CN112037397A CN202010904361.4A CN202010904361A CN112037397A CN 112037397 A CN112037397 A CN 112037397A CN 202010904361 A CN202010904361 A CN 202010904361A CN 112037397 A CN112037397 A CN 112037397A
Authority
CN
China
Prior art keywords
work ticket
measures
safety
equipment
mobile terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010904361.4A
Other languages
Chinese (zh)
Other versions
CN112037397B (en
Inventor
姚路
张同喜
唐夏冰
杨晓波
汪倩颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zheneng Lanxi Power Generation Co Ltd
Original Assignee
Zhejiang Zheneng Lanxi Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zheneng Lanxi Power Generation Co Ltd filed Critical Zhejiang Zheneng Lanxi Power Generation Co Ltd
Priority to CN202010904361.4A priority Critical patent/CN112037397B/en
Publication of CN112037397A publication Critical patent/CN112037397A/en
Application granted granted Critical
Publication of CN112037397B publication Critical patent/CN112037397B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C9/00Individual registration on entry or exit
    • G07C9/20Individual registration on entry or exit involving the use of a pass
    • G07C9/27Individual registration on entry or exit involving the use of a pass with central registration
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0025Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/24Reminder alarms, e.g. anti-loss alarms

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Engineering & Computer Science (AREA)
  • Emergency Management (AREA)
  • Alarm Systems (AREA)

Abstract

The invention provides a supervision method and an application system of a full-process work ticket, and belongs to the technical field of work tickets of power systems. The method comprises the following steps: receiving a security operation measure uploaded from a mobile terminal device, wherein the security operation measure is acquired by the mobile terminal device through scanning a two-dimensional code on an operation part of the device; checking the received safety operation measures and the standard operation measures of the corresponding operation parts on the generated work ticket; and sending a checking result to the movable terminal equipment. The supervision method and the application system of the full-flow work ticket have the advantages of effectively avoiding the situations of operation leakage, misoperation and the like in the process of executing safety measures by operators, sending out a warning before the misoperation occurs, effectively ensuring the personal safety and equipment safety of the operators, preventing safety production accidents from occurring and playing an important role in the safety production of enterprises.

Description

Method for supervising full-process work ticket and application system
Technical Field
The invention relates to the technical field of work tickets of power systems, in particular to a supervision method of a full-process work ticket and an application system of the full-process work ticket.
Background
The work ticket is an important component in the electric power overhaul process, is an important guarantee for the safety of operators, electric power production equipment and systems, and has important significance in safety production. The application of the work ticket in the power plant not only can reliably isolate production systems such as high-temperature and high-pressure steam pipelines and oil pipelines, but also can indicate the correct switching operation of high-pressure equipment, thereby ensuring the safety of maintenance work and normally developing the maintenance work. The filling, examination and approval, permission, execution and termination of the work ticket are important work in the thermal power generation safety production management process, and the issuing of safety measures of the work ticket and the accuracy of the execution are always important concerns.
The traditional work ticket is manually filled, the operation mode is single, the work efficiency is low, the problems of omission, incompleteness, non-standardization and the like of safety measures exist when the work ticket is manually filled, the safety of operators and equipment is threatened all the time, the burden of filling and checking of a work ticket filler and a responsible person is increased, the work ticket is gradually electronized along with the application of a PC (personal computer) end system in the power industry, but the work place is fixed by adopting the PC end system, and the limitation is large in timeliness and convenience; secondly, the execution condition of safety measures of operators cannot be ensured in the process of work ticket permission, the situations of operation missing, misoperation, interval false entry and the like may occur in the process of safety measure execution of the operators, operation checking and operation false warning cannot be realized in the process of execution, potential safety hazards can be generated due to the occurrence of operation missing, misoperation and interval false entry, and the safety of the operators and equipment is threatened.
Disclosure of Invention
The embodiment of the invention aims to provide a method for supervising a full-flow work ticket and an application system, so as to at least solve the problems that operation omission, misoperation and mistaken entry interval possibly occur in the safety measure execution process of an operator, and operation checking and misoperation warning cannot be realized in the execution process.
The invention provides a method for supervising a full-process work ticket, wherein the work ticket comprises standard operation measures corresponding to each operation part of equipment to be operated, and the method comprises the following steps:
receiving a security operation measure uploaded from a mobile terminal device, wherein the security operation measure is acquired by the mobile terminal device through scanning a two-dimensional code on an operation part of the device;
checking the received safety operation measures and the standard operation measures of the corresponding operation parts on the generated work ticket;
and sending a checking result to the movable terminal equipment.
Optionally, the method further includes:
presetting the type and format information of a work ticket, and storing standard safety measures corresponding to each operation part of equipment to be operated in a server;
before the checking, selecting corresponding equipment according to the operation of an operator on the mobile terminal equipment, and extracting a work ticket generated for the selected equipment from the server, wherein the work ticket comprises standard operation measures corresponding to each operation component of the equipment.
Optionally, the types of the work ticket include: the system comprises a mechanical work ticket, a fire work ticket, a thermal control work ticket, a relay protection work ticket, an electric operation ticket, an electric one-kind work ticket and an electric two-kind work ticket.
Optionally, the checking the received safety operation measure and the standard operation measure of the corresponding operation component on the generated work ticket includes:
and checking whether the standard operation measures of the corresponding operation parts on the work ticket are consistent with the received safety operation measures or not, and checking whether the standard operation measures sequenced before the checked standard operation measures on the work ticket are completely executed or not.
Optionally, the sending the check result to the mobile terminal device includes:
if the standard operation measures of the corresponding operation parts on the work ticket are consistent with the received safety operation measures and the standard operation measures sequenced before the checked standard operation measures are completely executed, sending a checking result for permitting an operator to implement the safety operation measures to the movable terminal equipment and displaying the checking result on the movable terminal equipment;
and otherwise, sending a checking result that the checking fails to pass to the mobile terminal equipment, and displaying alarm information on the mobile terminal equipment.
Optionally, the method further includes:
starting timing while displaying a checking result for permitting an operator to implement safety operation measures on the mobile terminal equipment, and after timing is finished, displaying a confirmation item for finishing the implementation of the safety operation measures on the mobile terminal equipment and locking an operation flow;
and after receiving feedback generated by clicking of the confirmation items by the operator and safety operation measures uploaded by the operator to implement the completion image, unlocking the operation process.
On the other hand, the invention also provides an application system of the full-process work ticket, which comprises the following steps:
the two-dimensional codes in the two-dimensional code group respectively correspond to each operating part of the equipment to be operated, and the two-dimensional codes in the two-dimensional code group record safety operating measures of the corresponding operating parts;
the mobile terminal equipment comprises a scanning module, a touch display screen and a communication module;
the scanning module is used for scanning the two-dimension code to obtain a safety operation measure recorded by the two-dimension code;
the touch display screen is used for displaying a generated work ticket and equipment for an operator to select safety measures to be implemented, and the work ticket comprises standard operation measures corresponding to all operation parts of the equipment;
the communication module is used for establishing contact with the server and sending and receiving data;
the server is prestored with the type and format information of the work ticket and standard safety measures corresponding to each operation part of the equipment to be operated, and is used for:
generating a work ticket corresponding to the equipment according to the equipment selected by the operator on the mobile terminal equipment;
receiving a security operation measure uploaded from a mobile terminal device, wherein the security operation measure is acquired by the mobile terminal device through scanning a two-dimensional code on an operation part of the device;
checking the received safety operation measures and the standard operation measures of the corresponding operation parts on the generated work ticket;
and sending a checking result to the movable terminal equipment.
Optionally, the system further comprises an access control system arranged in the overhaul site, and the access control system releases the access control through the authorization of the work ticket.
Optionally, access control system is provided with fixed two-dimensional code bar scanner, still include the entrance guard two-dimensional code on the work ticket, fixed two-dimensional code bar scanner is through the scanning on the work ticket entrance guard two-dimensional code authorizes and removes the entrance guard.
Optionally, the entrance guard two-dimensional code on the work ticket is updated every time along with the generation of the work ticket.
Through the technical scheme, in the application system of the full-flow work ticket, before safety measures are implemented by an operator, the two-dimensional code corresponding to the safety measures to be operated is scanned by using the mobile terminal equipment to check the safety measures, and the operator is reminded and warned again before executing the safety measures, so that the situations of missing operation, misoperation and the like in the safety measure executing process are effectively avoided, and warning is given out before misoperation occurs, the personal safety of the operator and equipment are effectively guaranteed, safety production accidents are prevented, and the application system plays an important role in safety production of enterprises.
Additional features and advantages of embodiments of the invention will be set forth in the detailed description which follows.
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the embodiments of the invention without limiting the embodiments of the invention. In the drawings:
FIG. 1 is a flow chart of a method of supervision of a full flow work ticket provided by the present invention;
FIG. 2 is a block diagram of an application system for a full-flow work ticket provided by the present invention;
fig. 3 is a schematic structural diagram of a mobile terminal device according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a mobile terminal device according to another embodiment of the present invention.
Description of the reference numerals
1-device, 2-two-dimensional code group, 3-mobile terminal device, 4-server,
31-a scanning module, 32-a touch display screen, 33-a communication module, 34-a timing module,
35-an alarm module, 36-a shooting module and 37-a power supply module.
Detailed Description
The following detailed description of embodiments of the invention refers to the accompanying drawings. It should be understood that the detailed description and specific examples, while indicating the present invention, are given by way of illustration and explanation only, not limitation.
FIG. 1 is a flowchart and flow diagram of a method for supervising a full-flow work ticket according to an embodiment of the present invention. As shown in fig. 1, an embodiment of the present invention provides a method for supervising a full-flow work ticket, where the method includes:
step 101, receiving security operation measures uploaded from a mobile terminal device, wherein the security operation measures are acquired by the mobile terminal device through scanning a two-dimensional code on an operation part of the device;
102, checking the received safety operation measures and the standard operation measures of the corresponding operation parts on the generated work ticket;
and 103, sending a check result to the mobile terminal equipment.
Further, the method further comprises:
presetting the type and format information of a work ticket, and storing standard safety measures corresponding to each operation part of equipment to be operated in a server;
before the checking, selecting corresponding equipment according to the operation of an operator on the mobile terminal equipment, and extracting a work ticket generated for the selected equipment from the server, wherein the work ticket comprises standard operation measures corresponding to each operation component of the equipment.
Furthermore, according to the operation of the operator on the mobile terminal device, selecting the corresponding device, and extracting the work ticket generated for the selected device from the server, the whole process adopts the image billing mode to select the device, firstly, the state menu information of the operation parts such as the relevant device, the device valve, the pump key and the like is formulated, and the simulation diagram of the corresponding maintenance state is generated and stored in the server, when the selection is performed through the mobile terminal device, according to the work plan, the device which needs to be overhauled and maintained and the corresponding operation part are selected according to the generated simulation diagram, and in the selection process, the selection is needed: the information of the work responsible person, the members of the work team, the work place, the completion time of the work plan and the like.
Specifically, the types of the work ticket include: the system comprises a mechanical work ticket, a fire work ticket, a thermal control work ticket, a relay protection work ticket, an electric operation ticket, an electric one-kind work ticket and an electric two-kind work ticket. When the equipment is overhauled and maintained, the corresponding types of work tickets are selected according to the operation tasks to be carried out.
Further, the checking the received safety operation measures and the standard operation measures of the corresponding operation components on the generated work ticket includes:
and checking whether the standard operation measures of the corresponding operation parts on the work ticket are consistent with the received safety operation measures or not, and checking whether the standard operation measures sequenced before the checked standard operation measures on the work ticket are completely executed or not.
Specifically, an operator sequentially selects equipment to be overhauled and maintained and related operations to be performed by using the mobile terminal equipment according to work schedule, and the server generates a work ticket according to the selected equipment and the corresponding operation component selection standard safety measures, and the operation sequence of the operator on the mobile terminal equipment sequentially executes the standard operation measures on the work ticket. When the server checks the standard operation measures of the corresponding operation components on the work ticket and the received safety operation measures, the server not only checks whether the standard operation measures of the corresponding operation components on the work ticket are consistent with the received safety operation measures, but also needs to check whether the standard operation measures in front of the checked standard operation measures on the work ticket are completely executed.
Further, the sending the check result to the mobile terminal device includes:
if the standard operation measures of the corresponding operation parts on the work ticket are consistent with the received safety operation measures and the standard operation measures sequenced before the checked standard operation measures are completely executed, sending a checking result for permitting an operator to implement the safety operation measures to the movable terminal equipment and displaying the checking result on the movable terminal equipment;
and otherwise, sending a checking result that the checking fails to pass to the mobile terminal equipment, and displaying alarm information on the mobile terminal equipment.
After the verification is passed, the safety operation measures are displayed through the movable terminal equipment, the warning and reminding effects are achieved for the operator, and the operator is prompted to operate the operation part of the corresponding equipment according to the safety operation measures on the movable terminal equipment; when the check is failed, the alarm is given, the alarm information can be displayed through the movable terminal equipment, and meanwhile, a loudspeaker and the like can be added to the movable terminal equipment for warning and reminding an operator.
Further, the method further comprises:
starting timing while displaying a checking result for permitting an operator to implement safety operation measures on the mobile terminal equipment, and after timing is finished, displaying a confirmation item for finishing the implementation of the safety operation measures on the mobile terminal equipment and locking an operation flow;
and after receiving feedback generated by clicking of the confirmation items by the operator and safety operation measures uploaded by the operator to implement the completion image, unlocking the operation process.
Specifically, after the operator completes the safety operation measure, the operator needs to click the confirmation item and use the mobile terminal device to shoot the image of the safety operation measure implementation completion, so that the next safety operation measure can be executed according to the above steps.
Fig. 2 is a block diagram of an application system of a full-flow work ticket according to an embodiment of the present invention. As shown in fig. 2, an embodiment of the present invention provides an application system of a full-flow work ticket, including:
the two-dimensional code group comprises a two-dimensional code group 1, wherein two-dimensional codes in the two-dimensional code group 1 respectively correspond to operation parts of equipment to be operated 2, and safe operation measures of the corresponding operation parts are recorded in the two-dimensional codes in the two-dimensional code group 11;
the mobile terminal device 3, the mobile terminal device 3 includes a scanning module 31, a touch display screen 32 and a communication module 33, and the structural diagram of the mobile terminal device is shown in fig. 3;
the scanning module 31 is configured to scan the two-dimensional code to obtain a security operation measure recorded by the two-dimensional code;
the touch display screen 32 is used for displaying a generated work ticket and equipment for an operator to select safety measures to be implemented, wherein the work ticket comprises standard operation measures corresponding to each operation part of the equipment;
the communication module 33 is used for establishing contact with the server 4, and sending and receiving data;
the server 4 prestores the type and format information of the work ticket and standard security measures corresponding to each operation component of the device to be operated, and is used for:
generating a work ticket corresponding to the equipment according to the equipment selected by the operator on the mobile terminal equipment;
receiving a security operation measure uploaded from a mobile terminal device, wherein the security operation measure is acquired by the mobile terminal device through scanning a two-dimensional code on an operation part of the device;
checking the received safety operation measures and the standard operation measures of the corresponding operation parts on the generated work ticket;
and sending a checking result to the movable terminal equipment.
Further, as shown in fig. 4, which is a schematic structural diagram of a mobile terminal device provided in another embodiment, in order to increase functions of a system and ensure a practical effect of the system, the mobile terminal device 3 is further provided with a timing module 34, an alarm module 35, a shooting module 36 and a power supply module 37;
the timing module 34 is configured to start timing while displaying a check result that permits an operator to implement the safety operation measure on the mobile terminal device 3 when the standard operation measure of the corresponding operation component on the work ticket is consistent with the received safety operation measure, and send a timing end signal to the server 4 through the communication module 33 after the timing is ended;
the alarm module 35 is configured to generate an alarm signal when the standard operation measure of the corresponding operation component on the work ticket is inconsistent with the received safety operation measure, so as to remind an operator and avoid missing operation and misoperation of the operator;
the shooting module 36 is used by an operator to shoot the finished device image implemented by the safety operation measures, and can send the shot device image to the server 4 through the communication module 33;
the power supply module 37 is configured to supply power to the mobile terminal device 3.
Further, the two-dimensional code may be replaced with an information code such as a barcode that can be used for identification, and the content included in the two-dimensional code is obtained by scanning the two-dimensional code.
Further, the system further comprises an access control system (not shown) arranged at the overhaul site, and the access control system releases the access control through the authorization of the work ticket. Through setting up access control system to authorize through the work ticket, operating personnel just can enter into the maintenance place, carries out corresponding operation.
Particularly, the entrance guard system is arranged to reliably and effectively isolate important facilities and dangerous equipment in the power plant, so that the safety index of a maintenance place is improved, and the occurrence of safety accidents in the power plant can be effectively reduced.
Further, the entrance guard system is provided with a fixed two-dimension code scanner (not shown), the work ticket further comprises an entrance guard two-dimension code, the fixed two-dimension code scanner authorizes the entrance guard to be removed by scanning the entrance guard two-dimension code on the work ticket,
furthermore, the entrance guard two-dimensional code on the work ticket is updated every time along with the generation of the work ticket.
When generating the work ticket, generate the entrance guard two-dimensional code that corresponds on the work ticket, operating personnel uses the entrance guard two-dimensional code through access control system, carries out the standard security operation measure on the operation ticket in proper order, and the back that finishes is carried out to the security measure, the work ticket ends, at this moment, entrance guard two-dimensional code inefficacy when generating new work ticket, generates new entrance guard two-dimensional code on the work ticket, carries out information update to access control system simultaneously for entrance guard two-dimensional code and access control system phase-match adopt this kind of mode, make a work ticket correspond an entrance guard two-dimensional code, avoid in the irrelevant personnel outside the operating personnel enter into the workplace, simultaneously, also can avoid operating personnel to get into the maintenance place at the time quantum that does not belong to operating time. Wherein, the entrance guard two-dimensional code can be replaced by a corresponding bar code.
Specifically, an operator selects equipment needing to be overhauled and maintained and related operation needing to be carried out in sequence by using a movable terminal device according to work arrangement, a server selects standard safety measures according to the selected equipment and corresponding operation parts to generate a work ticket, the work ticket comprises the standard safety measures, the movable terminal device can display the work ticket, the operator uses an entrance guard two-dimensional code on the work ticket to carry out corresponding overhaul on the corresponding equipment operation part according to the standard safety operation measures in the work ticket through an entrance guard system, before the standard safety operation measures are implemented, a scanning module of the movable terminal device scans the two-dimensional code corresponding to the safety measures of the operation part to obtain the safety measures recorded by the two-dimensional code, the safety measures are sent to the server through a communication module, and the server checks the safety operation measures and the standard safety operation measures in the work ticket, the operation personnel executes the safety measures, if the operation personnel does not pass the check, the server sends a signal that the check does not pass, and the signal is transmitted to the alarm module through the communication module to generate an alarm signal so as to alarm the loudspeaker, thereby reminding the operation personnel that the safety operation measures being executed are not consistent with the standard safety operation measures on the work ticket, the operation personnel reselects the two-dimensional code according to the standard safety operation measures, scans the two-dimensional code, repeats the previous steps to check until the check passes, displays the check result permitting the operation personnel to execute the safety operation measures on the mobile terminal equipment and starts timing, displays the confirmation item of the safety operation measures being executed on the mobile terminal equipment and locks the operation flow after the timing is finished, and after receiving the feedback generated by clicking of the operation personnel on the confirmation item and the image of the safety operation measures being uploaded by the operation personnel, unlocking the operation flow, after implementing the corresponding safety measures, shooting the image of the current operation component after implementing the safety measures by a shooting module, and sending the shot image to the server through a communication module and storing the shot image in the server; at this time, the current safety operation measure is implemented, and the next safety operation measure can be implemented; after the operating personnel finish all standard safety operation measures on the work ticket in sequence, the work ticket is ended, the equipment is overhauled and maintained, the work ticket is invalid, and meanwhile, the entrance guard two-dimensional code is invalid.
While the embodiments of the present invention have been described in detail with reference to the accompanying drawings, the embodiments of the present invention are not limited to the details of the above embodiments, and various simple modifications can be made to the technical solution of the embodiments of the present invention within the technical idea of the embodiments of the present invention, and the simple modifications are within the scope of the embodiments of the present invention. It should be noted that the various features described in the above embodiments may be combined in any suitable manner without departing from the scope of the invention. In order to avoid unnecessary repetition, the embodiments of the present invention will not be described separately for the various possible combinations.
In addition, any combination of the various embodiments of the present invention is also possible, and the same should be considered as disclosed in the embodiments of the present invention as long as it does not depart from the spirit of the embodiments of the present invention.

Claims (10)

1. A supervision method of a full-flow work ticket, wherein the work ticket contains standard operation measures corresponding to each operation part of equipment to be operated, and the supervision method is characterized by comprising the following steps:
receiving a security operation measure uploaded from a mobile terminal device, wherein the security operation measure is acquired by the mobile terminal device through scanning a two-dimensional code on an operation part of the device;
checking the received safety operation measures and the standard operation measures of the corresponding operation parts on the generated work ticket;
and sending a checking result to the movable terminal equipment.
2. The method of claim 1, wherein the method further comprises:
presetting the type and format information of a work ticket, and storing standard safety measures corresponding to each operation part of equipment to be operated in a server;
before the checking, selecting corresponding equipment according to the operation of an operator on the mobile terminal equipment, and extracting a work ticket generated for the selected equipment from the server, wherein the work ticket comprises standard operation measures corresponding to each operation component of the equipment.
3. The method for supervising a full-flow work ticket according to claim 2, wherein the types of the work ticket include: the system comprises a mechanical work ticket, a fire work ticket, a thermal control work ticket, a relay protection work ticket, an electric operation ticket, an electric one-kind work ticket and an electric two-kind work ticket.
4. The method for supervising the full-flow work ticket according to claim 2, wherein the checking the received safety operation measures against the standard operation measures of the corresponding operation components on the generated work ticket comprises:
and checking whether the standard operation measures of the corresponding operation parts on the work ticket are consistent with the received safety operation measures or not, and checking whether the standard operation measures sequenced before the checked standard operation measures on the work ticket are completely executed or not.
5. The method for supervising the full-flow work ticket according to claim 4, wherein the sending of the check result to the mobile terminal device comprises:
if the standard operation measures of the corresponding operation parts on the work ticket are consistent with the received safety operation measures and the standard operation measures sequenced before the checked standard operation measures are completely executed, sending a checking result for permitting an operator to implement the safety operation measures to the movable terminal equipment and displaying the checking result on the movable terminal equipment;
and otherwise, sending a checking result that the checking fails to pass to the mobile terminal equipment, and displaying alarm information on the mobile terminal equipment.
6. The method of claim 5, wherein the method further comprises:
starting timing while displaying a checking result for permitting an operator to implement safety operation measures on the mobile terminal equipment, and after timing is finished, displaying a confirmation item for finishing the implementation of the safety operation measures on the mobile terminal equipment and locking an operation flow;
and after receiving feedback generated by clicking of the confirmation items by the operator and safety operation measures uploaded by the operator to implement the completion image, unlocking the operation process.
7. A full-flow work ticket application system, comprising:
the two-dimensional codes in the two-dimensional code group respectively correspond to each operating part of the equipment to be operated, and the two-dimensional codes in the two-dimensional code group record safety operating measures of the corresponding operating parts;
the mobile terminal equipment comprises a scanning module, a touch display screen and a communication module;
the scanning module is used for scanning the two-dimension code to obtain a safety operation measure recorded by the two-dimension code;
the touch display screen is used for displaying a generated work ticket and equipment for an operator to select safety measures to be implemented, and the work ticket comprises standard operation measures corresponding to all operation parts of the equipment;
the communication module is used for establishing contact with the server and sending and receiving data;
the server is prestored with the type and format information of the work ticket and standard safety measures corresponding to each operation part of the equipment to be operated, and is used for:
generating a work ticket corresponding to the equipment according to the equipment selected by the operator on the mobile terminal equipment;
receiving a security operation measure uploaded from a mobile terminal device, wherein the security operation measure is acquired by the mobile terminal device through scanning a two-dimensional code on an operation part of the device;
checking the received safety operation measures and the standard operation measures of the corresponding operation parts on the generated work ticket;
and sending a checking result to the movable terminal equipment.
8. The system of claim 7, further comprising an access control system installed in the service site, wherein the access control system releases the access control through the work ticket authorization.
9. The system of claim 8, wherein the access control system is provided with a fixed two-dimensional code scanner, the work ticket further comprises an access control two-dimensional code, and the fixed two-dimensional code scanner is authorized to remove the access control by scanning the access control two-dimensional code on the work ticket.
10. The system of claim 9, wherein the two-dimensional access control code on the work ticket is updated each time the work ticket is generated.
CN202010904361.4A 2020-09-01 2020-09-01 Method for supervising full-process work ticket and application system Active CN112037397B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010904361.4A CN112037397B (en) 2020-09-01 2020-09-01 Method for supervising full-process work ticket and application system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010904361.4A CN112037397B (en) 2020-09-01 2020-09-01 Method for supervising full-process work ticket and application system

Publications (2)

Publication Number Publication Date
CN112037397A true CN112037397A (en) 2020-12-04
CN112037397B CN112037397B (en) 2022-11-25

Family

ID=73590826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010904361.4A Active CN112037397B (en) 2020-09-01 2020-09-01 Method for supervising full-process work ticket and application system

Country Status (1)

Country Link
CN (1) CN112037397B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112836188A (en) * 2021-02-08 2021-05-25 浙江浙能台州第二发电有限责任公司 Thermal power plant safety measure execution closed-loop management method and system
CN112990857A (en) * 2021-03-05 2021-06-18 浙江浙能兰溪发电有限责任公司 Power plant work ticket safety isolation method, device and system
CN113741304A (en) * 2021-09-13 2021-12-03 西安热工研究院有限公司 Mobile terminal for two-ticket management system of intelligent power plant
CN113822271A (en) * 2021-11-24 2021-12-21 广东电网有限责任公司惠州供电局 Ticket surface identification and sorting method, device, system and medium for power grid transformation operation ticket
CN114005202A (en) * 2021-10-28 2022-02-01 西安热工研究院有限公司 Wind power work ticket system based on intelligent active electronic lock and working method thereof
CN115273298A (en) * 2022-07-14 2022-11-01 华能铜川照金煤电有限公司 System for identifying whether operator enters electrified interval

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000235660A (en) * 1999-02-16 2000-08-29 Yasuhiko Nakazato Position confirmation system using non-contact identifying device
CN104036348A (en) * 2014-05-30 2014-09-10 段君寨 Electronic mobile operation order system
CN106780153A (en) * 2017-01-18 2017-05-31 国网江苏省电力公司徐州供电公司 It is a kind of in real time multi-functional back brake, patrol and examine operation note system
US20180182179A1 (en) * 2016-12-22 2018-06-28 Infostandard Sdn. Bhd. Comprehensive system and method for real-time monitoring and management of security patrolling operations
CN109165852A (en) * 2018-08-28 2019-01-08 武汉瑞莱保能源技术有限公司 A kind of operation field verification method and system based on RFID identification technology
CN109872410A (en) * 2018-12-30 2019-06-11 珠海一多监测科技有限公司 A kind of mobile cruising inspection system of power equipment
CN110046720A (en) * 2019-04-17 2019-07-23 济南纵向软件有限公司 Work ticket management method based on the control of electric field maintenance safety
CN110298932A (en) * 2019-07-26 2019-10-01 国网浙江省电力有限公司衢州供电公司 A kind of UAV Intelligent patrol inspection integral control platform
CN110910555A (en) * 2019-12-09 2020-03-24 国电龙源电气有限公司 Safety management method for intelligent operation ticket
JP2020102064A (en) * 2018-12-25 2020-07-02 株式会社日立システムズ Automatic instruction system, method and program
CN211062086U (en) * 2019-08-09 2020-07-21 内蒙古电力(集团)有限责任公司包头供电局 Novel power transformation inspection platform

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000235660A (en) * 1999-02-16 2000-08-29 Yasuhiko Nakazato Position confirmation system using non-contact identifying device
CN104036348A (en) * 2014-05-30 2014-09-10 段君寨 Electronic mobile operation order system
US20180182179A1 (en) * 2016-12-22 2018-06-28 Infostandard Sdn. Bhd. Comprehensive system and method for real-time monitoring and management of security patrolling operations
CN106780153A (en) * 2017-01-18 2017-05-31 国网江苏省电力公司徐州供电公司 It is a kind of in real time multi-functional back brake, patrol and examine operation note system
CN109165852A (en) * 2018-08-28 2019-01-08 武汉瑞莱保能源技术有限公司 A kind of operation field verification method and system based on RFID identification technology
JP2020102064A (en) * 2018-12-25 2020-07-02 株式会社日立システムズ Automatic instruction system, method and program
CN109872410A (en) * 2018-12-30 2019-06-11 珠海一多监测科技有限公司 A kind of mobile cruising inspection system of power equipment
CN110046720A (en) * 2019-04-17 2019-07-23 济南纵向软件有限公司 Work ticket management method based on the control of electric field maintenance safety
CN110298932A (en) * 2019-07-26 2019-10-01 国网浙江省电力有限公司衢州供电公司 A kind of UAV Intelligent patrol inspection integral control platform
CN211062086U (en) * 2019-08-09 2020-07-21 内蒙古电力(集团)有限责任公司包头供电局 Novel power transformation inspection platform
CN110910555A (en) * 2019-12-09 2020-03-24 国电龙源电气有限公司 Safety management method for intelligent operation ticket

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112836188A (en) * 2021-02-08 2021-05-25 浙江浙能台州第二发电有限责任公司 Thermal power plant safety measure execution closed-loop management method and system
CN112990857A (en) * 2021-03-05 2021-06-18 浙江浙能兰溪发电有限责任公司 Power plant work ticket safety isolation method, device and system
CN113741304A (en) * 2021-09-13 2021-12-03 西安热工研究院有限公司 Mobile terminal for two-ticket management system of intelligent power plant
CN113741304B (en) * 2021-09-13 2022-12-27 西安热工研究院有限公司 Mobile terminal for two-ticket management system of intelligent power plant
CN114005202A (en) * 2021-10-28 2022-02-01 西安热工研究院有限公司 Wind power work ticket system based on intelligent active electronic lock and working method thereof
CN113822271A (en) * 2021-11-24 2021-12-21 广东电网有限责任公司惠州供电局 Ticket surface identification and sorting method, device, system and medium for power grid transformation operation ticket
CN115273298A (en) * 2022-07-14 2022-11-01 华能铜川照金煤电有限公司 System for identifying whether operator enters electrified interval

Also Published As

Publication number Publication date
CN112037397B (en) 2022-11-25

Similar Documents

Publication Publication Date Title
CN112037397B (en) Method for supervising full-process work ticket and application system
CN111027932B (en) Security management method for intelligent work ticket
CN108960554B (en) Operation and maintenance safety control device, system and method
CN104661945B (en) Method for restoring a safety system for an elevator installation
CN103389705B (en) Operation supervise and control system and operation supervise and control method
JPH0689383A (en) Device and method for performing handling of storing place which is safely managed
CN105279419B (en) Intrinsic safety type electronic operation board system
CN108470313A (en) A kind of operation operation overall process management-control method and system based on mobile internet
CN107659572A (en) Intelligent and safe managing and control system based on information fusion
CN107704739A (en) Microcomputer anti-error operating system and method, anti-error main frame with listed function, Intelligent key, intelligent lock
CN111170094A (en) Non-contact elevator taking method and elevator taking system thereof
CN111948957B (en) Control method, device and system of grounding device and storage medium
CN110348545B (en) AR intelligent operation ticket method and device based on ERP system
CN112102527A (en) Power grid equipment operation method and device, computer equipment and storage medium
CN107276989B (en) Method and system for managing device operation
CN111815820A (en) Unlocking method based on substation relay security room intelligent lock system
CN117294531B (en) Ultrasonic metering instrument operation management method, device and equipment based on Internet of things
KR102232062B1 (en) System for controlling locking and unlocking of door locks on a plural number of cabinet
CN111680978A (en) Unlocking key authorization method, using method and returning method
CN116259117A (en) Method and system for monitoring whole process of inspection and maintenance operation
CN112365012B (en) Safety control method and system for petrochemical process production maintenance operation and storage medium
CN109508493A (en) A kind of application method based on BIM+ planar bar code technology in distribution debugging and maintenance
CN102953600A (en) Electronic coded lock system and unlocking method thereof
CN110941249B (en) Anti-error control system and method for switching flow in chemical technology
CN102353386B (en) Ground security detection device aiming at space camera

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant