CN103184878A - Method for improving second lining construction efficiency in tunnel widening section - Google Patents
Method for improving second lining construction efficiency in tunnel widening section Download PDFInfo
- Publication number
- CN103184878A CN103184878A CN2013100959767A CN201310095976A CN103184878A CN 103184878 A CN103184878 A CN 103184878A CN 2013100959767 A CN2013100959767 A CN 2013100959767A CN 201310095976 A CN201310095976 A CN 201310095976A CN 103184878 A CN103184878 A CN 103184878A
- Authority
- CN
- China
- Prior art keywords
- chassis
- tunnel
- trolley
- rotary stand
- widened section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention provides a method for improving the second lining construction efficiency in a tunnel widening section. The method comprises the following steps of: firstly prefabricating a rotating platform comprising a tower formed by bracing pieces, wherein the top of the tower is provided with a lifting platform, and a rotating bearing is connected below the lifting platform and is connected with a lifting system; after the second lining construction is completed in the tunnel widening section, dragging a trolley for construction to the middle part of the widening section; arranging the rotating platform under the trolley, jacking upwards the trolley through a lifting system of the rotating platform, taking down traveling wheels at the bottom of the trolley and traveling wheel guide rails, and then rotating the trolley by 90 degrees; rotating the trolley in place, then arranging the traveling wheels back to the bottom of the trolley, laying the guide rails below the traveling wheels, dropping the trolley through the lifting system of the rotating platform, removing the rotating platform, dragging the trolley to pass through a master cave of the tunnel along the guide rails to reach the next widening section, rotating the trolley by 90 degrees through the rotating platform, and carrying out second lining construction in the next section.
Description
Technical field
The present invention relates to the job practices of a kind of tunnel widened section Second Lining Construction, be applicable to containing widened section such as the band long tunnel of widened section and the super long tunnel two lining constructions of stopping in emergency.
Background technology
Secondary lining is the tunnel construction form concrete lining cutting that applies of supporting inboard in the early stage, carried out under the condition of preliminary bracing in the tunnel, build inner lining with materials such as concrete, reinforce supporting to reach, optimize the route waterproof and water drainage system, beautify outward appearance, the effect of facilities such as communication, illumination, monitoring conveniently be set, to adapt to the requirement of modernized super expressway tunnel construction.
Figure 1 shows that the used chassis 1 of Second Lining Construction in the tunnel.Roller 11 is equipped with in chassis 1 bottom, and roller 11 belows are equipped with guide rail 2, and chassis 1 can move along guide rail 2.After one section two lining construction finished in the tunnel, along the tunnel chassis 1 traction to next section is constructed.But in some long tunnel and super long tunnel, usually just have a widened section to be used for establishing the band that stops in emergency at a certain distance, the tunnel width of establishing the band place of stopping in emergency is more many greatly than normal through tunnel master hole width, among Fig. 1,3 is main hole outline line, and 4 is the widened section outline line.As can be seen, the section of widened section is greater than main hole section, and also the width than normal through tunnel master hole is big to the span of the chassis of widened section two lining constructions.To a widened section two lining construction finish, in the time of need constructing to next widened section, widened section construction chassis can not be normally by master hole, tunnel, after traditional method is an each widened section two linings of having constructed, all will dismantle two lining chassis, re-assembly during to next widened section two lining construction again, dismounting, assembling process need the two weeks time at least usually, this method greatly reduces widened section two lining efficiencies of construction, has delayed the construction period.
Summary of the invention
The objective of the invention is at the low problem of present tunnel widened section two lining efficiencies of construction, a kind of method that improves tunnel widened section two lining efficiencies of construction is provided, can reach normal through tunnel master hole in the situation that does not need to dismantle the construction chassis, improve efficiency of construction indirectly, the reduction of erection time.
The present patent application people finds, the size of common widened section two lining chassis, although it is along the span of the tunnel lateral direction width greater than master hole, tunnel, but stand along the tunnel longitudinally length then less than the width in master hole, tunnel, thus, the applicant expects the stand half-twist, makes stand integral body by master hole, tunnel.
Technical scheme of the present invention is as follows:
A kind of method that improves tunnel widened section two lining efficiencies of construction is characterized in that:
(1) a prefabricated rotary stand, described rotary stand comprises the pylon of being made up of support bar, and the top of pylon is provided with lift platform, and the below of described lift platform connects swivel bearing, and described swivel bearing connects a jacking system;
(2) after widened section two lining constructions finished in the tunnel, the chassis of will constructing drew to the widened section middle part;
(3) rotary stand is arranged on chassis below, by the jacking system of rotary stand, with the chassis jack-up that makes progress, the travelling wheel of the pallet bottom of dismantling, and travelling wheel guide rail are then with the chassis half-twist;
(4) after chassis is rotated in place, travelling wheel is installed back pallet bottom, and below travelling wheel, lay guide rail, jacking system by rotary stand falls chassis, remove rotary stand, draw chassis by master hole, tunnel, to next widened section along guide rail, again by rotary stand with the chassis half-twist, carry out next section two lining construction.
The present invention is by with the stand rotation, can integral body move in master hole, tunnel, does not need to dismantle and re-assembly.Traditional widened section two lining job practicess, dismounting, rigging chassis once need 15 days at least, adopt method of the present invention that two lining formwork jumbos are moved to next widened section from a widened section, whole process can be finished in one day, shortened the time that two lining formwork jumbos switch the scope of operation greatly, improve efficiency of construction greatly, shortened the duration.
Description of drawings
Fig. 1 is the structural representation of Second Lining Construction chassis in the tunnel
Fig. 2 is the structural representation of rotary stand provided by the invention
View when Fig. 3 is rotary stand with two lining chassis jack-up and half-twist
Fig. 4 is the view of chassis during by master hole, tunnel
The specific embodiment
Below in conjunction with the drawings and the specific embodiments, method of the present invention is described.The present invention includes following steps:
(1) a prefabricated rotary stand.The structure of rotary stand 5 as shown in Figure 2, described rotary stand 5 comprises the pylon of being made up of support bar 51, the top of pylon 51 is provided with lift platform 52, the below of described lift platform 52 connects swivel bearing 53, described swivel bearing 53 connects a jacking system.This jacking system can adopt the hydraulic lifting system of prior art.
The main material of processing rotary stand pylon is i iron, angle steel, steel plate etc.The weight that stand and used bearing need can bear stand as calculated.
(2) after widened section two lining constructions finished in the tunnel, chassis 1 traction of will constructing was to this widened section middle part.Also to dismantle local members such as the thousands of jin of chassis, very heavy oil cylinder, ladder in case of necessity, to guarantee the chassis rotation enough gaps can be arranged.
(3) as shown in Figure 3, rotary stand 5 is arranged on chassis 1 below, by the jacking system of rotary stand 5, lift platform 52 is risen, with chassis 1 jack-up upwards, the travelling wheel 11 of the pallet bottom of dismantling, and the track 2 of travelling wheel below, then with the chassis half-twist.
During practical operation, can be earlier place backing plate 6 at lift platform, chassis is pushed up lift the position stressed evenly.
(4) as shown in Figure 4, after chassis 1 is rotated in place, travelling wheel 11 is installed back pallet bottom, and lay guide rail 2 again below travelling wheel 11, the jacking system by rotary stand falls chassis, removes rotary stand 5, along guide rail 2 traction chassis 1 by master hole, tunnel.To next widened section, again by rotary stand with the chassis half-twist.Chassis moves to next widened section with regard to integral body like this, carries out next section two lining construction.
Claims (2)
1. one kind is improved the method that tunnel widened section two serves as a contrast efficiencies of construction, it is characterized in that:
(1) a prefabricated rotary stand, described rotary stand comprises the pylon of being made up of support bar, and the top of pylon is provided with lift platform, and the below of described lift platform connects swivel bearing, and described swivel bearing connects a jacking system;
(2) after widened section two lining constructions finished in the tunnel, the chassis of will constructing drew to the widened section middle part;
(3) rotary stand is arranged on chassis below, by the jacking system of rotary stand, with the chassis jack-up that makes progress, the travelling wheel of the pallet bottom of dismantling, and travelling wheel guide rail are then with the chassis half-twist;
(4) after chassis is rotated in place, travelling wheel is installed back pallet bottom, and below travelling wheel, lay guide rail, jacking system by rotary stand falls chassis, remove rotary stand, draw chassis by master hole, tunnel, to next widened section along guide rail, again by rotary stand with the chassis half-twist, carry out next section two lining construction.
2. method according to claim 1 is characterized in that: the jacking system employing hydraulic lifting system of described rotary stand.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310095976.7A CN103184878B (en) | 2013-03-25 | 2013-03-25 | Method for improving second lining construction efficiency in tunnel widening section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310095976.7A CN103184878B (en) | 2013-03-25 | 2013-03-25 | Method for improving second lining construction efficiency in tunnel widening section |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103184878A true CN103184878A (en) | 2013-07-03 |
CN103184878B CN103184878B (en) | 2015-02-25 |
Family
ID=48676294
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310095976.7A Active CN103184878B (en) | 2013-03-25 | 2013-03-25 | Method for improving second lining construction efficiency in tunnel widening section |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103184878B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104265304A (en) * | 2014-09-24 | 2015-01-07 | 中铁第五勘察设计院集团有限公司 | Metro circular-arc-shaped section reinforcing construction apparatus |
CN109356620A (en) * | 2018-12-03 | 2019-02-19 | 湖南五新隧道智能装备股份有限公司 | A kind of portal-framed structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001049999A (en) * | 1999-08-11 | 2001-02-20 | Zenitaka Corp | Reinforcing segment assembly device |
CN1403686A (en) * | 2002-07-31 | 2003-03-19 | 甘肃工业大学 | Hydraulic tunnel bogie for installing facing |
CN2575219Y (en) * | 2002-11-02 | 2003-09-24 | 陈定国 | Device for connecting pipes of scaffold |
CN202325552U (en) * | 2011-11-28 | 2012-07-11 | 中铁十二局集团第一工程有限公司 | Lining trolley for widened area construction of tunnel |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1553698A1 (en) * | 1987-03-25 | 1990-03-30 | Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт | Method of mechanized erection of support at steep beds |
-
2013
- 2013-03-25 CN CN201310095976.7A patent/CN103184878B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001049999A (en) * | 1999-08-11 | 2001-02-20 | Zenitaka Corp | Reinforcing segment assembly device |
CN1403686A (en) * | 2002-07-31 | 2003-03-19 | 甘肃工业大学 | Hydraulic tunnel bogie for installing facing |
CN2575219Y (en) * | 2002-11-02 | 2003-09-24 | 陈定国 | Device for connecting pipes of scaffold |
CN202325552U (en) * | 2011-11-28 | 2012-07-11 | 中铁十二局集团第一工程有限公司 | Lining trolley for widened area construction of tunnel |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104265304A (en) * | 2014-09-24 | 2015-01-07 | 中铁第五勘察设计院集团有限公司 | Metro circular-arc-shaped section reinforcing construction apparatus |
CN109356620A (en) * | 2018-12-03 | 2019-02-19 | 湖南五新隧道智能装备股份有限公司 | A kind of portal-framed structure |
Also Published As
Publication number | Publication date |
---|---|
CN103184878B (en) | 2015-02-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109538238B (en) | Tunnel arch prefabricated segment construction device and control method | |
CN206092022U (en) | Be used for lining cutting rectangular -section or radiation gradual change rectangular -section formula operation car of crawling | |
CN205618174U (en) | Box culvert platform truck | |
CN104775825A (en) | Shield machine single well overall originating construction method | |
CN205172590U (en) | Make up multi -purpose tunnel lining platform truck | |
CN106976157A (en) | A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape | |
CN106917356A (en) | A kind of new steel truss girder bridge railway ballast frid Efficient installation method | |
CN110258352A (en) | The steel reinforced concrete combined bridge construction method that two bridgings are done | |
CN104695335A (en) | Overall reinforcement binding and hoisting construction method and construction device adopting upstroke movable scaffolding | |
CN205400756U (en) | Variable section platform truck | |
CN103074871A (en) | Arc-shaped slope concrete sliding and lifting template | |
CN105019357B (en) | The installation method of abnormity prefabricated bridge on a kind of arch bridge uncovered lattice girder steel | |
CN103184878B (en) | Method for improving second lining construction efficiency in tunnel widening section | |
CN204851287U (en) | Big section moving as a whole formula formwork support | |
CN204023336U (en) | A kind of subway track-laying machine | |
CN103615262B (en) | A kind of agent structure can the overall steel form carrier by conventional section and its implementation | |
CN104831638B (en) | A kind of mobile formwork straddle truck and construction method thereof | |
CN203702180U (en) | Single-track railway outer mold tunnel trolley | |
CN205977235U (en) | Reinforcing bar platform truck suitable for section of turning construction | |
CN203570323U (en) | Steel form carrier with main structure capable of passing through conventional cross sections integrally | |
CN208803852U (en) | A kind of tunnel double-lining concrete movable maintenance type rack | |
CN204112226U (en) | A kind of holes connects does section assembling bridge manufacturing machine | |
CN204401473U (en) | Upstroke movable framework steel bar overall binding lifting construction device | |
CN107285209A (en) | A kind of Novel U-shaped erection equipment and its operating method | |
CN107386138A (en) | A kind of installation method of totally-enclosed gobo work car and totally-enclosed gobo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |