CN103114581B - 预应力钢筋混凝土桩的制作方法 - Google Patents

预应力钢筋混凝土桩的制作方法 Download PDF

Info

Publication number
CN103114581B
CN103114581B CN201310030684.5A CN201310030684A CN103114581B CN 103114581 B CN103114581 B CN 103114581B CN 201310030684 A CN201310030684 A CN 201310030684A CN 103114581 B CN103114581 B CN 103114581B
Authority
CN
China
Prior art keywords
concrete
stretch
draw
mold
kiln
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310030684.5A
Other languages
English (en)
Other versions
CN103114581A (zh
Inventor
杨发
焦金太
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310030684.5A priority Critical patent/CN103114581B/zh
Publication of CN103114581A publication Critical patent/CN103114581A/zh
Application granted granted Critical
Publication of CN103114581B publication Critical patent/CN103114581B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

预应力钢筋混凝土桩的制作方法,包括以下步骤:采用卧模安装钢筋骨架,合模前利用张拉器具沿张拉板、端板圆周对称张拉主筋至标准值fpy的10%,然后将上下半模组合完毕后,对称紧固螺栓,并再一次利用张拉器具沿张拉板、端板圆周对称张拉主筋至fptk的105%,持续载荷2min后退到fpy的100%,将锚具锁紧,10-20min后校检、补张合格后将模具吊起立直移入立窑中固定,补张应力后从上端板中心孔处安装砼料斗浇筑砼,然后将插入式振动器插入桩芯砼中,从桩底端开始振捣,并逐步向外拔振动器,直至全部桩芯砼振捣密实;桩砼浇筑完毕后封窑通热养护,窑内纵向温度保持均衡,保持在60-80℃,持续通热至少24小时,然后将模具吊出立窑进行放张,并拆除模板,切断桩端外露主筋,并常温保养至少5天。

Description

预应力钢筋混凝土桩的制作方法
技术领域
本发明涉及一种钢筋混凝土桩的制作方法,特别是一种能够保证桩身砼强度均匀的预应力钢筋混凝土桩的制作方法。
背景技术
在建筑工程设计中,普通的钢筋混凝土预制桩很难达到4-5N/mm2的拉应力。因此在一般情况下,沉桩入土过程中,预制桩难免会出现裂缝,尤其是细长桩在堆垛、运输吊装、竖立过程中也会出现裂缝。而桩处在地下时,由于渗水和有害物质的侵蚀,也会影响它的耐久性。而即便加大配筋率,仍然难以解决桩身裂缝问题,一不能确保桩的使用寿命,二不能保证工程质量。同时目前所使用的预应力管桩虽提高了桩的抗裂性能,但由于管桩薄壁防渗水和抗腐蚀性差,且不抗击打,其受拉承载力和抗剪力较低,因此在施工中桩身易出现脆断、碎裂、主筋墩头脱落至端板失效的现象,影响接桩质量。采用传统的方法所制备的钢筋混凝土装,都在一定程度上存在上述问题,因此现在需要一种新的制备方法,以其获得可克服上述问题的钢筋混凝土桩。
发明内容
本发明是为了解决现有技术所存在的上述不足,提出一种能够获得抗剪、抗弯、单桩竖向承载力、抗拉承载力,抗裂弯矩、极限弯矩等性能均较为优秀的预应力钢筋混凝土桩的制作方法。
本发明的技术解决方案是:一种预应力钢筋混凝土桩的制作方法,其特征在于:所述的方法包括以下步骤:
a、采用卧模安装钢筋骨架,合模前利用张拉器具沿张拉板、端板圆周对称张拉主筋至标准值fpy的10%,然后将上下半模组合完毕后,对称紧固螺栓,并在一次利用张拉器具沿张拉板、端板圆周对称张拉主筋至fptk的105%,持续载荷2min后退到fpy的100%,将锚具锁紧,10-20min后校检、补张合格后将模具吊起立直移入立窑中固定,补张应力后从上端板中心孔处安装砼料斗浇筑砼,然后将插入式振动器插入桩芯砼中,从桩底端开始振捣,并逐步向外拔振动器,直至全部桩芯砼振捣密实。
b、桩砼浇筑完毕后封窑通热养护,窑内纵向温度保持均衡,保持在60-80℃,持续通热至少24小时,然后将模具吊出立窑进行放张,并拆除模板,切断桩端外露主筋,并常温养护至少5天。
本发明同现有技术相比,具有如下优点:
采用本发明的方法所制备的钢筋混凝土桩,能够保证其桩身砼外形为圆柱形,解决了砼在卧式模具中不经离心便不成圆的难题,同时它保证窑内在纵向上的温度保持一致,保证了桩身砼强度增长的均匀性;所制备的钢筋混凝土圆桩其中心轴惯性矩、桩身截面增大,因此其成桩后的抗剪、抗弯、单桩竖向承载力、抗拉承载力,抗裂弯矩、极限弯矩等都得到很大的提高。同时该种结构形式的实心圆桩在沉桩施工中无裂缝,且具有抗击打、抗腐蚀性等优点。是当代桩基础理想的结构构件。因此可以说这种方法为钢筋混凝土桩的制备提供了新的思路,特别适合于在本领域中推广应用,其市场前景十分广阔。
具体实施方式
下面将说明本发明的具体实施方式。
一种预应力钢筋混凝土桩的制作方法,包括以下步骤:
首先,采用卧模安装钢筋骨架,并在合模前利用张拉器具沿张拉板、端板圆周对称张拉主筋至标准值fpy的10%,然后进行合模,将上下半模组合完毕后,对称紧固螺栓,并再一次利用张拉器具沿张拉板、端板圆周对称张拉主筋至fptk的105%,持续载荷2min后退到fpy的100%,最后将锚具锁紧;
10-20min后进行校检,补张合格后将模具吊起,在立直状态下移入立窑中固定,补张应力后从上端板中心孔处安装砼料斗浇筑砼,然后将插入式振动器插入桩芯砼中,从桩底端开始振捣,并逐步向外拔振动器,直至全部桩芯砼振捣密实,这一步骤能够保证桩身砼密实,无气泡,并且其表面光滑;
桩砼浇筑完毕后封窑,并通热养护,窑内纵向的温度保持均衡,保持在60-80℃,持续通热至少24小时,然后将模具吊出立窑进行放张,并拆除模板,切断桩端外露主筋,主筋端头凹入桩顶面内5-10mm,并常温养护至少5天。
为了让窑内纵向上的温度保持均衡,可以每隔一段高度设置一套蒸汽阀嘴和温度检测器,由于较热的空气比重较轻,导致窑内上部的温度比下部的温度高,如果温度检测器检测到某一高度窑内温度达不到预设值,会控制蒸汽阀嘴开启,向窑内喷放蒸汽,保证窑内纵向上的温度保持均衡。

Claims (1)

1.一种预应力钢筋混凝土桩的制作方法,其特征在于:所述的方法包括以下步骤:
a、采用卧模安装钢筋骨架,合模前利用张拉器具沿张拉板、端板圆周对称张拉主筋至标准值fpy的10%,然后将上下半模组合完毕后,对称紧固螺栓,并再一次利用张拉器具沿张拉板、端板圆周对称张拉主筋至fptk的105%,持续载荷2min后退到fpy的100%,将锚具锁紧,10-20min后校检、补张合格后将模具吊起立直移入立窑中固定,补张应力后从上端板中心孔处安装砼料斗浇筑砼,然后将插入式振动器插入桩芯砼中,从桩底端开始振捣,并逐步向外拔振动器,直至全部桩芯砼振捣密实;
b、桩砼浇筑完毕后封窑通热养护,窑内纵向温度保持均衡,保持在60-80℃,持续通热至少24小时,然后将模具吊出立窑进行放张,并拆除模板,切断桩端外露主筋,并常温养护至少5天。
CN201310030684.5A 2013-01-28 2013-01-28 预应力钢筋混凝土桩的制作方法 Expired - Fee Related CN103114581B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310030684.5A CN103114581B (zh) 2013-01-28 2013-01-28 预应力钢筋混凝土桩的制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310030684.5A CN103114581B (zh) 2013-01-28 2013-01-28 预应力钢筋混凝土桩的制作方法

Publications (2)

Publication Number Publication Date
CN103114581A CN103114581A (zh) 2013-05-22
CN103114581B true CN103114581B (zh) 2015-06-03

Family

ID=48413006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310030684.5A Expired - Fee Related CN103114581B (zh) 2013-01-28 2013-01-28 预应力钢筋混凝土桩的制作方法

Country Status (1)

Country Link
CN (1) CN103114581B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541356A (zh) * 2013-10-15 2014-01-29 杨发 预应力混凝土实心桩的制作方法以及该方法中所使用的张拉框架
CN111590714A (zh) * 2020-06-11 2020-08-28 吉林建筑大学 一种预制混凝土桩尖及其制备方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000064205A (ko) * 2000-08-29 2000-11-06 배정효 기초공사용 강관의 상단부 보강구조
CN101302758A (zh) * 2008-07-02 2008-11-12 大连大金马基础建设有限公司 预应力方桩的加工方法
CN101544022A (zh) * 2009-04-15 2009-09-30 李国华 一种预留孔围护桩的制备方法
CN101761075A (zh) * 2008-12-23 2010-06-30 陈子成 圆形实心预应力混凝土管桩及其生产工艺
CN101906776A (zh) * 2010-07-07 2010-12-08 东南大学 玻璃钢管模的大直径预应力混凝土管桩及其制备方法
CN101914913A (zh) * 2010-08-16 2010-12-15 句容长江建材有限公司 一种先张法预应力混凝土四边形桩及其生产方法
CN101942832A (zh) * 2010-06-07 2011-01-12 大连大金马基础建设有限公司 钢桩尖全预应力混凝土整根实心方桩及其加工方法
CN102373702A (zh) * 2011-08-26 2012-03-14 江苏固丰管桩集团有限公司 混凝土圆桩及其加工方法
CN102491702A (zh) * 2011-11-07 2012-06-13 江苏建华管桩有限公司 一种混凝土桩及其制备方法
CN102828510A (zh) * 2012-09-14 2012-12-19 谢建富 H型支护桩及其制备方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5858316A (ja) * 1981-10-01 1983-04-06 Asahi Chem Ind Co Ltd Pcコンクリート製品の製造方法
JP2006116740A (ja) * 2004-10-19 2006-05-11 Asahi Kasei Construction Materials Co Ltd らせん状突起を有するコンクリート杭の製造方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000064205A (ko) * 2000-08-29 2000-11-06 배정효 기초공사용 강관의 상단부 보강구조
CN101302758A (zh) * 2008-07-02 2008-11-12 大连大金马基础建设有限公司 预应力方桩的加工方法
CN101761075A (zh) * 2008-12-23 2010-06-30 陈子成 圆形实心预应力混凝土管桩及其生产工艺
CN101544022A (zh) * 2009-04-15 2009-09-30 李国华 一种预留孔围护桩的制备方法
CN101942832A (zh) * 2010-06-07 2011-01-12 大连大金马基础建设有限公司 钢桩尖全预应力混凝土整根实心方桩及其加工方法
CN101906776A (zh) * 2010-07-07 2010-12-08 东南大学 玻璃钢管模的大直径预应力混凝土管桩及其制备方法
CN101914913A (zh) * 2010-08-16 2010-12-15 句容长江建材有限公司 一种先张法预应力混凝土四边形桩及其生产方法
CN102373702A (zh) * 2011-08-26 2012-03-14 江苏固丰管桩集团有限公司 混凝土圆桩及其加工方法
CN102491702A (zh) * 2011-11-07 2012-06-13 江苏建华管桩有限公司 一种混凝土桩及其制备方法
CN102828510A (zh) * 2012-09-14 2012-12-19 谢建富 H型支护桩及其制备方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
廖振中."第5章 管桩的生产制造".《管桩简明手册》.2012, *

Also Published As

Publication number Publication date
CN103114581A (zh) 2013-05-22

Similar Documents

Publication Publication Date Title
CN103821677B (zh) 装配式预应力活性粉末混凝土风电塔架
CN106988483B (zh) 一种装配式钢筋混凝土u形框架梁及其连接钢架
CN106638313B (zh) 一种大型盖梁半预制施工技术方法
CN104746422A (zh) 一种桥梁预制空心墩柱后浇连接结构及施工方法
CN109403366B (zh) 一种装配式钢管混凝土桩基及其施工方法
CN206438500U (zh) 一种桥梁桩基钢筋笼空间定位系统
CN104141318A (zh) 一种大直径钢管柱柱脚安装施工方法
CN103114581B (zh) 预应力钢筋混凝土桩的制作方法
CN204001428U (zh) 一种大直径钢管柱柱脚安装预埋定位结构及其柱脚结构
CN204097864U (zh) 一种桥梁预制空心墩柱后浇连接结构
CN102409697A (zh) 预制装配式塔桅结构基础
CN108360508A (zh) 现浇混凝土芯水泥土搅拌桩的施工方法
CN104314075A (zh) 圆台形混凝土桩尖、带有该桩尖的管桩及该管桩的制造方法
CN204001429U (zh) 一种大直径钢管柱柱脚结构及其柱脚标高调节固定结构
CN103981909B (zh) 地脚螺栓断裂后的快速修复方法及结构
CN106149878A (zh) 混凝土框架结构预制柱与梁板节点处的连接结构及方法
CN204658661U (zh) 一种生产混凝土波形板桩用模具
CN103072203A (zh) 用于灌芯叠合的预制混凝土空心墙构件的成型方法及模具
CN103882840B (zh) 一种调压井现浇砼可装配式模板支架及其安装方法
CN109849176A (zh) 一种预制桩及其制备方法
CN202227362U (zh) 一种预制装配式塔桅结构基础
CN102975282A (zh) 成型不均匀配筋预制桩的方法
CN109138275A (zh) 一种钢管混凝土柱施工方法
CN110735444B (zh) 一种竖锚自保护式风机基础及其施工方法
CN204001427U (zh) 一种钢管柱柱脚安装用定位环板的预埋定位支撑结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20160128

EXPY Termination of patent right or utility model