CN106611452B - Overhaul isolating closing lock system and method - Google Patents

Overhaul isolating closing lock system and method Download PDF

Info

Publication number
CN106611452B
CN106611452B CN201510703316.1A CN201510703316A CN106611452B CN 106611452 B CN106611452 B CN 106611452B CN 201510703316 A CN201510703316 A CN 201510703316A CN 106611452 B CN106611452 B CN 106611452B
Authority
CN
China
Prior art keywords
isolation
xegregating unit
lock
maintenance
trial operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510703316.1A
Other languages
Chinese (zh)
Other versions
CN106611452A (en
Inventor
曾厉
田世锋
胡斌
褚兆勇
彭伟
陈仲意
刘拥民
刘海艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Unitech Power Technology Co Ltd
Original Assignee
Zhuhai Unitech Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Unitech Power Technology Co Ltd filed Critical Zhuhai Unitech Power Technology Co Ltd
Priority to CN201510703316.1A priority Critical patent/CN106611452B/en
Publication of CN106611452A publication Critical patent/CN106611452A/en
Application granted granted Critical
Publication of CN106611452B publication Critical patent/CN106611452B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention discloses a kind of maintenance isolating closing lock system, comprising: permission card is for being arranged inspection operation permission;Host generates lock operation instruction for receiving maintenance task, and according to maintenance task;Isolation key unlocks corresponding isolation lockset for receiving lock operation instruction, and by lock operation instruction;Whether the lock operation instruction that isolation lockset is used to verify isolation key matches with default unlocking information, if so, executing unlocking operation;Otherwise, unlocking operation is not executed;Host is also used to generate unlock operational order after the completion of overhauling xegregating unit, and when the inspection operation permission for verifying all permissions card is legal, and unlock operational order is sent to isolation key and is unlocked to isolation lockset.The isolation inspection operation to equipment can be facilitated using above system.The present invention also proposes a kind of maintenance isolating closing lock method.

Description

Overhaul isolating closing lock system and method
Technical field
The present invention relates to power equipment maintenance technology field more particularly to a kind of maintenance isolating closing lock system and method.
Background technique
In the overhaul of the equipments to industrial and mining enterprises, need to cut off it is all transfer to repair apparatus region energy (such as: point, water, Oil, gas and vapour etc.) source, to ensure the safety of repair apparatus and service personnel.Due to the inspection for opening/stopping operation and equipment of whose quilt Repairing work is completed by different majors personnel, and the maintenance of same range, the same area equipment can also be related to different majors Overhaul teams and groups.Coordination in work is improper or negligent supervision, is likely to result in accidentally to service area, repair apparatus conveying energy It happens, service personnel or repair apparatus is damaged.Therefore, when to overhaul of the equipments, usually by key dangerous source (switch or valve that transfer to service area energy) is closed, and is locked, and is realized the forced quarantine to peripheral energy source, is made to examine It repairs equipment periphery and forms a safety zone, the equipment as overhauled to needs carries out maintenance isolating closing lock.
A kind of existing mode for realizing maintenance isolating closing lock is directly locked to the danger source be isolated of needs, and right It is every that isolation lock is configured one dedicated isolation key.Isolating closing lock is done before overhaul of the equipments, operation staff presses maintenance task institute The safety measure of column to scene, be isolated one by one by locking;After overhaul of the equipments, then relevant isolation lock released.
The existing another mode for realizing maintenance isolating closing lock is isolation key locker mode: each maintenance task can be interim An independent isolation key locker is distributed, isolation key is placed in isolation key locker and collects management, does isolation before overhaul of the equipments and close Lock, operations staff lock by safety measure listed by maintenance task to scene one by one, put isolation key after the completion of locking Into in isolation key locker, and outside isolation key locker plus one safety lock and a control lockmaking, safe lock key and key is controlled Spoon is accepted by maintenance responsible person and maintenance licensor respectively;Each maintenance task by independent isolation key locker management it is corresponding every From key.
The solution lock key that the above two mode for realizing maintenance isolating closing lock is related to is more, and control difficulty is larger, causes Inspection operation is not convenient enough.
Summary of the invention
Based on this, it is necessary to provide a kind of easy to operate maintenance isolating closing lock system.
A kind of maintenance isolating closing lock system, comprising:
Permission card, for inspection operation permission to be arranged;
Host generates corresponding close for receiving the maintenance task of user's input or selection, and according to the maintenance task Lock operational order;
Key is isolated, the lock operation instruction sent for receiving the host, and referred to by the lock operation It enables and corresponding isolation lockset is unlocked;
Be isolated lockset, for verify it is described isolation key the lock operation instruction whether with default unlocking information Match, if so, executing unlocking operation;Otherwise, unlocking operation is not executed;
The host is also used to after the completion of overhauling to xegregating unit, generates unlock according to the unlock task of input or selection Operational order, and after the inspection operation permission of all permission cards is all proved to be successful, unlock operation is referred to Order is sent to the isolation key and unlocks to the isolation lockset;
Wherein, it is described isolation lockset number be more than one, and the isolation key correspond to it is more than one described in every From lockset;The quantity of the permission card is two or more, and the inspection operation permission of each permission card corresponds to more than one The xegregating unit;Each xegregating unit corresponds to the more than one isolation lockset.
The maintenance isolating closing lock system in one of the embodiments, further include:
Transmission adaptor charges for placing the isolation key, and for the isolation key, and described for receiving The lock operation of host instructs, and lock operation instruction is sent to the isolation key.
The maintenance isolating closing lock system in one of the embodiments, further include:
Authorization device is weighed for reading the inspection operation permission of the permission card, and by the inspection operation read Limit is sent to the host.
The maintenance isolating closing lock system in one of the embodiments, further include:
Isolating points label is arranged on xegregating unit, is stored with the identification information of the xegregating unit;
The isolation key includes:
Identification module, for instructing and the identification information progress in the isolating points label lock operation Match, if successful match, issuing indicates that the xegregating unit and the lock operation instruct the first information to match;Otherwise, Issuing indicates that the xegregating unit and the lock operation instruct unmatched second information;
It wherein, include the identification information of corresponding xegregating unit in the lock operation instruction.
The isolating points label includes the first radio frequency electronic tag in one of the embodiments,;The isolating points The identification information of the xegregating unit is sent to the isolation key by first radio frequency electronic tag by label.
The isolation key in one of the embodiments, further include: writing module, for the lock operation to be instructed It is written in the isolation lockset;
The isolation lockset includes:
Second radio frequency electronic tag, for receiving the lock operation instruction of the isolation key write-in;
Processing module, for verifying whether lock operation instruction matches with the default unlocking information, if so, holding Row unlocking operation;Otherwise, unlocking operation is not executed.
The isolation key in one of the embodiments, further include: first information logging modle, for recording described close Lock the unlocking operation time of operational order and the isolation lockset.
The host is also used to receive the trial operation task of input or selection in one of the embodiments, according to described Trial operation task generates trial operation and unlocks operational order, and
In the corresponding inspection operation Authority Verification success of trial operation xegregating unit, and have with the trial operation xegregating unit After the corresponding inspection operation permission of the xegregating unit of relevance is also proved to be successful, the trial operation operational order is sent to described Key is isolated;The trial operation xegregating unit is xegregating unit corresponding with trial operation unlock operational order;
The isolation key is also used to receive the trial operation unlock operational order, and passes through trial operation unlock operation Corresponding isolation lockset is unlocked in instruction;
The isolation lockset is also used to verify whether the trial operation unlock operational order matches with default unlocking information, if It is then to execute trial operation unlocking operation;Otherwise, trial operation unlocking operation is not executed.
It is right if meeting preset requirement to the trial operation operating result of the xegregating unit in one of the embodiments, The xegregating unit maintenance is completed, and the host generates the unlock operational order;Otherwise, the host generates trial operation and restores Instruction, the solution lock key restore to instruct by the trial operation xegregating unit according to the trial operation and are isolated with the trial operation There is equipment the xegregating unit of relevance to re-start maintenance isolating closing lock.
The host is also used to show the quantity and working condition of the isolation key, institute in one of the embodiments, State the quantity and work state information of isolation lockset, the work state information of xegregating unit, and maintenance mission bit stream.
The present invention also proposes a kind of maintenance isolating closing lock method, comprising the following steps:
Inspection operation permission is set;
The maintenance task of user's input or selection is received, and corresponding lock operation is generated according to the maintenance task and is referred to It enables;
The lock operation is instructed and is matched with the default unlocking information being isolated in lockset, if successful match, institute It states isolation lockset and executes unlocking operation;Otherwise, the isolation lockset does not execute unlocking operation;
After the completion of maintenance, the unlock task for being inputted or being selected according to user generates unlock operational order, and all described After inspection operation permission is all proved to be successful, xegregating unit is unlocked by the unlock operational order.
The maintenance isolating closing lock method in one of the embodiments, further include:
The trial operation task for being inputted or being selected according to user generates trial operation and unlocks operational order, and detection and trial operation Xegregating unit has the xegregating unit of relevance, and
In the trial operation xegregating unit corresponding inspection operation Authority Verification success, and with the trial operation xegregating unit After the corresponding inspection operation permission of xegregating unit with relevance is also proved to be successful, by the trial operation operational order to institute The unlock of trial operation xegregating unit is stated, and the xegregating unit with the trial operation xegregating unit with relevance is unlocked, is gone forward side by side The operation of row trial operation;
Wherein, the trial operation xegregating unit is xegregating unit corresponding with trial operation unlock operational order.
The maintenance isolating closing lock method in one of the embodiments, further include:
If the trial operation operating result to the xegregating unit meets preset requirement, unlock operational order, and root are generated All xegregating units are unlocked according to the unlock operational order;Otherwise, it generates trial operation and restores instruction, and according to the trial operation Restore instruction by the trial operation xegregating unit and with the trial operation xegregating unit have relevance xegregating unit again into Row maintenance isolating closing lock.
Above-mentioned maintenance isolating closing lock system and method, the maintenance task that host is inputted or selected according to user generate locking behaviour Instruct, isolation key according to the lock operation instruct to isolation lockset unlock, isolation lockset by lock operation instruction with The default unlocking information of isolation lockset is matched, and unlocking operation is executed after successful match;Maintenance completes aft engine according to user The unlock task of input or selection generates unlock operational order, and is all proved to be successful in the inspection operation permission of all permissions card Afterwards, xegregating unit is unlocked by unlocking operational order, the convenient isolation inspection operation to equipment, and is also able to achieve maintenance When inspection operation permission distribution, meet associated safety regulation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of present invention maintenance isolating closing lock system one embodiment;
Fig. 2 is the structural schematic diagram of the isolation key in present invention maintenance isolating closing lock system one embodiment;
Fig. 3 is the structural schematic diagram of the isolation lockset in present invention maintenance isolating closing lock system one embodiment;
Fig. 4 is the flow diagram of present invention maintenance isolating closing lock method one embodiment.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, the present invention is overhauled below in conjunction with attached drawing The specific embodiment of isolating closing lock system and method is illustrated.It should be appreciated that specific embodiment described herein is only To explain the present invention, it is not intended to limit the present invention.
Referring to Fig. 1, in an embodiment, maintenance isolating closing lock system includes permission card 100, host 200, isolation key 300 and isolation lockset 400.Wherein, permission card 100 is used to be arranged the inspection operation permission of user.Host 200 is for receiving user The maintenance task of input or selection, and the maintenance task for inputting or selecting according to user generates corresponding lock operation and instructs.It should Lock operation instruction indicates the instruction that equipment corresponding with maintenance task is repaired to isolation.Isolation key 300 is for receiving The lock operation instruction that host 200 is sent, and corresponding isolation lockset 400 is unlocked by lock operation instruction.Isolation lock Tool 400 is for verifying whether the lock operation instruction of isolation key 300 matches with default unlocking information, if so, executing unlocking Operation;Otherwise, unlocking operation is not executed.Host 200 is also used to be inputted after the completion of overhauling xegregating unit 500 according to user Or the unlock task of selection generates unlock operational order, and is all proved to be successful in the inspection operation permission of all permissions card 100 Afterwards, unlock operational order isolation 300 pairs of isolation locksets 400 of key are sent to unlock.User will using isolation lockset 400 Latching accessory and Padlock with identification card plate are on corresponding xegregating unit 500.
In the present embodiment, default unlocking information may include the number that lockset 400 is isolated.Correspondingly, lock operation instructs In also include be isolated lockset 400 number.By the way that the number that lockset 400 is isolated in default unlocking information is referred to lock operation The matched mode of number of lockset 400 is isolated in order, to determine isolation lockset 400 corresponding with lock operation instruction.
It should be noted that isolation lockset 400 number be more than one, isolation key 300 can with it is more than one It is corresponding that lockset 400 is isolated.For example, isolation key 300 can correspond to multiple isolation locksets 400.Host 200 is raw according to maintenance task At lock operation instruction, can correspond to multiple xegregating units 500, and can be distributed for each xegregating unit 500 it is corresponding every From lockset 400.More than one isolation lockset 400 is corresponding with an xegregating unit 500, and an xegregating unit 500 is corresponding The particular number that lockset 400 is isolated is related to the structure attribute of xegregating unit 500.Therefore, the lock operation that host 200 generates refers to Multiple isolation locksets 400 can be opened by the way that key 300 is isolated by enabling.
In addition, permission card 100 is two or more.Inspection operation permission is used for when overhauling to xegregating unit 500, limit The isolation that no maintenance is completed is set the unlocking operation permission of isolation lockset 400 to prevent staff from missing by staff processed Standby 500 corresponding isolation lockset 400 is unlocked, and can be improved the safety of operation.After the completion of maintenance task, host 200 is by testing Whether all legal all corresponding inspection operation permissions of permission card 100 are demonstrate,proved, to determine whether a unlock operational order hair Intelligent key is given, can be further improved the safety of system operatio.For example, permission card 100 can be respectively by work permit People and work responsible person accept.The permission card 100 that the permission card 100 and work responsible person that work permit people accepts are accepted needs whole Verifying authorization isolation release after, host 200 just can to isolation key 300 send unlock operational order, to isolation lockset 400 into Row unlock.
As an embodiment, maintenance isolating closing lock system further includes transmission adaptor 600.Transmission adaptor 600 Key 300 is isolated for placing, and charges for isolation key 300.Transmission adaptor 600 is also used to the transmission of receiving host 200 Lock operation instruction, and by lock operation instruction be sent to isolation key 300, realize host 200 be isolated between key 300 Data communication.It should be understood that the quantity of transmission adaptor 600 can be one, or more than two.And each biography The corresponding more than one isolation key 300 of defeated adapter 600.Preferably, the corresponding multiple isolation keys of each transmission adaptor 600 300。
As an embodiment, maintenance isolating closing lock system can also include authorization device 700.Authorization device 700 Host 200 is uploaded to for reading the inspection operation permission of permission card 100, and by the inspection operation permission read.Authorization dress Setting 700 can be separately provided, and also can be set on transmission adaptor 600.Authorization device 700 includes module of swiping the card, authorization dress Set the 700 inspection operation permissions that permission card 100 is read by the module of swiping the card.
As an embodiment, maintenance isolating closing lock system can also include isolating points label 800.Isolating points label 800 can be set on xegregating unit 500, and be stored with the identification information of the xegregating unit 500.Isolation key 300 can pass through Isolating points label 800 verifies lock operation instruction, and whether xegregating unit 500 corresponding with isolating points label 800 matches.Isolating points Label 800 includes the first radio frequency electronic tag, and passes through first radio frequency electronic tag for the mark of xegregating unit 500 Know information and is sent to isolation key 300.
Referring to fig. 2, in one embodiment, isolation key 300 includes identification module 310.Identification module 310, for that will close Lock operational order is matched with the identification information in isolating points label 800, if successful match, issues expression xegregating unit 500 instruct the first information to match with lock operation;Otherwise, issuing indicates that xegregating unit 500 and lock operation do not instruct not The second information matched.It certainly, include identification information corresponding with xegregating unit 500 in lock operation instruction.For example, the mark Information can be the information such as the number of xegregating unit 500.
Wherein, the first information and the second information can remind staff by way of sound and/or indicator light.It can be with Understand, setting isolating points label 800 can prompt whether staff's xegregating unit 500 is that this time maintenance needs that is isolated to set It is standby, staff's miswork can be preferably prevented, working efficiency is improved.
Referring to figs. 2 and 3, in one embodiment, isolation key 300 can also include writing module 320.Writing module 320 for lock operation instruction to be written in corresponding isolation lockset 400.It may include the second less radio-frequency that lockset 400, which is isolated, Electronic tag 410 and processing module 420.Wherein, the second radio frequency electronic tag 410 is written for receiving isolation key 300 Lock operation instruction.Processing module 420, for verifying whether lock operation instruction matches with default unlocking information, if so, Execute unlocking operation;Otherwise, unlocking operation is not executed.
Preferably, isolation lockset 400 can also include the second information logging modle 430.Second information logging modle 430 is used In operation notes information such as the unlocking operation times of the instruction of record lock operation and isolation lockset 400.Second information logging modle 430 can be uploaded to operation note information host 200, to facilitate staff to check operation note.In addition, in other implementations In example, isolation key 300 also may include first information logging modle 330.It can be remembered by the way that the first information of key 300 is isolated It records module 330 and records the operation notes such as the unlocking operation time of lock operation instruction and isolation lockset 400, trial operation operating time Information, and it is uploaded to host 200, to facilitate staff to check operation note.
Preferably, host 100 is also used to receive the trial operation task of user's input or selection, is generated according to trial operation task Trial operation unlocks operational order.And in the corresponding inspection operation Authority Verification success of trial operation xegregating unit, and with the test run After there are row xegregating unit other corresponding inspection operation permissions of xegregating unit 500 of relevance to be also proved to be successful, host 100 will Trial operation operational order is sent to isolation key 300.Wherein, trial operation xegregating unit is corresponding with trial operation unlock operational order Xegregating unit.Therefore, trial operation xegregating unit can be an xegregating unit 500, or more than two isolation are set Standby 500, or all xegregating units 500.
Isolation key 300 is also used to receive trial operation unlock operational order, and unlocking operational order by trial operation will be right The isolation lockset 400 answered is unlocked.Isolation lockset 400 be also used to verify trial operation unlock operational order whether with default unlocking information Matching, if so, executing trial operation unlocking operation;Otherwise, trial operation unlocking operation is not executed.
Wherein, trial operation operational order may include the number that lockset 400 is isolated.It can be by will be in default unlocking information It is isolated in the number and trial operation operational order of lockset 400 and the matched mode of number of lockset 400 is isolated, determines the trial operation The corresponding specific isolation lockset 400 of operational order.
If the trial operation operating result to trial operation xegregating unit meets preset requirement, the maintenance to xegregating unit 500 It completes, host 200 generates unlock operational order.It is main if the trial operation operating result to xegregating unit 500 does not meet preset requirement Machine 200 generates trial operation and restores instruction, and solution lock key 300 restores instruction for trial operation xegregating unit and and test run according to trial operation There is row xegregating unit the xegregating unit 500 of relevance to re-start maintenance isolating closing lock, continue to overhaul.
In addition, host 200 provides administration interface, for managing and checking facility information.For example, the display isolation of host 200 The quantity of lockset 400 and the work of each isolation lockset 400 is isolated in the quantity of key 300 and each 300 working condition of isolation key Make status information, the work state information of xegregating unit 500, and maintenance mission bit stream etc..Staff can pass through host 200 display interface checks above- mentioned information.The display interface of host 200 can also show the xegregating unit etc. that area of isolation includes Information.
In addition, the lock operation instruction that host 200 generates is specifically as follows maintenance isolation ticket, trial operation operational order is specific It can be trial operation ticket, trial operation recovery operation instruction is specifically as follows trial operation and restores ticket, and unlock operational order specifically can be with Ticket is released for isolation.Moreover, host 200, which can be adopted, graphically issues maintenance isolation ticket, trial operation ticket, trial operation recovery Ticket and isolation release ticket.
In addition, the first radio frequency electronic tag can use RFID (the Radio Frequency of 125kHz Identification, radio frequency identification) technology.Second radio frequency electronic tag 410 and the second information logging modle 430 Using the RFID chip of the 125kHz with user storage area.Equally, first information logging modle 330 can also be used and be had The RFID chip of the 125kHz of user storage area.
Above-mentioned maintenance isolating closing lock system, the maintenance task that host 200 is inputted or selected according to user generate lock operation Instruction, isolation key 300 instruct according to the lock operation and corresponding isolation lockset 400 are unlocked, and isolation lockset 400 grasps locking Make instruction to be matched with default unlocking information, unlocking operation is executed after successful match;After the completion of maintenance, host 200 is generated Operational order is unlocked, and when the inspection operation permission for verifying all permissions card 100 is legal, unlock operational order is sent to Isolation 300 pairs of isolation locksets 400 of key are unlocked, and the corresponding multiple isolation locksets 400 of unlock of an isolation key 300, side Just inspection operation is isolated.Permission card 100 is set, moreover it is possible to which work permit people is isolated with work responsible person's co- controlling when realizing maintenance The inspection operation permission of point interlock meets associated safety regulation.
Based on unified inventive concept, the embodiment of the present invention also proposes a kind of maintenance isolating closing lock method, due to the method solution Certainly the principle of problem is similar to a kind of aforementioned maintenance isolating closing lock system, and therefore, the device for implementing this method can be according to aforementioned System realizes that overlaps will not be repeated.
Referring to fig. 4, in one embodiment, maintenance isolating closing lock method the following steps are included:
Inspection operation permission is arranged in S401.
Wherein, inspection operation permission may include multiple, and each inspection operation permission can correspond to xegregating unit, one A above isolation lockset.More than one isolation lockset is corresponding with an xegregating unit, an xegregating unit it is corresponding every It is related to the structure attribute of xegregating unit from the particular number of lockset.After maintenance, verifying this time maintenance pair can be passed through In the case that all inspection operation permissions answered are legal, then start contact maintenance isolation, with the work of effective guarantee staff Industry safety.
S402 receives the maintenance task of user's input or selection, and generates corresponding lock operation according to maintenance task and refer to It enables.
Wherein, user can region according to this maintenance and the equipment that is related to, input or the corresponding maintenance of selection appoint Business.Corresponding lock operation instruction is generated according to maintenance task.For example, this time maintenance is related to multiple regions and multiple equipment, It should include then lock operation corresponding with each equipment in lock operation instruction.It is every according to the structure attribute of equipment itself The isolation lockset of a equipment distribution predetermined number.
Lock operation is instructed and is matched with the default unlocking information being isolated in lockset by S403, if successful match, every Unlocking operation is executed from lockset;Otherwise, isolation lockset does not execute unlocking operation.
Wherein, be isolated lockset in default unlocking information can for isolation lock tool number information, lock operation instruction in Also the number information for including and lockset being isolated.Number information and default solution by the isolation lockset that will be latched in control command The matched mode of number information of isolation lockset in lock information, to determine isolation lockset corresponding with lock operation instruction. If it is isolation lockset corresponding with lock operation instruction that lockset, which is isolated, which opens according to lock operation instruction execution Lock operation.
S404 is overhauled after xegregating unit is carried out isolating closing lock using isolation lockset.
It should be understood that isolation lockset execute unlocking operation after, operating personnel using the isolation lockset by it is corresponding every Isolating closing lock is carried out from equipment, and is overhauled.
S405, the trial operation task for being inputted or being selected according to user generate trial operation and unlock operational order, and according to test run Row unlock operational order unlocks corresponding xegregating unit.
Wherein, it after overhauling xegregating unit, needs to carry out trial operation operation, to verify the effect of maintenance.Therefore, Staff can according to specific needs, and selected section or whole xegregating units carry out trial operation operation.
Preferably, it is also necessary to examine other xegregating units that there is relevance with trial operation xegregating unit.And in trial operation The corresponding inspection operation Authority Verification success of xegregating unit, and have the xegregating unit of relevance corresponding with trial operation xegregating unit Inspection operation permission be also proved to be successful after, by trial operation operational order to trial operation xegregating unit unlock, and to examination Running xegregating unit, there is the xegregating unit of relevance to unlock, and carry out trial operation operation.
Wherein, trial operation xegregating unit is xegregating unit corresponding with trial operation unlock operational order.Therefore, trial operation every It can be an xegregating unit from equipment, or more than two xegregating units, or all xegregating units.
Whether the trial operation operating result of S406, detection and isolation equipment meet preset requirement, if so, thening follow the steps S407;Otherwise, step 408 is executed.
S407, the unlock task that maintenance is completed to be inputted according to user or be selected generate unlock operational order, and in all inspections It repairs after operating right is all proved to be successful, xegregating unit is unlocked by unlocking operational order.
Wherein, it after the completion of maintenance, needs to be unlocked xegregating unit, works normally xegregating unit.Specifically, can be with Unlock operational order is generated, then waits the verifying of this time all inspection operation permissions of maintenance, and in all of this maintenance After inspection operation permission is all proved to be successful, all xegregating units are unlocked by unlocking operational order, release maintenance Isolation.
S408, the trial operation recovery tasks for being inputted or being selected according to user generate trial operation and restore instruction, and according to test run Row, which restores instruction, by trial operation xegregating unit and with trial operation xegregating unit there is the xegregating unit of relevance to re-start maintenance Isolating closing lock overhauls xegregating unit again, and return step S405.
It should be understood that if the trial operation effect of trial operation xegregating unit is not up to preset requirement, need by trial operation every Maintenance isolating closing lock is carried out again from equipment, and re-starts maintenance.Specifically, trial operation, which can be generated, restores instruction, according to Trial operation, which restores instruction, by trial operation xegregating unit and with trial operation xegregating unit there is the xegregating unit of relevance to re-start Isolating closing lock is overhauled, xegregating unit is overhauled again.And return step S405, trial operation operation is carried out again, until inspection Repair completion.
In addition, maintenance isolating closing lock method can also include: to upload the isolating closing lock operation note to xegregating unit, it is right The trial operation operation note of xegregating unit uploads, and the step of returning to the isolation unlock operation note of xegregating unit.
Above-mentioned maintenance isolating closing lock method, the maintenance task for being inputted or being selected according to user generate lock operation instruction, will Lock operation instruction is matched with the default unlocking information that lockset is isolated, and lockset is isolated after successful match and executes unlocking operation; The unlock task for inputting or selecting according to user after the completion of maintenance generates unlock operational order, and is verifying all inspection operation power When limiting legal, xegregating unit is unlocked by unlocking operational order, facilitates isolation inspection operation, and be also able to achieve maintenance When work permit people and work responsible person's co- controlling isolating points interlock inspection operation permission, meet associated safety rule It is fixed.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (13)

1. a kind of maintenance isolating closing lock system characterized by comprising
Permission card, for inspection operation permission to be arranged;
Host for receiving the maintenance task of user's input or selection, and generates corresponding locking according to the maintenance task and grasps It instructs;
Key is isolated, the lock operation instruction sent for receiving the host, and being instructed by the lock operation will Corresponding isolation lockset is unlocked;
Lockset is isolated, the lock operation for verifying the isolation key instructs whether match with default unlocking information, if It is then to execute unlocking operation;Otherwise, unlocking operation is not executed;
The host is also used to after the completion of overhauling to xegregating unit, generates unlock operation according to the unlock task of input or selection Instruction, and after the inspection operation permission of all permission cards is all proved to be successful, the unlock operational order is sent out The isolation key is given to unlock to the isolation lockset;
Wherein, the number of the isolation lockset is more than one, and the isolation key corresponds to the more than one isolation lock Tool;The quantity of the permission card is two or more, and the inspection operation permission of each permission card corresponds to more than one described Xegregating unit;Each xegregating unit corresponds to the more than one isolation lockset.
2. maintenance isolating closing lock system according to claim 1, which is characterized in that further include:
Transmission adaptor charges for placing the isolation key, and for the isolation key, and for receiving the host The lock operation instruction, and by the lock operation instruction be sent to the isolation key.
3. maintenance isolating closing lock system according to claim 1, which is characterized in that further include:
Authorization device is sent out for reading the inspection operation permission of the permission card, and by the inspection operation permission read Give the host.
4. maintenance isolating closing lock system according to claim 1, which is characterized in that further include:
Isolating points label is arranged on xegregating unit, is stored with the identification information of the xegregating unit;
The isolation key includes:
Identification module is matched for instructing the lock operation with the identification information in the isolating points label, If successful match, issuing indicates that the xegregating unit and the lock operation instruct the first information to match;Otherwise, it issues Indicate that the xegregating unit and the lock operation instruct unmatched second information;
It wherein, include the identification information of corresponding xegregating unit in the lock operation instruction.
5. maintenance isolating closing lock system according to claim 4, which is characterized in that the isolating points label includes the first nothing Line radio electronic label;The isolating points label is by first radio frequency electronic tag by the mark of the xegregating unit Information is sent to the isolation key.
6. maintenance isolating closing lock system according to claim 4, which is characterized in that the isolation key further include: write-in Module, for lock operation instruction to be written in the isolation lockset;
The isolation lockset includes:
Second radio frequency electronic tag, for receiving the lock operation instruction of the isolation key write-in;
Processing module, for verifying whether the lock operation instruction match with the default unlocking information, if so, execution is opened Lock operation;Otherwise, unlocking operation is not executed.
7. maintenance isolating closing lock system according to claim 6, which is characterized in that the isolation key further include: first Information logging modle, for recording the unlocking operation time of the lock operation instruction and the isolation lockset.
8. maintenance isolating closing lock system according to claim 1, which is characterized in that the host be also used to receive input or The trial operation task of selection generates trial operation according to the trial operation task and unlocks operational order, and
There is relevance in the inspection operation Authority Verification success of trial operation xegregating unit, and with the trial operation xegregating unit After the inspection operation permission of xegregating unit is also proved to be successful, trial operation unlock operational order is sent to the isolation key Spoon;The trial operation xegregating unit is xegregating unit corresponding with trial operation unlock operational order;
The isolation key is also used to receive the trial operation unlock operational order, and unlocks operational order by the trial operation Corresponding isolation lockset is unlocked;
The isolation lockset is also used to verify whether the trial operation unlock operational order matches with default unlocking information, if so, Then execute trial operation unlocking operation;Otherwise, trial operation unlocking operation is not executed.
9. maintenance isolating closing lock system according to claim 8, which is characterized in that if to the trial operation of the xegregating unit Operating result meets preset requirement, then overhauls and complete to the xegregating unit, and the host generates the unlock operational order;It is no Then, the host generates trial operation and restores to instruct, and the isolation key restores instruction for the trial operation according to the trial operation Xegregating unit and with the trial operation xegregating unit have relevance xegregating unit re-start maintenance isolating closing lock.
10. according to claim 1 to maintenance isolating closing lock system described in 9 any one, which is characterized in that the host is also used In the quantity and working condition that show the isolation key, the quantity and work state information of the isolation lockset, xegregating unit Work state information, and maintenance mission bit stream.
11. a kind of maintenance isolating closing lock method, which comprises the following steps:
Inspection operation permission is set;
The maintenance task of user's input or selection is received, and corresponding lock operation is generated according to the maintenance task and is instructed;
The lock operation is instructed and is matched with the default unlocking information being isolated in lockset, if successful match, described in every Unlocking operation is executed from lockset;Otherwise, the isolation lockset does not execute unlocking operation;
After the completion of maintenance, receives the unlock task of user's input or selection and generate unlock operational order, in all maintenance After operating right is all proved to be successful, xegregating unit is unlocked by the unlock operational order.
12. maintenance isolating closing lock method according to claim 11, which is characterized in that further include:
The trial operation task for being inputted or being selected according to user generates trial operation and unlocks operational order, and detection is isolated with trial operation Equipment has the xegregating unit of relevance, and
In the corresponding inspection operation Authority Verification success of the trial operation xegregating unit, and have with the trial operation xegregating unit After the corresponding inspection operation permission of the xegregating unit of relevance is also proved to be successful, operational order is unlocked to institute by the trial operation It states trial operation xegregating unit and with the trial operation xegregating unit there is the xegregating unit of relevance to unlock, and carry out trial operation behaviour Make.
13. maintenance isolating closing lock method according to claim 12, which is characterized in that further include:
If meeting preset requirement to the result of trial operation of the trial operation xegregating unit, unlock operational order is generated, and according to The unlock operational order unlocks all xegregating units;Otherwise, it generates trial operation and restores instruction, and is extensive according to the trial operation Multiple instruction by the trial operation xegregating unit and with the trial operation xegregating unit there is the xegregating unit of relevance to re-start Overhaul isolating closing lock.
CN201510703316.1A 2015-10-23 2015-10-23 Overhaul isolating closing lock system and method Active CN106611452B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510703316.1A CN106611452B (en) 2015-10-23 2015-10-23 Overhaul isolating closing lock system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510703316.1A CN106611452B (en) 2015-10-23 2015-10-23 Overhaul isolating closing lock system and method

Publications (2)

Publication Number Publication Date
CN106611452A CN106611452A (en) 2017-05-03
CN106611452B true CN106611452B (en) 2019-10-11

Family

ID=58613627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510703316.1A Active CN106611452B (en) 2015-10-23 2015-10-23 Overhaul isolating closing lock system and method

Country Status (1)

Country Link
CN (1) CN106611452B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107994499A (en) * 2018-01-03 2018-05-04 王建涛 A kind of distribution board maintenance safety isolating device
CN109164752A (en) * 2018-09-08 2019-01-08 芜湖新兴铸管有限责任公司 A kind of electronic hang tag system and electronic hang tag method
CN109146321B (en) * 2018-09-12 2021-05-28 珠海长园共创软件技术有限公司 Maintenance operation safety control method and system
CN111476929B (en) * 2020-04-30 2022-05-20 福建联合石油化工有限公司 Electrical equipment maintenance site safety isolation method
CN112150673A (en) * 2020-09-21 2020-12-29 武汉瑞莱保能源技术有限公司 Electrical equipment isolation management and control system based on Internet of things technology
CN112365012B (en) * 2020-11-10 2024-01-26 珠海优特电力科技股份有限公司 Safety control method and system for petrochemical process production maintenance operation and storage medium
CN112967428B (en) * 2021-02-25 2023-05-02 立宏安全设备工程(上海)有限公司 Linkage type intelligent automatic locking and hanging method and system
CN113570760A (en) * 2021-08-06 2021-10-29 北斗天地股份有限公司 Locking control method and device of heading machine
CN113673718B (en) * 2021-08-23 2024-03-15 珠海优特电力科技股份有限公司 Method and device for controlling site operation safety measure execution process and storage medium
CN113991854A (en) * 2021-10-28 2022-01-28 珠海华伟电气科技股份有限公司 Power anti-misoperation maintenance management method, system, equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101820141A (en) * 2010-04-09 2010-09-01 珠海共创电力安全技术股份有限公司 Overhauling, separating, managing and controlling system of electrical equipment
CN203588339U (en) * 2013-10-09 2014-05-07 郑州乐金电力自动化有限公司 High-voltage power distribution cabinet with intelligent lock
CN104299308A (en) * 2014-11-11 2015-01-21 国网冀北电力有限公司廊坊供电公司 Misoperation preventing and lock group managing system and method for electric machine room
CN104680634A (en) * 2015-03-04 2015-06-03 珠海华伟电气科技股份有限公司 Maintenance isolation locking system and method
CN205158482U (en) * 2015-10-23 2016-04-13 珠海优特电力科技股份有限公司 Overhaul and keep apart blocking device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101820141A (en) * 2010-04-09 2010-09-01 珠海共创电力安全技术股份有限公司 Overhauling, separating, managing and controlling system of electrical equipment
CN203588339U (en) * 2013-10-09 2014-05-07 郑州乐金电力自动化有限公司 High-voltage power distribution cabinet with intelligent lock
CN104299308A (en) * 2014-11-11 2015-01-21 国网冀北电力有限公司廊坊供电公司 Misoperation preventing and lock group managing system and method for electric machine room
CN104680634A (en) * 2015-03-04 2015-06-03 珠海华伟电气科技股份有限公司 Maintenance isolation locking system and method
CN205158482U (en) * 2015-10-23 2016-04-13 珠海优特电力科技股份有限公司 Overhaul and keep apart blocking device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
智能安全隔离锁控系统;bsghr968;《豆丁网》;20141203;正文第3-6页 *

Also Published As

Publication number Publication date
CN106611452A (en) 2017-05-03

Similar Documents

Publication Publication Date Title
CN106611452B (en) Overhaul isolating closing lock system and method
CN205158482U (en) Overhaul and keep apart blocking device
CN105827576B (en) Method for unlocking and system based on dynamic puzzle-lock
CN103580872B (en) A kind of system and method generating for key and managing
CN106372786A (en) "Two ticket" operation safety management and control system and method
US9916701B2 (en) Vehicle auditing and control of maintenance and diagnosis for vehicle systems
CN109995138A (en) Substation's anti-misoperation locking management system and maintenance isolating closing lock management method
CN104282062A (en) Locking and unlocking method based on safe and intelligent lock system
CN112699987B (en) Method and system for monitoring work task by using lock
CN106056313A (en) Stamp information control method and system, and stamp
CN111445610B (en) System for managing work ticket isolation key
CN104680634A (en) Maintenance isolation locking system and method
CN106327652A (en) System and method for protecting electronic intelligent door locks and fingerprint locks
CN103425916A (en) Safety operation device and method taking safety criteria as working process auditing standards
KR101661313B1 (en) Method for controlling danger facility and computer program for executing the method
CN105785959A (en) Near field communication-based modern chemical plant equipment management method
CN105701612A (en) Overhauling isolation management system
CN206857897U (en) A kind of authenticating user identification device of building construction hoist
CN103177399A (en) Transformer substation standard operation firming method
CN110516908A (en) A kind of operation management-control method applied to industry spot
CN101765821A (en) Fingerprint reader resetting system and method
CN110956720A (en) Special intelligent lock system for laboratory hazardous article management and operation method
CN103295299A (en) Remote intelligent unlocking key management box
CN101662128A (en) Unlock key management device of transformer substation
CN112365012B (en) Safety control method and system for petrochemical process production maintenance operation and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant