CN103091126B - Overhead crane test improved method - Google Patents

Overhead crane test improved method Download PDF

Info

Publication number
CN103091126B
CN103091126B CN201310053400.4A CN201310053400A CN103091126B CN 103091126 B CN103091126 B CN 103091126B CN 201310053400 A CN201310053400 A CN 201310053400A CN 103091126 B CN103091126 B CN 103091126B
Authority
CN
China
Prior art keywords
test
weight
wire rope
lifting
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310053400.4A
Other languages
Chinese (zh)
Other versions
CN103091126A (en
Inventor
李勇
代祥文
刘贵仁
张德浩
胡海平
栾春林
李鹏吉
卜继勋
贾利刚
刘福佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Songhua River Hydropower Generation Co Ltd Jilin Baishan Power Plant
STATE GRID XINYUAN HYDROPOWER CO Ltd
State Grid Corp of China SGCC
Original Assignee
STATE GRID XINYUAN HYDROPOWER CO Ltd
Baishan Power Plant
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID XINYUAN HYDROPOWER CO Ltd, Baishan Power Plant, State Grid Corp of China SGCC filed Critical STATE GRID XINYUAN HYDROPOWER CO Ltd
Priority to CN201310053400.4A priority Critical patent/CN103091126B/en
Publication of CN103091126A publication Critical patent/CN103091126A/en
Application granted granted Critical
Publication of CN103091126B publication Critical patent/CN103091126B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention relates to an overhead crane test improved method, and belongs to the technical field of crane overhaul and maintenance. The overhead crane test improved method comprises the following steps of calculating the test load with 10% overload of dynamic loads, calculating the largest pulling force each steel wire rope can bear, determining the weight of a hoisting weight test block, determining the length of each steel wire rope, determining lifting speed and determining a load test method, wherein the load test method comprises the steps of fixing two steel wire ropes at two ends of a coiling block, and connecting the steel wire ropes with the weight test block after a safety number of circles of the steel wire ropes are wound at each side; with the test time being 15 seconds, lifting slightly the weight test block firstly, then dropping the weight test block, again lifting the weight test block by 10 centimeters, stopping to observe a band-type brake, then lifting the weight test block to 2 meters if no problems exist and stopping to drop the weight test block. The test is then completed if no problems exist after a brake and a mechanism transmission part are observed. The overhead crane test improved method has the advantages of saving cost, shortening work period, guaranteeing safety, reducing labor intensity, improving efficiency and the like.

Description

A kind of overhead travelling crane test is improved one's methods
technical field
The present invention relates to the test of a kind of overhead travelling crane to improve one's methods, belong to crane maintenance, maintenance technology field.
Background technology
In the prior art, overhead travelling crane belongs to special equipment.Country expressly provides that every two years carrying out a load test carries out, and testing requirements carries out dynamic loading experiment with the weight of 1.1 times, and is supervised the implementation of by special equipment inspection department.All adopt the rated load weight of crane loading 1.1 times to carry out when doing experiment in the past.The biggest lifting capacity as specified in crane is 250t, and the weight of test needs 275t.Scene every two years will from other places, and the steel transporting enough weight are tested to scene as load, and from being transported to lease needs tens0000 yuan, even dress band unloads and adds the experiment work that traffic requirements one wheat harvesting period can complete whole crane.This not only makes testing crew dog-tired, but also the scene that makes is full of steel, make to be all danger very putting load, the steel of six or seven meters high will cave in slightly because of carelessness at every turn, cause the great person and equipment breakdown, whole test also exists major hidden danger.
Summary of the invention
The object of the invention is for above-mentioned deficiency and provide one to improve one's methods, testing the test of feasible, that safety, efficiency are high overhead travelling crane and improve one's methods.
Technical solution of the present invention is: a kind of overhead travelling crane test is improved one's methods, and its step is as follows:
(1) press overload 10% and calculate test load.
(2) calculate every root wire rope and bear maximum pull.
(3) lifting test mass block weight is determined.
(4) rope capacity is determined.
(5) pulling speed is determined.
(6) load test method:
A, fix two wire rope at reel two ends, after often end is wound around safe number of turns, wire rope is connected with test block.
Test mass block, by 15 seconds, is first mentioned a little, is then fallen by b, test period. and test mass block is mentioned 10 centimeters, stop, observe band-type brake, no problem continues to rise to 2m and stops, and then falls, and observes detent, mechanical driving part is no problem.
Preferred overhead travelling crane test is improved one's methods, and its step is as follows: lifting weight 250 tons of crane meters:
(1) press overload 10% and calculate test load: be 275 tons.
(2) calculate every root wire rope and bear maximum pull: 19.03 tons.
(3) lifting pouring weight weight is determined: 38 tons.
(4) rope capacity is determined: 104 meters.
(5) pulling speed is determined: 8m/min.
Advantage of the present invention is: 1, by improving rear test method, the test of bridge machine adopts the method reducing pulley block ratio, carries out the test of lifting mechanism dynamic load, has saved cost, shortens the duration, ensure that safely, reduces labour intensity, improves efficiency.No longer just can save tens0000 yuan of funds from nonlocal transport rental steel as load single one.2, the crane test period shortened to present week age by one month, and it is just enough that required personnel are also half in the past, and the personnel labor intensity of test also reduces greatly.
Below in conjunction with accompanying drawing, embodiment, embodiments of the present invention are described in further detail.
Accompanying drawing explanation
Fig. 1 is that the inventive method plays rearrangement schematic diagram.
Embodiment
Embodiment
See Fig. 1, main parts size title is as follows: hoist roller 1, test mass block 2, fixed pulley group 3, running block 4, gear case 5, detent 6, motor 7, wire rope.
Overhead travelling crane test is improved one's methods, and its step is as follows:
One, overhead travelling crane basic parameter
Model: 9.8 × 2 × 250/50/10KN---Shanxi Tai Chong factory produces.
Number of units: 2,4 lifting mechanisms.
Main hook lifting velocity: 1m/min.
Wire rope 8 number of share of stock: 2 × 8.
Wire rope 8 working pulling force: 17.9 × 9.8KN.
Wire rope 8 structure and diameter: 6W(19)-155; ¢ 40mm.
Drum diameter: ¢ 1390mm.
250 tons of hook gear weight: 6553Kg.
Running block and suspension hook side plate weight: 4588 Kg.
Mechanical reduction gear overall ratio: 326.03.
Two, testing program
Adopt the method cancelling whole pulley blocks to carry out, achieve successfully.Be calculated as follows:
1, consider that overload 10%(is dynamic load overload 10%) press, 250 × 10%+250=275(T) calculate test load.
2, every root wire rope 8 bears maximum pull (S):
In formula: pulling force (T) suffered by S-steel cable 8 (not counting wire rope 8 weight).Q-considers the outer load 275 tons of overload 10%.Carrying rope point number 16 in n rope-pulley blocks.The efficiency 0.94 of η rope-pulley blocks.G-suspender weight 11.2T.
So: S=(275+11.2)/(16 × 0.94)=19.03(T).
3, test mass block weight P
The weight of pulley blocks and suspension hook do not remembered during test, directly draw lower two wire rope 8 by reel (1) and be connected with test mass block 2, the pulling force that every root wire rope 8 bears is 9.8 × 19KN
P=4 × S=2 × 19 × 9.8=372.4KN=38(T), test mass block weight is 38 tons.
4, wire rope 8 length
Length clipping room floor calculating wire rope 8 is dropped on by test mass block 2
L=πDgZo+h+C
In formula: Dg-drum diameter, get Dg=1.39m; Zo-safe number of turns, gets Zo=6 circle; H-wire rope 8, from reel 1 horizontal centre to wire rope 8 stiff end length, gets h=24.13m.
So L=3.14 × 1.39 × 6+24.13+1.25=51.57m, get 52m.Two wire rope 8 total lengths are 104m.
Three, test method
1, load test method
Fix two wire rope 8 at reel 1 two ends, after often holding winding 6 to enclose safe number of turns, wire rope 8 is connected with test mass block 2.
2, weight is tested
Test mass block 2 weight is 38t.The existing little balance beam of power plant is utilized to do test mass thing.Two little balance beams add suspension hook deadweight for 38.14t, meet the demands.
3, heavy lift height
Do not fill pulley because of during test, the pulling speed of test mass thing equals the speed of reel 1
V=πDn
In formula: the pulling speed of V-weight; D-drum diameter, D=1.39m.
N=n electricity/I
N electricity-motor speed, n electricity=870r/m.I-overall ratio, I=490.231.
N=870/490.231=1.775r/min。
So V=3.14 × 1.39 × 1.775=7.75m/min, get 8m/min
Test period was by 15 seconds, and hoisting depth is 2m.
4 test methods
During test. first test mass block 2 is mentioned a little. then fall. again test mass block 2 is mentioned 10 centimeters, stop, observe band-type brake etc., no problem continues to rise to 2m and stops, and then falls, and it is no problem that detent 6, mechanical drive department grade.
Four, points for attention are tested
1, should check before test, band-type brake adjusts in advance comprehensively, can test run after each portion passed examination, first unloaded trial run, and after all are normal, application of load is tested again.
2, because test mass block downslide amount is large, will put flitch during test under test mass block, commander and operating personnel will strictly control lifting altitude.
3, in process of the test, each key position should have special messenger to guard, and the phenomenon that notes abnormalities should stop test immediately, and test mass block rises and falls must be steady, strictly controls speed of rising and falling.
4, work-yard will be cleaned totally, and forbid storage equipment near test site, non-test personnel must not enter test site, so as to avoid an accident.
5, safety is given and is stayed more than long necessary six circles of rope, prevents test steels silk rope 8 from coming off and hurts sb.'s feelings or damage equipment.
6, because test steels silk rope 8 and former machine wire rope 8 are not same models, end holding clamp needs again to make new jig, to meet testing requirements.

Claims (1)

1. an overhead travelling crane test is improved one's methods, and it is characterized in that step is as follows:
(1) press overload 10% and calculate test load;
(2) calculate every root wire rope (8) and bear maximum pull;
(3) lifting test mass block (2) weight is determined;
(4) wire rope (8) length is determined;
(5) pulling speed is determined;
(6) load test method:
A, fix two wire rope (8) at reel (1) two ends, after often end is wound around safe number of turns, wire rope (8) is connected with test mass block (2);
Test mass block (2), by 15 seconds, is first mentioned a little, is then fallen by b, test period, again test mass block (2) is mentioned 10 centimeters, stop, observe band-type brake, no problem continues to rise to 2m and stops, and then falls, and observes detent (6), mechanical driving part is no problem;
In lifting weight 250 tons of cranes:
(1) press overload 10% and calculate test load: be 275 tons;
(2) calculate every root wire rope (8) and bear maximum pull: 19.03 tons;
(3) lifting test mass block (2) weight is determined: 38 tons;
(4) wire rope (8) length is determined: 104 meters
(5) pulling speed is determined: 8m/min.
CN201310053400.4A 2013-02-19 2013-02-19 Overhead crane test improved method Active CN103091126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310053400.4A CN103091126B (en) 2013-02-19 2013-02-19 Overhead crane test improved method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310053400.4A CN103091126B (en) 2013-02-19 2013-02-19 Overhead crane test improved method

Publications (2)

Publication Number Publication Date
CN103091126A CN103091126A (en) 2013-05-08
CN103091126B true CN103091126B (en) 2015-06-24

Family

ID=48203970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310053400.4A Active CN103091126B (en) 2013-02-19 2013-02-19 Overhead crane test improved method

Country Status (1)

Country Link
CN (1) CN103091126B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103674601A (en) * 2013-12-25 2014-03-26 中国水电顾问集团成都勘测设计研究院有限公司 Method for analyzing working efficiency of cable crane in concrete construction
CN109540568B (en) * 2019-01-08 2024-01-26 北京市城市管理研究院(北京市环境卫生监测中心) Side driving device of road sweeper cleaning performance test bed

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4697458A (en) * 1986-11-21 1987-10-06 Billstein Herbert H Crane load-test gauge
CN101886985A (en) * 2010-06-29 2010-11-17 太平湾发电厂 Dynamic load test method of load lifting capacity of bridge crane

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4697458A (en) * 1986-11-21 1987-10-06 Billstein Herbert H Crane load-test gauge
CN101886985A (en) * 2010-06-29 2010-11-17 太平湾发电厂 Dynamic load test method of load lifting capacity of bridge crane

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《桥式起重机机械系统故障及维修》;李勇等;《中国电机工程学会第十届青年学术会议·吉林》;20081231;第3299页 *
《漫湾水电站二期工程主厂房双小车桥机安装技术》;宋长斌;《水力发电》;20070530;第33卷(第5期);第66-68页 *
《葛洲坝大江电站厂内双小车桥式起重机的负荷试验》;李正安;《水电站机电技术》;19880430(第2期);第30-33页、第52页 *

Also Published As

Publication number Publication date
CN103091126A (en) 2013-05-08

Similar Documents

Publication Publication Date Title
CN106315349B (en) A kind of depth vertical is restricted winding hoisting steel wire rope tension automatic equalization device and method more
CN101717038B (en) Multiplication-variable hook device
CN106144896B (en) A kind of pull-type carriage walking mechanism
CN201942435U (en) Special trolley for double-beam gantry crane
CN103091126B (en) Overhead crane test improved method
CN202671090U (en) Rope-breaking and rope-winding prevention device of bridge-type crane
CN103708360B (en) Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method
CN203865920U (en) Steel wire rope winding structure for large-tonnage crane hoisting mechanism
CN101886985B (en) Dynamic load test method of load lifting capacity of bridge crane
CN208327167U (en) Novel tower crane moment safety control system
CN104340864B (en) A kind of hoisting crane and lifting mechanism thereof
CN203654191U (en) Device for stay cable to be lifted on bridge
CN205114826U (en) Special hoist of soft hook -type aluminium alloy
CN203558395U (en) Hoisting mechanism of stacker loading platform
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN109132906B (en) Lifting balance energy storage device of crane lifting mechanism
CN205275079U (en) A manual winch that is used for nuclear power station monitoring detector loading and unloading of reloading
CN203653125U (en) Hoister for tower crane hoisting
CN204434122U (en) The two loading trolley of tower crane
CN203006760U (en) Crane cable wire adjusting device
CN202787930U (en) Hanging basket for high-place operations
CN202992022U (en) Dedicated device for connecting steel wire ropes of hoisting mechanism of crane
CN202687627U (en) Steel wire rope sizing arrangement device
CN203767917U (en) Pulley mechanism of hoisting machinery
CN205346692U (en) Swing arm tower machine of supporting multiple mounting means becomes width of cloth pulley yoke

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Yong

Inventor after: Liu Fujia

Inventor after: Dai Xiangwen

Inventor after: Liu Guiren

Inventor after: Zhang Dehao

Inventor after: Hu Haiping

Inventor after: Luan Chunlin

Inventor after: Li Pengji

Inventor after: Bo Jixun

Inventor after: Jia Ligang

Inventor before: Li Yong

Inventor before: Dai Xiangwen

Inventor before: Liu Guiren

Inventor before: Zhang Dehao

Inventor before: Hu Haiping

Inventor before: Luan Chunlin

Inventor before: Li Pengji

Inventor before: Bo Jixun

Inventor before: Jia Ligang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI YONG DAI XIANGWEN LIU GUIREN ZHANG DEHAO HU HAIPING LUAN CHUNLIN LI PENGJI BU JIXUN JIA LIGANG TO: LI YONG DAI XIANGWEN LIU GUIREN ZHANG DEHAO HU HAIPING LUAN CHUNLIN LI PENGJI BU JIXUN JIA LIGANG LIU FUJIA

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171026

Address after: 132000 Jilin Jilin Huadian Baishan town production complex building

Co-patentee after: State Grid Corporation of China

Patentee after: Songhua River hydropower generation Co., Ltd. Jilin Baishan power plant

Co-patentee after: State Grid Xinyuan Hydropower Co., Ltd.

Address before: 132400, No. 274, Huadian Avenue, Huadian, Jilin, Jilin

Co-patentee before: State Grid Corporation of China

Patentee before: Baishan Power Plant

Co-patentee before: State Grid Xinyuan Hydropower Co., Ltd.