CN103177399B - Solidification power transformation specification operation method - Google Patents
Solidification power transformation specification operation method Download PDFInfo
- Publication number
- CN103177399B CN103177399B CN201310078774.1A CN201310078774A CN103177399B CN 103177399 B CN103177399 B CN 103177399B CN 201310078774 A CN201310078774 A CN 201310078774A CN 103177399 B CN103177399 B CN 103177399B
- Authority
- CN
- China
- Prior art keywords
- prompting
- display screen
- order
- unlocking
- eject
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000007711 solidification Methods 0.000 title claims abstract description 8
- 230000008023 solidification Effects 0.000 title claims abstract description 8
- 230000009466 transformation Effects 0.000 title claims abstract description 8
- 230000002265 prevention Effects 0.000 claims abstract description 8
- 238000012790 confirmation Methods 0.000 claims description 9
- 230000008569 process Effects 0.000 claims description 8
- 238000004088 simulation Methods 0.000 claims description 6
- 241000238876 Acari Species 0.000 claims description 3
- 230000009471 action Effects 0.000 claims description 3
- 230000003993 interaction Effects 0.000 claims description 3
- 230000008901 benefit Effects 0.000 abstract description 4
- 230000007123 defense Effects 0.000 abstract description 2
- 230000007812 deficiency Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 230000003245 working effect Effects 0.000 abstract description 2
- 238000010200 validation analysis Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 3
- 230000015556 catabolic process Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000026676 system process Effects 0.000 description 1
Landscapes
- User Interface Of Digital Computer (AREA)
Abstract
The invention discloses a kind of solidification power transformation specification operation method, comprise the steps such as operation order selection, identity validation, Identity Management, Electronic Signature.The present invention is rational in infrastructure, can effectively improve anti-misoperation working effect, is preventing from reaching the effect of getting twice the result with half the effort in misoperation fault; Make full use of " technical precaution " measure, compensate for the deficiency of " people's air defense ", achieve be difficult to for these years to realize to the more effective security management and control of on-the-spot grid switching operation standardization behavior, improve the ability of accident prevention, greatly inhibit the number of times that scene is violating the regulations, accident occurs, direct economic benefit and the social indirect benefit of its enterprise are huge.
Description
Technical field
The present invention relates to a kind of solidification power transformation specification operation method.
Background technology
Grid switching operation is an important process of transformer station of power supply enterprise operation maintenance personnel, and it is related to the safe operation of transformer station and electric system, is also related to the personal safety of operating personnel and operating personnel itself.Simultaneously, the work of grid switching operation or a more complicated, the operation of existing primary circuit, also have the operation of secondary circuit, operation item is various, sometimes tens and even hundreds of item is reached, slightly neglect, will maloperation be caused, cause transformer station's full cut-off, even expand whole electric system to, make system break-down.
Summary of the invention
The object of the present invention is to provide a kind of solidification power transformation specification operation method can guaranteeing safety, exact operations.
Technical solution of the present invention is:
A kind of solidification power transformation specification operation method, is characterized in that: after receiving certain scheduling order, select corresponding operation order, open from the list of operating means display screen operation order; Select to confirm that this operation scheduling is no to issue an order, insert the people that issues an order, made us name; Show " operation starts " button of corresponding scheduling order, press " operation starts " button, automatically start the machine recording; Confirm that operation order has been audited and qualified; Add their confirmation to the object that whether clearly operates of display screen display, Analysis about Dangerous Point and pre-control work are carried out in display screen prompting; According to display screen prompting, operator, guardian carry out fingerprint signature or cryptographic signatures; According to display screen prompting, guardian fills in the operation start time; Display screen ejects picture, prompting simulation is checked, equipment on prompting simulation drawing runs and must conjugate operation, check end, prompting requires guardian, operator should jointly check simulated operation after system operation mode, system wiring whether meet the operation object of scheduling operation task, and by ACK button; Display screen ejects picture, according to action type, and the preliminary work of prompting Work tool, operation key; The picture of display screen ejection operation ticket Section 1 operation item, other operation items are visible, but display is implicit, can not operate, in operation, " unlocking operation " button that size is less should be set below operation order, unlock flow process problem to facilitate to flow at any time; Display screen prompting " call out the names of those voted for while counting ballot-slips rehearse, point and check, confirm to perform ", guardian and operator complete to call out the names of those voted for while counting ballot-slips and rehearse, point and check, confirm implementation, and guardian ticks operation before the serial number of operation item; Eject picture, confirm that equipment operating puts in place according to prompting; After operation order Section 1 operation item falls back on, the picture of ejection operation ticket Section 2 operation item in order, continues to perform aforesaid operations; If run into the operation not carrying out " working copy " for a long time, " unlocking operation " button that size is less ejects, and occur the INQUIRE statement of " the need of unlocking ", "No"---then carry out operating, "Yes"---system then enters unlocking operation program; After overall operations terminates, eject prompting frame, require that the equipment after reply operation once checks all sidedly, to confirm that operating complete nothing leaks item, selects confirmation equipment to be in normal condition; Display screen ejects the prompting frame filling in the operation end time, confirms after filling in; The prompting frame that display screen ejects " terminate and the end time to scheduling reporting operations, recheck single job task simultaneously, rehearsed errorless by scheduling ", presses " confirmation " key; Eject the prompting requiring to carry out relative recording; Eject the picture of " executed " Electronic Signature, below operation order last column, carry out Electronic Signature operation; If carried out unlocking operation in this task, also by eject key playbacked and carried out the prompting of relative recording; Terminate recording, video recording, operation completes.
Described unlocking operation flow process is: guardian is by "Yes", and system enters unlocking operation program; Eject prompting frame, inquiry " whether operation order is correct ", select "Yes", otherwise terminate, indicate in remarks column and terminate reason; Eject prompting frame, inquiry " whether operating interval is correct ", select "Yes"; When confirming to unlock, ejecting prompting frame, requiring the full-time people of contact error-unlocking prevention; When contact continues operation after agreeing to, eject prompting frame, display " error-unlocking prevention full-time people with or without agreement ", rehearse by re-starting after "Yes" to call out the names of those voted for while counting ballot-slips, point and check, confirm executable operations.
Describedly comprise data processing module, data processing module and the information interaction model calling being connected to display screen, capacitance contact board, data processing module and operation order virtual printer model calling, data processing module is connected with finger print acquisition module, and supply module provides power supply to above-mentioned module.
The present invention can effectively improve anti-misoperation working effect, is preventing from reaching the effect of getting twice the result with half the effort in misoperation fault; Make full use of " technical precaution " measure, compensate for the deficiency of " people's air defense ", achieve be difficult to for these years to realize to the more effective security management and control of on-the-spot grid switching operation standardization behavior, improve the ability of accident prevention, greatly inhibit the number of times that scene is violating the regulations, accident occurs, direct economic benefit and the social indirect benefit of its enterprise are huge.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is the hardware configuration schematic diagram of one embodiment of the invention.
Fig. 2 is main system process flow diagram of the present invention.
Fig. 3 unlocks process flow diagram.
Embodiment
A kind of solidification power transformation specification operation method, after receiving certain scheduling order, selects corresponding operation order, opens from the list of operating means display screen operation order; Select to confirm that this operation scheduling is no to issue an order, insert the people that issues an order, made us name; Show " operation starts " button of corresponding scheduling order, press " operation starts " button, automatically start the machine recording; Confirm that operation order has been audited and qualified; Add their confirmation to the object that whether clearly operates of display screen display, Analysis about Dangerous Point and pre-control work are carried out in display screen prompting; According to display screen prompting, operator, guardian carry out fingerprint signature or cryptographic signatures; According to display screen prompting, guardian fills in the operation start time; Display screen ejects picture, prompting simulation is checked, equipment on prompting simulation drawing runs and must conjugate operation, check end, prompting requires guardian, operator should jointly check simulated operation after system operation mode, system wiring whether meet the operation object of scheduling operation task, and by ACK button; Display screen ejects picture, according to action type, and the preliminary work of prompting Work tool, operation key; The picture of display screen ejection operation ticket Section 1 operation item, other operation items are visible, but display is implicit, can not operate, in operation, " unlocking operation " button that size is less should be set below operation order, unlock flow process problem to facilitate to flow at any time; Display screen prompting " call out the names of those voted for while counting ballot-slips rehearse, point and check, confirm to perform ", guardian and operator complete to call out the names of those voted for while counting ballot-slips and rehearse, point and check, confirm implementation, and guardian ticks operation before the serial number of operation item; Eject picture, confirm that equipment operating puts in place according to prompting; After operation order Section 1 operation item falls back on, the picture of ejection operation ticket Section 2 operation item in order, continues to perform aforesaid operations; If run into the operation not carrying out " working copy " for a long time, " unlocking operation " button that size is less ejects, and occur the INQUIRE statement of " the need of unlocking ", "No"---then carry out operating, "Yes"---system then enters unlocking operation program; After overall operations terminates, eject prompting frame, require that the equipment after reply operation once checks all sidedly, to confirm that operating complete nothing leaks item, selects confirmation equipment to be in normal condition; Display screen ejects the prompting frame filling in the operation end time, confirms after filling in; The prompting frame that display screen ejects " terminate and the end time to scheduling reporting operations, recheck single job task simultaneously, rehearsed errorless by scheduling ", presses " confirmation " key; Eject the prompting requiring to carry out relative recording; Eject the picture of " executed " Electronic Signature, below operation order last column, carry out Electronic Signature operation; If carried out unlocking operation in this task, also by eject key playbacked and carried out the prompting of relative recording; Terminate recording, video recording, operation completes.
Described unlocking operation flow process is: guardian is by "Yes", and system enters unlocking operation program; Eject prompting frame, inquiry " whether operation order is correct ", select "Yes", otherwise terminate, indicate in remarks column and terminate reason; Eject prompting frame, inquiry " whether operating interval is correct ", select "Yes"; When confirming to unlock, ejecting prompting frame, requiring the full-time people of contact error-unlocking prevention; When contact continues operation after agreeing to, eject prompting frame, display " error-unlocking prevention full-time people with or without agreement ", rehearse by re-starting after "Yes" to call out the names of those voted for while counting ballot-slips, point and check, confirm executable operations.
Described operating means comprises data processing module 1, data processing module be connected to display screen, the information interaction module 2 of capacitance contact board is connected, data processing module is connected with operation order virtual printer module 3, data processing module is connected with finger print acquisition module 4, and supply module 5 provides power supply to above-mentioned module.
Claims (1)
1. a solidification power transformation specification operation method, it is characterized in that: adopt operating means to operate, described operating means comprises data processing module, data processing module and the information interaction model calling being connected to display screen, capacitance contact board, data processing module and operation order virtual printer model calling, data processing module is connected with finger print acquisition module, and supply module provides power supply to above-mentioned module; After receiving certain scheduling order, from the list of operating means display screen operation order, select corresponding operation order, open; Select to confirm that operation scheduling is issued an order, insert the people that issues an order, made us name; Show " operation starts " button of corresponding scheduling order, press " operation starts " button, automatically start the machine recording; Confirm that operation order has been audited and qualified; Add their confirmation to the object that whether clearly operates of display screen display, Analysis about Dangerous Point and pre-control work are carried out in display screen prompting; According to display screen prompting, operator, guardian carry out fingerprint signature or cryptographic signatures; According to display screen prompting, guardian fills in the operation start time; Display screen ejects picture, prompting simulation is checked, equipment on prompting simulation drawing runs and must conjugate operation, check end, prompting requires guardian, operator should jointly check simulated operation after system operation mode, system wiring whether meet the operation object of scheduling operation task, and by ACK button; Display screen ejects picture, according to action type, and the preliminary work of prompting Work tool, operation key; The picture of display screen ejection operation ticket Section 1 operation item, other operation items are visible, but display is implicit, can not operate, in operation, should arrange " unlocking operation " button below operation order, unlock flow process problem to facilitate to flow at any time; Display screen prompting " call out the names of those voted for while counting ballot-slips rehearse, point and check, confirm to perform ", guardian and operator complete to call out the names of those voted for while counting ballot-slips and rehearse, point and check, confirm implementation, and guardian ticks operation before the serial number of operation item; Eject picture, confirm that equipment operating puts in place according to prompting; After operation order Section 1 operation item falls back on, the picture of ejection operation ticket Section 2 operation item in order, continues to perform aforesaid operations; If run into the operation not carrying out for a long time " working copy ", " unlocking operation " button ejects, and occurs the INQUIRE statement of " the need of unlocking ", and "No"---then operates, "Yes"---that system then enters unlocking operation program; After overall operations terminates, eject prompting frame, require that the equipment after reply operation once checks all sidedly, to confirm that operating complete nothing leaks item, selects confirmation equipment to be in normal condition; Display screen ejects the prompting frame filling in the operation end time, confirms after filling in; The prompting frame that display screen ejects " terminate and the end time to scheduling reporting operations, recheck single job task simultaneously, rehearsed errorless by scheduling ", presses " confirmation " key; Eject the prompting requiring to carry out relative recording; Eject the picture of " executed " Electronic Signature, below operation order last column, carry out Electronic Signature operation; If carried out unlocking operation, also by ejecting key playbacked and carried out the prompting of relative recording; Terminate recording, video recording, operation completes; Described unlocking operation flow process is: guardian is by "Yes", and system enters unlocking operation program; Eject prompting frame, inquiry " whether operation order is correct ", select "Yes", otherwise terminate, indicate in remarks column and terminate reason; Eject prompting frame, inquiry " whether operating interval is correct ", select "Yes"; When confirming to unlock, ejecting prompting frame, requiring the full-time people of contact error-unlocking prevention; When contact continues operation after agreeing to, eject prompting frame, display " error-unlocking prevention full-time people with or without agreement ", rehearse by re-starting after "Yes" to call out the names of those voted for while counting ballot-slips, point and check, confirm executable operations.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310078774.1A CN103177399B (en) | 2013-03-13 | 2013-03-13 | Solidification power transformation specification operation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310078774.1A CN103177399B (en) | 2013-03-13 | 2013-03-13 | Solidification power transformation specification operation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103177399A CN103177399A (en) | 2013-06-26 |
CN103177399B true CN103177399B (en) | 2016-02-03 |
Family
ID=48637232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310078774.1A Active CN103177399B (en) | 2013-03-13 | 2013-03-13 | Solidification power transformation specification operation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103177399B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104777808B (en) * | 2015-03-27 | 2017-07-14 | 国家电网公司 | A kind of record and read method of power station running status debugging |
CN108876655A (en) * | 2018-06-04 | 2018-11-23 | 国网浙江省电力有限公司温州供电公司 | A kind of power distribution network scheduling method for preventing misoperation containing micro-capacitance sensor |
CN109213125A (en) * | 2018-09-05 | 2019-01-15 | 长园共创电力安全技术股份有限公司 | A kind of control method of operation task, device and equipment |
CN112102527A (en) * | 2020-09-14 | 2020-12-18 | 广东电网有限责任公司广州供电局 | Power grid equipment operation method and device, computer equipment and storage medium |
CN112687032B (en) * | 2020-12-03 | 2022-07-05 | 郑勇进 | Method and system for monitoring work task by using mechanical lock |
CN112769628B (en) * | 2021-02-08 | 2022-11-04 | 浙江浙能台州第二发电有限责任公司 | Two-ticket online management implementation method comprising offline device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2567753Y (en) * | 2002-06-24 | 2003-08-20 | 镇江市电工器材厂 | On-line anti-mislatching operating system controlled by microcomputer |
CN101226369A (en) * | 2006-12-07 | 2008-07-23 | 三星电子株式会社 | Fuser cleaning apparatus and method of operating a fuser cleaning device for use with an image forming device |
CN102136759A (en) * | 2011-01-10 | 2011-07-27 | 苏州工业园区金禾电气设备有限公司 | All-direction monitoring and management method for switching operation or equipment routing inspection and examine and system |
CN202275319U (en) * | 2011-10-01 | 2012-06-13 | 洛宁供电公司 | Transformer station switch operated voice repeater |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030013503A1 (en) * | 2001-07-16 | 2003-01-16 | Royal Thoughts, L.L.C. | Intercom module for a wireless system |
-
2013
- 2013-03-13 CN CN201310078774.1A patent/CN103177399B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2567753Y (en) * | 2002-06-24 | 2003-08-20 | 镇江市电工器材厂 | On-line anti-mislatching operating system controlled by microcomputer |
CN101226369A (en) * | 2006-12-07 | 2008-07-23 | 三星电子株式会社 | Fuser cleaning apparatus and method of operating a fuser cleaning device for use with an image forming device |
CN102136759A (en) * | 2011-01-10 | 2011-07-27 | 苏州工业园区金禾电气设备有限公司 | All-direction monitoring and management method for switching operation or equipment routing inspection and examine and system |
CN202275319U (en) * | 2011-10-01 | 2012-06-13 | 洛宁供电公司 | Transformer station switch operated voice repeater |
Also Published As
Publication number | Publication date |
---|---|
CN103177399A (en) | 2013-06-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103177399B (en) | Solidification power transformation specification operation method | |
CN100485558C (en) | Electrical power system safety operation intelligent monitoring device and monitoring method thereof | |
CN105279419B (en) | A kind of intrinsic safety type electric operates board system | |
CN103199455B (en) | Solidification power transformation specification operation system | |
CN105741126B (en) | Management method and management device of air conditioner, server, terminal and communication device | |
CN103389705B (en) | Operation supervise and control system and operation supervise and control method | |
CN106611452B (en) | Overhaul isolating closing lock system and method | |
CN103164159B (en) | Solidification power transformation specification operation procedure touch working copy | |
CN205158482U (en) | Overhaul and keep apart blocking device | |
CN102591223B (en) | Intelligentized diagnostic system of substation-operation operation tickets | |
CN103426215B (en) | For door lock management-control method and the system of unexpected relief | |
CN104680634A (en) | Maintenance isolation locking system and method | |
EP2870045B1 (en) | Local operation of a component of a railway track system | |
CN105550826A (en) | Security isolation anti-misoperation system | |
CN102749874B (en) | Duplicating monitoring system | |
CN106059078A (en) | Monitoring system for on/off state of flexible pressing plate for intelligent substation relay protection | |
CN112037397A (en) | Method for supervising full-process work ticket and application system | |
CN106327077A (en) | Electrical maloperation-preventing control device based on entrance guard and control method thereof | |
CN105528264A (en) | Anti-misoperation data recovery method and system | |
CN103034918A (en) | Electric power safe production management system operating method | |
CN111948957B (en) | Control method, device and system of grounding device and storage medium | |
CN103295299A (en) | Remote intelligent unlocking key management box | |
CN105374088A (en) | Control method and control apparatus of substation active misoperation prevention equipment | |
CN104598838A (en) | File storage and editing method for random check and providing of trusted operating environments | |
CN102915144A (en) | Method of Operating an Operator Control and Monitoring Device for Safety-Critical Applications |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |