CN103104059A - Bridging mechanism of shoulder height different greenhouse gable walls - Google Patents

Bridging mechanism of shoulder height different greenhouse gable walls Download PDF

Info

Publication number
CN103104059A
CN103104059A CN2012105865719A CN201210586571A CN103104059A CN 103104059 A CN103104059 A CN 103104059A CN 2012105865719 A CN2012105865719 A CN 2012105865719A CN 201210586571 A CN201210586571 A CN 201210586571A CN 103104059 A CN103104059 A CN 103104059A
Authority
CN
China
Prior art keywords
gable
gutter
shoulder height
blanking plates
roofing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105865719A
Other languages
Chinese (zh)
Other versions
CN103104059B (en
Inventor
芮娟
孙林军
陆乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Dushi Green Engineering Co Ltd
Original Assignee
Shanghai Dushi Green Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Dushi Green Engineering Co Ltd filed Critical Shanghai Dushi Green Engineering Co Ltd
Priority to CN201210586571.9A priority Critical patent/CN103104059B/en
Publication of CN103104059A publication Critical patent/CN103104059A/en
Application granted granted Critical
Publication of CN103104059B publication Critical patent/CN103104059B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Greenhouses (AREA)

Abstract

The invention relates to a bridging mechanism of shoulder height different greenhouse gable walls. The bridging mechanism of the shoulder height different greenhouse gable walls comprises a horizontal gutter between a high roof and a low roof, and two blanking plates, the horizontal gutter is an inverted trapezoid without a lower bottom, edges are stretched out in a direction from the two lateral sides of the inverted trapezoid to the two blanking plates, one ends of the blanking plates are connected on the edges in a lap joint mode, the other ends of the blanking plates are sealed with wall beams of gable walls, the horizontal gutter is supported by an overhanging bracket, and the overhanging bracket is fixed on a vertical column of one gable wall of the high roof or the low roof. A gap between the two gable walls is about 700millimeters, and the enough gap enables workers to install the other gable wall after completing construction of one gable wall. The horizontal gutter is supported by a high vertical column overhanging bracket, the blanking plates are respectively arranged on the two sides of the gutter, and the blanking plates are sealed with the wall beams on the gable walls, rainwater of an original greenhouse roof is same with rainwater of a normal greenhouse, the rainwater is discharged to the gutter and to an underdrainage system through the vertical column, water of two greenhouse gable walls vertical faces is discharged to the gutter through the blanking plates, is organized to discharge through the gutter, and is discharged to the underdrainage system.

Description

The combining mechanism of the different greenhouses of a kind of shoulder height gable
Technical field
The present invention relates to a kind of combining mechanism, relate in particular to and a kind ofly taken into account that draining is simple, the combining mechanism of the shoulder height different greenhouses gable of easy construction, good looking appearance.
Background technology
Because Different Crop has different needs to growing environment, so the shoulder height in greenhouse also has different values thereupon.Often due to the restriction in plot, the needs of perhaps producing, the greenhouse that shoulder height is different need in gable place's connection.
Summary of the invention
For the problems referred to above, main purpose of the present invention is to provide a kind of and has taken into account that draining is simple, the combining mechanism of the shoulder height different greenhouses gable of easy construction, good looking appearance.
The present invention solves above-mentioned technical problem by following technical proposals: the combining mechanism of a kind of shoulder height different greenhouses gable, described combining mechanism comprises horizontal gutter and the two blocks of shroudings between high roofing and low roofing, horizontal gutter is one and lacks the inverted trapezoidal of going to the bottom, two sides of inverted trapezoidal are extended with the edge to the direction of two blocks of shroudings, shrouding one end is overlapped on the edge, wall beam sealing on the other end and gable, laterally gutter is by the bracket rest of encorbelmenting, and the bracket of encorbelmenting is fixed on the column of high roofing or a low roofing gable wherein.
In specific embodiments of the invention, the base of described inverted trapezoidal is the groove of " V " font, encorbelmenting is provided with a raised land on bracket, be provided with on raised land the base of supporting inverted trapezoidal and with the groove of supporting " V " font in the base of inverted trapezoidal.
In specific embodiments of the invention, the two sides gable interstice coverage between high roofing and low roofing is 600-800mm.
In specific embodiments of the invention, the gable gap, two sides between high roofing and low roofing is 700mm.
positive progressive effect of the present invention is: the present invention and existing similar technology compare, two sides of the present invention gable gap 700mm left and right, can hold the workman after a gable construction is complete, there are enough gaps to carry out the installation of another side gable, laterally gutter is by the high column bracket rest of encorbelmenting, each attached shrouding of gutter both sides, with the wall beam sealing on gable, the rainwater of former greenhouse roof is identical with normal greenhouse, be discharged to gutter, be discharged to underdrainage system by column, the water of two greenhouse gable facades is discharged to gutter by shrouding, organize draining by gutter, be discharged to underdrainage system.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the enlarged diagram at the A place of Fig. 1.
The specific embodiment
Provide preferred embodiment of the present invention below in conjunction with accompanying drawing, to describe technical scheme of the present invention in detail.
Fig. 1 is structural representation of the present invention, and Fig. 2 is the enlarged diagram at the A place of Fig. 1.As shown in Fig. 1-2: the present invention includes horizontal gutter 3 and two blocks of shroudings 4 between high roofing 1 and low roofing 2, horizontal gutter 3 is one and lacks the inverted trapezoidal of going to the bottom, two sides of inverted trapezoidal are extended with edge 31 to the direction of two blocks of shroudings 4, shrouding 4 one ends are overlapped on edge 31, wall beam 6 sealings on the other end and gable, laterally gutter 3 is by bracket 5 rests of encorbelmenting, and the bracket 5 of encorbelmenting is fixed on the column of high roofing or a low roofing face wall wherein.
Two sides gable interstice coverage between high roofing 1 and low roofing 2 is 600-800mm, after can holding a gable and installing, enough space mounting another side gables is arranged, suggestion 700mm left and right.In specific implementation process of the present invention, the base of described inverted trapezoidal is the groove of " V " font, encorbelmenting is provided with a raised land 51 on bracket 5, be provided with on raised land 51 base of supporting inverted trapezoidal and with the groove of supporting " V " font in the base of inverted trapezoidal.
The present invention can hold the workman after a gable construction is complete, has enough gaps to carry out the installation of another side gable.Laterally gutter is by the high column bracket rest of encorbelmenting.Each attached shrouding of gutter both sides is with the wall beam sealing on gable.
The rainwater of former greenhouse roof is identical with normal greenhouse, is discharged to gutter, is discharged to underdrainage system by column.The water of two greenhouse gable facades is discharged to gutter by shrouding, organizes draining by gutter, is discharged to underdrainage system.Detailed draining can be seen the direction of the arrow in Fig. 1.
Above demonstration and described basic principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that describes in above-described embodiment and manual just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications; these changes and improvements all fall in the claimed scope of the invention, and the claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (4)

1. the combining mechanism of the different greenhouses of shoulder height gable, it is characterized in that: described combining mechanism comprises horizontal gutter and the two blocks of shroudings between high roofing and low roofing, horizontal gutter is one and lacks the inverted trapezoidal of going to the bottom, two sides of inverted trapezoidal are extended with the edge to the direction of two blocks of shroudings, shrouding one end is overlapped on the edge, wall beam sealing on the other end and gable, laterally gutter is by the bracket rest of encorbelmenting, and the bracket of encorbelmenting is fixed on the column of high roofing or a low roofing gable wherein.
2. the combining mechanism of the different greenhouses of shoulder height according to claim 1 gable, it is characterized in that: the base of described inverted trapezoidal is the groove of " V " font, encorbelmenting is provided with a raised land on bracket, be provided with on raised land the base of supporting inverted trapezoidal and with the groove of supporting " V " font in the base of inverted trapezoidal.
3. the combining mechanism of the different greenhouses of shoulder height according to claim 1 gable, it is characterized in that: the two sides gable interstice coverage between high roofing and low roofing is 600-800mm.
4. the combining mechanism of the different greenhouses of shoulder height according to claim 3 gable, it is characterized in that: the gable gap, two sides between high roofing and low roofing is 700mm.
CN201210586571.9A 2012-12-28 2012-12-28 Bridging mechanism of shoulder height different greenhouse gable walls Active CN103104059B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210586571.9A CN103104059B (en) 2012-12-28 2012-12-28 Bridging mechanism of shoulder height different greenhouse gable walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210586571.9A CN103104059B (en) 2012-12-28 2012-12-28 Bridging mechanism of shoulder height different greenhouse gable walls

Publications (2)

Publication Number Publication Date
CN103104059A true CN103104059A (en) 2013-05-15
CN103104059B CN103104059B (en) 2015-04-29

Family

ID=48312230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210586571.9A Active CN103104059B (en) 2012-12-28 2012-12-28 Bridging mechanism of shoulder height different greenhouse gable walls

Country Status (1)

Country Link
CN (1) CN103104059B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594573A (en) * 2014-11-28 2015-05-06 郑秋锁 Metal drainage channel and application and construction method thereof in waterproof construction of pitched roof nightside ridge
CN106906949A (en) * 2017-05-02 2017-06-30 北京齐家怡居科技有限责任公司 A kind of girder steel and roof structure for taking into account load-bearing, draining and daylighting

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5809701A (en) * 1992-06-29 1998-09-22 Cravo Equipment Ltd. Drainage system for retractable roof
EP1126755A1 (en) * 1998-10-30 2001-08-29 Rovero Systems B.V. Building having joists and a gutter, and a gutter and joist for use therein
CN201369961Y (en) * 2009-03-02 2009-12-30 上海都市绿色工程有限公司 Multi-span greenhouse combining high and tall exhibition greenhouse and production greenhouse
CN201369963Y (en) * 2009-03-02 2009-12-30 上海都市绿色工程有限公司 Multi-span greenhouse combining wide-open greenhouse and Venlo greenhouse
CN201439627U (en) * 2009-05-19 2010-04-21 北京东方英宝联合技术有限公司 Drain gutter used in roof of multi-span greenhouse
CN201640087U (en) * 2010-03-04 2010-11-24 廊坊市九天农业工程有限公司 Energy-saving and heat-insulation gutter for greenhouse
CN201789823U (en) * 2010-09-28 2011-04-13 成都成飞绿色环境科技有限责任公司 Continuous greenhouse
CN201972325U (en) * 2010-12-30 2011-09-14 山东杭萧钢构有限公司 Outer-hanging gutter
CN201972327U (en) * 2010-12-24 2011-09-14 上海都市绿色工程有限公司 Greenhouse pillar drainage structure
CN203015541U (en) * 2012-12-28 2013-06-26 上海都市绿色工程有限公司 Connection mechanism for green house gable walls with different shoulder heights

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5809701A (en) * 1992-06-29 1998-09-22 Cravo Equipment Ltd. Drainage system for retractable roof
EP1126755A1 (en) * 1998-10-30 2001-08-29 Rovero Systems B.V. Building having joists and a gutter, and a gutter and joist for use therein
CN201369961Y (en) * 2009-03-02 2009-12-30 上海都市绿色工程有限公司 Multi-span greenhouse combining high and tall exhibition greenhouse and production greenhouse
CN201369963Y (en) * 2009-03-02 2009-12-30 上海都市绿色工程有限公司 Multi-span greenhouse combining wide-open greenhouse and Venlo greenhouse
CN201439627U (en) * 2009-05-19 2010-04-21 北京东方英宝联合技术有限公司 Drain gutter used in roof of multi-span greenhouse
CN201640087U (en) * 2010-03-04 2010-11-24 廊坊市九天农业工程有限公司 Energy-saving and heat-insulation gutter for greenhouse
CN201789823U (en) * 2010-09-28 2011-04-13 成都成飞绿色环境科技有限责任公司 Continuous greenhouse
CN201972327U (en) * 2010-12-24 2011-09-14 上海都市绿色工程有限公司 Greenhouse pillar drainage structure
CN201972325U (en) * 2010-12-30 2011-09-14 山东杭萧钢构有限公司 Outer-hanging gutter
CN203015541U (en) * 2012-12-28 2013-06-26 上海都市绿色工程有限公司 Connection mechanism for green house gable walls with different shoulder heights

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594573A (en) * 2014-11-28 2015-05-06 郑秋锁 Metal drainage channel and application and construction method thereof in waterproof construction of pitched roof nightside ridge
CN104594573B (en) * 2014-11-28 2017-02-22 郑秋锁 Construction method for waterproof construction of pitched roof nightside ridge through metal drainage channel
CN106906949A (en) * 2017-05-02 2017-06-30 北京齐家怡居科技有限责任公司 A kind of girder steel and roof structure for taking into account load-bearing, draining and daylighting

Also Published As

Publication number Publication date
CN103104059B (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN103993664A (en) Assembled light house and building and dismounting method thereof
CN203361592U (en) Sliding platform used for installing arch-shaped roof truss of steel structure
CN103104059B (en) Bridging mechanism of shoulder height different greenhouse gable walls
CN107338892B (en) The removable plate of type unitized curtain wall and disassembly, installation method
CN203669179U (en) Joint structure of steel roof at longitudinal and transverse striding position of steel structure factory building
CN204645387U (en) A kind of stable building heat preservation connects brick
CN203015541U (en) Connection mechanism for green house gable walls with different shoulder heights
CN203686563U (en) Thin oil sealing type gas holder bottom plate
CN204126082U (en) A kind of integral cast-in-situ light weight concrete construction partition wall
CN205116413U (en) Covering or awning on a car, boat, etc. room structure
CN205116421U (en) Steel structure node convenient to external eaves gutter of installation
CN205329918U (en) Step board light partition wall system
CN205370593U (en) Two lining edge walls and cable duct integral type construction formwork
CN110872883A (en) Assembled wall body of buckle connection
CN203320834U (en) Ventilated roof light in steel structure building
CN205509388U (en) Three cascades climbing crane span structure
CN205224272U (en) Steel construction factory building is with structure of encorbelmenting
CN203977647U (en) A kind of dry suspension ceramic board curtain wall system
CN203701702U (en) Splicing type dustproof shed
CN105227110A (en) The buckled splicing hermetically-sealed construction of solar photovoltaic assembly
CN203174910U (en) Structural waterproof type flashing plate
CN202731037U (en) Curtain wall framework structure
CN204252644U (en) Sound-insulating dust-proof screen
CN205355591U (en) Concatenation formula box substation and box -type substation
CN203569763U (en) Control room roof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant