CN103101544A - Train central control unit (CCU) installation box, train control device and train control cabinet - Google Patents

Train central control unit (CCU) installation box, train control device and train control cabinet Download PDF

Info

Publication number
CN103101544A
CN103101544A CN2011103560270A CN201110356027A CN103101544A CN 103101544 A CN103101544 A CN 103101544A CN 2011103560270 A CN2011103560270 A CN 2011103560270A CN 201110356027 A CN201110356027 A CN 201110356027A CN 103101544 A CN103101544 A CN 103101544A
Authority
CN
China
Prior art keywords
train
ccu
cpu
processing unit
central processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103560270A
Other languages
Chinese (zh)
Other versions
CN103101544B (en
Inventor
王�锋
石勇
武生国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Yangtze Co Ltd
Original Assignee
CNR Dalian Electric Traction R& D Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNR Dalian Electric Traction R& D Center Co Ltd filed Critical CNR Dalian Electric Traction R& D Center Co Ltd
Priority to CN201110356027.0A priority Critical patent/CN103101544B/en
Publication of CN103101544A publication Critical patent/CN103101544A/en
Application granted granted Critical
Publication of CN103101544B publication Critical patent/CN103101544B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The invention provides a train central control unit (CCU) installation box, a train control device and a train control cabinet. The train CCU installation box comprises a box for installing a train CCU and an interface panel. The box is provided with an opening. The interface panel is arranged at the opening of the box. The interface panel is provided with second interfaces corresponding to multiple first interfaces of the CCU. The train control device comprises the CCU and the train CCU installation box. The train control cabinet comprises a cabinet body and the train control device. The train CCU installation box, the train control device and the train control cabinet can be installed by different methods according to different demands without change of a structure of the train CCU installation box so that CCU installation and maintenance performances are improved.

Description

Train Central Processing Unit (CPU) install bin, Train Control equipment and Train Control cabinet
Technical field
The present invention relates to the Train Control Technology field, relate in particular to a kind of train Central Processing Unit (CPU) install bin, Train Control equipment and Train Control cabinet.
Background technology
Train network control system is applied to comprise in the trains such as locomotive, subway, light rail, motor train unit usually, is one of 7 large subsystems of train, is the kernel subsystems of train.Train Central Processing Unit (CPU) (Central Control Unit, be called for short CCU) be the brain of train network control system, the various information of train all are pooled in CCU by CCU, CCU sends the relevant action of actuating unit execution that control command is controlled other subsystems after judging computing, to guarantee that train moves according to related needs.
Mounting structure to CCU in prior art adopts modular usually.The CCU of modular can be arranged on any position of vehicle, if but be arranged in the Train Control cabinet, special support need to be installed, and its dismounting, maintainability are all poor in the Train Control cabinet.
Summary of the invention
The invention provides a kind of train Central Processing Unit (CPU) install bin, Train Control equipment and Train Control cabinet, to improve the installation and maintenance performance of CCU.
The invention provides a kind of train Central Processing Unit (CPU) install bin, comprising:
Be used for installing the casing of train Central Processing Unit (CPU) CCU, be provided with opening on described casing;
Interface panel is arranged on the opening part of described casing, is provided with the second corresponding with a plurality of first interfaces of described CCU respectively interface on described interface panel.
The invention provides a kind of Train Control equipment, comprise CCU, and train Central Processing Unit (CPU) install bin provided by the invention;
Described CCU is arranged in the casing of described train Central Processing Unit (CPU) install bin, a plurality of first interfaces on described CCU respectively with the interface panel of described train Central Processing Unit (CPU) install bin on corresponding the second interface be connected.
The invention provides a kind of Train Control cabinet, comprising:
Cabinet; And
Train Control equipment provided by the invention is arranged in described cabinet, and described Train Control equipment is captiveed joint with the inwall of described cabinet.
As shown from the above technical solution, train Central Processing Unit (CPU) install bin provided by the invention, setting by casing, CCU can be arranged in this casing, and communicate by interface panel and the external device of box opening setting, CCU can be arranged on train corresponding position by this train Central Processing Unit (CPU) install bin, also can be arranged in the Train Control cabinet, can select mounting means according to different project demands, need not to change the housing construction of train Central Processing Unit (CPU) install bin, improved the installation and maintenance performance of CCU.
Train Control equipment provided by the invention, setting by train Central Processing Unit (CPU) install bin, CCU can be arranged in train Central Processing Unit (CPU) install bin, so that CCU can be arranged on train corresponding position by this train Central Processing Unit (CPU) install bin, also can be arranged in the Train Control cabinet, can select mounting means according to different project demands, need not to change the housing construction of train Central Processing Unit (CPU) install bin, improve the installation and maintenance performance of CCU.
Train Control cabinet provided by the invention, because Train Control equipment is provided with train Central Processing Unit (CPU) install bin, CCU can be arranged in cabinet by this train Central Processing Unit (CPU), can select mounting means according to different project demands, need not to change the housing construction of train Central Processing Unit (CPU) install bin, improved the installation and maintenance performance of CCU.
Description of drawings
A kind of train Central Processing Unit (CPU) install bin structural representation that Fig. 1 provides for the embodiment of the present invention;
The another kind of train Central Processing Unit (CPU) install bin blast structural representation that Fig. 2 provides for the embodiment of the present invention;
The Train Control cabinet schematic diagram that Fig. 3 provides for the embodiment of the present invention;
The cabinet body structure schematic diagram of the Train Control cabinet that Fig. 4 provides for the embodiment of the present invention.
The specific embodiment
A kind of train Central Processing Unit (CPU) install bin structural representation that Fig. 1 provides for the embodiment of the present invention.As shown in Figure 1, the train Central Processing Unit (CPU) install bin that the present embodiment provides can be applied to install train Central Processing Unit (CPU) CCU, and the train Central Processing Unit (CPU) install bin that the present embodiment provides specifically comprises: the casing 1 and the interface panel 2 that are used for installing CCU.Be provided with opening on casing 1, interface panel 2 is arranged on the opening part of casing 1, is provided with the second corresponding with a plurality of first interfaces of CCU respectively interface 3 on interface panel 2.
Particularly, have a plurality of first interfaces on CCU, first interface can be used for for serial interface, parallel interface etc. the interface of data transmission.CCU communicates by first interface and external device.The shape of casing 1 is specifically as follows cube, also can arrange according to the needs of the installing space of reality, and the shape of casing 1 can realize getting final product at the interior CCU of setting of casing 1, is not limited with the present embodiment.Be provided with opening on casing 1, when casing 1 was cube, opening was specifically as follows a cubical surface.Interface panel 2 is arranged on the opening part of casing 1, and the second interface 3 that arranges on interface panel 2 is concrete corresponding with the first interface on CCU, and a plurality of the second interface 3 concentrated settings facilitate the user to debug and safeguard on interface panel 2.
In actual applications, CCU can be arranged in the train Central Processing Unit (CPU) install bin that the present embodiment provides.Particularly, can be provided with the installing components such as mounting hole 5 or bolt on train Central Processing Unit (CPU) install bin, can by installing component, this train Central Processing Unit (CPU) install bin be mounted on the relevant position of train, also can be mounted in the Train Control cabinet.
The train Central Processing Unit (CPU) install bin that the present embodiment provides, setting by casing 1, CCU can be arranged in this casing 1, and communicate with external device by the interface panel 2 of casing 1 opening part setting, CCU can be arranged on train corresponding position by this train Central Processing Unit (CPU) install bin, also can be arranged in the Train Control cabinet, can select mounting means according to different project demands, need not to change the housing construction of train Central Processing Unit (CPU) install bin, improved the installation and maintenance performance of CCU.
The another kind of train Central Processing Unit (CPU) install bin blast structural representation that Fig. 2 provides for the embodiment of the present invention.As shown in Figure 2, in the present embodiment, this train Central Processing Unit (CPU) install bin specifically can also comprise adapter plate 4, and adapter plate 4 is fixedly installed on the outside face of casing 1, is provided with a plurality of mounting holes 5 on adapter plate 4.
Particularly, adapter plate 4 can be bolted on the outside face that is arranged on casing 1, also can directly be welded on the outside face of casing 1.Casing 1 can be arranged on predeterminated position corresponding to train by adapter plate 4, so that the interface panel 2 of train Central Processing Unit (CPU) install bin is in the position of convenient operation and maintenance.Mounting hole 5 on adapter plate 4 can be bolted on the relevant position of train or Train Control cabinet.
In the present embodiment, this train Central Processing Unit (CPU) install bin can also comprise handle 6, and handle 6 is arranged on interface panel 2.The quantity of handle 6 is specifically as follows one, also can be two.By the setting of handle 6, can carry out the push-and-pull operation to train Central Processing Unit (CPU) install bin easily, improved the convenience of embedded installation process.
In the present embodiment, specifically can be provided with a plurality of louvres 7 on casing 1.Usually the train Central Processing Unit (CPU) can produce heat at run duration, by the setting of louvre 7, the heat in casing 1 can be discharged, and improves the performance and used life of train Central Processing Unit (CPU).
In the present embodiment, preferably, louvre 7 is fish scale hole or waist-shaped hole.Louvre 7 can also for other shapes, not be limited with the present embodiment.
In the present embodiment, preferably, casing 1 be shaped as cube, the length of casing 1, width and highly be respectively 212 millimeters, 129 millimeters and 120 millimeters.The casing of this size is adapted to the size of CCU, CCU is arranged on wherein easily and be unlikely to too crowded and, the heat radiation that is easy to CCU is arranged.
In actual applications, casing 1 part specifically can adopt the stainless steel sheet material of 1.2 millimeters, and interface panel 2 adopts aluminum alloy material, its film on surface.
The present embodiment provides a kind of Train Control equipment, and CCU and the train Central Processing Unit (CPU) install bin that provides as any embodiment of the present invention are provided.CCU is arranged in the casing of train Central Processing Unit (CPU) install bin, a plurality of first interfaces on CCU respectively with the interface panel of train Central Processing Unit (CPU) install bin on corresponding the second interface be connected.
The Train Control equipment that the present embodiment provides, setting by train Central Processing Unit (CPU) install bin, CCU can be arranged in the casing of this train Central Processing Unit (CPU) install bin, and communicate by interface panel and the external device of box opening setting, CCU can be arranged on train corresponding position by this train Central Processing Unit (CPU) install bin, also can be arranged in the Train Control cabinet, can select mounting means according to different project demands, need not to change the housing construction of train Central Processing Unit (CPU) install bin, improved the installation and maintenance performance of CCU.
The Train Control cabinet schematic diagram that Fig. 3 provides for the embodiment of the present invention.As shown in Figure 3, the Train Control cabinet that the present embodiment provides specifically comprises cabinet 8, and the Train Control equipment 9 that provides of any embodiment of the present invention, and Train Control equipment 9 is arranged in cabinet 8, and Train Control equipment 9 is captiveed joint with the inwall of cabinet 8.
The Train Control cabinet that the present embodiment provides, Train Control equipment 9 is by the setting of train Central Processing Unit (CPU) install bin, CCU can be arranged in the casing of this train Central Processing Unit (CPU) install bin, and communicate by interface panel and the external device of box opening setting, need not to set up support, CCU just can be arranged in the cabinet 8 of Train Control cabinet by this train Central Processing Unit (CPU) install bin, has improved the installation and maintenance performance of CCU.
The cabinet body structure schematic diagram of the Train Control cabinet that Fig. 4 provides for the embodiment of the present invention.As shown in Figure 4, in the present embodiment, the quantity of Train Control equipment 9 is specifically as follows two, is provided with the guide rail 10 that corresponds respectively to each Train Control equipment in cabinet 8.Two Train Control equipment 9 can share a guide rail 10, and cabinet 8 specifically is divided into two parts by the guide rail 10 that shares, and Train Control equipment 9 is installed respectively.
In the present embodiment, cabinet 8 is interior can also be provided with guide positioning pin 11, so that Train Control equipment 9 is played positioning action, has improved the steadiness that Train Control equipment 9 is installed in cabinet 8.
It should be noted that at last: above embodiment only in order to technical scheme of the present invention to be described, is not intended to limit; Although with reference to previous embodiment, the present invention is had been described in detail, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme that aforementioned each embodiment puts down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution break away from the scope of various embodiments of the present invention technical scheme.

Claims (9)

1. a train Central Processing Unit (CPU) install bin, is characterized in that, comprising:
Be used for installing the casing of train Central Processing Unit (CPU) CCU, be provided with opening on described casing;
Interface panel is arranged on the opening part of described casing, is provided with the second corresponding with a plurality of first interfaces of described CCU respectively interface on described interface panel.
2. train Central Processing Unit (CPU) install bin according to claim 1, is characterized in that, also comprises:
Adapter plate is fixedly installed on the outside face of described casing, is provided with a plurality of mounting holes on described adapter plate.
3. train Central Processing Unit (CPU) install bin according to claim 1 and 2, is characterized in that, also comprises:
Handle is arranged on described interface panel.
4. train Central Processing Unit (CPU) install bin according to claim 1 and 2 is characterized in that:
Be provided with a plurality of louvres on described casing.
5. train Central Processing Unit (CPU) install bin according to claim 4 is characterized in that:
Described louvre is fish scale hole or waist-shaped hole.
6. train Central Processing Unit (CPU) install bin according to claim 1 is characterized in that:
Described casing be shaped as cube, the length of described casing, width and highly be respectively 212 millimeters, 129 millimeters and 120 millimeters.
7. Train Control equipment is characterized in that: comprise CCU, and described train Central Processing Unit (CPU) install bin as arbitrary in claim 1-6;
Described CCU is arranged in the casing of described train Central Processing Unit (CPU) install bin, a plurality of first interfaces on described CCU respectively with the interface panel of described train Central Processing Unit (CPU) install bin on corresponding the second interface be connected.
8. a Train Control cabinet, is characterized in that, comprising:
Cabinet; And
Train Control equipment as claimed in claim 7 is arranged in described cabinet, and described Train Control equipment is captiveed joint with the inwall of described cabinet.
9. Train Control cabinet according to claim 8 is characterized in that:
The quantity of described Train Control equipment is two;
Be provided with the guide rail that corresponds respectively to each described Train Control equipment in described cabinet.
CN201110356027.0A 2011-11-10 2011-11-10 Train central control unit install bin, Train Control equipment and Train Control cabinet Active CN103101544B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110356027.0A CN103101544B (en) 2011-11-10 2011-11-10 Train central control unit install bin, Train Control equipment and Train Control cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110356027.0A CN103101544B (en) 2011-11-10 2011-11-10 Train central control unit install bin, Train Control equipment and Train Control cabinet

Publications (2)

Publication Number Publication Date
CN103101544A true CN103101544A (en) 2013-05-15
CN103101544B CN103101544B (en) 2015-11-25

Family

ID=48309824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110356027.0A Active CN103101544B (en) 2011-11-10 2011-11-10 Train central control unit install bin, Train Control equipment and Train Control cabinet

Country Status (1)

Country Link
CN (1) CN103101544B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104300464A (en) * 2014-10-27 2015-01-21 成都市思码特科技有限公司 Multimedia box convenient for wiring
CN104340235A (en) * 2014-11-04 2015-02-11 株洲南车时代电气股份有限公司 Whole vehicle control device
CN106870884A (en) * 2015-11-16 2017-06-20 阿自倍尔株式会社 Panel meter and display device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10278784A (en) * 1997-04-11 1998-10-20 Toyo Electric Mfg Co Ltd Control box for railway rolling stock
CN2927612Y (en) * 2006-06-26 2007-07-25 株洲南车时代电气股份有限公司 Controlling module of automobile
JP2007326388A (en) * 2006-06-06 2007-12-20 Mitsubishi Electric Corp Box for control device of electric rolling stock and its manufacturing method
CN201219332Y (en) * 2008-09-05 2009-04-08 铁道部运输局 Central control apparatus cabinet
CN201219334Y (en) * 2008-09-05 2009-04-08 铁道部运输局 Control device cabinet
CN201966520U (en) * 2011-02-25 2011-09-07 长春研奥电器有限公司 Push-and-pull type integrated cabinet of cab

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10278784A (en) * 1997-04-11 1998-10-20 Toyo Electric Mfg Co Ltd Control box for railway rolling stock
JP2007326388A (en) * 2006-06-06 2007-12-20 Mitsubishi Electric Corp Box for control device of electric rolling stock and its manufacturing method
CN2927612Y (en) * 2006-06-26 2007-07-25 株洲南车时代电气股份有限公司 Controlling module of automobile
CN201219332Y (en) * 2008-09-05 2009-04-08 铁道部运输局 Central control apparatus cabinet
CN201219334Y (en) * 2008-09-05 2009-04-08 铁道部运输局 Control device cabinet
CN201966520U (en) * 2011-02-25 2011-09-07 长春研奥电器有限公司 Push-and-pull type integrated cabinet of cab

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104300464A (en) * 2014-10-27 2015-01-21 成都市思码特科技有限公司 Multimedia box convenient for wiring
CN104340235A (en) * 2014-11-04 2015-02-11 株洲南车时代电气股份有限公司 Whole vehicle control device
CN106870884A (en) * 2015-11-16 2017-06-20 阿自倍尔株式会社 Panel meter and display device
CN106870884B (en) * 2015-11-16 2019-05-03 阿自倍尔株式会社 Panel meter and display equipment

Also Published As

Publication number Publication date
CN103101544B (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN103101544B (en) Train central control unit install bin, Train Control equipment and Train Control cabinet
CN202373058U (en) Data recording unit of train network control and monitoring system
CN203150024U (en) Rotatable type LED screen display device capable of displaying stock futures in real time
CN204998468U (en) Many connecting rods anticollision institution and intelligence motion body
CN204013573U (en) A kind of equipment fault rapid rush-repair device
CN203870534U (en) Computer case capable of being easily installed and maintained
TW200725294A (en) Data transmission system applied in an electronic apparatus with multiple servo units
CN203157115U (en) Corrugated pipe forming machine device with automatic protection device
CN201389585Y (en) Horizontal type rotatable bender
TWI265437B (en) Predictive maintenance system with generic embedded devices
CN204423124U (en) A kind of aluminium bar industries process control system
CN215582009U (en) High-low temperature controller for sludge low-temperature control
CN203211099U (en) Brake system speed transmission mechanism for joint simulation
CN203217863U (en) A brake system instruction transmission mechanism for united simulation
CN105081081A (en) Inserted-block structure and mold of sheet-metal door shell
CN202975684U (en) Air channel maintenance and inspection system
CN203462676U (en) Concealed ceiling electric appliance connecting device
CN210605549U (en) Machine room information comprehensive monitoring equipment
CN209642944U (en) A kind of vehicle audio with high tone quality
CN203909685U (en) Optical drive mounting structure of ATM (Asynchronous Transfer Mode) industrial control host computer
CN200998672Y (en) Novel conical mineral supplying distributing plate device
CN202870859U (en) RFID data transmission apparatus
CN205071195U (en) Monitored control system in classroom
CN101581886A (en) Photoetching machine control system
CN205158239U (en) Hard disk replacement device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA CNR CORPORATION LIMITED

Free format text: FORMER OWNER: DALIAN ELECTRIC TRACTION RESEARCH + DEVELOPMENT CENTER OF CHINA NORTH LOCOMOTIVE CO.,LTD.

Effective date: 20140414

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 116022 DALIAN, LIAONING PROVINCE TO: 100078 FENGTAI, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20140414

Address after: 100078 Beijing Fengtai District city park is a district 15 building

Applicant after: China CNR Corporation Limited

Address before: 116022 Shahekou, Liaoning, China No. 51 The Strip

Applicant before: Dalian Electric Traction Research & Development Center of China North Locomotive Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant