CN103161305B - 一种超厚混凝土顶板施工方法 - Google Patents

一种超厚混凝土顶板施工方法 Download PDF

Info

Publication number
CN103161305B
CN103161305B CN201310120900.5A CN201310120900A CN103161305B CN 103161305 B CN103161305 B CN 103161305B CN 201310120900 A CN201310120900 A CN 201310120900A CN 103161305 B CN103161305 B CN 103161305B
Authority
CN
China
Prior art keywords
super
concrete
coarse sand
sand material
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310120900.5A
Other languages
English (en)
Other versions
CN103161305A (zh
Inventor
沈家文
刘勇
杨少真
杨兴华
付永春
周怀春
赵永任
张云鹤
雷春燕
孟应磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih No1 Water Resources And Hydropower Construction Co ltd
Ycih No3 Construction Co ltd
Yunnan Construction Engineering Group Co ltd
Yunnan Construction and Investment Holding Group Co Ltd
YCIH No 2 Construction Co Ltd
Original Assignee
SECOND CONSTRUCTION Co Ltd OF YNJG
YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Yunnan Construction Engineering Water Conservancy & Hydropower Construction Co Ltd
Third Construction Co Ltd Of Ynjg
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SECOND CONSTRUCTION Co Ltd OF YNJG, YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd, Yunnan Construction Engineering Water Conservancy & Hydropower Construction Co Ltd, Third Construction Co Ltd Of Ynjg filed Critical SECOND CONSTRUCTION Co Ltd OF YNJG
Priority to CN201310120900.5A priority Critical patent/CN103161305B/zh
Publication of CN103161305A publication Critical patent/CN103161305A/zh
Application granted granted Critical
Publication of CN103161305B publication Critical patent/CN103161305B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明涉及一种超厚混凝土顶板施工方法,特别适于超厚混凝土墙、超厚混凝土顶板的施工,属建筑工程技术领域。本发明直接采用向剪力墙体内填筑粗砂料的方式,代替传统钢管脚手架支撑,进行超厚混凝土顶板施工,由于填筑在剪力墙体内的粗砂料进行了夯实,所以填筑后的粗砂料受力均匀,能够支撑上部2.6米以上的混凝土砼,从而巧妙在解决传统施工方法不足,实现发明目的。本发明施工技术减少了脚手架搭设的工程量,不需要持证的特种作业工人,只需要普工就可以操作,粗砂料可重复利用,降低了施工成本,本施工技术便于操作,且质量和安全得到保障。

Description

一种超厚混凝土顶板施工方法
技术领域
本发明涉及一种超厚混凝土顶板施工方法,特别适于超厚混凝土墙、超厚混凝土顶板的施工,属建筑工程技术领域。
背景技术
目前,新建、扩建医疗建设项目中都有如直线加速器机房、伽玛刀手术室等辐射量较大的医疗设备功能性用房。这些特殊功能用房为保障医疗仪器工作时不泄漏带辐射射线需求,设计时要求顶板厚度采用2.6米以上混凝土板,业内又称超厚混凝土顶板。
现有施工方式是:先浇铸好这种功能性用房间的四周混凝土剪力墙,然后在该房间中间部位,人工搭设装拆密度较大的钢管脚手架,再在钢管脚手架上放置浇铸用模板,安装后的钢管脚手架数量需保证浇铸顶板混凝土时,能支撑整个顶部不会倒塌为准。
但由于这种功能性用房间整体面积小(通常为50-200平方),为支撑厚达2.6米以上混凝土板顶板,其底部安装的钢管脚手架密度很大,钢管脚手架之间的间距很小,工人安装钢管支撑架时,转身操作都很困难,操作难度大。
发明内容
本发明的目的在于克服上述现有类型超厚混凝土施工楼板、超厚混凝土剪力墙荷载大的困难,提供一种新的超厚混凝土顶板施工方法。
本发明超厚混凝土顶板施工方法是:按设计要求,先按常规施工方法在设计尺寸房间的四周浇筑混凝土剪力墙(3),形成有门(5)的房间,将剪力墙中有门部位用木板/钢板材料封住;
然后,用粗砂料(4)从顶部贯满或夯填到已施工完毕的房间空间内,夯实已填满整间房屋空间内的粗砂料;
在已经夯实粗砂料(4)上用低强度混凝土找水平,在已找平且凝固后混凝土层上面铺设或放置一层木胶板(2);
在木胶板(2)上直接浇筑厚度为1.0-—50米以上的混凝土,浇筑完毕待混凝土凝固后,
再折开封住剪力墙门(5)部位的木板/钢板材料,从门部位挖出填满房间的全部粗砂料(4),则完成厚度为1.0-—50米的超厚混凝土顶板(1)的施工。
粗砂料(4)最好按每填装250mm-300mm后夯实一次的分层填满夯实方式施工。
找水平采用的低强度混凝土为C10混凝土或者C15混凝土。
所述木胶板(2)的厚度最好为1-2厘米,各块木胶板(2)之间应相互连接,以减少接缝缝隙。
找好水平用的混凝土层厚度为5厘米。
所述的粗砂料是指砂土中砾粒含量不大于25%,而粒径大于0.5毫米的含量超过总质量50%的砂。
施工方法及原理:本发明直接采用向剪力墙体内填筑粗砂料的方式,代替传统钢管脚手架支撑,进行超厚混凝土顶板施工,由于填筑在剪力墙体内的粗砂料进行了夯实,所以填筑后的粗砂料受力均匀,能够支撑上部任何厚度的混凝土砼,从而巧妙在解决传统施工方法不足,实现发明目的。
本发明有益效果:
1、该施工技术减少了钢材的使用量,粗砂料可重复利用,降低了施工成本。
2、该施工技术减少了脚手架搭设的工程量,不需要持证的特种作业工人,只需要普工就可以操作,降低了施工成本。钢材的使用量,
3、该施工技术便于操作,且质量和安全得到保障。
附图说明
图1为采用本发明施工方法施工的超厚混凝土顶板房间示意图。
图中:1—超厚混凝土顶板;2—木胶板;3—剪力墙;4—粗砂料;5—门;6—5cm厚的低强度混凝土。
具体实施方式
实施例1(直线加速器机房用2.6米超厚混凝土顶板的施工)
在采用本发明粗砂填筑支撑作为模板支撑体系,需确定实际施工地面是否可承受粗砂料及现浇板混凝土竖向总荷载。
经验算,所产生的竖向荷载小于基础抗浮设计值,剪力墙混凝土墙达到82%强度后也承受其施加的侧压力,可以施工,
1)按设计要求,先用常规施工方法浇筑四周为剪力墙3混凝土的房间,形成只有一扇门5的功能房间,随后把剪力墙中有门5部位用木板或者钢板封住,防止粗砂料漏出;
2)将粗砂料从房间顶部贯入或者填入到已施工完毕的房间空间内,贯入或者填入的粗砂料按300mm分层一次夯填一次的方式,渐渐夯填满四周剪力墙房间顶部,施工完毕;
3)在已经夯实的最上层粗砂料上,用低强度混凝土[C10混凝土]找水平,目的是保证顶板施工质量达到设计要求,找水平所用的混凝土的厚度选择为5厘米;
3)在整块已找好水平的混凝土层上部,再铺设或者放置一层厚度为1-2厘米的木胶板2,各块木胶板2之间需相互连紧连接,尽量减少各块木胶板2之间连接部位的间隙,以保证浇筑时混凝土不要从隙中漏下,影响浇筑顶板面的平整度;
4)在连接好的木胶板2上,按常规施工方法搭设厚度为2.6米的超厚混凝土顶板层模板,向模板内浇筑混凝土,由于底部垫有的粗砂料受力均匀,可以承受任何厚度的混凝土浇筑;
5)浇筑完毕待顶部混凝土层凝固后,打开封住门5部位的板材,从门部位逐一挖出填满房间的粗砂料4,因为是采用低强度的C10混凝土基础垫层,挖出填满房间的粗砂料4时,该C10混凝土基础垫层会自然裂开,所以不会影响挖出工作,将全部粗砂料4挖出后,则形成顶部具有2.6米厚度混凝土顶板1层的房间。
本发明在填满整个房间空间内的粗砂料过程中,可以是一次填满后总的一次夯实;也可以采用每填贯250mm-300mm的粗砂料,就夯实一次粗砂料,再填250mm-300mm粗砂料,再夯实一次粗砂料的分层夯实方式,目的只要保证浇筑顶部混凝土时,该垫层不发生移动即可。
本发明所述的C10混凝土的一个强度等级。字母C是混凝土的英语单词“Concretes”第一个字母;数字10,指的是混凝土的立方体抗压强度标准值为10N/mm2
本发明C10混凝土可按《公路工程预算定额》JGJTB06-02-2007附录砂浆与混凝土材料消耗;C10水泥中的中砂;碎石(最大粒径4cm)225kg;0.51立方;0.87立方;换算为质量比1方C10的:水泥225kg,中砂729kg,碎石1305kg。
本发明所用的粗砂料是指砂土中砾粒含量不大于25%,而粒径大于0.5毫米的含量超过总质量50%的砂。
本发明成功解决超厚混凝土顶板或者墙体施工荷载大、脚手架间距小、搭设操作难度的问题,不需要持证的特种作业工人,只需要普工就可以操作,粗砂料可重复利用,降低了施工成本,可用于任何尺寸的各种超厚顶板或者超厚混凝土墙施工(如金融行业的金库用房等)。

Claims (5)

1.一种超厚混凝土顶板施工方法,其特征在于按设计要求,先按常规施工方法在设计尺寸房间的四周浇筑混凝土剪力墙(3),形成有门(5)的房间,将剪力墙中有门部位用木板/钢板材料封住;
然后,用粗砂料(4)从顶部贯满或夯填到已施工完毕的房间空间内,夯实已填满整间房屋空间内的粗砂料;
在已经夯实粗砂料(4)上用低强度混凝土找水平,在找平且凝固后混凝土层上面铺设或放置一层木胶板(2);
在木胶板(2)上直接浇筑厚度为2.6米的混凝土,浇筑完毕待混凝土凝固后,
再折开封住剪力墙门(5)部位的木板/钢板材料,从门部位挖出填满房间的全部粗砂料(4),则完成厚度为2.6米的超厚混凝土顶板(1)的施工;
所述的粗砂料是指砂土中砾粒含量不大于25%,而粒径大于0.5毫米的含量超过总质量50%的砂。
2.根据权利要求1所述的一种超厚混凝土顶板施工方法,其特征在于粗砂料(4)最好按每填装250mm-300mm后夯实一次的分层填满夯实方式施工。
3.根据权利要求1所述的一种超厚混凝土顶板施工方法,其特征在于找平采用的低强度混凝土为C10混凝土或者C15混凝土。
4.根据权利要求1所述的一种超厚混凝土顶板施工方法,其特征在于所述木胶板(2)的厚度最好为1-2厘米,各块木胶板(2)之间应相互连接,以减少接缝缝隙。
5.根据权利要求1所述的一种超厚混凝土顶板施工方法,其特征在于找平用的混凝土层厚度为5厘米。
CN201310120900.5A 2013-04-09 2013-04-09 一种超厚混凝土顶板施工方法 Active CN103161305B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310120900.5A CN103161305B (zh) 2013-04-09 2013-04-09 一种超厚混凝土顶板施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310120900.5A CN103161305B (zh) 2013-04-09 2013-04-09 一种超厚混凝土顶板施工方法

Publications (2)

Publication Number Publication Date
CN103161305A CN103161305A (zh) 2013-06-19
CN103161305B true CN103161305B (zh) 2016-01-20

Family

ID=48584809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310120900.5A Active CN103161305B (zh) 2013-04-09 2013-04-09 一种超厚混凝土顶板施工方法

Country Status (1)

Country Link
CN (1) CN103161305B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359587B (zh) * 2019-07-12 2021-03-23 无锡市亨利富建设发展有限公司 一种直线加速房超厚墙顶板及其施工工艺

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1080777A (zh) * 1992-06-24 1994-01-12 西屋电气公司 核反应堆控制室的建造
JPH0839525A (ja) * 1994-08-02 1996-02-13 I L B Kk 粗面コンクリートブロックの製造方法
RU2261960C1 (ru) * 2004-03-24 2005-10-10 Кубанский государственный аграрный университет Способ изготовления строительного элемента
CN101343947A (zh) * 2008-08-21 2009-01-14 青海送变电工程公司 一种大体积混凝土的施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1080777A (zh) * 1992-06-24 1994-01-12 西屋电气公司 核反应堆控制室的建造
JPH0839525A (ja) * 1994-08-02 1996-02-13 I L B Kk 粗面コンクリートブロックの製造方法
RU2261960C1 (ru) * 2004-03-24 2005-10-10 Кубанский государственный аграрный университет Способ изготовления строительного элемента
CN101343947A (zh) * 2008-08-21 2009-01-14 青海送变电工程公司 一种大体积混凝土的施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
医用直线加速器室现浇大体积混凝土施工技术;冯锦华;梁伟;《施工技术》;20090630(第12期);第40页 *
浅谈抗癌中心直线加速器室大体积混凝土施工方案;刘乐超 等;《青岛理工大学学报》;20110630(第3期);第131页 *

Also Published As

Publication number Publication date
CN103161305A (zh) 2013-06-19

Similar Documents

Publication Publication Date Title
CN110185844B (zh) 浅覆土大直径顶管施工方法
CN109611102B (zh) 一种冷开挖下穿立交桥施工方法
CN111519665A (zh) 一种地基后浇带无间隙式填封方法
KR20140075767A (ko) 부지의 압축 및 굴착을 이용한 옹벽 구축
Silva et al. Effectiveness of the repair of unstabilised rammed earth with injection of mud grouts
CN110258538B (zh) 一种土钉加强缓冲型人工挖孔桩及其施工方法
CN107142959A (zh) 一种土工格室加筋泡沫混凝土挡土墙填筑结构及其方法
CN110273436A (zh) 明挖隧道利用支护桩及冠梁的压顶抗浮结构及其施工方法
CN206070508U (zh) 一种加固地基基础的装置
CN111395375A (zh) 一种基于触变泥浆减阻的沉井施工方法
CN109706952A (zh) 大型沉井施工方法
CN102182866A (zh) 一种大型超深循环水管道回填工艺
Auvinen et al. Covering the highway E12 in the centre of Hämeenlinna–Innovative use of foamed glass as light weight material of approach embankment
CN108385612B (zh) 一种稳定性好的混凝土护面板的施工方法
CN206693272U (zh) 控制检查井沉降的井底结构
CN210946329U (zh) 一种地铁上方高填路堤结构
CN103161305B (zh) 一种超厚混凝土顶板施工方法
CN217629964U (zh) 地下室深基坑替换撑
CN117127642A (zh) 一种流态固化土承台结构及制作方法
CN101498131B (zh) 深大基坑钢筋混凝土支撑的收缩补偿方法
CN100523394C (zh) 砼井壁墙体模块砌筑施工方法
CN111335912A (zh) 湿陷性黄土地区软土地基大管径机械顶管施工工艺
Cui Nondestructive controllable grouting: a novel method to correct deviation of building foundation
CN111535339B (zh) 垃圾填埋场混凝土坝体的施工工艺
Lundskog Large-scale testing of reinforced lightweight cellular concrete backfill for mse walls

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: YUNNAN THIRD CONSTRUCTION ENGINEERING CO., LTD.

Free format text: FORMER OWNER: WATER RESOURCES + HYDROPOWER CONSTRUCTION CO., LTD. OF YUNNAN CONSTRUCTION ENGINEERING GROUP

Effective date: 20140328

Owner name: WATER RESOURCES + HYDROPOWER CONSTRUCTION CO., LTD

Effective date: 20140328

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Shen Jiawen

Inventor after: Meng Yinglei

Inventor after: Liu Yong

Inventor after: Yang Shaozhen

Inventor after: Yang Xinghua

Inventor after: Fu Yong Chun

Inventor after: Zhou Huaichun

Inventor after: Zhao Yongren

Inventor after: Zhang Yunhe

Inventor after: Lei Chunyan

Inventor before: Shen Jiawen

Inventor before: Yang Xinghua

Inventor before: Fu Yong Chun

Inventor before: Zhou Huaichun

Inventor before: Zhao Yongren

Inventor before: Zhang Yunhe

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 650041 KUNMING, YUNNAN PROVINCE TO: 650032 KUNMING, YUNNAN PROVINCE

Free format text: CORRECT: INVENTOR; FROM: SHEN JIAWEN YANG XINGHUA FU YONGCHUN ZHOU HUAICHUN ZHAO YONGREN ZHANG YUNHE TO: SHEN JIAWEN LIU YONG YANG SHAOZHEN YANG XINGHUA FU YONGCHUN ZHOU HUAICHUN ZHAO YONGREN ZHANG YUNHE LEI CHUNYAN MENG YINGLEI

TA01 Transfer of patent application right

Effective date of registration: 20140328

Address after: 650032 No. 292, news Road, Wuhua District, Yunnan, Kunming

Applicant after: YUNNAN NO.3 CONSTRUCTIONAL ENGINEERING Co.,Ltd.

Applicant after: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Applicant after: Yunnan No.2 Construction Engineering Co.,Ltd.

Applicant after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 650041, 89 east suburb Road, Guandu District, Yunnan, Kunming

Applicant before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

CB02 Change of applicant information

Address after: Grand View Road Wuhua District Yunnan city of Kunming Province, No. 36 650032

Applicant after: THE THIRD CONSTRUCTION CO.,LTD. OF YNJG

Applicant after: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Applicant after: SECOND CONSTRUCTION Co.,Ltd. OF YNJG

Applicant after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 650032 No. 292, news Road, Wuhua District, Yunnan, Kunming

Applicant before: YUNNAN NO.3 CONSTRUCTIONAL ENGINEERING Co.,Ltd.

Applicant before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Applicant before: Yunnan No.2 Construction Engineering Co.,Ltd.

Applicant before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Grand View Road 650032 Yunnan city of Kunming province No. 36

Patentee after: YCIH NO.3 CONSTRUCTION Co.,Ltd.

Patentee after: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Patentee after: YCIH NO.2 CONSTRUCTION Co.,Ltd.

Patentee after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: Grand View Road Wuhua District Yunnan city of Kunming Province, No. 36 650032

Patentee before: THE THIRD CONSTRUCTION CO.,LTD. OF YNJG

Patentee before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Patentee before: SECOND CONSTRUCTION Co.,Ltd. OF YNJG

Patentee before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20170220

Address after: Grand View Road 650032 Yunnan city of Kunming province No. 36

Patentee after: YCIH NO.3 CONSTRUCTION Co.,Ltd.

Patentee after: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Patentee after: YCIH NO.2 CONSTRUCTION Co.,Ltd.

Patentee after: Yunnan Construction Investment Holding Group Co., Ltd.

Address before: Grand View Road 650032 Yunnan city of Kunming province No. 36

Patentee before: YCIH NO.3 CONSTRUCTION Co.,Ltd.

Patentee before: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Patentee before: YCIH NO.2 CONSTRUCTION Co.,Ltd.

Patentee before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.