03-06 | 2020-07-07 | 河海大学 | River model making method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3393810B2 (en) * | 1998-07-17 | 2003-04-07 | 特定非営利活動法人 砂防広報センター | Transport equipment for model test equipment |
CN101013531B (en) * | 2007-02-05 | 2010-05-19 | 武汉大学 | Method for preparing landform of model and apparatus thereof |
CN201610538U (en) * | 2009-09-29 | 2010-10-20 | 黄河水利委员会黄河水利科学研究院 | River bottom peeling off simulation test device of hyperconcentrated flood |
KR101183238B1 (en) * | 2010-06-01 | 2012-09-14 | 한국원자력연구원 | Instrument for wave generating hydraulic model on small scale of circulation type |
CN102140785B (en) * | 2011-01-07 | 2012-02-15 | 北京航空航天大学 | Device for making hydraulic model |
CN102519428B (en) * | 2011-12-09 | 2014-07-23 | 清华大学 | Apparatus positioning and controlling device for river cross-section measurement |
-
2013
- 2013-04-02 CN CN201310112233.6A patent/CN103195012B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103195012A (en) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105040754B (en) | Device for testing limited soil mass rigid retaining wall soil pressure model | |
CN109839315A (en) | Simulate the two-way sliding physical model case and Cross-fault leveling tunnel mechanics performance testing method in Cross-fault leveling tunnel | |
CN104499714A (en) | Mechanical and electrical installation engineering construction method based on BIM platform and measuring robot | |
CN102426396B (en) | Testing apparatus for simulating deep-displacement-initiated strata deformation coordination mechanism | |
CN104778334B (en) | Based on the railway of CATIA freely-supported bridge threedimensional model creation method | |
CN103114732B (en) | Cast steel penetration pipe node space positioning method | |
CN105043343A (en) | Method for automated measurement of tunnel vault settlement based on laser displacement sensor | |
CN103057662B (en) | Drilling ship anchor platform process for integrally manufacturing and anchor platform structure | |
CN103411584B (en) | Method and device for inspection measurement of fan-shaped section base of continuous casting machine | |
CN105973141A (en) | Device and method of measuring shield tunnel segment dislocation | |
CN104999548A (en) | Mechanical template system of curved magnetic levitation track beam and application method of mechanical template system | |
CN103523169A (en) | Double-shell ship building method | |
CN106638318A (en) | Method for positioning anchor point of beam end of cable stayed bridge and installation method of cable guide pipe | |
CN103195012B (en) | Terrain manufacture rack for ecological river channel model | |
CN105113410A (en) | Support moulding bed and linear forming method for setting up road steel bridge using same | |
US9803977B2 (en) | Apparatus and method for bridge assembly | |
CN208547543U (en) | Tunnel threedimensional model bracket loading test platform | |
CN103344214B (en) | 1.6-degree parabolic extralarge pier measuring and pier body linear control method | |
CN102518045B (en) | Arch rib embedded section installing and positioning support and adjusting and positioning method thereof | |
CN109290739A (en) | A kind of space curve head tower segment manufacturing process | |
CN203502015U (en) | Special measuring scale for horizontal displacement by collimation line method | |
CN209541687U (en) | A kind of cross distribution point method measurement combined bay | |
CN108253193A (en) | Wall pipe built-in construction method | |
CN204919633U (en) | Limited soil body rigidity barricade soil pressure model test device | |
CN104296734B (en) | A kind of curve abnormal shape rod member location measurement method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |