CN103184878A - Method for improving second lining construction efficiency in tunnel widening section - Google Patents

Method for improving second lining construction efficiency in tunnel widening section Download PDF

Info

Publication number
CN103184878A
CN103184878A CN2013100959767A CN201310095976A CN103184878A CN 103184878 A CN103184878 A CN 103184878A CN 2013100959767 A CN2013100959767 A CN 2013100959767A CN 201310095976 A CN201310095976 A CN 201310095976A CN 103184878 A CN103184878 A CN 103184878A
Authority
CN
China
Prior art keywords
chassis
tunnel
trolley
rotary stand
widened section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100959767A
Other languages
Chinese (zh)
Other versions
CN103184878B (en
Inventor
田连民
阎王虎
钱江
薛海璞
薛明英
谢全福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communications Road and Bridge North China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201310095976.7A priority Critical patent/CN103184878B/en
Publication of CN103184878A publication Critical patent/CN103184878A/en
Application granted granted Critical
Publication of CN103184878B publication Critical patent/CN103184878B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a method for improving the second lining construction efficiency in a tunnel widening section. The method comprises the following steps of: firstly prefabricating a rotating platform comprising a tower formed by bracing pieces, wherein the top of the tower is provided with a lifting platform, and a rotating bearing is connected below the lifting platform and is connected with a lifting system; after the second lining construction is completed in the tunnel widening section, dragging a trolley for construction to the middle part of the widening section; arranging the rotating platform under the trolley, jacking upwards the trolley through a lifting system of the rotating platform, taking down traveling wheels at the bottom of the trolley and traveling wheel guide rails, and then rotating the trolley by 90 degrees; rotating the trolley in place, then arranging the traveling wheels back to the bottom of the trolley, laying the guide rails below the traveling wheels, dropping the trolley through the lifting system of the rotating platform, removing the rotating platform, dragging the trolley to pass through a master cave of the tunnel along the guide rails to reach the next widening section, rotating the trolley by 90 degrees through the rotating platform, and carrying out second lining construction in the next section.

Description

A kind of method that improves tunnel widened section two lining efficiencies of construction
Technical field
The present invention relates to the job practices of a kind of tunnel widened section Second Lining Construction, be applicable to containing widened section such as the band long tunnel of widened section and the super long tunnel two lining constructions of stopping in emergency.
Background technology
Secondary lining is the tunnel construction form concrete lining cutting that applies of supporting inboard in the early stage, carried out under the condition of preliminary bracing in the tunnel, build inner lining with materials such as concrete, reinforce supporting to reach, optimize the route waterproof and water drainage system, beautify outward appearance, the effect of facilities such as communication, illumination, monitoring conveniently be set, to adapt to the requirement of modernized super expressway tunnel construction.
Figure 1 shows that the used chassis 1 of Second Lining Construction in the tunnel.Roller 11 is equipped with in chassis 1 bottom, and roller 11 belows are equipped with guide rail 2, and chassis 1 can move along guide rail 2.After one section two lining construction finished in the tunnel, along the tunnel chassis 1 traction to next section is constructed.But in some long tunnel and super long tunnel, usually just have a widened section to be used for establishing the band that stops in emergency at a certain distance, the tunnel width of establishing the band place of stopping in emergency is more many greatly than normal through tunnel master hole width, among Fig. 1,3 is main hole outline line, and 4 is the widened section outline line.As can be seen, the section of widened section is greater than main hole section, and also the width than normal through tunnel master hole is big to the span of the chassis of widened section two lining constructions.To a widened section two lining construction finish, in the time of need constructing to next widened section, widened section construction chassis can not be normally by master hole, tunnel, after traditional method is an each widened section two linings of having constructed, all will dismantle two lining chassis, re-assembly during to next widened section two lining construction again, dismounting, assembling process need the two weeks time at least usually, this method greatly reduces widened section two lining efficiencies of construction, has delayed the construction period.
Summary of the invention
The objective of the invention is at the low problem of present tunnel widened section two lining efficiencies of construction, a kind of method that improves tunnel widened section two lining efficiencies of construction is provided, can reach normal through tunnel master hole in the situation that does not need to dismantle the construction chassis, improve efficiency of construction indirectly, the reduction of erection time.
The present patent application people finds, the size of common widened section two lining chassis, although it is along the span of the tunnel lateral direction width greater than master hole, tunnel, but stand along the tunnel longitudinally length then less than the width in master hole, tunnel, thus, the applicant expects the stand half-twist, makes stand integral body by master hole, tunnel.
Technical scheme of the present invention is as follows:
A kind of method that improves tunnel widened section two lining efficiencies of construction is characterized in that:
(1) a prefabricated rotary stand, described rotary stand comprises the pylon of being made up of support bar, and the top of pylon is provided with lift platform, and the below of described lift platform connects swivel bearing, and described swivel bearing connects a jacking system;
(2) after widened section two lining constructions finished in the tunnel, the chassis of will constructing drew to the widened section middle part;
(3) rotary stand is arranged on chassis below, by the jacking system of rotary stand, with the chassis jack-up that makes progress, the travelling wheel of the pallet bottom of dismantling, and travelling wheel guide rail are then with the chassis half-twist;
(4) after chassis is rotated in place, travelling wheel is installed back pallet bottom, and below travelling wheel, lay guide rail, jacking system by rotary stand falls chassis, remove rotary stand, draw chassis by master hole, tunnel, to next widened section along guide rail, again by rotary stand with the chassis half-twist, carry out next section two lining construction.
The present invention is by with the stand rotation, can integral body move in master hole, tunnel, does not need to dismantle and re-assembly.Traditional widened section two lining job practicess, dismounting, rigging chassis once need 15 days at least, adopt method of the present invention that two lining formwork jumbos are moved to next widened section from a widened section, whole process can be finished in one day, shortened the time that two lining formwork jumbos switch the scope of operation greatly, improve efficiency of construction greatly, shortened the duration.
Description of drawings
Fig. 1 is the structural representation of Second Lining Construction chassis in the tunnel
Fig. 2 is the structural representation of rotary stand provided by the invention
View when Fig. 3 is rotary stand with two lining chassis jack-up and half-twist
Fig. 4 is the view of chassis during by master hole, tunnel
The specific embodiment
Below in conjunction with the drawings and the specific embodiments, method of the present invention is described.The present invention includes following steps:
(1) a prefabricated rotary stand.The structure of rotary stand 5 as shown in Figure 2, described rotary stand 5 comprises the pylon of being made up of support bar 51, the top of pylon 51 is provided with lift platform 52, the below of described lift platform 52 connects swivel bearing 53, described swivel bearing 53 connects a jacking system.This jacking system can adopt the hydraulic lifting system of prior art.
The main material of processing rotary stand pylon is i iron, angle steel, steel plate etc.The weight that stand and used bearing need can bear stand as calculated.
(2) after widened section two lining constructions finished in the tunnel, chassis 1 traction of will constructing was to this widened section middle part.Also to dismantle local members such as the thousands of jin of chassis, very heavy oil cylinder, ladder in case of necessity, to guarantee the chassis rotation enough gaps can be arranged.
(3) as shown in Figure 3, rotary stand 5 is arranged on chassis 1 below, by the jacking system of rotary stand 5, lift platform 52 is risen, with chassis 1 jack-up upwards, the travelling wheel 11 of the pallet bottom of dismantling, and the track 2 of travelling wheel below, then with the chassis half-twist.
During practical operation, can be earlier place backing plate 6 at lift platform, chassis is pushed up lift the position stressed evenly.
(4) as shown in Figure 4, after chassis 1 is rotated in place, travelling wheel 11 is installed back pallet bottom, and lay guide rail 2 again below travelling wheel 11, the jacking system by rotary stand falls chassis, removes rotary stand 5, along guide rail 2 traction chassis 1 by master hole, tunnel.To next widened section, again by rotary stand with the chassis half-twist.Chassis moves to next widened section with regard to integral body like this, carries out next section two lining construction.

Claims (2)

1. one kind is improved the method that tunnel widened section two serves as a contrast efficiencies of construction, it is characterized in that:
(1) a prefabricated rotary stand, described rotary stand comprises the pylon of being made up of support bar, and the top of pylon is provided with lift platform, and the below of described lift platform connects swivel bearing, and described swivel bearing connects a jacking system;
(2) after widened section two lining constructions finished in the tunnel, the chassis of will constructing drew to the widened section middle part;
(3) rotary stand is arranged on chassis below, by the jacking system of rotary stand, with the chassis jack-up that makes progress, the travelling wheel of the pallet bottom of dismantling, and travelling wheel guide rail are then with the chassis half-twist;
(4) after chassis is rotated in place, travelling wheel is installed back pallet bottom, and below travelling wheel, lay guide rail, jacking system by rotary stand falls chassis, remove rotary stand, draw chassis by master hole, tunnel, to next widened section along guide rail, again by rotary stand with the chassis half-twist, carry out next section two lining construction.
2. method according to claim 1 is characterized in that: the jacking system employing hydraulic lifting system of described rotary stand.
CN201310095976.7A 2013-03-25 2013-03-25 Method for improving second lining construction efficiency in tunnel widening section Active CN103184878B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310095976.7A CN103184878B (en) 2013-03-25 2013-03-25 Method for improving second lining construction efficiency in tunnel widening section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310095976.7A CN103184878B (en) 2013-03-25 2013-03-25 Method for improving second lining construction efficiency in tunnel widening section

Publications (2)

Publication Number Publication Date
CN103184878A true CN103184878A (en) 2013-07-03
CN103184878B CN103184878B (en) 2015-02-25

Family

ID=48676294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310095976.7A Active CN103184878B (en) 2013-03-25 2013-03-25 Method for improving second lining construction efficiency in tunnel widening section

Country Status (1)

Country Link
CN (1) CN103184878B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104265304A (en) * 2014-09-24 2015-01-07 中铁第五勘察设计院集团有限公司 Metro circular-arc-shaped section reinforcing construction apparatus
CN109356620A (en) * 2018-12-03 2019-02-19 湖南五新隧道智能装备股份有限公司 A kind of portal-framed structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001049999A (en) * 1999-08-11 2001-02-20 Zenitaka Corp Reinforcing segment assembly device
CN1403686A (en) * 2002-07-31 2003-03-19 甘肃工业大学 Hydraulic tunnel bogie for installing facing
CN2575219Y (en) * 2002-11-02 2003-09-24 陈定国 Device for connecting pipes of scaffold
CN202325552U (en) * 2011-11-28 2012-07-11 中铁十二局集团第一工程有限公司 Lining trolley for widened area construction of tunnel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1553698A1 (en) * 1987-03-25 1990-03-30 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт Method of mechanized erection of support at steep beds

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001049999A (en) * 1999-08-11 2001-02-20 Zenitaka Corp Reinforcing segment assembly device
CN1403686A (en) * 2002-07-31 2003-03-19 甘肃工业大学 Hydraulic tunnel bogie for installing facing
CN2575219Y (en) * 2002-11-02 2003-09-24 陈定国 Device for connecting pipes of scaffold
CN202325552U (en) * 2011-11-28 2012-07-11 中铁十二局集团第一工程有限公司 Lining trolley for widened area construction of tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104265304A (en) * 2014-09-24 2015-01-07 中铁第五勘察设计院集团有限公司 Metro circular-arc-shaped section reinforcing construction apparatus
CN109356620A (en) * 2018-12-03 2019-02-19 湖南五新隧道智能装备股份有限公司 A kind of portal-framed structure

Also Published As

Publication number Publication date
CN103184878B (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN109538238B (en) Tunnel arch prefabricated segment construction device and control method
CN206092022U (en) Be used for lining cutting rectangular -section or radiation gradual change rectangular -section formula operation car of crawling
CN205618174U (en) Box culvert platform truck
CN104775825A (en) Shield machine single well overall originating construction method
CN205172590U (en) Make up multi -purpose tunnel lining platform truck
CN106976157A (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN106917356A (en) A kind of new steel truss girder bridge railway ballast frid Efficient installation method
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN104695335A (en) Overall reinforcement binding and hoisting construction method and construction device adopting upstroke movable scaffolding
CN205400756U (en) Variable section platform truck
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN105019357B (en) The installation method of abnormity prefabricated bridge on a kind of arch bridge uncovered lattice girder steel
CN103184878B (en) Method for improving second lining construction efficiency in tunnel widening section
CN204851287U (en) Big section moving as a whole formula formwork support
CN204023336U (en) A kind of subway track-laying machine
CN103615262B (en) A kind of agent structure can the overall steel form carrier by conventional section and its implementation
CN104831638B (en) A kind of mobile formwork straddle truck and construction method thereof
CN203702180U (en) Single-track railway outer mold tunnel trolley
CN205977235U (en) Reinforcing bar platform truck suitable for section of turning construction
CN203570323U (en) Steel form carrier with main structure capable of passing through conventional cross sections integrally
CN208803852U (en) A kind of tunnel double-lining concrete movable maintenance type rack
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine
CN204401473U (en) Upstroke movable framework steel bar overall binding lifting construction device
CN107285209A (en) A kind of Novel U-shaped erection equipment and its operating method
CN107386138A (en) A kind of installation method of totally-enclosed gobo work car and totally-enclosed gobo

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant