CN103103930B - 一种后加预紧力拉索加固方法 - Google Patents

一种后加预紧力拉索加固方法 Download PDF

Info

Publication number
CN103103930B
CN103103930B CN201310041058.6A CN201310041058A CN103103930B CN 103103930 B CN103103930 B CN 103103930B CN 201310041058 A CN201310041058 A CN 201310041058A CN 103103930 B CN103103930 B CN 103103930B
Authority
CN
China
Prior art keywords
drag
line
preliminary tension
add
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310041058.6A
Other languages
English (en)
Other versions
CN103103930A (zh
Inventor
周长东
张葆妍
潘庆龙
王京京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
Original Assignee
Beijing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University filed Critical Beijing Jiaotong University
Priority to CN201310041058.6A priority Critical patent/CN103103930B/zh
Publication of CN103103930A publication Critical patent/CN103103930A/zh
Application granted granted Critical
Publication of CN103103930B publication Critical patent/CN103103930B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种后加预紧力拉索加固方法,包括以下步骤:先在待加固部件周围,设置若干个用于固定拉索的地面锚固系统;在地面锚固系统连接键上安装施加预紧力的装置;在待加固部件上部适当位置安装用于固定拉索的套筒;将拉索上端固定在套筒上,下端固定在施加预紧力的装置上;通过旋紧施加预紧力装置的螺母,对拉索施加预紧力,使预紧力拉索产生对桥墩的下压力。该发明既可用于桥墩的应急快速加固,也可用于永久加固;预紧力的施加过程可控、易行、后期可调;桥墩的加固成本低;对原有桥梁结构不构成任何的损坏;实用性强,加固结构方便简单、加固效果明显等。

Description

一种后加预紧力拉索加固方法
技术领域
本发明涉及机械技术领域,尤其涉及一种后加预紧力拉索加固方法。
背景技术
桥梁结构的振动通常分为上部梁结构振动和下部墩结构振动,以往研究偏重梁结构振动,而忽略了墩台的影响。但对于高墩、轻型墩或者桥墩基础刚度较弱的桥梁,桥墩的振动对整体结构的影响较大。
目前,铁路线路不断提速,列车密度剧增,很多既有桥梁由于桥墩长细比较大,横向薄弱或者基础埋置较浅等因素造成墩顶横向振动较大,已不能保证通车安全。
传统的加固钢筋混凝土桥墩的方法有增大截面法、嵌入式加固技术、体外预应力加固技术、钢套管加固技术、FRP加固技术、绕丝加固技术等。传统技术加固成本高,施工不方便,加固效果不明显。
发明内容
为了克服现有技术结构的不足,本发明提供了一种利用预紧力拉索对桥墩产生下压力,使桥梁桥墩的刚度和稳定性得以增加,达到墩顶横向振动减小目的的一种后加预紧力拉索加固方法。
本发明实施例公开了一种后加预紧力拉索加固方法,包括以下步骤:先在待加固部件周围,设置若干个用于固定拉索的地面锚固系统;在地面锚固系统连接键上安装施加预紧力的装置;在待加固部件上部适当位置安装用于固定拉索的套筒;将拉索上端固定在套筒上,下端固定在施加预紧力的装置上;通过旋紧施加预紧力装置的螺母,对拉索施加预紧力,使预紧力拉索产生对桥墩的下压力。
进一步,作为优选,设置的多个地面锚固系统,以桥墩为基准点,相邻地面锚固系统之间角度相等。
进一步,作为优选,在竖直面内,每根拉索与桥墩所成的角度相等。
进一步,作为优选,所述套筒为复合材料套筒。
进一步,作为优选,还包括对所述钢套筒做表面防锈处理步骤。
进一步,作为优选,所述拉索采用钢绞线,并对钢绞线进行防锈防腐处理。
进一步,作为优选,所述拉索采用预紧力FRP筋。
进一步,作为优选,每根拉索的预紧力值相等,保证每根拉索对桥墩施加的力相等。
进一步,作为优选,施加预紧力的装置通过拧紧螺母对拉索施加预紧力,同时起到连接拉索与地面锚固系统的作用。
本发明相比于传统技术本发明的方法加固成本低,实用性强,预紧力的施加过程可控,易行。
附图说明
当结合附图考虑时,通过参照下面的详细描述,能够更完整更好地理解本发明以及容易得知其中许多伴随的优点,但此处所说明的附图用来提供对本发明的进一步理解,构成本发明的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定,其中:
图1为本发明实施例的桥梁加固结构示意图。
图2为本发明实施例的地面锚固系统结构示意图。
图3为本发明实施例的桥墩上的套筒结构示意图。
图4为本发明实施例的施加预紧力的装置的结构示意图。
图中:
1、桥墩2、地面锚固系统21、锚桩22、承台23、连接键一3、套筒31、结构一32、结构二33、咬合锯齿34、螺栓35、螺母一36、孔4、施加预紧力的装置41、带有螺纹的U型钢筋42、连接键二43、螺母二5、拉索。
具体实施方式
参照图1-4对本发明的实施例进行说明。
为使上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。
下面以桥梁加固为例进行具体说明,但本发明不限于桥梁加固应用。
本发明所述的后加预紧力拉索加固方法,该方法是:先在地面上的适当位置,设置用于固定拉索5的地面锚固系统2;在地面锚固系统2的连接键23上安装施加预紧力的装置4;在桥墩1上部适当位置安装用于固定拉索5的套筒3;将拉索5上端固定在套筒3上,下端固定在施加预紧力的装置4上;通过旋紧施加预紧力的装置4的螺母二43,对拉索5施加预紧力,达到适当的预紧力值,预紧力使拉索产生对桥墩1的下压力。
图1所示,本发明在地面适当位置设置地面锚固系统2,在地面锚固系统2上安装施加预紧力的装置4,将套筒3安装在桥墩1的适当位置,将拉索5上端固定在套筒3上,下端固定在施加预紧力的装置4上。在地面上适当位置,设置地面锚固系统2,并且以桥墩1为基准点,相邻的地面锚固系统2之间角度相等,且要使每根拉索5与桥墩1在竖直面内所成的角度相等,对每根拉索5施加相等的预紧力,就可在水平面内,保证拉索5对桥墩1的作用力可以相互平衡。
图2所示,所述的地面锚固系统2由锚桩21,承台22和连接键一23组成。
图3所示,所述的套筒3由两个相同的结构一31和结构二32通过咬合锯齿33拼接而成。将螺栓34固定在孔36内,拧紧螺母一35。通过控制螺母35旋紧的圈数,可以对套筒3施加适当的预紧力。将拉索5穿过孔36进行固定。固定于桥墩上的套筒3以咬合锯齿状组合,再用螺栓相连,拧紧螺母,对套筒3施加一定的预紧力,增加了套筒3与桥墩1之间的作用力,从而增加了套筒1与桥墩1之间的摩擦力。
图4所示,施加预紧力的装置4将带有螺纹的U型钢筋41穿过地面锚固系统2的连接键一23,拉索5穿过施加预紧力的装置4的连接键二42进行固定,在带有螺纹的U型钢筋两端分别安装三个相同的螺母二43。通过控制螺母二43旋紧的圈数,可对拉索5施加适当的预紧力。
本方法对桥面等原有的桥梁不构成任何的损害,不影响桥面通车,施工更加方便,加固效果明显。本方法既可用于桥墩的应急快速加固,也可用于永久加固。
虽然以上描述了本发明的具体实施方式,但是本领域的技术人员应当理解,这些具体实施方式仅是举例说明,本领域的技术人员在不脱离本发明的原理和实质的情况下,可以对上述方法和系统的细节进行各种省略、替换和改变。例如,合并上述方法步骤,从而按照实质相同的方法执行实质相同的功能以实现实质相同的结果则属于本发明的范围。因此,本发明的范围仅由所附权利要求书限定。

Claims (5)

1.一种后加预紧力拉索加固方法,其特征在于,包括以下步骤:
先在待加固部件周围,设置若干个用于固定拉索的地面锚固系统;所述地面锚固系统包括由下而上依次相连的锚桩、承台和连接键一;
施加预紧力的装置包括带有螺纹的U型钢筋、连接键二以及螺母二;其中:
带有螺纹的U型钢筋的两端穿过连接键二后,分别通过螺母二旋紧,拉索的端部夹置于U型钢筋两端的螺母二之间,并固定于连接键二;
施加预紧力的装置将带有螺纹的U型钢筋穿过地面锚固系统的连接键一,将其安装于地面锚固系统连接键一上;
在待加固部件上部适当位置安装套筒;所述套筒由相同的结构一和结构二通过咬合锯齿拼接而成,且结构一和结构二的孔内固定有若干组用于对拉索施加一定预紧力的螺栓螺母组件,拉索穿过孔从而将拉索的上端固定在套筒上,拉索的下端固定在施加预紧力的装置的带有螺纹的U型钢筋之间;通过旋紧带有螺纹的U型钢筋上的螺母二,对拉索施加预紧力,预紧力使拉索产生对桥墩的下压力;其中:
所述拉索采用预紧力FRP筋,为保证每根拉索对桥墩施加的作用力相互平衡,每根所述预紧力FRP筋的预紧力值相等;
在竖直面内,每根拉索与桥墩所成的角度相等;
以待加固部件为基准点,相邻的地面锚固系统之间角度相等。
2.根据权利要求1所述的一种后加预紧力拉索加固方法,其特征在于,所述套筒为钢套筒。
3.根据权利要求1所述的一种后加预紧力拉索加固方法,其特征在于,所述套筒为复合材料套筒。
4.根据权利要求2所述的一种后加预紧力拉索加固方法,其特征在于,还包括对所述钢套筒做表面防锈处理步骤。
5.根据权利要求1所述的一种后加预紧力拉索加固方法,其特征在于,所述拉索采用钢绞线,并对钢绞线进行防锈防腐处理。
CN201310041058.6A 2013-02-01 2013-02-01 一种后加预紧力拉索加固方法 Expired - Fee Related CN103103930B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310041058.6A CN103103930B (zh) 2013-02-01 2013-02-01 一种后加预紧力拉索加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310041058.6A CN103103930B (zh) 2013-02-01 2013-02-01 一种后加预紧力拉索加固方法

Publications (2)

Publication Number Publication Date
CN103103930A CN103103930A (zh) 2013-05-15
CN103103930B true CN103103930B (zh) 2016-06-08

Family

ID=48312104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310041058.6A Expired - Fee Related CN103103930B (zh) 2013-02-01 2013-02-01 一种后加预紧力拉索加固方法

Country Status (1)

Country Link
CN (1) CN103103930B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740340B (zh) * 2017-12-07 2020-06-30 中铁二院工程集团有限责任公司 一种改善大跨度上承式拱桥拱上结构抗震性能的装置
CN107893367A (zh) * 2017-12-07 2018-04-10 中铁二院工程集团有限责任公司 一种用于改善施工过程中大跨度上承式拱桥拱上结构抗震性能的方法
CN109235237A (zh) * 2018-09-27 2019-01-18 中铁二院工程集团有限责任公司 一种高烈度地震区高墩桥梁抗震系统
CN110130234B (zh) * 2019-05-07 2021-04-30 东南大学 一种新型桥梁加固体系及其施工方法
CN110528379B (zh) * 2019-08-27 2021-07-13 深圳市深安企业有限公司 一种用于大跨度梁的钢绞线防护结构
CN112832144B (zh) * 2021-01-08 2021-12-07 重庆交通大学工程设计研究院有限公司 人行悬索桥加固结构及其施工工艺

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09296459A (ja) * 1996-04-30 1997-11-18 Masumi Yamada 鉄骨鉄筋入りコンクリート
JP3668964B2 (ja) * 2001-04-25 2005-07-06 有限会社吉田構造デザイン 防護柵
JP2007211408A (ja) * 2006-02-07 2007-08-23 East Japan Railway Co 既設コンクリート橋脚の耐震補強工法
JP2007239440A (ja) * 2006-02-07 2007-09-20 East Japan Railway Co 既設コンクリート橋脚の耐震補強工法
JP2008196135A (ja) * 2007-02-08 2008-08-28 Akio Kitayama 橋梁の補強構造物
CN102277830A (zh) * 2011-04-21 2011-12-14 深圳大学 一种用于斜拉桥的减振辅助索装置及斜拉桥
CN202466431U (zh) * 2012-03-22 2012-10-03 深圳市兴班建筑工程有限公司 一种桥梁特异造型花瓶墩施工装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202392035U (zh) * 2011-11-09 2012-08-22 中国电力科学研究院 电气设备拉线式减震系统

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09296459A (ja) * 1996-04-30 1997-11-18 Masumi Yamada 鉄骨鉄筋入りコンクリート
JP3668964B2 (ja) * 2001-04-25 2005-07-06 有限会社吉田構造デザイン 防護柵
JP2007211408A (ja) * 2006-02-07 2007-08-23 East Japan Railway Co 既設コンクリート橋脚の耐震補強工法
JP2007239440A (ja) * 2006-02-07 2007-09-20 East Japan Railway Co 既設コンクリート橋脚の耐震補強工法
JP2008196135A (ja) * 2007-02-08 2008-08-28 Akio Kitayama 橋梁の補強構造物
CN102277830A (zh) * 2011-04-21 2011-12-14 深圳大学 一种用于斜拉桥的减振辅助索装置及斜拉桥
CN202466431U (zh) * 2012-03-22 2012-10-03 深圳市兴班建筑工程有限公司 一种桥梁特异造型花瓶墩施工装置

Also Published As

Publication number Publication date
CN103103930A (zh) 2013-05-15

Similar Documents

Publication Publication Date Title
CN103103930B (zh) 一种后加预紧力拉索加固方法
CN104790424B (zh) 风力发电塔基础环基础的加固系统及其加固方法
CN102733640B (zh) 用于路灯杆、电线杆以及高压电线塔固定安装的基座及其安装方法
CN203007856U (zh) 空心板梁桥的体外预应力加固系统
CN207646604U (zh) 单元装配式减震调高调平多向变位梳形板桥梁伸缩装置
CN202990170U (zh) 一种配置交叉斜向体内预应力的剪力墙结构
CN104233962A (zh) 一种悬索桥主缆索补强加固方法
CN103628477A (zh) 一种用于玻璃纤维筋锚杆的预应力加载装置
CN104060545B (zh) 可用于泵送混凝土的水上悬索栈桥及其施工方法和用途
CN109653350A (zh) 一种混合配筋内埋式低预应力干式梁柱节点及方法
CN105970803A (zh) 装配式桥墩的抗剪耗能装置及施工方法
CN206035053U (zh) 一种穿斗式木结构古建筑柱架耗能加固装置
CN206190458U (zh) 全向预应力抗疲劳组合钢结构风塔
CN106638334B (zh) 一种体外预应力加固装置及其施工方法
CN205242238U (zh) 一种应用于自锚式悬索桥的主梁结构
CN204039898U (zh) 可用于泵送混凝土的水上悬索栈桥
CN104806031A (zh) 木结构加固施工方法
CN203654194U (zh) 桥梁快速施工结构
CN106574462A (zh) 多部件式建筑构件和用于组装该多部件式建筑构件的工艺
CN103147412A (zh) 一种碳纤维筋体外预应力张拉锚固装置及锚固方法
CN203546578U (zh) 一种装配式体外横向预应力空心板桥
CN203654193U (zh) 一种桥梁快速施工结构
CN103696370B (zh) 一种桥梁快速施工工法及结构
CN102653953B (zh) 内张拉预应力混凝土单层变截面板箱形结构
CN202323990U (zh) 一种可以调节塔吊平衡度的塔基基础

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20210201

CF01 Termination of patent right due to non-payment of annual fee