CN103161172A - Elevator shaft bottom precipitation construction method - Google Patents
Elevator shaft bottom precipitation construction method Download PDFInfo
- Publication number
- CN103161172A CN103161172A CN2012101696853A CN201210169685A CN103161172A CN 103161172 A CN103161172 A CN 103161172A CN 2012101696853 A CN2012101696853 A CN 2012101696853A CN 201210169685 A CN201210169685 A CN 201210169685A CN 103161172 A CN103161172 A CN 103161172A
- Authority
- CN
- China
- Prior art keywords
- elevator shaft
- metal tube
- sump
- shaft bottom
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The invention discloses a building elevator shaft bottom precipitation construction method which comprises the following steps: digging a sump in an elevator shaft, pre-burying metal tubes in the sump, filling cobblestones into the sump to reach the standard height of a bedding, fixing the metal tubes in the sump, adopting a self-priming pump to work, casting a concrete bedding while pumping water, paving waterproof coiled materials , carrying out construction operation of a concrete protective layer, and carrying out construction operation of foundation slabs. The building elevator shaft bottom precipitation construction method can effectively overcome the practical difficulty that due to the fact that water is too much in the elevator shaft, the next process cannot be carried out, ensures normal construction of the bedding and effectively prevents the waterproof roll from protruding out of the foundation bottom due to the water.
Description
Technical field
The present invention relates to a kind of architecture construction method, specifically, relate to a kind of building elevator shaft bottom dewatering construction method.
Background technology
During building foundation construction at present, due to turning one's coat of underground water, it is too much that ponding often appears in elevator shaft, and cause elevator shaft can't carry out the construction of concrete cushion and waterproof roll paving operation, if construction cushion coat and laying water-proof coiled material by force, waterproof roll is easily gone out backplate surface by drum.
On the building site, precipitation all uses foundation ditch perimeter well point dewatering at present, and the method can be controlled foundation ditch water level inside absolute altitude.But there is following defective in the method: the elevator shaft elevation of bottom is all in the foundation ditch bottom; along with increasing of floor; the elevator shaft degree of depth also increases relatively; therefore be easy to occur the phenomenon that the elevator shaft internal water accumulation too much can't drain; therefore can cause very large difficulty to cushion construction; if water is drained and construction cushion coat and waterproof roll by force, waterproof roll can occur and be gone out backplate surface by drum, and the phenomenon that the fish tail and waterproof layer top is split.Therefore the construction of next procedure caused certain difficulty.
Summary of the invention
For above-mentioned deficiency of the prior art, the present invention effectively stops waterproof roll and is gone out backplate surface by drum, cause elevator shaft bottom can't carry out the technical barrier of the construction of concrete cushion and waterproof roll paving operation, and a kind of building elevator shaft bottom dewatering construction method is provided.
The technical solution used in the present invention is:
A kind of building elevator shaft bottom dewatering construction method, the method comprises the steps:
A. elevator shaft bottom is dug 1m~1.2m downwards, make base diameter 500mm~700mm, the sump of top diameter 700mm~900mm; Built-in metal pipe in sump, described metal tube diameter 80mm~120mm;
B. backfill stone in sump, be backfilled to the bed course absolute altitude, and metal tube be fixed in sump;
C. adopt the self prime pump operation of drawing water, the ponding in sump is extracted out, and the Pouring concrete at the same time bed course that is drawing water; Laying water-proof coiled material; In waterproof roll and metal tube junction, use waterproofing unction that metal tube is sealed;
D. carry out the concrete cover construction operation;
E. carry out the sole plate construction operation;
F. metal tube is provided with the annulus seal plate at the sole plate layer:
G. cut off metal tube; The metal tube shutoff is closely knit.
Described metal tube root is provided with the circular hole of diameter 10mm~20mm.
The diameter of the particle of described backfill stone is: 20mm~40mm.
Described metal tube shutoff is that spunyarn and asbestos cement are filled in metal tube, then uses the micro-expansion cement sealing; Perhaps use metal sheet that the metal mouth of pipe is welded and carry out shutoff.
Described annulus seal plate is at least twice.
Described annulus seal plate is arranged on sole plate layer centre position.
The thickness of described annulus seal plate is 3mm~8mm; External diameter 150mm~180mm.
Described annulus seal plate is that welding can be also to weld in advance when construction.
Described metal tube lower end is 1/4th of sump overall height apart from the height of sump bottom.The beneficial effect of the relative prior art of the present invention:
Building elevator shaft bottom dewatering construction method of the present invention can effectively be controlled the practical difficulty that can't carry out next procedure that elevator shaft internal cause ponding too much brings to construction; Guaranteed the normal construction of bed course; Prevent that effectively waterproof roll from bloating foundation bed because of ponding.
Description of drawings
Fig. 1 is building elevator shaft bottom dewatering construction structural representation of the present invention;
Critical piece symbol description in accompanying drawing:
In figure:
1, concrete foundation base plate 2, concrete cover
3, waterproof roll 4, concrete cushion
5, annulus seal plate 6, metal tube
7, stone 8, circular hole
9, waterproofing unction 10, sump.
The specific embodiment
The present invention will be described in detail referring to drawings and Examples:
Accompanying drawing 1 as can be known, a kind of building elevator shaft bottom dewatering construction method, the method comprises the steps:
A. elevator shaft bottom is dug 1m~1.2m downwards, make base diameter 500mm~700mm, the sump of top diameter 700mm~900mm; The interior built-in metal pipe 6 of sump 10, described metal tube 6 diameter 80mm~120mm;
B. the interior backfill stone 7 of sump 10, be backfilled to the bed course absolute altitude, and metal tube 6 is fixed in sump 10;
C. adopt the self prime pump operation of drawing water, 10 ponding in sump is extracted out, and the Pouring concrete at the same time bed course 4 that is drawing water; Laying water-proof coiled material 3; In waterproof roll 3 and metal tube 6 junctions, use waterproofing unction 9 with metal tube 6 sealings;
D. carry out concrete cover 2 construction operations;
E. carry out sole plate 1 construction operation;
G. cut off metal tube 6; Metal tube 6 shutoff are closely knit.
Described metal tube 6 roots are provided with the circular hole of diameter 10mm~20mm.
The diameter of the particle of described backfill stone 7 is: 20mm~40mm.
Described metal tube 6 shutoff are that spunyarn and asbestos cement are filled in metal tube 6, then use the micro-expansion cement sealing; Perhaps use metal sheet that the metal mouth of pipe is welded and carry out shutoff.
Described annulus seal plate 5 is at least twice.
Described annulus seal plate 5 is arranged on sole plate layer 1 centre position.
The thickness of described annulus seal plate 5 is 3mm~8mm; External diameter 150mm~180mm.
Described annulus seal plate 5 is that welding can be also to weld in advance when construction.
Described metal tube 6 lower ends are 1/4th of sump 10 overall heights apart from the height of sump 10 bottoms.
If elevator shaft inner waterproofing topping is built, and split by waterproof roll top, cover concrete is chiseled, cut open the waterproof roll that bloats, then carry out above-mentioned construction.
Metal tube of the present invention can be also the non-metal pipe that enough wall thickness are arranged, and can adopt the mode of bonding shutoff when shutoff.
Building elevator shaft bottom dewatering construction method of the present invention can effectively be controlled the practical difficulty that can't carry out next procedure that elevator shaft internal cause ponding too much brings to construction; Guaranteed the normal construction of bed course; Prevent that effectively waterproof roll from bloating foundation bed because of ponding.
Claims (9)
1. a building elevator shaft bottom dewatering construction method, is characterized in that the method comprises the steps:
A. elevator shaft bottom is dug 1m~1.2m downwards, make base diameter 500mm~700mm, the sump of top diameter 700mm~900mm; Built-in metal pipe in sump, described metal tube diameter 80mm~120mm;
B. backfill stone in sump, be backfilled to the bed course absolute altitude, and metal tube be fixed in sump;
C. adopt the self prime pump operation of drawing water, the ponding in sump is extracted out, and the Pouring concrete at the same time bed course that is drawing water; Laying water-proof coiled material; In waterproof roll and metal tube junction, use waterproofing unction that metal tube is sealed;
D. carry out the concrete cover construction operation;
E. carry out the sole plate construction operation;
F. metal tube is provided with the annulus seal plate at the sole plate layer:
G. cut off metal tube; The metal tube shutoff is closely knit.
2. building elevator shaft bottom dewatering construction method according to claim 1, it is characterized in that: described metal tube root is provided with the circular hole of diameter 10mm~20mm.
3. building elevator shaft bottom dewatering construction method according to claim 1, it is characterized in that: the diameter of the particle of described backfill stone is: 20mm~40mm.
4. building elevator shaft bottom dewatering construction method according to claim 1, it is characterized in that: described metal tube shutoff is that spunyarn and asbestos cement are filled in metal tube, then uses the micro-expansion cement sealing; Perhaps use metal sheet that the metal mouth of pipe is welded and carry out shutoff.
5. building elevator shaft bottom dewatering construction method according to claim 1, it is characterized in that: described annulus seal plate is at least twice.
6. building elevator shaft bottom dewatering construction method according to claim 1 is characterized in that: described annulus seal plate is arranged on sole plate layer centre position.
7. building elevator shaft bottom dewatering construction method according to claim 1, it is characterized in that: the thickness of described annulus seal plate is 3mm~8mm; External diameter 150mm~180mm.
8. building elevator shaft bottom dewatering construction method according to claim 1, it is characterized in that: described annulus seal plate is that welding can be also to weld in advance when construction.
9. building elevator shaft bottom dewatering construction method according to claim 1 is characterized in that: described metal tube lower end is 1/4th of sump overall height apart from the height of sump bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210169685.3A CN103161172B (en) | 2012-05-29 | 2012-05-29 | Elevator shaft bottom precipitation construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210169685.3A CN103161172B (en) | 2012-05-29 | 2012-05-29 | Elevator shaft bottom precipitation construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103161172A true CN103161172A (en) | 2013-06-19 |
CN103161172B CN103161172B (en) | 2016-01-20 |
Family
ID=48584681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210169685.3A Active CN103161172B (en) | 2012-05-29 | 2012-05-29 | Elevator shaft bottom precipitation construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103161172B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103967028A (en) * | 2014-05-27 | 2014-08-06 | 江苏南通三建集团有限公司 | Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure |
CN104452786A (en) * | 2014-11-14 | 2015-03-25 | 武汉一冶建筑安装工程有限责任公司 | Deep foundation pit elevator shaft sump dewatering construction method |
CN106223351A (en) * | 2016-07-26 | 2016-12-14 | 中国二十二冶集团有限公司 | Self priming pump reduces local groundwater level construction method |
CN106638642A (en) * | 2017-02-21 | 2017-05-10 | 潍坊市宏源防水材料有限公司 | Underground building pit body waterproof construction precipitation treating method |
CN106894431A (en) * | 2017-02-21 | 2017-06-27 | 潍坊市宏源防水材料有限公司 | Hypogee hole body waterproof construction precipitation processing method under a kind of water resource enriched environment |
CN107152031A (en) * | 2017-06-24 | 2017-09-12 | 中铁十局集团第二工程有限公司 | It is a kind of to cheat elevator drainage arrangement without pair |
CN108487276A (en) * | 2018-04-27 | 2018-09-04 | 陕西建工机械施工集团有限公司 | A kind of embed-type shallow-layer combined water drain pipe and construction method |
CN112695779A (en) * | 2021-01-26 | 2021-04-23 | 山西三建集团有限公司 | High-rise building foundation pit construction method for local precipitation of elevator shaft foundation pit |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4260334A (en) * | 1976-02-11 | 1981-04-07 | Kelley Contract Dewatering Company | Ground dewatering system |
CN101148884A (en) * | 2007-10-30 | 2008-03-26 | 山东天齐置业集团股份有限公司 | Waterproof and plugging construction method for precipitation well in foundation pit |
CN101768976A (en) * | 2009-12-29 | 2010-07-07 | 中建城市建设发展有限公司 | Base pit dewatering and water saving device and construction method thereof |
CN101936010A (en) * | 2010-08-19 | 2011-01-05 | 天津二十冶建设有限公司 | Construction method of dewatering well in underground concrete structure |
-
2012
- 2012-05-29 CN CN201210169685.3A patent/CN103161172B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4260334A (en) * | 1976-02-11 | 1981-04-07 | Kelley Contract Dewatering Company | Ground dewatering system |
CN101148884A (en) * | 2007-10-30 | 2008-03-26 | 山东天齐置业集团股份有限公司 | Waterproof and plugging construction method for precipitation well in foundation pit |
CN101768976A (en) * | 2009-12-29 | 2010-07-07 | 中建城市建设发展有限公司 | Base pit dewatering and water saving device and construction method thereof |
CN101936010A (en) * | 2010-08-19 | 2011-01-05 | 天津二十冶建设有限公司 | Construction method of dewatering well in underground concrete structure |
Non-Patent Citations (1)
Title |
---|
郏键: "深基坑集水坑地下涌水的处理措施", 《建筑工人》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103967028A (en) * | 2014-05-27 | 2014-08-06 | 江苏南通三建集团有限公司 | Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure |
CN104452786A (en) * | 2014-11-14 | 2015-03-25 | 武汉一冶建筑安装工程有限责任公司 | Deep foundation pit elevator shaft sump dewatering construction method |
CN106223351A (en) * | 2016-07-26 | 2016-12-14 | 中国二十二冶集团有限公司 | Self priming pump reduces local groundwater level construction method |
CN106223351B (en) * | 2016-07-26 | 2019-03-19 | 中国二十二冶集团有限公司 | Self priming pump reduces local groundwater level construction method |
CN106638642A (en) * | 2017-02-21 | 2017-05-10 | 潍坊市宏源防水材料有限公司 | Underground building pit body waterproof construction precipitation treating method |
CN106894431A (en) * | 2017-02-21 | 2017-06-27 | 潍坊市宏源防水材料有限公司 | Hypogee hole body waterproof construction precipitation processing method under a kind of water resource enriched environment |
CN106894431B (en) * | 2017-02-21 | 2019-08-27 | 宏源防水科技集团有限公司 | Hypogee pit body waterproof construction precipitation processing method under a kind of water resource enriched environment |
CN106638642B (en) * | 2017-02-21 | 2019-08-27 | 宏源防水科技集团有限公司 | A kind of hypogee pit body waterproof construction precipitation processing method |
CN107152031A (en) * | 2017-06-24 | 2017-09-12 | 中铁十局集团第二工程有限公司 | It is a kind of to cheat elevator drainage arrangement without pair |
CN108487276A (en) * | 2018-04-27 | 2018-09-04 | 陕西建工机械施工集团有限公司 | A kind of embed-type shallow-layer combined water drain pipe and construction method |
CN112695779A (en) * | 2021-01-26 | 2021-04-23 | 山西三建集团有限公司 | High-rise building foundation pit construction method for local precipitation of elevator shaft foundation pit |
Also Published As
Publication number | Publication date |
---|---|
CN103161172B (en) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103161172A (en) | Elevator shaft bottom precipitation construction method | |
CN103343543B (en) | Foundation pit dewatering well pressure-reduction-type plugging method | |
CN103334444B (en) | A kind of method for blocking of foundation pit dewatering well pressure release type | |
CN105201002B (en) | A kind of underground structure oozes drainage system and its construction method | |
CN102797266B (en) | Well sealing waterproof construction method for dewatering well | |
CN104895098A (en) | Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof | |
CN104711994A (en) | Foundation pit deep well rainfall and plugging construction method | |
CN103015456B (en) | Rapid pit-in-pit form erecting method in foundation slab of buried concrete structure | |
CN104452786A (en) | Deep foundation pit elevator shaft sump dewatering construction method | |
CN206090653U (en) | Anchor rod static pressure pile slip casting structure | |
JP2006265964A (en) | Drainage treatment method | |
CN209339169U (en) | A kind of precipitation well in foundation pit plugging device | |
CN104895118A (en) | Underground diaphragm wall internal corner position piping plug structure and grouting processing method thereof | |
CN101979781B (en) | Method for constructing oil drilling waste mud solidification pool | |
CN104846836A (en) | Water supply and drainage device for deep foundation pit and construction method based on water supply and drainage device | |
CN202730786U (en) | Well-sealing waterproof construction structure of dewatering well | |
CN105484277A (en) | Component for tubular well precipitation construction in elevator foundation pit or sump and construction method | |
CN109025899B (en) | Well sealing device | |
CN104404960B (en) | A kind of underground diaphragm wall seam grouting device and constructional method | |
CN104060622B (en) | Steel drum Yield rainfall relation method is cheated in a kind of hole | |
CN203768925U (en) | Seal device for dewatering well in foundation pit | |
CN104074195B (en) | A kind of method controlling the outer surface subsidence of foundation ditch by horizontal grouting | |
CN103898915B (en) | Building small-area deep foundation pit anti-floating water stop construction method | |
CN103397637B (en) | Pre-embedding method of grouting sleeve under raft foundation | |
CN110670613B (en) | Foundation pit elevator shaft water seepage prevention structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |