CN103145050B - Rotating multi-crane integrated operation platform with integral automatic lifting function - Google Patents
Rotating multi-crane integrated operation platform with integral automatic lifting function Download PDFInfo
- Publication number
- CN103145050B CN103145050B CN201310088685.5A CN201310088685A CN103145050B CN 103145050 B CN103145050 B CN 103145050B CN 201310088685 A CN201310088685 A CN 201310088685A CN 103145050 B CN103145050 B CN 103145050B
- Authority
- CN
- China
- Prior art keywords
- automatic lifting
- annular
- support frame
- platform
- loop wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A rotating multi-crane integrated operation platform with an integrated automatic lifting function comprises a wall-climbing automatic lifting system arranged on a core tube shear wall, an annular bracket surrounding the periphery of the core tube shear wall and connected on the wall-climbing automatic lifting system, and an annular rotating platform surrounding the periphery of the core tube shear wall and supported on the annular bracket, wherein the annular bracket includes a support truss group, an annular support platform and a driving system; the annular rotating platform includes an annular base, cranes, and a driven system; and the cranes include a large boom-type tower crane and at least one small-medium crane. The operation platform provided by the invention optimizes the crane configuration in construction of super high-rise buildings, reduces the number of the large boom-type tower crane, and reduces the cost of vertical transportation equipment.
Description
Technical field
The present invention relates to the integrated operation platform of the many loop wheel machines of a kind of swinging for construction of super highrise building.
Background technology
Current high-rise building is designed to the version of housing steel structure+Core Walls Structure+semi-girder truss more, and in construction, quantity, weight and the planimetric position in housing steel structure after each member merogenesis become the Main Basis that tower crane is equipped with.Although housing steel structure is the light members such as horizontal girder steel in a large number after merogenesis, but mega steel column few in number is as maximum member, because it distributes wide---be looped around uniformly the periphery of Core Walls Structure cylinder, but affected the type selecting of tower crane, therefore conventionally needing many of configurations to be worth expensive large-scale movable arm type tower crane is arranged in Core Walls Structure or on periphery body of wall, to meet the lifting of the each member of housing steel structure.
Summary of the invention
The object of this invention is to provide a kind of overall many loop wheel machines of automatic lifting swinging integrated operation platform for construction of super highrise building, when construction of super highrise building be solved, large-scale movable arm type tower crane arranges too many problem.
Solve the problems of the technologies described above, the present invention adopts following technical scheme: a kind of overall many loop wheel machines of automatic lifting swinging integrated operation platform, is characterized in that: comprise the wall formula of the climbing automatic lifting system that is arranged on Core Walls Structure shear wall, be looped around Core Walls Structure shear wall surrounding and be connected to and climb the loop bracket in wall formula automatic lifting system and be looped around Core Walls Structure shear wall surrounding and be supported on the annular turn table on loop bracket.
Described loop bracket comprises sub-truss group, annular brace platform and active system, described sub-truss group is fixedly connected on climbs in wall formula automatic lifting system, described annular brace platform fixed placement is in sub-truss group, and the upper surface of annular brace platform is provided with circular orbit and annular stack carrying platform, and described active system is arranged on annular brace platform.
Described annular turn table comprises circular base, loop wheel machine and servo system, described circular base is arranged on circular orbit, described loop wheel machine is arranged on circular base, described servo system is fixedly connected with circular base, is also connected with active system simultaneously, and described loop wheel machine comprises a large-scale movable arm type tower crane and at least one middle-size and small-size loop wheel machine.
The described wall formula automatic lifting system of climbing comprises and climbs wall formula load-carrying construction, lower support frame, upper support frame and jacking cylinder, wherein climbing wall formula load-carrying construction is fixedly connected on Core Walls Structure shear wall, upper support frame and lower support frame are connected to climbs on wall formula load-carrying construction, and jacking cylinder is connected between upper support frame and lower support frame.
The lower end of described sub-truss group is connected on upper support frame, and the upper end of sub-truss group is connected with annular brace platform.
Described sub-truss group is del.
Described circular orbit is positioned at outer ring, annular stack carrying platform is positioned at inner ring.
Compared with prior art the present invention has following characteristics and beneficial effect: in construction of super highrise building, the present invention is by the revolution of annular turn table, realize the displacement of loop wheel machine in high-rise building plane, thereby increase the delivery radius of loop wheel machine on construction ground, improved the carrying capacity of loop wheel machine and brought into play to greatest extent the delivery function of loop wheel machine.So, in whole building structure manufacture process, only need to configure a large-scale movable arm type tower crane, many middle-size and small-size loop wheel machines (required model, type and quantity being set according to concrete construction requirement) of arranging in pairs or groups just can solve the handling problem that is distributed in Core Walls Structure periphery housing steel structure simultaneously, that is to say, the present invention has optimized the loop wheel machine configuration in construction of super highrise building, reduce the quantity of large-scale movable arm type tower crane, reduced the expense of vertical transport equipment.
The present invention is supported on the Core Walls Structure shear wall of high-rise building by climbing wall formula load-carrying construction, and by the jacking of jacking cylinder and the automatic lifting of bounced back loop bracket and annular turn table.On loop bracket in the present invention, be provided with active system, annular turn table is provided with servo system, the loop wheel machine of many required models is equipped with and, in the time that the active system on loop bracket turns round, by driving the servo system on annular turn table, realize the revolution of annular turn table, and then drive the revolution displacement of the loop wheel machine being arranged on annular turn table in high-rise building plane.
The present invention can be widely used in construction of super highrise building.
Brief description of the drawings
Fig. 1 is schematic top plan view of the present invention.
Fig. 2 is the schematic diagram of A-A section in Fig. 1.
Reference numeral: 1-climbs wall formula automatic lifting system, 1.1-climbs wall formula load-carrying construction, 1.2-lower support frame, 1.3-upper support frame, 1.4-jacking cylinder; 2-loop bracket, 2.1-sub-truss group, 2.2-annular brace platform, 2.3-active system, 2.2.1-circular orbit, 2.2.2-annular stockyard; 3-annular turn table, 3.1-circular base, 3.2-loop wheel machine, 3.3-servo system, the large-scale movable arm type tower crane of 3.2.1-, the middle-size and small-size loop wheel machine of 3.2.2-; 4-Core Walls Structure shear wall.
Detailed description of the invention
Embodiment is referring to Fig. 1, Fig. 2, this overall many loop wheel machines of automatic lifting swinging integrated operation platform, comprises the wall formula of the climbing automatic lifting system 1 that is arranged on Core Walls Structure shear wall 4, is looped around Core Walls Structure shear wall 4 surroundings and is connected to and climb the loop bracket 2 in wall formula automatic lifting system 1 and be looped around Core Walls Structure shear wall 4 surroundings and be supported on the annular turn table 3 that is integrated with many loop wheel machines on loop bracket 2.
Described loop bracket 2 comprises sub-truss group 2.1, annular brace platform 2.2 and active system 2.3, described sub-truss group 2.1 is del and is fixedly connected on climbs in wall formula automatic lifting system 1, described annular brace platform 2.2 fixed placement are in sub-truss group 2.1, sub-truss group 2.1 and annular brace platform 2.2 have formed similar bowl-shape version, and the upper surface of described annular brace platform 2.2 is provided with circular orbit 2.2.1 and annular stack carrying platform 2.2.2.In the present embodiment, circular orbit 2.2.1 is positioned at outer ring, annular stack carrying platform 2.2.2 is positioned at inner ring.
Described active system 2.3 is arranged on annular brace platform 2.2, and active system is arranged on by circular orbit, is used for providing the driving force of rotation to annular turn table; Described annular stack carrying platform can be used as the turnover stockyard of loop wheel machine handling goods and materials.
In the present embodiment, 2.1 one-tenth chamfer triangles of sub-truss group, the lower end of sub-truss group 2.1 is connected on the upper support frame of climbing wall formula automatic lifting system 1, and the upper end of sub-truss group 2.1 connects annular support platform 2.2.
Described annular turn table 3 comprises circular base 3.1, loop wheel machine 3.2 and servo system 3.3, described circular base 3.1 is arranged on circular orbit 2.2.1, described loop wheel machine 3.2 is arranged on circular base 3.1, and described servo system 3.3 is fixedly connected with circular base 3.1, is also connected with active system 2.3 simultaneously.In the time that the active system arranging on loop bracket 2 turns round, can drive servo system running, and then drive annular turn table 3 to turn round, thereby change the planimetric position of loop wheel machine 3.2.
Described loop wheel machine 3.2 comprises that a large-scale movable arm type tower crane 3.2.1(generally refers to that hoisting moment is more than or equal to 1000 tons. the movable arm type tower crane of rice) and model, type and the quantity of at least one the middle-size and small-size loop wheel machine of middle-size and small-size loop wheel machine 3.2.2(can be according to concrete construction requirement setting) form.
The described wall formula automatic lifting system 1 of climbing comprises and climbs wall formula load-carrying construction 1.1, lower support frame 1.2, upper support frame 1.3 and jacking cylinder 1.4, wherein climbing wall formula load-carrying construction 1.1 is fixed on Core Walls Structure shear wall 4, upper support frame 1.3 and lower support frame 1.2 are connected to climbs on wall formula load-carrying construction 1.1, and jacking cylinder 1.4 is connected between upper support frame 1.3 and lower support frame 1.2.
The lower end of described sub-truss group 2.1 is connected on upper support frame 1.3, and the upper end of sub-truss group 2.1 is connected with annular brace platform 2.2.
Climb wall formula load-carrying construction 1.1 and be fixed on Core Walls Structure shear wall 4 load-carrying construction as whole platform, upper support frame, lower support frame are connected to climbs on wall formula load-carrying construction, by jacking and the retraction of jacking cylinder, realize whole automatic lifting of climbing wall formula automatic lifting system 1.
Specific embodiment of the invention step is as follows.
Step 1, starts the jacking cylinder 1.4 of climbing in wall formula automatic lifting system 1, and upper support frame 1.3 departs from climbs wall formula load-carrying construction 1.1, and after upper support frame jacking puts in place, upper support frame connects again climbs wall formula load-carrying construction.
Step 2, jacking cylinder 1.4 bounces back, and lower support frame 1.2 departs from climbs wall formula load-carrying construction 1.1, starts retraction, and after putting in place, lower support frame connects again climbs wall formula load-carrying construction 1.1, completes operation automatic lifting of the present invention.
Step 3, starts the active system 2.3 on loop bracket 2, and the circular base 3.1 of annular turn table 3 starts revolution.
Step 4: circular base 3.1 returns back to correct position, closes active system 2.3.
Step 5: the loop wheel machine 3.2 on circular base 3.1 starts to allocate and transport member, and member is placed on rational position or annular stockyard 2.2.2 for turnover.
Claims (3)
1. overall many loop wheel machines of automatic lifting swinging integrated operation platform, is characterized in that: comprise the wall formula of the climbing automatic lifting system (1) that is arranged on Core Walls Structure shear wall (4), be looped around Core Walls Structure shear wall (4) surrounding and be connected to the loop bracket (2) of climbing in wall formula automatic lifting system (1) and be looped around Core Walls Structure shear wall (4) surrounding and be supported on the annular turn table (3) on loop bracket (2);
Described loop bracket (2) comprises sub-truss group (2.1), annular brace platform (2.2) and active system (2.3), described sub-truss group (2.1) is fixedly connected on climbs in wall formula automatic lifting system (1), described annular brace platform (2.2) fixed placement is in sub-truss group (2.1), and the upper surface of annular brace platform (2.2) is provided with circular orbit (2.2.1) and annular stack carrying platform (2.2.2), described active system (2.3) is arranged on annular brace platform (2.2);
Described annular turn table (3) comprises circular base (3.1), loop wheel machine (3.2) and servo system (3.3), described circular base (3.1) is arranged on circular orbit (2.2.1), described loop wheel machine (3.2) is arranged on circular base (3.1), described servo system (3.3) is fixedly connected with circular base (3.1), is also connected with active system (2.3) simultaneously, and described loop wheel machine (3.2) comprises a large-scale movable arm type tower crane (3.2.1) and at least one middle-size and small-size loop wheel machine (3.2.2);
The described wall formula automatic lifting system (1) of climbing comprises and climbs wall formula load-carrying construction (1.1), lower support frame (1.2), upper support frame (1.3) and jacking cylinder (1.4), wherein climbing wall formula load-carrying construction (1.1) is fixedly connected on Core Walls Structure shear wall (4), upper support frame (1.3) and lower support frame (1.2) are connected to climbs wall formula load-carrying construction (1.1) above, and jacking cylinder (1.4) is connected between upper support frame (1.3) and lower support frame (1.2);
Described circular orbit (2.2.1) is positioned at outer ring, annular stack carrying platform (2.2.2) is positioned at inner ring.
2. overall many loop wheel machines of automatic lifting swinging integrated operation platform according to claim 1, it is characterized in that: it is upper that the lower end of described sub-truss group (2.1) is connected to upper support frame (1.3), and the upper end of sub-truss group (2.1) is connected with annular brace platform (2.2).
3. overall many loop wheel machines of automatic lifting swinging integrated operation platform according to claim 1, is characterized in that: described sub-truss group (2.1) is del.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310088685.5A CN103145050B (en) | 2013-03-20 | 2013-03-20 | Rotating multi-crane integrated operation platform with integral automatic lifting function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310088685.5A CN103145050B (en) | 2013-03-20 | 2013-03-20 | Rotating multi-crane integrated operation platform with integral automatic lifting function |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103145050A CN103145050A (en) | 2013-06-12 |
CN103145050B true CN103145050B (en) | 2014-11-12 |
Family
ID=48543442
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310088685.5A Active CN103145050B (en) | 2013-03-20 | 2013-03-20 | Rotating multi-crane integrated operation platform with integral automatic lifting function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103145050B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103950841A (en) * | 2014-04-16 | 2014-07-30 | 山东送变电工程公司 | Auxiliary hoisting device for outer-side cross arms of crank arm of wine glass type ultrahigh-voltage transmission line iron tower |
CN105293315B (en) * | 2015-11-12 | 2017-03-08 | 山东恒堃机械有限公司 | A kind of hanging device of assembled architecture prefabricated components |
CN206172849U (en) * | 2016-09-29 | 2017-05-17 | 中建三局集团有限公司 | Integrated operation platform rotary system of many loop wheel machines |
CN106429885B (en) * | 2016-09-29 | 2018-04-24 | 中建三局集团有限公司 | A kind of entirety Zi moves the more loop wheel machine pedestal operation platforms of Ding Sheng rotation types |
CN109797964A (en) * | 2019-01-30 | 2019-05-24 | 中建四局第六建筑工程有限公司 | A kind of lifting platform system of integrated tower crane |
CN111502318A (en) * | 2020-05-04 | 2020-08-07 | 璐句附 | Protective structure for construction of core tube in building |
CN114644296A (en) * | 2022-04-07 | 2022-06-21 | 中国建筑第四工程局有限公司 | Single-standard-section double-tower machine supporting system and construction and operation method thereof |
CN115749234A (en) * | 2022-11-18 | 2023-03-07 | 中广核工程有限公司 | Reactor factory building internal structure climbing rotation type construction platform and climbing method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09188495A (en) * | 1995-11-10 | 1997-07-22 | Hitachi Zosen Corp | Crane device and building method for structure |
CN2763237Y (en) * | 2005-01-10 | 2006-03-08 | 关永雄 | Hydraulic raising type freight elevator |
CN201258229Y (en) * | 2008-07-21 | 2009-06-17 | 新疆生产建设兵团第五建筑安装工程公司 | Polar crane hoisting apparatus in cooling column |
CN203112375U (en) * | 2013-03-20 | 2013-08-07 | 中建三局建设工程股份有限公司 | Integral revolution type multi-crane integration operation platform capable of automatically jacking |
-
2013
- 2013-03-20 CN CN201310088685.5A patent/CN103145050B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09188495A (en) * | 1995-11-10 | 1997-07-22 | Hitachi Zosen Corp | Crane device and building method for structure |
CN2763237Y (en) * | 2005-01-10 | 2006-03-08 | 关永雄 | Hydraulic raising type freight elevator |
CN201258229Y (en) * | 2008-07-21 | 2009-06-17 | 新疆生产建设兵团第五建筑安装工程公司 | Polar crane hoisting apparatus in cooling column |
CN203112375U (en) * | 2013-03-20 | 2013-08-07 | 中建三局建设工程股份有限公司 | Integral revolution type multi-crane integration operation platform capable of automatically jacking |
Also Published As
Publication number | Publication date |
---|---|
CN103145050A (en) | 2013-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103145050B (en) | Rotating multi-crane integrated operation platform with integral automatic lifting function | |
CN106759883B (en) | The tower crane construction method of large-scale steel structure air cooling tower | |
CN203112375U (en) | Integral revolution type multi-crane integration operation platform capable of automatically jacking | |
CN202450774U (en) | Shaft template of small-step-pitch self-climbing elevator | |
CN205615024U (en) | Glass fiber -reinforced plastic cylinder manufacture equipment | |
CN112265907A (en) | Portal frame device for mechanical automation processing | |
CN108590322A (en) | A kind of method of free-standing steel chimney upside-down method of hull-section construction assembling segmental hoisting | |
CN105668428A (en) | Lifting transportation device suitable for being mounted on window | |
CN104179121A (en) | Movable formwork bracket four-stage-lifting self-assembling method | |
CN202346636U (en) | Crane | |
CN104047229A (en) | Method for prefabricating T-beam on girder | |
CN105417397A (en) | Moving type jacking and lifting transporting equipment and method | |
CN207242299U (en) | Wheeled disk pallet apparatus | |
CN104074365B (en) | The equipment gate mounting method of steel containment vessel of nuclear power station | |
CN104358414A (en) | Concrete spreader using soft sliding film platform | |
CN215291292U (en) | Lifting device for housing construction | |
CN111852169B (en) | Method for mounting tower type exhaust funnel | |
CN201198659Y (en) | Formwork support system of prilling tower hanging structure | |
CN204265339U (en) | A kind of can be spacing revolution ceiling crab | |
CN205294694U (en) | Independent gin pole hoist device of movable | |
CN210620060U (en) | Prefabricated part conveying device | |
CN211283475U (en) | Rotary telescopic rigid guide pillar | |
CN209536831U (en) | A kind of Lift-on/Lift-off System | |
CN203546619U (en) | Horizontal type simple cable unreeling disc for bridge construction | |
CN103510742B (en) | Multifunctional rotary derrick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |