CN103078259A - Ring main unit improvement method for reducing switching station power failure time - Google Patents

Ring main unit improvement method for reducing switching station power failure time Download PDF

Info

Publication number
CN103078259A
CN103078259A CN2013100072999A CN201310007299A CN103078259A CN 103078259 A CN103078259 A CN 103078259A CN 2013100072999 A CN2013100072999 A CN 2013100072999A CN 201310007299 A CN201310007299 A CN 201310007299A CN 103078259 A CN103078259 A CN 103078259A
Authority
CN
China
Prior art keywords
ring main
main unit
switching station
improved
switchyard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100072999A
Other languages
Chinese (zh)
Inventor
卢峰
张页
沈骏
张从柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changxing county power supply bureau
State Grid Corp of China SGCC
Original Assignee
Changxing county power supply bureau
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changxing county power supply bureau, State Grid Corp of China SGCC filed Critical Changxing county power supply bureau
Priority to CN2013100072999A priority Critical patent/CN103078259A/en
Publication of CN103078259A publication Critical patent/CN103078259A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a ring main unit improvement method for reducing switching station power failure time. The method comprises the following steps of: (1) confirming a specification of a ring main unit needing to be improved in a switching station, and then selecting an appropriate standby ring main unit to be conveyed to the switching station; (2) temporarily interrupting electricity, and disassembling the ring main unit needing to be improved in the switching station; (3) installing the standby ring main unit, and temporarily recovering power; (4) returning and improving the disassembled ring main unit, and after finishing comprehensive debugging, conveying to the switching station; (5) temporarily interrupting electricity, and disassembling the standby ring main unit; and (6) installing the improved ring main unit, and recovering power. Compared with a traditional ring main unit improvement construction scheme, through adopting the improvement method, only few standby ring main units with high generality needs to be provided, and the power only needs to be temporarily cut off when the standby ring main unit is replaced and after the improved ring main unit is replaced, so that the power failure time is greatly reduced; and meanwhile, the whole ring main unit is improved, so that the efficiency for improving the switching station is also greatly improved.

Description

A kind of ring main unit remodeling method that shortens the switchyard interruption duration
Technical field
The present invention relates to the transformation of ring main unit in the electric power system, be specifically related to a kind of ring main unit remodeling method that shortens the switchyard interruption duration.
Background technology
In traditional ring main unit rebuilding construction scheme, all be that a plurality of ring main units in the switchyard are transformed one by one, impact to residential electricity consumption for avoiding rebuilding construction, usually can only transform 1 ring main unit every day, since 9 power failures in morning, restore electricity before 5.The transformation of ring main unit brings to be interrupted in continuous many days and has a power failure.And the inefficiency of rebuilding construction, the cycle of switchyard rebuilding construction is long.
Summary of the invention
Technical problem to be solved by this invention just provides a kind of ring main unit remodeling method that shortens the switchyard interruption duration, and interruption duration is shortened greatly, reduces the impact on residential electricity consumption, and the efficient of Simultaneous Switching station transformation improves greatly.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: a kind of ring main unit remodeling method that shortens the switchyard interruption duration is characterized in that comprising the steps:
1) then definite ring main unit specification that needs to transform in the switchyard is chosen suitable ring main unit for subsequent use and is transported to switchyard;
2) temporary interruption is removed the ring main unit that needs transformation in the switchyard;
3) ring main unit for subsequent use is installed, is restored electricity temporarily;
4) ring main unit of removing is returned factory and transform, transport switchyard back after comprehensive debugging is complete;
5) temporary interruption is removed ring main unit for subsequent use;
6) improved ring main unit is installed, is restored electricity.
Compare with traditional ring main unit rebuilding construction scheme, adopt remodeling method of the present invention only need be equipped with the high ring main unit for subsequent use of a small amount of versatility, this remodeling method is only being changed ring main unit for subsequent use and is being changed the improved ring main unit stage and cut off the electricity supply temporarily, interruption duration shortens greatly, remodeling method of the present invention is that whole ring main unit is transformed simultaneously, so that the efficient that switchyard is transformed also improves greatly.
Embodiment
A kind of ring main unit remodeling method that shortens the switchyard interruption duration of the present invention comprises the steps:
1) then definite ring main unit specification that needs to transform in the switchyard is chosen suitable ring main unit for subsequent use and is transported to switchyard;
2) temporary interruption is removed the ring main unit that needs transformation in the switchyard;
3) ring main unit for subsequent use is installed, is restored electricity temporarily;
4) ring main unit of removing is returned factory and transform, transport switchyard back after comprehensive debugging is complete;
5) temporary interruption is removed ring main unit for subsequent use;
6) improved ring main unit is installed, is restored electricity.
Above-mentioned steps 2) and the interruption duration that causes of the whole process of step 3) usually be no more than 2 hours; The interruption duration that the whole process of step 5) and step 6) causes is no more than 3 hours usually, that is the time that required power failure is finished in whole ring main unit transformations of removing also be no more than 5 hours, need not will have a power failure the operation in the of twice of ring main unit of transformation as traditional approach.Certainly for the more switchyard of ring main unit, consider interruption duration and actual transformation ability, also can finish by the mode of transforming several times by trying one's best few batch, it also is greatly to shorten the transformation time that such mode is compared with traditional approach.
The present invention is in ring main unit power failure improvement project implementation process, and ring main unit is taked integral hoisting, returned the mode that factory transforms, and after comprehensive debugging is finished, carries out integrative installation technology again, has shortened the field apparatus set-up time, thereby has shortened the interruption duration of power consumer.
Compare with traditional ring main unit rebuilding construction scheme, adopt remodeling method of the present invention only need be equipped with the high ring main unit for subsequent use of a small amount of versatility, ring main unit for subsequent use with switchyard in the ring main unit specification be all mutually most preferably, as long as it also is feasible certainly satisfying other specification ring main unit of the interim power reguirements of switchyard, for example a certain ring main unit is 4 groups in the switchyard, ring main unit for subsequent use can be selected 5 groups or above ring main unit for subsequent use in the situation that the space is feasible.

Claims (1)

1. a ring main unit remodeling method that shortens the switchyard interruption duration is characterized in that comprising the steps:
1) then definite ring main unit specification that needs to transform in the switchyard is chosen suitable ring main unit for subsequent use and is transported to switchyard;
2) temporary interruption is removed the ring main unit that needs transformation in the switchyard;
3) ring main unit for subsequent use is installed, is restored electricity temporarily;
4) ring main unit of removing is returned factory and transform, transport switchyard back after comprehensive debugging is complete;
5) temporary interruption is removed ring main unit for subsequent use;
6) improved ring main unit is installed, is restored electricity.
CN2013100072999A 2013-01-09 2013-01-09 Ring main unit improvement method for reducing switching station power failure time Pending CN103078259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100072999A CN103078259A (en) 2013-01-09 2013-01-09 Ring main unit improvement method for reducing switching station power failure time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100072999A CN103078259A (en) 2013-01-09 2013-01-09 Ring main unit improvement method for reducing switching station power failure time

Publications (1)

Publication Number Publication Date
CN103078259A true CN103078259A (en) 2013-05-01

Family

ID=48154708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100072999A Pending CN103078259A (en) 2013-01-09 2013-01-09 Ring main unit improvement method for reducing switching station power failure time

Country Status (1)

Country Link
CN (1) CN103078259A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101066732A (en) * 2007-06-01 2007-11-07 苏州江南嘉捷电梯集团有限公司 Power failure rescue method for sync motor driven lift
CN202159923U (en) * 2011-08-02 2012-03-07 湖南丰日电源电气股份有限公司 Intelligent inflatable high-voltage vacuum switch cabinet for metros
CN102403779A (en) * 2011-12-08 2012-04-04 河南省电力公司郑州供电公司 Power supply system for bypass to operate without power failure
JP2012239320A (en) * 2011-05-12 2012-12-06 Fuji Electric Co Ltd Distribution board

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101066732A (en) * 2007-06-01 2007-11-07 苏州江南嘉捷电梯集团有限公司 Power failure rescue method for sync motor driven lift
JP2012239320A (en) * 2011-05-12 2012-12-06 Fuji Electric Co Ltd Distribution board
CN202159923U (en) * 2011-08-02 2012-03-07 湖南丰日电源电气股份有限公司 Intelligent inflatable high-voltage vacuum switch cabinet for metros
CN102403779A (en) * 2011-12-08 2012-04-04 河南省电力公司郑州供电公司 Power supply system for bypass to operate without power failure

Similar Documents

Publication Publication Date Title
CN103532096B (en) 10kV feeder protection equipments, which do not have a power failure, eliminates defect method
WO2014202504A3 (en) Energy management device and method for controlling a charging process
GB201213526D0 (en) Control system and method
WO2012096490A3 (en) Method for restricting the cell access of a terminal in a wireless communication system, and apparatus therefor
CN103779955A (en) Backup automatic switching throwing-retreating control method based on N-1 criterion
CN103580286A (en) Intelligent power distribution network closed-loop self-healing control method
WO2013093287A3 (en) Method of exchanging electrical energy between an electrical network conveying a dc or ac electrical quantity and an electrical energy storage unit for hybrid or electric vehicle
CN103683480A (en) Spare power automatic switching cooperation control method of substation area
CN103166138B (en) The method of switching cabinet is changed based on the case segmentation transformation of bypass cable branch
CN103078259A (en) Ring main unit improvement method for reducing switching station power failure time
CN104037635A (en) Control method of intelligent low-pressure drawer unit system
CN203445816U (en) Two compressor soft start apparatus
IN2015DN02698A (en)
MX2016006887A (en) Method and apparatus to optimize generator start delay and runtime following outage.
CN104218670B (en) A kind of super-container vessel power interruption recovering starting method
WO2012165779A3 (en) Uninterruptible power system for electricity facilities of a large building
US10381147B2 (en) Container arrangement for power transformers
MX2016006884A (en) Method and apparatus to change generator start delay and runtime following outage.
CN104638987A (en) Method for controlling soft starting of multiple-driven-by-two redundant motor
CN104124749B (en) The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation
CN202059325U (en) High-voltage starting power supply system with terminal voltage of zero for polycrystalline silicon reducing furnace
CN101820184B (en) Communication power supply system
CN105140910A (en) Power restoration method for power distribution station after complete shutdown
CN102611191B (en) Plant multi-wire-inlet spare power automatic switching method and device
CN111262162A (en) Method for overhauling live line between ring main units

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130501