CN103074996B - Building scaffold wall connecting piece - Google Patents

Building scaffold wall connecting piece Download PDF

Info

Publication number
CN103074996B
CN103074996B CN201310042512XA CN201310042512A CN103074996B CN 103074996 B CN103074996 B CN 103074996B CN 201310042512X A CN201310042512X A CN 201310042512XA CN 201310042512 A CN201310042512 A CN 201310042512A CN 103074996 B CN103074996 B CN 103074996B
Authority
CN
China
Prior art keywords
angle steel
rod
adjusting screw
connecting piece
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310042512XA
Other languages
Chinese (zh)
Other versions
CN103074996A (en
Inventor
张风虎
俞小姣
俞志江
陈生贤
傅国君
林水昌
袁亦桥
丁立英
徐洪佳
张洪基
郭奇伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG SHENGYE CONSTRUCTION CO Ltd
ZHEJIANG YUNYE CONSTRUCTION ENGINEERING Co Ltd
CHINA ZHONGSHE CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
ZHEJIANG SHENGYE CONSTRUCTION CO Ltd
ZHEJIANG YUNYE CONSTRUCTION ENGINEERING Co Ltd
CHINA ZHONGSHE CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG SHENGYE CONSTRUCTION CO Ltd, ZHEJIANG YUNYE CONSTRUCTION ENGINEERING Co Ltd, CHINA ZHONGSHE CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical ZHEJIANG SHENGYE CONSTRUCTION CO Ltd
Priority to CN201310042512XA priority Critical patent/CN103074996B/en
Publication of CN103074996A publication Critical patent/CN103074996A/en
Application granted granted Critical
Publication of CN103074996B publication Critical patent/CN103074996B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a building scaffold wall connecting piece, which belongs to the technical field of building construction. The building scaffold wall connecting piece comprises angle steel, a U-shaped bolt, an adjustable screw rod and an embedded part, wherein the U-shaped bolt is arranged on one side of one end of the angle steel in a punching way; the other side of the other end of the angle steel is provided with a through groove; the embedded part is positioned in the through groove, and passes through the through groove; the adjustable screw rod is fixedly connected with the embedded part; and meanwhile, the adjustable screw rod is fixedly connected with the angle steel. The building scaffold wall connecting piece disclosed by the invention has the advantages of high bearing capacity, convenience in installing, no need of welding during installation, elimination of fire hidden trouble, no damage to structures, acceleration of the construction progress, raise in the civilized construction level, guarantee of safety, reusability of the wall connecting piece, and remarkable technical and economic benefits.

Description

A kind of building scaffold wall-connecting piece
Technical field
The present invention relates to a kind of building scaffold wall-connecting piece, belong to the technical field of building operations.
Background technology
Wall-connecting piece is the important component part of scaffold.In time mend and establish after being removed if wall-connecting piece arranges deficiency or wall-connecting piece, very easily cause Scaffold Collapse Accident.
Present domestic scaffold wall connecting piece way eaily is to adopt fastener to connect, scaffold regulation and stipulation list fastener resisting slipping Design of Bearing Capacity value is 8kN, the two fastener resisting slipping antiskid Design of Bearing Capacity values of " Zhejiang Province's building operations Formwork-supportof Fastener-style Steel Pipe tecnical regulations " (DB33/1035-2006) the 5.4th joint regulation are 12kN, just should adopt other drawknot modes during greater than 12kN when the wall-connecting piece Force Calculation.
" building operations fastener type steel pipe scaffold technical specification of security " (JGJ130-2011) the 6.4th joint has been made concrete regulation to wall-connecting piece, but wall-connecting piece must adopt the structure of bearing tension and pressure,, for the double-pole scaffold more than height 24m, should adopt rigid connecting tube to be connected with building.
The requirement of the low-carbon energy-saving of builing industry, environmental protection, safety construction is more and more higher.
The embedded steel tube method is wall-connecting piece way the most commonly used at present, can play the effect of being rigidly connected.The embedded steel tube method is to be embedded in beam approximately 20cm with a vertical short steel pipes before concrete is built, and exposes the beam 20cm that breaks an agreement, and after concrete has been built, connects vertical rod with horizontal steel pipe connecting and gets final product with vertical short steel pipes.
Shortcoming is: cost is high, dismounting trouble, when the wall-connecting piece Force Calculation inapplicable during greater than 12kN.
The banded column method is with four short steel pipes and four fasteners, the concrete tie to be lived, and with horizontal steel pipe connecting, connects scaffold upright rod.Shortcoming is: required material is many, the economy extreme difference, and the wall-connecting piece Force Calculation is inapplicable during greater than 12kN.
The pre-embedded steel slab method is before the beam column wall concrete construction of agent structure, is subscribing the pre-buried steel plate with the anchor pin in position.After form removable, with steel pipe and Plate Welding, the opposite side of steel pipe is connected with fastener with the vertical rod of scaffold.Advantage: good rigidly, without masonry filling-up hole operation, without infiltration hidden danger.Shortcoming is: cost is high, and the construction trouble, have disaster hidden-trouble.
Summary of the invention
Technical problem to be solved by this invention be realize that a kind of bearing capacity is large, easy for installation, economy, without the building scaffold wall-connecting piece of potential safety hazard.
For achieving the above object, the technical solution adopted in the present invention is:
A kind of building scaffold wall-connecting piece, comprise angle steel (being wall connecting rod spare), U-bolt (U-bolt is used for fixedly scaffold upright rod) but adjusting screw(rod), built-in fitting, wherein the U-bolt perforation is arranged on a side of angle steel one end, offer groove on the opposite side of the angle steel other end, built-in fitting is positioned at groove, and run through groove, but adjusting screw(rod) be fixedly connected with built-in fitting, but simultaneously adjusting screw(rod) is fixedly connected with angle steel.
Further setting as such scheme, be fixedly installed coupling assembling on described angle steel, but adjusting screw(rod) is fixedly connected with coupling assembling.
Described coupling assembling comprises two trimming angle steel, but adjusting screw(rod) is folded between two trimming angle steel, but on adjusting screw(rod) and the one or both ends that are positioned at the trimming angle steel are provided with nut one (but by nut one, being undertaken adjusting screw(rod) and two trimming angle steel fastening), and two trimming angle steel line centered by the axis of groove is symmetrical simultaneously.
Described coupling assembling is two, lays respectively at the left and right sides of groove, but the connecting hole one and built-in fitting socket of adjusting screw(rod) by being positioned at centre, and fastening by nut two, but the two ends, left and right of adjusting screw(rod) are fixedly connected with a corresponding coupling assembling respectively.
Described coupling assembling is one, between groove place end and corresponding angle steel end, but the connecting hole two and built-in fitting socket of adjusting screw(rod) by being positioned at an end end, and fastening by nut two, but the other end of adjusting screw(rod) is fixedly connected with coupling assembling.
But on described adjusting screw(rod) and be positioned at trimming angle steel two ends and be equipped with two nuts one.
Described built-in fitting is bolt or mantle fiber reinforcing bar.
Between described trimming angle steel and angle steel for being welded to connect.
the invention has the advantages that bearing capacity is large, as long as the material of wall-connecting piece is not destroyed and just is considered as safety and (gets U-bolt during checking computations, fluting place wall connecting rod spare angle steel, pre embedded bolt or mantle fiber reinforcing bar, the weld seam of trimming angle steel, but the design bearing capacity minimum value of adjusting screw(rod)), pre embedded bolt or mantle fiber reinforcing bar convenient (before casting and compacting of concrete or water in smashing pre-buried all can), pre-buried position accuracy demand is not high, as long as the error in half scope of wall connecting rod spare slotting length does not all affect installation, easy for installation, without disaster hidden-trouble, wall-connecting piece can be reused, do not destroy structure, technology, remarkable in economical benefits, and certain anti-upflow effect arranged.
The invention will be further described below in conjunction with the drawings and specific embodiments.
Description of drawings
Fig. 1 is the structural representation of the embodiment of the present invention 1;
Fig. 2 is the fragmentary top TV structure schematic diagram of Fig. 1;
Fig. 3 is the syndeton enlarged diagram between angle steel and trimming angle steel in Fig. 2;
But Fig. 4 is the structural representation of adjusting screw(rod) in embodiment 1;
Fig. 5 is the structural representation of embodiment 2;
Fig. 6 is the fragmentary top TV structure schematic diagram of Fig. 5;
Fig. 7 is the syndeton enlarged diagram between angle steel and trimming angle steel in Fig. 6;
But Fig. 8 is the structural representation of adjusting screw(rod) in embodiment 2.
The specific embodiment
Embodiment 1
As shown in Figure 1, Figure 2, Figure 3, Figure 4, a kind of building scaffold wall-connecting piece of the present invention, but comprise angle steel 1, U-bolt 2 adjusting screw(rod)s 3, built-in fitting 4, wherein U-bolt 2 perforation are arranged on a side of angle steel 1 one ends, offer groove 5 on the opposite side of angle steel 1 other end, built-in fitting 4 is positioned at groove 5, and runs through groove 5, but adjusting screw(rod) 3 is fixedly connected with built-in fitting 4, but adjusting screw(rod) 3 is fixedly connected with angle steel 1 simultaneously.
Be fixedly installed coupling assembling on angle steel 1, but adjusting screw(rod) 3 is fixedly connected with coupling assembling.Coupling assembling specifically comprises two trimming angle steel 6, but adjusting screw(rod) 3 is folded between two trimming angle steel 6, but on the adjusting screw(rod) 3 and one or both ends that are positioned at trimming angle steel 6 are provided with nut 1, and two trimming angle steel 6 line centered by the axis of groove 5 is symmetrical simultaneously.
In the present embodiment, coupling assembling is two, lay respectively at the left and right sides of groove 5, but adjusting screw(rod) 3 is by the connecting hole 1 in the middle of being positioned at and built-in fitting 4 sockets, and fastening by nut 29, but the two ends, left and right of adjusting screw(rod) 3 are fixedly connected with a corresponding coupling assembling respectively, but simultaneously on adjusting screw(rod) 3 and be positioned at trimming angle steel 6 and be equipped with two nuts 1 near an end of grooves 5.
Built-in fitting 4 is bolt or mantle fiber reinforcing bar.Between trimming angle steel 6 and angle steel 1 for being welded to connect.But adjusting screw(rod) 3 is through antirust processing.
In the present embodiment, angle steel 1 is 63 * 63-4 angle steel, and U-bolt 2 is Φ 14U type bolt, and trimming angle steel 6 is 50/32-3 trimming angle steel.
On angle steel 1 one end one sides, the outside pitch-row angle steel end 50mm left and right of Φ 14U type bolt is installed in perforation, and penetration hole diameter is greater than bolt 1mm.
The groove 5 of offering on angle steel 1 other end opposite side, groove 5 width be greater than pre-embedded bolt or mantle fiber bar diameter 1-2mm, but adjusting deviation 50mm when groove 5 length 100mm(install).
Trimming angle steel 6 and angle steel 1 welding, nearest groove limit 50mm left and right, the parallel distance 17-18mm of 2 welding trimming angle steel 6.
Above pre-embedded bolt or the mantle fiber reinforcing bar Transducers Embedded in Concrete degree of depth are greater than 100mm, exceed concrete surface and be not less than 50mm, but above adjusting screw(rod) 3 length are not less than 250mm, above 2 trimming angle steel 6(are coupling assembling) but horizontal range greater than adjusting screw(rod) 3 diameter 1-2mm, above pre-embedded bolt or mantle fiber bar diameter 16mm, open groove 5, perforation should meet the regulation of " shaped steel bolt line-spacing table " on above angle steel 1.
Embodiment 2
As shown in Fig. 5,6,7,8, coupling assembling in the embodiment of the present invention 2 is one, between groove 5 place ends and corresponding angle steel 1 end, but the connecting hole two 10 and built-in fitting 4 sockets of adjusting screw(rod) 3 by being positioned at an end end, and fastening by nut 29, but the other end of adjusting screw(rod) 3 be fixedly connected with coupling assembling, but on while the adjusting screw(rod) 3 and two ends that are positioned at trimming angle steel 6 are equipped with two nuts 1, all the other structures are identical with embodiment 1, at this, just seldom repeated.
In a word, a kind of building scaffold wall-connecting piece of the present invention, bearing capacity is large, and is easy for installation, need not welding during installation,, without disaster hidden-trouble, do not destroy structure, accelerated construction speed, improved the civilized construction level, guaranteed safety, wall-connecting piece can be reused, technology, remarkable in economical benefits.
Above-described embodiment only is used for explaining inventive concept of the present invention, but not to the restriction of rights protection of the present invention, allly utilizes this design to carry out the change of unsubstantiality to the present invention, all should fall into protection scope of the present invention.

Claims (6)

1. building scaffold wall-connecting piece, it is characterized in that: but comprise angle steel, U-bolt adjusting screw(rod), built-in fitting, wherein the U-bolt perforation is arranged on a side of angle steel one end, offer groove on the opposite side of the angle steel other end, built-in fitting is positioned at groove, and run through groove, but adjusting screw(rod) be fixedly connected with built-in fitting, but simultaneously adjusting screw(rod) is fixedly connected with angle steel;
Be fixedly installed coupling assembling on described angle steel, but adjusting screw(rod) is fixedly connected with coupling assembling;
Described coupling assembling comprises two trimming angle steel, but adjusting screw(rod) be folded between two trimming angle steel, but on adjusting screw(rod) and the one or both ends that are positioned at the trimming angle steel are provided with nut one, two trimming angle steel line centered by the axis of groove is symmetrical simultaneously.
2. a kind of building scaffold wall-connecting piece as claimed in claim 1, it is characterized in that: described coupling assembling is two, lay respectively at the left and right sides of groove, but adjusting screw(rod) is by the connecting hole one in the middle of being positioned at and built-in fitting socket, and fastening by nut two, but the two ends, left and right of adjusting screw(rod) are fixedly connected with a corresponding coupling assembling respectively.
3. a kind of building scaffold wall-connecting piece as claimed in claim 1, it is characterized in that: described coupling assembling is one, between groove place end and corresponding angle steel end, but the connecting hole two and built-in fitting socket of adjusting screw(rod) by being positioned at an end end, and fastening by nut two, but the other end of adjusting screw(rod) is fixedly connected with coupling assembling.
4. a kind of building scaffold wall-connecting piece as claimed in claim 1 is characterized in that: but on described adjusting screw(rod) and be positioned at trimming angle steel two ends and be equipped with two nuts one.
5. a kind of building scaffold wall-connecting piece as claimed in claim 1, it is characterized in that: described built-in fitting is bolt or mantle fiber reinforcing bar.
6. a kind of building scaffold wall-connecting piece as claimed in claim 1 is characterized in that: between described trimming angle steel and angle steel for being welded to connect.
CN201310042512XA 2013-01-31 2013-01-31 Building scaffold wall connecting piece Active CN103074996B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310042512XA CN103074996B (en) 2013-01-31 2013-01-31 Building scaffold wall connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310042512XA CN103074996B (en) 2013-01-31 2013-01-31 Building scaffold wall connecting piece

Publications (2)

Publication Number Publication Date
CN103074996A CN103074996A (en) 2013-05-01
CN103074996B true CN103074996B (en) 2013-11-20

Family

ID=48151682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310042512XA Active CN103074996B (en) 2013-01-31 2013-01-31 Building scaffold wall connecting piece

Country Status (1)

Country Link
CN (1) CN103074996B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266756A (en) * 2013-04-28 2013-08-28 中天建设集团有限公司 Wall connector for scaffolding
DE102015209735A1 (en) * 2015-05-27 2016-12-01 Peri Gmbh Scaffolding with scaffold holder and use of a recess in a scaffolding handle
CN106320687A (en) * 2016-03-04 2017-01-11 中天建设集团有限公司 Detachable wall connecting component for scaffold
CN111706065B (en) * 2020-05-27 2022-06-24 江苏省建筑工程集团有限公司 Can have enough to meet need outer wall scaffold frame drawknot device of use
CN115467506A (en) * 2022-09-05 2022-12-13 中国建筑第八工程局有限公司 Variable cross-section backing plate and creeping formwork support body

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2365911A (en) * 2000-08-15 2002-02-27 Richard Bradstock Connecting device for attaching scaffold to a wall
CN2646282Y (en) * 2003-09-06 2004-10-06 江苏金土木建设集团有限公司第七分公司 Wall connecting member of scaffold
DE102008015389B4 (en) * 2008-03-20 2010-07-22 Carola Wardermann scaffolding anchors
CN201714059U (en) * 2010-05-25 2011-01-19 潍坊昌大建设集团有限公司 Wall connecting part
CN202347834U (en) * 2011-11-25 2012-07-25 江苏兴港建设集团有限公司 Novel scaffold wall fastener
CN202577934U (en) * 2012-05-03 2012-12-05 武汉常阳新力建设工程有限公司 Screw thread wall-connection member of scaffold and building
CN202627475U (en) * 2012-05-10 2012-12-26 南通海洲建设集团有限公司 Scaffold wall connecting member
CN102704667A (en) * 2012-06-08 2012-10-03 四汇建设集团有限公司 Scaffold pre-buried assembled connecting wall device

Also Published As

Publication number Publication date
CN103074996A (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN103074996B (en) Building scaffold wall connecting piece
CN201554121U (en) Connection joint of inner sleeve squared rectangular steel pipe column and H-shaped steel beam
CN203393848U (en) Connection node structure of reinforced concrete column and steel I-beam
CN106150055B (en) The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting
CN104196055A (en) Construction method for frameworks on lower portion of basement exterior wall
CN107503473A (en) A kind of tool-type rectangular column steel bar positioning fixture
CN104005556B (en) For the fixed form combination shuttering construction technology of expansion joint place shear wall
CN103225419A (en) Corner connector for workside guard rail
CN206859719U (en) A kind of efficient assembled safety barrier for edge protection
CN206233579U (en) A kind of shear wall formwork is to drawing connector and its formwork reinforcement structure
CN203113762U (en) Construction scaffolding wall-connecting piece
CN204212447U (en) Door and window concrete arch lintel strengthening construction device
CN201635381U (en) Wall connecting piece
CN211647306U (en) Floor carrier plate bearing structure with adjustable steel construction large-span
CN202047580U (en) Bolt pin type wall connecting piece for scaffold
CN205153515U (en) Overhanging bearing frame makes up positioner
CN204266572U (en) Scaffold wall connecting piece
CN103243907A (en) Novel shear wall template reinforcing system
CN201614748U (en) Composite-material brace keel
CN208122270U (en) A kind of scaffold wall connecting piece mounting structure
CN103225412A (en) Vertical connector for workside guard rails
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN205840298U (en) Scaffold exterior wall connector
CN204059589U (en) A kind of shaped steel combination formula supporting and the cantilevered structure of going along with sb. to guard him
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant